25
Creating a Practical IPv6 Transition Plan Jeff Doy Preside Jeff Doyle and Associates, In Global IPv6 Summit in China 15 - 17 April, 2008

Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

Embed Size (px)

Citation preview

Page 1: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

Creating a Practical IPv6 Transition Plan

Jeff DoylePresident

Jeff Doyle and Associates, Inc.

Global IPv6 Summit in China15 - 17 April, 2008

Page 2: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

Planning = Risk Management

Copyright © 2008 Jeff Doyle and Associates, Inc.

Any network change project imposes risks. Any network change project imposes risks.

New technology RISK

Comprehensive planningRISK

Page 3: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

Prerequisites

Copyright © 2008 Jeff Doyle and Associates, Inc.

Transition Plan

Transition Plan

Page 4: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

Prerequisites

Copyright © 2008 Jeff Doyle and Associates, Inc.

Transition Plan

Transition Plan

FeasibilityStudy

FeasibilityStudy

Page 5: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

The Feasibility Study

• Problem Statement

• Change Assessment

• Standards Assessment

• Vendor Assessment

• Risk Assessment

• Cost Assessment

• Value Assessment

• Timeframe Assessment

• Recommendations

Copyright © 2008 Jeff Doyle and Associates, Inc.

Page 6: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

Feasibility Study: The Problem Statement

• What problems are you trying to solve?

• Are there alternative solutions?

• Factors to weigh when evaluating solutions:• Cost

• Technological maturity

• In-house expertise

• Outsourced expertise

• Multi-problem solution

• Hardware and software support

Copyright © 2008 Jeff Doyle and Associates, Inc.

IPv6 is not an objective; it is a potential solution to a problem!

IPv6 is not an objective; it is a potential solution to a problem!

Page 7: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

Feasibility Study: Change Assessment

• What must be changed?• Only need a rough estimate here

• Factors to consider:• Upgrades of existing hardware and software

• Configuration changes to existing systems

• New hardware and software

• External peering

• Staff education

Copyright © 2008 Jeff Doyle and Associates, Inc.

Page 8: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

Feasibility Study: Standards Assessment

• What standards are relevant to the project?

• Are the standards mature?• Or, do they exist at all?

• Immature standards pose a risk

• Are there competing standards?• This is also a sign of immaturity

Copyright © 2008 Jeff Doyle and Associates, Inc.

Page 9: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

Feasibility Study: Vendor Assessment

• Not vendor selection

• Resulting vendor list is input to vendor selection in the implementation plan

• The longer the list, the lower the risk

Copyright © 2008 Jeff Doyle and Associates, Inc.

Page 10: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

Feasibility Study: Risk Assessment

• Risk identification is essential to risk mitigation

• Prerequisites:• Change assessment

• Standards assessment

• Vendor assessment

• Factors to consider:• Potential cost overruns

• Stability of standards

• Vendor roadmap dependencies

• Potential vendor interoperability problems

• Partner and service provider dependencies

• Supportable backout plans at every project phase

Copyright © 2008 Jeff Doyle and Associates, Inc.

Page 11: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

Feasibility Study: Cost Assessment

• Cost rough-in only

• Cost estimates influence the value assessment• High costs can negate value

• Cost estimates influence timeframes• Adjusting milestones might reduce costs

Copyright © 2008 Jeff Doyle and Associates, Inc.

Page 12: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

Feasibility Study: Value Assessment

• Value balances against cost

• Essential for gaining funding

• Essential for gaining executive buy-in

Copyright © 2008 Jeff Doyle and Associates, Inc.

Page 13: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

Feasibility Study: Timeframe Assessment

• Time rough-in only

• Factors to consider:• Standards stability

• Vendor roadmaps

• Cost variability over time

• Staff training and development

Copyright © 2008 Jeff Doyle and Associates, Inc.

