AgendaAgenda

• Draft Long Term Control PlanDraft Long Term Control Plan

• Letter to U.S. and Ohio EPAsLetter to U.S. and Ohio EPAs

• Next meetingNext meeting

Page 3: CPAC Meeting 11-1-05

Common ProjectsCommon Projects

Flow Reduction Projects Flow Reduction Projects $27.8m$27.8m

Eastside Grit Facility Eastside Grit Facility $13.8m$13.8m

GRIT GRIT FACILITYFACILITY

Page 4: CPAC Meeting 11-1-05

Regulator 4 - PaineRegulator 4 - Paine

Capital Cost Capital Cost $1.1m$1.1m

Page 5: CPAC Meeting 11-1-05

Regulator 5 - DearbornRegulator 5 - Dearborn

Capital Cost Capital Cost $14.6m$14.6m

Page 6: CPAC Meeting 11-1-05

R6-Main & R7-NevadaR6-Main & R7-Nevada

Capital Cost Capital Cost $18.6m$18.6m

Page 7: CPAC Meeting 11-1-05

R8-Fassett & R9-OakdaleR8-Fassett & R9-Oakdale

R9 Capital Cost R9 Capital Cost $22.2m$22.2m

R8 Capital Cost R8 Capital Cost $1m$1m

Page 8: CPAC Meeting 11-1-05

R23-Columbus, R24-Galena R23-Columbus, R24-Galena & R25-Ash& R25-Ash

Capital Cost Capital Cost $8.9m$8.9m

Page 9: CPAC Meeting 11-1-05

Regulators 26, 27, 28, 29, Regulators 26, 27, 28, 29, 30, 31 and 6830, 31 and 68

R26 Capital Cost R26 Capital Cost $5.5m$5.5m

Tunnel Capital Tunnel Capital Cost $14mCost $14m

Page 10: CPAC Meeting 11-1-05

Regulator 33 - MaumeeRegulator 33 - Maumee

Capital Cost Capital Cost $18.3m$18.3m

Page 11: CPAC Meeting 11-1-05

Regulators 65 and 67 Regulators 65 and 67 ConveyanceConveyance

Capital Cost Capital Cost $6.8m$6.8m

Page 12: CPAC Meeting 11-1-05

Regulators 61, 62, 65 and Regulators 61, 62, 65 and 67 Joe E. Brown Park 67 Joe E. Brown Park StorageStorage

Capital Cost Capital Cost $63.1m$63.1m

Page 13: CPAC Meeting 11-1-05

Sewer Separation for Sewer Separation for Regulators 63 and 64Regulators 63 and 64

Capital Cost Capital Cost $14.3m$14.3m

Page 14: CPAC Meeting 11-1-05

Regulators 42, 43, 45 and Regulators 42, 43, 45 and 47 Swan Creek North 47 Swan Creek North Tunnel SystemTunnel System

Capital Cost Capital Cost $10.25m$10.25m

Provide disinfection of CSO Provide disinfection of CSO discharge from existing tunnel discharge from existing tunnel systemsystem

Page 15: CPAC Meeting 11-1-05

Regulators 46, 48, 50 and 69 Regulators 46, 48, 50 and 69 Swan Creek South Tunnel Swan Creek South Tunnel SystemSystem

Capital Cost Capital Cost $17.25m$17.25m

Provide disinfection of CSO Provide disinfection of CSO discharge from existing tunnel discharge from existing tunnel systemsystem

Page 16: CPAC Meeting 11-1-05

Letter to U.S. and Ohio Letter to U.S. and Ohio EPAsEPAs• Would like to finalize letter today

• Re-emphasize efforts

• Commitment to achieve significant level of control

• $450 million commitment

• Financial strain on residents