Upload
keranews2
View
21
Download
2
Embed Size (px)
Citation preview
Texas Military ForcesOPERATION CRACKDOWN
Capt Samantha MartinezSSG Michael Leslie
Texas Military ForcesOPERATION CRACKDOWN
AGENDA
Mission History Equipment and Personnel
details and cost Military & City Requirements After Action Review (AAR) Future Operations
MISSION
Operation Crackdown is an engineer mission, which works as an active partner reclaiming neighborhoods from the influences of illegal drugs
and associated violence by removing structures that house illegal
activities.
Texas Military ForcesOPERATION CRACKDOWN
No. of Demos1993 San Antonio 181994 Taylor 101995 San Antonio/Taylor 311996 San Antonio/Elgin/Taylor/Richmond 1471997 Corpus/Taylor/San Antonio 781998 Elgin/Corpus Christi 321999 Nueces Co/Corpus Christi 712000 Elgin, Galveston 522001 San Antonio/Corpus Christi 522002 Corpus Christi/Robstown 482003 Corpus Christi/Robstown 382004 Kingsville/Robstown/Corpus Christi 432005 Corpus Christi 272006 Corpus Christi/Bishop/Nueces Co 119
2007 Granger/Corpus Christi/Nueces Co/Kingsville 892008 Kingsville/Corpus Christi/Eden 1242009 Robstown/Corpus Christi/ Eden 612010 Kingsville 512011 Dallas/Harlingen 632012 Calvert 26
Texas Military ForcesOPERATION CRACKDOWN HISTORY
Personnel Used for CRACKDOWN7 Total Personnel
1 JCDTF OIC/NCOIC1 JCDTF DDR Representative (as available)2-3 Heavy Equipment Operators/Ground Crew (ANG)2-4 M916 Operators/Ground Crew (ARNG) Lowboy truck
and trailerTotal Cost for CRACKDOWN from National Guard
$20,385 approximate for Corpus Christi49% Asset Forfeiture – $10,000 for Equipment
51% P&A Funds - $10,385 for Per Diem
Total Cost for City variesTotal Cost for City variesDebris removal; includes dump trucks / roll off containers and land Debris removal; includes dump trucks / roll off containers and land
fill costsfill costsAsbestos Testing for each site and, if positive, abatementAsbestos Testing for each site and, if positive, abatement
We use seized drug money to pay for the Heavy Equipment rental, fuel and tool costs.
Joint Counterdrug Task ForceOPERATION CRACKDOWN COST
24,000lbs Wheeled Loader with a 3.5 yard bucket with NO
rippers
Texas Military ForcesOPERATION CRACKDOWN
Tracked Excavator 48,000lbs0 degree turn, 36in bucket
Texas Military ForcesOPERATION CRACKDOWN
MILITARY PRE-MISSION
REQUIREMENTS Pre-mission Meetings 90, 60, 30 preplanning meetings with city Troop Coordination Army & Air Personnel
Equipment Support Heavy Equipment Rental Truck and Trailer
Mission On-site Paperwork Mission Close-out Paperwork
Texas Military ForcesOPERATION CRACKDOWN
CITY PRE-MISSION REQUIREMENTS
Written Request from City MOU signed by NGTX-JCD and City Hold Harmless/Covenant Not To Sue for each site Historical review for each site Drug Nexus Memo signed by Police Department Map and Photo locating each site Utilities removed at each site validation Validation of no hazardous materials Asbestos testing for each site and abatement if necessary All these items need to be in a 3 ring binder on site
for a final check, then we demo.
Texas Military ForcesOPERATION CRACKDOWN
Must have a police officer escort to clear each structureMust have a police officer escort to clear each structureand a city point of contact present at all times. and a city point of contact present at all times.
After Action Review with all parties involved.
Lessons Learned
Sustain Improve Recommendations
Texas Military ForcesOPERATION CRACKDOWN
Texas Military ForcesOPERATION CRACKDOWN
Texas Military ForcesOPERATION CRACKDOWN
Texas Military ForcesOPERATION CRACKDOWN
Texas Military ForcesOPERATION CRACKDOWN
Texas Military ForcesOPERATION CRACKDOWN
Texas Military ForcesOPERATION CRACKDOWN
Texas Military ForcesOPERATION CRACKDOWN
Texas Military ForcesOPERATION CRACKDOWN