covered by class( class ) hull Propulsion & Steering system Not covered by class (but covered by statutory, flag state )CLASS Flotational Stability Load line cert items class load lind cert class items Section 1 General ( class ) 1.1 Application 1.1.1. Cargo ships of 500 gross tons or more, all passenger ships and gas and chemical tankers on international voyages , where provision is made within International Conventions, are to be provided with the fire safety measures required by the International Convention for the Safety of Life at Sea, 1974, as amended (SOLAS 74) . Fishing vessels of 45 m freeboard

covered by class( class ) Propulsion & Steering system

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: covered by class( class ) Propulsion & Steering system

covered by class( class မွတါ၀န္ယူေသါအ၇ာမ်ား)

သေဘါၤ hull နဲ႔ ယင္းႏွင္႔ဆက္ႏြယ္ေနေသါအပုိင္းမ်ားၿက႔ံခုိင္မွဳ

Propulsion & Steering system တို႔လုံၿခဳံစိတ္ခ်၇မွဳ

ေက်ာက္ခ်။ကမ္းကပ္။ပင္လယ္ၿပင္ေမါင္းႏွင္စဥ္ ကုန္ႏွင္႔လူမ်ားလံဳၿခဳံမွဳ

Not covered by class (but covered by statutory, flag state

ကတါ၀န္ယူ၇ပါတယ္။)CLASS မွတါ၀န္မယူေသါအ၇ာမ်ား

Flotational Stability ႏွင္႔သက္ဆိုင္ေသါအ၇ာမ်ား

အသက္ကယ္က၇ိယါမ်ား

ပင္လယ္ၿပင္ညစ္ညမ္းမွဳဆိုင္၇ာက၇ိယါမ်ား

မီးေဘးကါကြယ္မွဳက၇ိယါမ်ား

Load line cert အ၇ လိုအပ္ေသါ items မ်ားဟါ class အ၇လိုအပ္လို႔ load lind cert

ကိုဘယ္အဖြဲ႔အစည္းက တါ၀န္ယူယူ class ကထပ္ၿပီး အဒဲ ီitems ေတြကိုစစ္မွာၿဖစ္ပါတယ္။

Section 1 General ( class ကတါ၀န္မယူဘူးဆုိတါ ဘါကုိဆုိလုိသလဲဆုိတါ၇ွင္းၿပထါးတါ)

1.1 Application

1.1.1. Cargo ships of 500 gross tons or more, all passenger ships and gas and chemical tankers on international voyages, where provision is made within International Conventions, are to be provided with the fire safety measures required by the International Convention for the Safety of Life at Sea, 1974, as amended (SOLAS 74). Fishing vessels of 45 m freeboard

Page 2: covered by class( class ) Propulsion & Steering system

length and over are to be provided with the fire safety measures required by the Torremolinos Protocol of 1993 relating to the Torremolinos International Convention for the Safety of Fishing Vessels, 1977 (Torremolinos Protocol).

1.1.2. Cargo ships of 500 gross tons or more, all passenger ships, and gas and chemical tankers, employed on national voyages are to comply with the fire safety measures prescribed and approved by the Government of the Flag State.

1.1.3. It is the responsibility of the Government of the Flag State to give effect to the fire protection, detection and extinction requirements of 1.1.1and 1.1.2. However, Lloyd’s Register (hereinafter referred to as ’LR’) will undertake to do this in cases where:

(a). contracting Governments have authorised LR to apply the requirements of SOLAS 74 or the Torremolinos Protocol and issue the appropriate certification on their behalf; or

(b). the Government of the Flag State is not a signatory to SOLAS 74 or the Torremolinos Protocol; or

(c). the ship or fishing vessel is to be classed for restricted or special service in national waters for which the Government of the Flag State has no national requirements. In such cases, LR will apply the fire safety measures required by SOLAS 74 or the Torremolinos Protocol, as appropriate.

Page 3: covered by class( class ) Propulsion & Steering system

However, due consideration will be given to arrangements deemed to

provide an equivalent level of fire safety, taking due cognisance of the

circumstances of the restricted or special service.

Delivery လုပ္တဲ႔ေန႔ဟါ LMC NOTATION အရ REGISTER SPECIAL SURVEY

ၿပီးတဲ႔ေန႔နဲ႔ ထပ္တူၿဖစ္ရမွာၿဖစ္ပါတယ္။

AS BUILT DRAWING & ESSENTIAL ITEMS ေတြရဲဲ႔ ( ANCHORS,CHAIN

CABLES,MAIN ENGINE , BOILERS စသည္တို႔၇ဲ႔) EQUIPMENT CERT ေတြကို

classification sub committee ကအတည္ၿပဳၿပီးရင္ ၅ ႏွစ္သက္တမ္း၇ွိ class

လက္မွတ္ထုတ္ေပးပါမယ္။

Class notation – 100A1,DOUBLE HULL OIL TANKER,SHIP RIGHT SDA FDA

CM,ESP,IWS,LI,LMC,UMS,IGS

Descriptive class notation- shipright SCM(screwshaft condition monitoring

notation)

Class notation ကၿပ်တ္တယ္ဆိုတါနဲ႔ class cert ေတြၿပန္သိမ္းသါြးပါတယ္။ class

ကေန အထုတ္ခံ၇ပါတယ္။ တကယ္႔ၿပသနာၿကီးပါ။ဒါေၿကာင္႔ manning cert အ၇

စက္ခန္းကို manned နဲ႔ေမါင္းေနေပမဲ႔ UMS NOTATION ဆို DEAD MAN ALARM

စတ႔ဲ UMS ကရိယါေတြေကါင္းေအါင္ ထိန္းသိမ္းထါးပါ။

Description notation- သူၿပဳတ္ေပမဲ႔ class ကအထုတ္မခံ၇ပါဘူး။ဥပမါ- SCM-

SCREWSHAFT CONDITION MONITORING NOTATION

CLASS WITHDRAWAL

ကိုယ္ဟါကိုယ္ထြက္တါ

Page 4: covered by class( class ) Propulsion & Steering system

Class ၇ဲ႔စည္းမ်ဥ္းေတြနဲ႔ မကုိက္လို႔အထုတ္ခံရတါ။

Condition of class (COC)- The rectification of COC can not be postponed

beyond the date of the ship’s special survey.

