Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
1
During development of the Comprehensive Program Plan,cost projections for specific GL Codes within a program or program component are entered into the Budget tab in PCS. Budget entries are editable at this stage, and can be locked or modified throughout the workflow.
Budget Overview
1 Click the tab, and then click the sub-tab. The Budget Overview screen appears. Select a program component from the program tree.
Quick Tip Click the icon to expand the navigation tree. Click the to collapse sections. To enlarge the navigation window , click and drag the icon. To hide the tree, click the icon.
Quick Tip To access a program, click My Programs or run a search.
Publishing Control System (PCS)
Create and/or Revise Detailed Budget per Program Component
2
2 Type budget estimates into the text boxes in the following sections:
a Plant Budget
b Projected Fiscal Plant Spend
c Calculated Cost
d Type any comments into the Budget Comments text box.
e Click the button to save your work. Click the button to clear all fields.
a
b
c
d
e
Publishing Control System (PCS)
3
Create or Modify Budget
1 Click the tab, and then click the sub-tab to access the Create/Modify Budget screen. There are three ways to create a budget in this screen:
•Copy GL Codes from an existing program component.
•Use a pre-defined template.
•Manually select GL Codes.
Copy a Budget from an Existing Program Component
1 To copy a budget from another program:
a Click the drop-down menu and select whether to run a search using an ISBN-10, ISBN-13, or PEAR ID.
b Type the ISBN-10, ISBN-13, or PEAR ID in the corresponding text box.
c Click the drop-down menu and select whether PCS should copy only GL Codes, or GL Codes + Contents.
abc
Publishing Control System (PCS)
4
2 Click the button. The copied GL Codes appear in the right pane. Click the button to save the copied budget.
Use a Pre-Defined Template
1 Click the Select Template drop-down menu and select a template from the list.
NotePre-defined templates are created by a super user in the Budget Maintainence screen, located in the Admin menu.
Publishing Control System (PCS)
5
2 a Click the button. A view of the GL Codes from the template appear in the right pane. Repeat the process as necessary until you have the appropriate template.
b Click the button to save the template and its GL Codes as your new budget.
a
b
Publishing Control System (PCS)
6
Select GL Codes Manually
1 To manually add GL Codes to a budget:
a Click the Select Category drop-down menu to view available categories.
b GL Codes for each category appear in the Select GL Code(s): box. Select a category that contains the GL Codes that apply to your program.
c Click on a GL Code to select it, and then click the button to add it to your budget.
a
b
c
2 The GL Code is added to your budget. Click the button.
Publishing Control System (PCS)
7
Specifying Costs
1 After you have created a budget on the Create/Modify Budget screen, you can specify costs for each GL Code in the right pane.
a Type an Author Alteration Allowance, if applicable.
b Select a copyright year from the Use Cost Table For Copyright Year selection drop-down menu.
c Click the button to restore default GL Code values.
d Type a budget dollar amount in the Latest Budget column. Click the arrow icon to enter costs for a VARC (Visual Asset Resource Center) category, chapter, or other category. See step 2 of this section for more details.
e To delete one or more GL Codes, select the check box next to it, then click the button.
f To clear all GL Codes and budget information, click or .
g Click the button to save your updated or newly created budget.
a
g f
d
e
c
NoteClick or to delete all entries, and remove the template or copied budget that you are working on.
Publishing Control System (PCS)
8
2 Select the VARC Category, Chapter or Other option for a GL Code.
3 A sub-set window appears within the GL Code.
a Type a quantity in the Qty text box.
b Select a chapter range from the From and To selection drop-down menus.
c Type a description of work in the Desc. Of Work text box.
d Type a dollar amount in the Unit Price text box.
e A total dollar amount is calculated by PCS, and appears in the Extended text box. This text box is not editable.
f Click the icon to add another sub-set to this GL Code.
g To delete an entry, click the icon, or select a check box next to the entry, and then click the button.
h Click the button to save your budget. Click the button to clear all fields and remove any templates or copied budgets from the right pane.
a b c d e f g
h
Quick TipTo expand the Description of Work dialog box, click Desp. of Work button, type a description of work, and then click the
button.
Publishing Control System (PCS)
9
4 Click the button to save your budget. Click the button to clear your entries.
Budget Details
1 When you save your budget at the Create/Modify Budget sub-tab, PCS will automatically open the Budget Details screen, where you can:
a Select from the list of Actions to create a new revision, lock or unlock a budget, or print a budget.
b Edit costs and descriptions of specific GL Codes.
c Type additional comments that apply to this budget.
d Click the button to save any changes. Click the button to clear any new entries.
a
b
c
d
Publishing Control System (PCS)
10
Program Component Level Info
The Program Component Level Info screen provides a clear picture of budget variences at different stages of the program component life cycle.
1 Click the tab, then click the sub-tab. The Budget: Program Component Level Info screen appears.
a Select a program component from the program tree
b GL Code appears in the GL Code column
c GL Code Description describes the task associated with the GL Code.
d The Estimated Cost column displays the plant cost identified in the Cost screen under the EDITORIAL tab.
e Commited Cost is the committed cost identified during the manufacturing phase.
f WIP Actual Cost is the Work in Progress (WIP) cost received from SAP.
g The Budgeted Cost column shows the latest budget revision, created in the Budget Details screen during the production phase.
h The % Of Actual vs. Budgeted column indicates the variance between what was forecasted and what is actual.
a
b c d e f g h
Publishing Control System (PCS)
11
Group Level Info
The Group Level Info screen provides the ability to analyze costs associated with a Program, Series, or a Package Component group.
1 Click the tab, and then click the sub-tab. The Budget: Group Level Information screen appears.
a Select a basis of grouping (Parent/Supplement, Package Componet, or Series).
b Select a PEAR ID.
c ISBN-10 (if applicable) is shown in the ISBN-10 column.
d The component type (Main Product or Supplement) is displayed in the Type column.
e The Estimated Cost column displays the plant cost identified in the Cost screen under the EDITORIAL tab.
f Commited Cost is the committed cost identified during the manufacturing phase.
g The Actual Cost column shows current costs associated with the selected component.
h The Budgeted Cost column shows the latest budget revision, created in the Budget Details screen during the production phase.
i The % Of Actual vs. Budgeted column indicates the variance between what was forecasted and what is actual.
j Click the button to go to the Product: Title Info screen
k Click the button to go to the Program Component Level Info screen.
ab
c d e f g h i
j k
Publishing Control System (PCS)