CPRA Board Meeting, Baton Rouge, LA May 15, 2013 Coastal Protection and Restoration Authority

Embed Size (px)

Citation preview

  • Slide 1

CPRA Board Meeting, Baton Rouge, LA May 15, 2013 Coastal Protection and Restoration Authority Slide 2 Currently MRT system under high water watch Extreme rain events in Illinois and Ohio valley. Phase I flood fight is in effect, Levee Districts are performing high river inspections, no major issues at this time, monitoring historic sand boils. Water flowing thru 174 needles at Bonnet Carre enough to fill the stilling basin. Six bays are opened on the overbank structure at Old River (670 cfs) Predicted stage at Carrollton gage will be 14.3 on 5/19 although river can continue to rise with additional rainfall. Stage at Carrollton on 5/19/2011 was 17.0. Coastal Protection and Restoration Authority Slide 3 HSDRRS SYSTEM HIGHLIGHTS All gates are operable an there will be no need to perform interim gap closures. Levees meet the 1% elevation for this years hurricane season. Some levees that have settled will be rehabilitated. Fronting protection at pump stations will complete this fall. Trolley Gate at LA-46 Lakefront Levees, Hayne Blvd. Slide 4 Coastal Protection and Restoration Authority HSDRRS SYSTEM HIGHLIGHTS IHNC corridor can be operated although work is still ongoing at the 150 concrete barge gate. WCC is operable with minor modifications ongoing at the pump station. System will be in utilization period this hurricane season, with joint operations by Corps and NFS. Western Closure Complex IHNC Complex Slide 5 Coastal Protection and Restoration Authority Hurricane Protection Efforts in SW LA South West Coastal Integrated Feasibility study (State and USACE effort) 1. Calcasieu 2. Cameron 3. Vermilion South Central Project (state only effort) 1. Iberia 2. St. Mary 3. St. Martin Flood Control Closure Structures (State surplus and CDBG) 1. Bayou Tigre 2. Delcambre Avery Slide 6 I-10 Laplace Ring Levee Concept Coastal Protection and Restoration Authority Efforts are ongoing between the USACE, DOTD and CPRA investigate a ring levee around I-10 near Laplace. Preliminary Alignment Slide 7 West Shore Lake Pontchartrain Coastal Protection and Restoration Authority Levee alignment efforts are ongoing between the USACE and the State Slide 8 Coastal Protection and Restoration Authority New Orleans to Venice (future projects) Features Hurricane protection in Plaquemines Parish South of Oakville consists of both federal and non-federal levees. CPRA is providing engineering and construction inspection assistance. West bank: Enlargement Mississippi River levees from City Price to Venice Enlargement of back levees from St. Jude to City Price Enlargement of back levees from City Price to Tropical Bend and two 54- inch flap-gated culverts Enlargement of back levees from Tropical Bend to Fort Jackson and a new floodgate at Empire Enlargement of back levees from Fort Jackson to Venice East bank: Enlargement of back levees from Phoenix to Bohemia and flap-gated culverts Slide 9 Coastal Protection and Restoration Authority Lafourche and Terrebonne South Lafourche 1. Reviewing USAE plans for Larose floodwall improvements phase 2. 2. Continues to improve and raise levees with in-house forces. North Lafourche Providing technical assistance for levee repairs from Valentine to Larose. Terrebonne Levee and Conservation 1. Houma Navigational Canal and Bayou Grand Caillou are operational. 2. Award CDBG project for a one mile levee repair, Pointe-Aux- Chene connector Project (East side of J-2 levee alignment) 3. Received 404 permit last week for Little Caillou & Grand Caillou. Slide 10 Coastal Protection and Restoration Authority I Levee Effort Monitor movements and seepage of levees and T-walls Slide 11 Coastal Protection and Restoration Authority Conclusion CPRA will reach to all coastal levee authorities and flood protection entities by June 1 st. CPRA has backup Emergency Operations Center backup with the Port of Baton Rouge. Have updated our Emergency Contract. Have received emergency operation Manual from Levee Districts. Are working on public access for Levee Information Management System (LIMS) that depicts which gates are open or closed. Will work with the Corps and local levee districts to jointly operate major flood control features this hurricane season, including Seabrook, IHNC, Caernarvon Sector gate, Western Closure Complex, Bayou Segnette, Eastern Tie In and Western Tie In. Slide 12 Coastal Protection and Restoration Authority Questions? John R. Monzon, P.E. CPRA Operation Division Chief [email protected] Off. 225-342-4501 Cel. 504-432-7741