Class status မွာၿကည္႔၇င္ CONDITION OF CLASS & CoC NARRATIVE ဆိုၿပီး

ေတြ႔၇ပါမယ္။ defects။ damages ။wasted parts ေတြဟါ maintenance of class

ကိ ုဆိုး၀ါးစြာ ထိခုိက္ေစ၇င္ CoC အေရးခံရပါမယ္။

Reason for class suspend or withdraw (CLASS အထုတ္ခံရတဲ႔အေၿကာင္းေတြ)

1-annual/intermediate surveys not complete within 3 month of due date

2-special survey not completed by due date

3-not complying with regulation

4-COC not dealt with by due date

5-damanges, defects, breakdowns or grounding not reported

6-ship does not have valid convention cert

7-repairs made are not acceptable to class

8-ship under tow and class not advised

9-ship operated with relevant freeboard mark submerged

10-incorrectly located freeboard marks

11-inappropriate use of ship or operation in unsuitable environment

12-inadequate remedial action of any of the above

Page 5: covered by class( class ) Propulsion & Steering system

13-TOC, scrapping – class withdrawn at owner’s request

Memoranda – as well as conditions of class being held against the ship,

significant, notes are held in the form of memoranda. ( some will be minor

hull damage – such as plating indentation that has little distortion of the

stiffening members.—basically cosmetic, can be repaired at the owner’s

convenience.)

Maintenance of class – the relevant standards must be maintained if the

ship is to remain in class

Survey cycle structure-

The special survey items may be examined on a continuous survey basis

=continuous survey hull(CSH) for structural items (plus anchoring and

mooring equipment) & continuous survey machinery(CSM)for propulsion

and essential aux machinery.---all items spread across the ship’s five year

survey cycle.

Propulsion & essential aux machinery ေတြအတြက္ Continuous survey basis

နဲ႔ စစ္တါကို CSM လို႔ေခၚပါတယ္။

Survey all items over a short period of time at a single special survey held

every five year – special survey cycle (SS) for hull survey and engine

survey (ES).

Continuous survey Hull (CSH) ကို OIL TANKERS, COMBINATION CARRIERS,

CHEMICAL TANKERS, BULK CARRIERS, ORE CARRIERS ေတြမွာခြင္႔မၿပဳပါဘူး။

Page 6: covered by class( class ) Propulsion & Steering system

ဘါေၿကာင္႔လဆဲိုေတါ႔ IMO RESOLUTION A 744(18) အရ ENHANCE SURVEY

PROGRAMME ကို လိုက္နာရမွာၿဖစ္လို႔ပါ။

TABLE က CAS ၿဖစ္ေပၚလါပံ ုပါဘဲ၊double hull& Double bottom

တင္းၿပည္႔က်ပ္ၿပည္႔ မဟုတ္တဲ႔သေဘာၤေတြအတြက္ပါ.

Category of oil tanker

Date or year

Page 7: covered by class( class ) Propulsion & Steering system

CAT 1 ကေတါ႔ ဖ်က္္ကိုဖ်က္ရမွာပါ။

CAT 2 & CAT 3 -15 ႏွစ္သါးနဲ႔အထက္ကေတါ႔ CAS (CONDITION ASSESSMENT

SCHEME) RESULT ေကါင္းရင္ဆက္သုံးလို႔၇ပါတယ္။ဒါေပမဲ႔ သူ႔ date of delivery

ကေန ၂၅ ႏွစ္ထက္မေက်ာ္၇ပါဘူး။

အဒဲီလိုသံုးမယ္ဆို MEPC. 94(46) အ၇ Condition Assessment Scheme (CAS) ကို လုပ္၇မယ္ၿဖစ္ပါတယ္။

ဒါေပမဲ႔ဒီ CAS နဲ႔ အဒီဲ သေဘၤါေတြဆက္သံုးဘို႔ ခြင္႔ၿပဳခ်က္က ၂၀၁၅ သူ႔၇ဲ႔ Delivery date ေနာက္ဆံုးပါဘဲ

Category 1 5 April 2005 for ships delivered on 5 April 1982 or earlier

2005 for ships delivered after 5 April 1982

Category 2 and 5 April 2005 for ships delivered on 5 April 1977 or earlier

Category 3 2005 for ships delivered after 5 April 1977 but before 1 January 1978

2006 for ships delivered in 1978 and 1979

2007 for ships delivered in 1980 and 1981

2008 for ships delivered in 1982

2009 for ships delivered in 1983

2010 for ships delivered in 1984 or later

Page 8: covered by class( class ) Propulsion & Steering system

• Flag state may extend Categories 2&3 up to 2015 or 25th anniversary (whichever earlier)

• Flag state may extend Categories 2&3 with db or ds which may trade up to 25th anniversary of delivery (even past 2015)

