Crawford W. Long Middle School
AtlantaNew Construction/Additions
Award TypePerkins+Will
2008 Exhibition of School Planning and Architecture
Project NarrativePerkins+Will was commissioned to totally renovate and expand Long Middle School for the Atlanta Public School system to accommodate 900 students. We reorganized the building to have a 6th grade cluster, 7th grade cluster, and 8th grade cluster. Each grade level has 9 general classrooms, 3 science rooms, a foreign language classroom, and a special education resource room as well as teacher workroom space and administrative areas.
To create the clusters we added a third floor on the main part of the building. Respecting the structural integrity of the original building, we posted up with new steel columns on the original building's exposed piers. Sun screens hang between the columns on the south side of the building.
Renovation of the kitchen, cafeteria, art and music rooms, gymnasium, and media center with new interactive labs is included in our design.
Building ExteriorCrawford Long Middle School is located at the end of a cul de sac. The building is sited below the entry drive. Prior to adding an additional floor, the view when approaching the school was of the roof. Now with a third floor, the school has a much improved scale and presence from the street. Before
After
Building Exterior
IMAGE
The original school was a two story brick and concrete building with an exposed exterior structure. In order to respect the structural integrity of the original design, we added a third floor and posted up with new steel columns on the original exposed piers.
Exhibition of School Planning and Architecture 2008 Project Data
Submitting Firm :Project Role ArchitectProject Contact Barbara CrumTitle PrincipalAddress 1382 Peachtree StreetCity, State or Province, Country Atlanta, GAPhone 404-443-7613
Joint Partner Firm:Project RoleProject ContactTitleAddressCity, State or Province, CountryPhone
Other Firm:Project RoleProject ContactTitleAddressCity, State or Province, CountryPhone
Construction Firm:Project Role C.D. Moody ConstructionProject Contact Joan Quinn-CannonTitle Sr, Project ManagerAddress 6017 Redan RoadCity, State or Province, Country Lithonia, GAPhone 770-482-7778
Exhibition of School Planning and Architecture 2008 Project Details
Project Name Crawford W. Long Middle School
City Atlanta
State GA
District Name Atlanta Public Schools
Supt/President Dr. Beverly Hall
Occupancy Date January 2007
Grades Housed 6th-8th
Capacity(Students) 936
Site Size (acres) 16 acres
Gross Area (sq. ft.) 106,000
Per Occupant(pupil) 114
gross/net please indicate
Design and Build?
If yes, Total Cost:
Includes:
If no,
Site Development:
Building Construction: 14.4 Million (Includes Site Development)
Fixed Equipment: Owner Furnished
Other:
Total:
Building ExteriorThe building was completely reglazed, restoring the original ribbon window design that had been compromised over the years by infill panels and exterior wall hung mechanical units. The north facing storefront in the cafeteria was also increased to create more views into the school and providing lots of natural light.
Before After
Crawford Long Middle School is located at the end of a cul de sac. The building is sited below the entry drive. Prior to adding an
additional floor, the view when approaching the school was of the roof. Now with a third floor, the school has a much improved scale
and presence from the street.