Page 14: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

Feasibility Study: Recommendations

• Go / No-go decision point

• Feasibility study makes the case for funding

• Feasibility study provides inputs for implementation plan

Copyright © 2008 Jeff Doyle and Associates, Inc.

Transition Plan

Transition Plan

FeasibilityStudy

FeasibilityStudy

Page 15: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

The Transition Plan

Copyright © 2008 Jeff Doyle and Associates, Inc.

Transition plan or implementation plan? Transition plan or implementation plan?

ImplementationPlan

Detailed designConfigurationsExecution scriptsSchedulesResource allocationsBackout plans

ImplementationPlan

Detailed designConfigurationsExecution scriptsSchedulesResource allocationsBackout plans

TransitionPlan

TransitionPlan

Page 16: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

The Transition Plan

• High-level design

• Inventory

• Milestones

• Vendor evaluation and selection

• Support and interoperability testing

• Training

• Methodology

• Cost and risk Analysis

Copyright © 2008 Jeff Doyle and Associates, Inc.

Page 17: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

The Transition Plan: High-Level Design

• Feasibility study starts with “what”

• Transition plan starts with “how”• High-level design specifies how transition is

accomplished

• Takes inputs from the change assessment

Copyright © 2008 Jeff Doyle and Associates, Inc.

Page 18: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

The Transition Plan: Inventory

• Detailed listing of all systems, HW and SW, that IPv6 will touch

• Input for IPv6 readiness assessment

• Examples:• Routers and switches

• Management systems

• Backoffice systems

• Security systems

• End-user operating systems

• End-user services

Copyright © 2008 Jeff Doyle and Associates, Inc.

Page 19: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

The Transition Plan: Milestones

• Sets project phases

• Sets dates for completion of phases

• Takes input from timeframe assessment

• Influences choice of methodology

Copyright © 2008 Jeff Doyle and Associates, Inc.

Page 20: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

The Transition Plan: Vendor Evaluation and Selection

• Takes input from vendor assessment

• Requires detailed evaluation criteria

• Lab testing is highly encouraged

Copyright © 2008 Jeff Doyle and Associates, Inc.

Page 21: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

The Transition Plan:Support and Interoperability Testing

• Essential risk mitigation step• First implementation should not be on your

production network!

• Takes input from high-level design

• Testplans should include:• Design component validation

• Design architectural validation

• Vendor capability validation

• Component interoperability validation

• Network modeling adds high value here

• Testing provides primary inputs to implementation project

Copyright © 2008 Jeff Doyle and Associates, Inc.

Page 22: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

The Transition Plan: Training

• Who must be trained?• Top-tier network architects

• Management

• Operations

• How should training be delivered?• Self-development

• In-house programs

• Packaged outsourced training

• What are the training milestones?

• Lab testing is a good training opportunity

Copyright © 2008 Jeff Doyle and Associates, Inc.

Page 23: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

The Transition Plan: Methodology

• “Flash cuts” are always dangerous

• Implementation should be incremental• Phase execution

• Stop

• Test

• Validate

• Move to next phase

• Core-to-edge approach usually best for IPv6• Core IPv6 deployment usually the simplest step

• Network support systems usually the hardest step

• IPv6 does not “touch” end users until very end

• Core deployment contributes to operational experience

Copyright © 2008 Jeff Doyle and Associates, Inc.

Page 24: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

The Transition Plan: Cost and Risk Analysis

• Go / No-go decision point

• Detailed breakdown of costs

• Accurate analysis of risk

• Inputs:• Cost assessment

• Risk assessment

• All earlier steps of transition plan

Copyright © 2008 Jeff Doyle and Associates, Inc.

Even if IPv6 project is delayed at this step, it should not be canceled.

IPv6 is not an option, it is inevitable.

Even if IPv6 project is delayed at this step, it should not be canceled.

IPv6 is not an option, it is inevitable.

Page 25: Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China 15 - 17 April, 2008

Thank [email protected]

(303) 428-4680

www.doyleassociates.net