HOWEVER

• Port state may deny entry of either such flag-state-extended tankers • 13H - Double hull required from 5/4/05 for Heavy Grade Oil as cargo

for tankers 5,000 dwt and above, and for tankers 600-4,999 dwt (except single-hulls built with db and ds) from anniversary date in 2008

• Flag state may allow single-hull 5,000 dwt and above with db or ds to continue with HGO up to 25th anniversary (even beyond 2015)

• Flag state may allow single-hull 5,000 dwt and above to continue with HGO between 900 and 945 kg/cubic meter until 25th anniversary or 2015 whichever is earlier, subject to CAS

• Flag state may allow single-hull 600-4,999 dwt to continue with HGO until 25th anniversary or 2015 whichever is earlier

• HOWEVER• Port state may deny entry of any of the above mentioned flag-state-

extended tankers carrying HGO •• Annual survey=ႏွစ္တိုင္းစစ္တဲ႔ survey ပါ။ဒါေပမဲ႔ intermediate survey &

special survey ၂ ခါကေတါ႔ ထပ္ annual survey လုပ္မေနေတါ႔ပါဘူး။ ႏွစ္ပတ္လည္ေန႔ မတိုင္ခင္ ၃ လ။ ေက်ာ္ၿပီး ၃ လ အခ်ိန္အတိုင္းအတါ (window period လို႔ေခၚပါတယ္) အတြင္းလုပ္လို႔၇ပါတယ္။window period အစနဲ႔အဆံုးကို range date လို႔ေခၚပါတယ္။

Page 9: covered by class( class ) Propulsion & Steering system

Intermediate survey –Intermediate survey က ဒုတိယႏွစ္ပတ္လည္survey

မေ၇ာက္ခင္ ၃ လ အလို ကေန တတိယႏွစ္ပတ္လည္survey ခ်ိန္ ၿပီး ၃ လအေက်ာ္ထိ

ၿကားၿကိုက္တဲ႔အခိ်န္လုပ္ႏိုင္ပါတယ္။ဒါထက္ေတါ႔ ေ၇ြ႔လို႔မ၇ပါဘူး။

Intermediate survey နဲ႔ annual survey စစ္တဲ႔ items ေတြကေတါ႔

အတူတူပါဘ။ဲဒါေပမဲ႔ intermediate survey မွာ electrical generating set ေတြကို

under working conditions နဲ႔စစ္ပါလိမ္႔မယ္။ေနာက္ၿပီး

သေဘာၤသက္တမ္းေပၚမူတည္ၿပီး ေအါက္ပါအတိုင္း လိုသလို ထပ္စစ္ပါတယ္။

Over 5 years old –၅ ႏွစ္သါးဆို Salt water ballast tank တလုံးကိုစစ္လို႔ အထကဲ

သုတ္ထါးတဲ႔ protective coating ေဆးေတြ အေၿခအေန မေကါင္း၇င္ အၿခား ballast

tank ေတြကို ထပ္စစ္ပါလိမ္႔မယ္။

Tank testing =

5.14.6(b) special periodical survey No 2 and subsequent special periodical

surveys (Age>5 years)

1)- all ballast tank boundaries

2)-all cargo tank bulkheads

Kindly refer to following Cargo /ballast tank testing procedure prior to

your vsl arrival Zhoushan Xinya S/Y, class surveyor might want to witness

the testing himself.(COT must be cleaned, carry out purging & gas free for

safe entry). C/O to record down this tank testing entry into logbook

accordingly. WBT to ballast 1P/S,3P/S & 5P/S.

A:Tank Testing:

Page 10: covered by class( class ) Propulsion & Steering system

For your information, Cargo tank testing carried out by the vessel’s crew

under the direction of the Master may be accepted by the Surveyor

provided the following conditions are complied with:

i) A tank testing procedure, specifying fill heights, for tanks

and bulkheads being tested, has been submitted by the owner and

reviewed by the Surveyor prior to the testing being carried out;

ii) There is no record of leakage, distortion or substantial

corrosion that would affect the structural integrity of the tank;

iii) The tank testing has been satisfactorily carried out within

special survey window not more than 3 months prior to the date of the

survey on which the overall or close up survey is completed;

iv) The satisfactory results of the testing is recorded in the

vessel’s logbook;

v) The internal and external condition of the tanks and

associated structure are found satisfactory by the Surveyor at the time of

the overall and close up survey.

B:1. As your vessel is scheduled for dry docking after last cargo

discharge. As such, the following are for your reference and preparation:

Deck side

(a) Prior arrival at anchorage de-slopping operation will be carried out),

ER waste oil, sludge, bilge water, etc must be transferred into Slop tank

Page 11: covered by class( class ) Propulsion & Steering system

before vessel arrives at anchorage. After de-slopping Slop tanks, please

wash and gas free the Slop tanks; and drain out all remaining oily water

from cargo suction/ cargo discharge/ Marpol/ COW piping system on

board. Cargo lines inside cargo pump should be drained/ stripped empty

(b) Cargo pump room tank top and bilge wells are to be kept free of oil

and bilges; as hot work may have to be carried in the cargo pump room

later during dry docking.

(c) Ship is to ensure that the following spaces are well-ventilated and

gas-freed

(i) Cargo tanks

(ii) Ballast tanks

(iii) Slop tanks

(iv) Cargo pump room void tank

(v) Other void tanks

(vi) Bunker tanks (< 50% LEL)

(vii) Cargo/ COW/ Marpol/ ODME pipelines.

(viii) Cargo manifolds (pipe flanges to be kept open for gas-check),

PLEASE ensure on deck pipelines & manifold lines are gas free! As hot

work might be performed in drydock, when removal of cargo valves for

overhaul.

Page 12: covered by class( class ) Propulsion & Steering system

Engine side

a. Special tools required to be used during dry dock are to be checked

and prepared, eg, M/E hydraulic tensioning jacks, hydraulic hoses,

connectors, etc. (Remarks: M/E hydraulic tensioning jacks should be tested

for oil leakages physically; up to the respective correct tensioning pressure

by mounting them onto the respective studs/ nuts. Spare hydraulic jack

seal and O rings must be checked available on board. Leaking jacks are to

be serviced and made ready for use.)

b. Before entry into shipyard, E/R tank top, waste oil tank, bilge holding

tank, sludge tank and bilge wells are to be empty/ kept low as far as

possible. If possible to avoid, any pumping and disposal of oil/ sludge/

bilge in shipyard.

General dry cargo ships over 15years old –၁၅ႏွစ္သါး non ESP ship ကေတါ႔

အ၇င္ special survey ေတြစစ္နည္းနဲ႔ အတူတူပါဘဲ။

Over 10 year old – ၁၀ ႏွစ္သါးဆို - anchor ကို partially ေလ်ာ႔ခ်ၿပီး သေဘၤာ

windlass နဲ႔ၿပန္တင္ခိုင္းပါလိမ္႔မယ္။

Saltwater ballast tank ေတြအါးလုံးကို စစ္ပါလိမ္႔မယ္။ protecting coating ေတြ

အေၿခအေန မေကါင္း၇င္ ေနာက္ပုိင္း annual intervals မွာစစ္တဲ႔ result

ေပၚမူတည္ၿပီး class ကေနထုတ္ မထုတ္ဆံုးၿဖတ္ပါလိမ္႔မယ္။

Page 13: covered by class( class ) Propulsion & Steering system

ESP ships types- ESP SHIP လို႔ေခၚတဲ႔ OIL TANKERS, COMBINATION

CARRIERS, CHEMICAL TANKERS, BULK CARRIERS, ORE CARRIERS

ေတြမွာေတါ႔ ၁၀ ႏွစ္သါးေက်ာ္တါနဲ႔ လါမဲ႔ intermediate survey ကို ITMS

လို႔ေခၚလိုက္ပါၿပီ။ITSS လို႔ေတါင္မေခၚေတါ႔ပါဘူး။အဲဒီေတါ႔ ပုံမွန္ SURVEY ITEMS

အၿပင္ ေအါက္ကဟါေတြပါပုိလုပ္ရပါမယ္။

ESP survey extensions by ship types

OIL TANKER ဆိုရင္ HULL GIRDER THICKNESS ေတြတိုင္းရပါေတါ႔မယ္။ SALT

WATER BALLAST TANK နဲ႔ CARGO TANK ေတြရဲ႔ COATING

ASSESSMENT,CLOSE UP SURVEY,THICKNESS MEASUREMENTအခ်ိဳ႔ေနရာ

ေတြလုပ္ရပါလိမ္႔မယ္။CARGO TANK ရွိတဲ႔ေနရာတေလ်ာက္မွာရိွ (PUMP ROOM

အပါအ၀င္) ေနရာေတြအကုန္SURVEY လုပ္ပါလိမ္႔မယ္။CARGO TANK ကိုၿဖတ္တဲ႔

BALLAST PIPE ေတြ၊PUMP ROOM ထရွိဲ PIPING SYSTEM ေတြစစ္ပါလိမ္႔မယ္။

Docking survey(DS)

၅ႏွစ္မွာ ၂ ခါ ၊ တခါနဲ႔ တခါၿကား ၃ ႏွစ္ထက္မေက်ာ္ဘဲDOCK တက္ရပါမယ္။ ၅

ႏွစ္ၿပည္႔တက္တဲ႔ ဟါက SPECIAL SURVEY နဲ႔ ကိုက္ပါလိမ္႔မယ္။ ၿကားက

INTERMEDIATE DOCKING SURVEY ကေတါ႔ IN WATER SURVEY လုပ္ဘို႔

လိုအပ္ခ်က္ေတြနဲ႔ ၿပည္႔စံဳရင္၊ IWS CLASS NOTATION ရိွရင္

ေရထဲမွာဘလဲုပ္လို႔ရပါတယ္။

DOCK မတိုင္ခင္ ၿကည္႔၇မဲ႔ဟါေတြ

၁-last dock outstanding items

Page 14: covered by class( class ) Propulsion & Steering system

2-any report of system failure

3-item due at dock

4-M.R (material requisition) for dock

5-tank cleaning / gas freeing plan

6-amount of sludge / slop to remove

7-ship /dock/ contractor work divide

8-codition of ballast tank & cargo tank

9-condition of pipe on deck , E/R , pump room

10-hull plating and out fitting

11-all defect at ship file d5h & e5g

12-any draft restriction on way to dock

13-gas free certificate from MPA

Dock survey မွာစစ္မဲ႔ဟါေတြ

၁-bottom/side/bow/sea inlet/keel/stern/stern frame/rudder

2- rudder bearing clearance

3-sea inlet & overboard

4-propeller & fastening/ stern bush fastening/sea inlet grating

Page 15: covered by class( class ) Propulsion & Steering system

5-propeller shaft seal

6-anchoring and mooring

-5 year over tanker

1-hazard zone elec equipment/ meggar test record

2-underwater high resistance paint for IWS

3-cargo /crude oil washing/bunker/ballast/ steam/vent

4-insulation resistance

-10-15 year over tanker

1-salt water ballast cargo tank inspection

2-at least 2 represent tank (cargo)

3-all s/w ballast tanks, + 2 combine salt water ballast/cargo

4-E/R, BOILER SPACE, TANK TOP, BILGE, COFFERDAM, SEA SUCTION, O/B

DRY DOCK က ၿပန္ထြက၇္င္

၁-all dept check ,test carry out. Survey are completed or not check

2-rudder plug, vent, anode

3-hull coating/paint

4-ICCP fit in position & cover remove

Page 16: covered by class( class ) Propulsion & Steering system

5-DB Tk plug

6-sea inlet & outlet grating fit back

7-echo sounder & log fit back cover removed

8-propeller & rudder free from obstruction

9-anchor and anchor chain secure onboard

10-external connection ( power & water ) removed

11-O/B valve fit back or not

12-secure moving items

13-check all sounding & tally with enter dock

14-stability & trim / (+) GM

15-if any load shift or change stability – inform to dock masters

16-master sign flood certificate

17-when flood, reach o/board valve level – stop and check all valve & stern

tube

IWS-ဆုိတါကေတါ႔

Section 7 Classification of ship with *IWS notation (in water survey)

Page 17: covered by class( class ) Propulsion & Steering system

IWSကို ESP SHIP ၁၅ ႏွစ္သါး ေက်ာ္၇င္ခြင္႔မၿပဳေတါ႔ပါဘူး

Passenger ship ကေတါ႔ ႏွစ္တိုင္း ship bottom ကိုစစ္၇မွာ ၿဖစ္လို႔ 5 ႏွစ္မွာ ၂ ၿကိမ္- တၿကိမ္နဲ႔တၿကိမ္ၿကား ၃၆ လထက္မေက်ာ္ဘဲ dry dock တင္တါကလြဲၿပီး က်န္တါေတြကို IWS နဲ႔စစ္ႏုိင္ပါတယ္။

CARGO SHIP ကေတါ႔ DRY DOCK 2 ၿကိမ္ထကဲ တခါကို IWS လုပ္ႏိုင္ပါတယ္။(၁၅ ႏွစ္ေအါက္ OIL TANKER , BULK CARRIER ေတြအတြက္)

၁၅ ႏွစ္ေက်ာ္ သေဘၤါေတြအတြက္ iws ေလ်ာက္၇င္ hull condition နဲ႔ ပက္သက္လို႔ surveyor ေတြ၇ဲ႔ report ေပၚမူတည္ၿပီးစဥ္းစါးမွာၿဖစ္ပါတယ္။

တလ အလိုက ၿကိုတင္ရမွာၿဖစ္ပါတယ္။

အခ်ိန္နဲ႔ေနရာ

အစီအစဥ္

ၿပီးခဲ႔တဲ႔ inspection ၿပီးေတါ႔ အခုထိ Grounding , bottom contact ေတြမၿဖစ္ဘူးေၿကာင္း၊ၿဖစ္၇င္လ ဲဘယ္လိုၿဖစ္ေၿကာင္း၊ ဘါမွ မထိခုိက္ေၿကာင္း ပုိင္၇ွင၇ဲ္႔ statement

လိုအပ္လို႔ dry dock တင္၇၇င္ ၃ လအတြင္းတင္္ဖို႔

ပုံမွန္မဟုတ္ operating feature ေတြ ( ေ၇တိမ္မွာ၊ narrow channel ေတြမွာ စသၿဖင္႔ သံဳးဖို႔ ) အတြက္ iws ေလ်ာက္ခဲ႔၇င္ အဒဲီအတြက္ information အစုံတင္ၿပပါ။

PREPARATIONS IN A DRY DOCK IN ANTICIPATION OF A SUBSEQUENT APPLICATION

FOR IWS

Page 18: covered by class( class ) Propulsion & Steering system

လါမဲ႔ ႏွစ္ေတြမွာ iws ေလ်ာက္မယ္ဆို အခု dry dock မွာ ၿကိုၿပင္ထါး၇မဲ႔ဟါေတြ

Anodes ေတြ component ေတြ စစ္ၿပီးလသဲင္႔တါလဲ၇ဲ႔လါး။

Hull ကို high quality paint သုတ္ထါး၇ဲ႔လါး။ hull အေၿခအေနေကါေကါင္းရဲ႔လါး။

Iws လုပ္ဖို႔ notation ၇ိွ၇ဲ႔လါး။

Rudder bearing & bush ေတြတိုင္းထါးတါ၊ shaft survey လုပ္တါ၊ ship side’s valve ေတြ o/h လုပ္တါေတြကို ေနာက္ dry dock ထိခံေအါင္ လုပ္ထါးပါ။ diver အလြယ္တကူမေ၇ာက္ႏုိင္တဲ႔ ေန၇ာ ေတြကို stabilizer boxes,sea inlet box ေတြကို ပုိဂ၇ုစိုက္ပါ။ hinged grid plate ကိ္ု shell opening မွာတပ္ပါ။

အခ်ိဳ႔ paint ေတြက diver inspection လုပ္ဖို႔ ပုိလြယ္ပါတယ္။ (underwater environment နဲ႔ လိုက္ဖက္တဲ႔ paint )

စစ္ေဆး၇ာမွာလြယ္ကူေအါင္ ေ၇ေအါက္ hull & fitting ေတြကို bead welding နဲ႔ ေန၇ာ ၿပထါးပါ။

၅ မီတါအကြါတိုင္းမွာ transverse and longitudinal bulkhead including tank boundaries ေတြအတြက္ ၿပထါးပါ။

b. Decks and flats (below the waterline);

water line ေအါက္ deck and flat

docking plugs, thruster units, stabilizer fin, suction and discharge valve ေတြအတြက္

propeller blade ေတြကို နံပါတ္ ေ၇းထါးဖို႔

Rudder & stern frame ေတြ၇ဲ႔ liner ေတြ ေန၇ာမွန္၇ွိမ၇ွိ စစ္ႏိုင္တဲ႔ marking ေတြ

Page 19: covered by class( class ) Propulsion & Steering system

Shell expansion drawing showing both side of vessel ကို ေဆါင္ထါးပါ။

a. External hull markings as required in Para 5 above;(အေပၚမွာ ေၿပာခဲ႔တဲ႔ hull marking ေတြ)

b. Bilge keels; bilge keel ၿပတဲ႔ drawing

drain plug ၿပတဲ႔ drawing ေ၇tank ဆို square, ဆီဆို၇င္ hexagon နဲ႔ ၿပထါး၇င္ ပုိေကါင္းပါတယ္။

d. All shell openings and means of access e.g. bolted plates, gratings, “opening”;

အ၇င္ၿဖစ္ဘူးတဲ႔ hull damage ၿပင္ဘူးတဲ႔ မွတ္တမ္း

B. Specific plan and data detailing (as relevant):

rudder, stock, stern frame စတါေတြရဲ႔ plan

propeller,rope guard, liner datum mark စတဲ႔ ဟါေတြ၇ဲ႔ plan

A frame , bossing စတဲ႔ ့hull attachment ေတြ

bow thruster / stabilizer fin boxes ေတြ၇ဲ႔ plan

(carrying customised blanks is recommended); diver safety အတြက္ ပိတ္ေပး၇မဲ႔ shell opening ေတြကို ဘယ္လိုပိတ္မလဲဆိုတါ

အဒဲီဟါ ေတြကို dry dock ေတြမွာ ဓါတ္ပံု၇ုိက္ထါး၇င္ iws မွာ တင္ၿပ၇င္ ပုိေကါင္းပါတယ္။

REQUIREMENTS FOR PROPOSED IN-WATER SURVEY

Page 20: covered by class( class ) Propulsion & Steering system

ေ၇စီးႏွဳန္း ၀.၅ knot ထက္နဲ၇ပါမယ္။ ေ၇ၿပင္ေအါက္ေၿခက သ ဲ၊ ေက်ာက္ ေတြၿဖစ္၇င္ visibility ပုိေကါင္းပါတယ္။

ပတ္္၀န္းက်င္မွာ သေဘၤါလွဳပ္၇ွားမွဳမ၇ွိ၇င္ပုိေကါင္းပါတယ္။

ေက်ာက္ခ်ထါး၇င္ အေကါင္းဆုံးပါဘဲ။ကမ္းကပ္ထါး၇င္ လိုအပ္တဲ႔ clearance ၇ေအါင္ fenders ေတြဆင္ထါးပါ။

ဒီ ေ၇ငုပ္လုပ္ငန္းအတြက္ အါဏါပုိင္အဖြဲ႔တခု (သို႔) class တခုက အသိအမွတ္ၿပဳ၇ပါမယ္။

လိုအပ္တဲ႔ ေ၇ငုပ္သမားအေ၇အတြက္ ရွိ၇ပါမယ္။

သိပ္ၿကီးတဲ႔ ၿပားတဲ႔ ေအါက္ေၿခ၇ွိ သေဘါၤေတြအတြက္ မီးေတြ ပါတဲ႔ underwater trolley ကိုသံုးသင္ပါတယ္။

Iws မလုပ္ခင္ hull cleaning ကို လိုအပ္၇င္ ၿကိုလုပ္ထါးမွ iws ေန႔မွာ ေကါင္းေကါင္းၿမင္၇မွာၿဖစ္ပါတယ္.

Propeller shaft seal, စတါေတြမွာ သံဳးတဲ႔ ဆီၿဖည္႔၇တဲ႔မွတ္တမ္းေတြ။ oil analysis & temperature မွတ္တမ္းေတြ အသင္႔ေဆါင္ထါး၇ပါမယ္။

သင္႔ေလ်ာ္တဲ႔ draught & trim ၇ွိ၇ပါမယ္။

Hull ထိခိုက္မိတဲ႔ မွတ္တမ္းေတြ၇ွိ၇င္ၿပ၇ပါမယ္။

Daylight ၇ွိတဲ႔အခ်ိန္မွာလုပ္သင္႔ပါတယ္။

PROCEDURES WHEN UNDERTAKING AN IN-WATER SURVEY

Page 21: covered by class( class ) Propulsion & Steering system

owner ‘s superintendent, deck and engineer officers of the ship, diving and survey personnel စတဲ႔ သူေတြပါတဲ႔ Meeting လုပ္၇မယ္။ လုပ္တဲ႔အခ်ိန္မွာ ဒါေတြေဆြးေနြး၇မယ္။

arrangements for locking the propellers,rudders and thrusters, the stopping of all pumps

effective communication

safety of divers and other personnel အတြက္ Permit to Work System ၇ွိ၇မယ္။အဲဒီ စံနစ္မွာ relevant ships staff and port authorities ေတြကို inform လုပ္ဖို႔ပါ၇မယ္။

ပုံမွန္အါးၿဖင္႔ သေဘါၤေ၇ွ႔ေနာက္ကေန midship ေတါက္ေလ်ာက္ hull အေၿခအေနကိုစစ္ပါတယ္။ hog/sag amount ကိို loading computer က data အ၇ record လုပ္ပါတယ္။

သိပ္ area ၿကီးတဲ႔ bottom ကိုစစ္တဲ႔အခါ ခက္ခဲနိုင္လို႔ senior diver ပါသင္ပါတယ္။

ထိခုိက္မွဳေတြ၇ွိခဲ႔ေၿကာင္း master ဆီက သိ၇၇င္ Hull အတြင္းပိုင္းေတြကိုပါ စစ္မယ္ၿဖစ္ပါတယ္။ၿပီး၇င္ dry dock တက္ဖုိ႔လိုလါး။ afloat နဲ႔ temporary ၿပင္လို႔၇လါးဆံုးၿဖတ္ပါလိ္မ္႔မယ္။

Closed circuit TV & Underwater cameras မေကါင္း၇င္ စ စစ္မွာမဟုတ္ပါဘူး။ စစ္ေနတံုးပ်က္သြါး၇င္လ ဲဆက္စစ္မွာမဟုတ္ပါဘူး။

hull and associated fittings ေတြကို dry dock အစါးစစ္တါၿဖစ္လို႔ ေသေသခ်ာခ်ာစစ္မွာပါ

out-of-water portion of the hull ကိုလတဲခါတည္းစစ္မွာၿဖစ္ပါတယ္။

Page 22: covered by class( class ) Propulsion & Steering system

၇ွာေတြ႔သမ်ွအခ်က္ေတြကို super နဲ႔ညိွၿပီး record လုပ္ ေနာက္ dry dock အတြက္ထည္႔မွာၿဖစ္ပါတယ္။

The diving company ကdiver’s report ေပး၇မယ္။ video and/or still photographs and plans ေတြ ထါး၇မယ္။

ACTION FOLLOWING THE IWS, INCLUDING RECORDS

1. owners က surveyor ကတဆင္႔ diving company report, copies of any associated still photographs. Video records ေတြပုိ႔ေပး၇မယ္။surveyor က အဒဲီေပၚမွာ comment ေ၇းေပး၇မယ္။ ေနာက္ dock မွာ ဘါလုပ္၇မယ္ဆိုတါ။

condition of the hull plating, weld seams, corrosion, distortion, any indentations, cracks, fractures or similar defects. The report should include the condition of the paint and the examination should include all hull openings, sea chests, stabiliser boxes, thruster tunnels and any special features. A report of the condition of propellers (including blades), liners, seals, rudders, bearings and any holding arrangements (bolts etc) စတါေတြအကုန္လံုးပါ၇ပါ႔မယ္။

IWS notation ေလ်ာက္ရင္ - RUDDER PINTLE & BUSH CLEARANCES ကိုေရထဲမွာဘယ္လိုတိုင္းႏုိင္သလ၊ဲ pintles သူ႔၇ဲ႔ socket ထမွဲာ ခုိင္ခိုင္မာမာ၇ိွမ၇ွိ ဘယ္္လိုစစ္မလ ဲဆိုတါေတြ တင္ၿ႔ပ၇ပါတယ္။

Stern bush clearance ကိုေ၇ထဘဲယ္လိုတိုင္းမလ ဲဆိုတါလတဲင္ၿပ၇ပါတယ္။

Underwater portion မွာသုတ္ထါးတဲ႔ high resistant paint information လတဲင္ၿပ၇ပါတယ္။

IWS SURVEY လုပ္လို႔ DAMAGE ေတြ႔လို႔ DOCK တင္မွရမယ္ဆိုရင္ေတါ႔ DOCK တင္ရပါမယ္။

Page 23: covered by class( class ) Propulsion & Steering system

IWS SURVEY လုပ္ဖို႔ေအာက္ပါDOCUMENT ေတြစုေဆါင္းရပါတယ္။

1-basic ship information , documentation on board

2-main structural plans including information of higher strength steels

3-relevant previous survey and inspection reports

4-information regarding corrosion protection level

5-location of heated tanks

6-to assist divers, color photographs should be provided, of items such as

rudder closing plate and wear down gauge plugs

RUDDER CLOSING PLATE ေတြ၊WEAR DOWN GAUGE PLUGS

ေတြ၇ဲ႔ဓါတ္ပုံေတြရွာထါးပါ။

Sea inlet ကိ ုblank လုပ္ၿပီး က်န္ေ၇ကို bilge

ထေဲဖာက္ခ်ၿပီးၿပင္တဲ႔လုပ္ငန္းေတြလုပ္ႏိုင္ပါ၇မယ္။

Shell grating ကို ဆြဲလွန္ၿပီးခိ်တ္ထါးလို႔၇ႏိုင္၊anode ေတြေ၇ထဲမွာလႏဲိုင္ ၇ပါမယ္၊

Operation – A self propelled, steerable survey vehicle fitted with a long

range TV camera is used. To aid steering and to check for hull distortion, a

close up, high resolution TV color camera gives true picture of the state of

the coating and weld seams. In some cases, a 35 mm still camera is fitted.

An ultrasonic probe is provided to measure plate thickness and other

equipment included a depth meter and speed indicator. Power is supplied

Page 24: covered by class( class ) Propulsion & Steering system

and information relayed by means of an umbilical from the vehicle to the

survey boat.

Survey boat equipment-

Is usually housed in a console containing T.V monitors, plate thickness

print out, audio cassette recorder, video recorder and play back unit, diver

communication system, vehicle control system and associated

instrumentation.

The survey vehicle is taken to the starting datum by a diver. With the aid

of one of the TV monitors and using the shell expansion plan as a map, the

vehicle may be guided, from the control console, over the bottom and

sides of the hull, by following weld runs and by reference to other features,

such as inlets and tank plugs. Pictures and navigational information are

relayed back and video films recorded, along with plate thickness, giving

the surveyor an integrated picture of all the required and relevant

information. In addition to plate thickness, print out can be produced

and/or an audio recording.

The vehicle will also provide pictures of such items as stern frame, rudder,

propeller, bilge keels and hull openings. A diver may be used with hand

held camera. For closer inspection of these items and also for inspection of

the plating on the of bilge. It should be ensured during this operation, that

there is a 2 way communication between diver and attending surveyor.

Page 25: covered by class( class ) Propulsion & Steering system

Dry dock မွာစစ္၇မဲ႔ဟါေတြ - bottom plating = ေ၇ယိုတါ၊ကြဲတါ၊ပုံပ်က္တါ

ေတြစစ္ပါ။ side shell plating = bottom plating ကိုစစ္သလိုစစ္ပါ.bilge keel end

& butt weld ေန၇ာေတြစစ္ပါ။bow plating – bulb indent,slamming,deformation

ေတြ၊welding seams ေတြမွာ corrosion ၿဖစ္တါ၊wastage ေတြ၇ိွတါစစ္ပါ။keel

plating & stern plating ကို bottom plating စစ္သလိုစစ္ပါ။stern frame လစဲစ္ပါ။

rudder မွာ fracture/Leak/fall ေတြစစ္ပါ။ stock bolts ၇ဲ႔အေၿခအေန၊pintle &

rudder nut ေတြ၇ဲ႔ locking arrangement ေတြစစ္ပါ။rudder bearing clearance

ကိုတိုင္းပါ။( pintle & stock – max=5 mm + 0.002 diameter)၊ Vertical

movement & general movement ေတြစစ္ပါ။ sea connection/grating at sea

inlet/overboard discharge ေတြစစ္ပါ။cpp ဆို၇င္ hub tightness စစ္ပါ။propeller ၇ဲ႔

deformation/fracture/cavitation/impact damage ေတြစစ္ပါ။ stern tube gland

လုံမလံဳစစ္ပါ။tail shaft/stern bush clearance တိုင္းပါ( white metal bearing = 2

mm ထက္နဲ၇ပါမယ္။) diameter of chain cable၇ယ္ stud ေတြေခ်ာင္မေခ်ာင္ စစ္ပါ။

D Shackle anchor ၿဖစ္ခဲ႔၇င္ pin & shank clearance/crown pin/locking pin/

shell housing ေတြစစ္ပါ။ ၅ႏွစ္သက္တမ္း၇ိွoil tanker ေတြဆို hazardous zone

electrical equipment ေတြစစ္ပါတယ္။

Special survey (SS)Initial classification survey ကစၿပီး ၅ ႏွစ္ တၿကိမ္ special

survey လုပ္ပါတယ္။ လက္မွတ္ေတြေနာက္ ၅ ႏွစ္စါသက္တမ္းတိုးေပးပါတယ္။

SS(SPECIAL SURVEY) အခ်ိန္ကစၿပီး TM ေတြစပါလါၿပီၿဖစ္ပါတယ္။အကုန္ၿခဳံsurvey

လုပ္တါအၿပင္ အနီးကပ္လက္တကမ္း=close up survey လည္းပါပါတယ္။( IMO

RESOLUTION - A744-ANNEX ေတြအရ)

Page 26: covered by class( class ) Propulsion & Steering system

Thickness measurements at special survey

TMs (THICKNESS MEASUREMENT ) ကို SPECIAL SURVEY

အခ်ိန္မွာလုပ္ပါတယ္။ CLOSE UP SURVEY နဲ႔တြဲလုပ္ပါတယ္။ CLOSE UP SURVEY

မလုပဘ္ဲ TMs ခ်ည္းလုပ္ဘို႔ခြင္႔မၿပဳပါဘူး၊

ESP လိုအပ္ခ်က္အရ သေဘာၤသက္တမ္းအလိုက္ TMs

လုပ္၇မဲ႔ေန၇ာေတြပုိမ်ားလါပါတယ္။(ေနာက္ပိုင္း table မွာၿပထါးပါတယ္။)

Page 27: covered by class( class ) Propulsion & Steering system

Enhanced surveys (res A744(18))

ESP ဟါတကယ္ေတါ႔ ၅ ႏွစ္သါးကါလကေနစတယ္ေၿပာလုိ႔၇ပါတယ္။

The features of ESP are ( ESP ရဲ႔ထူးၿခားတဲ႔။ပုိၿပီးတင္းက်ပ္တဲ႔ အသြင္အၿပင္)

Page 28: covered by class( class ) Propulsion & Steering system

1-survey planning ( မတိုင္ခင္ ၆ လ ကတဲက PLANNING လုပ္ရပါတယ္။)

2-document file on board ( ESP FILE ကို သေဘာၤေပၚအၿမဲထါး၇ပါတယ္)

3-improved procedures for thickness measurement ( TMs လုပ္တဲ႔ procedure

ေတြတိုးတက္လါပါတယ္။TMs Report ေနာက္က်၇င္ CoC ေတါင္ထိႏုိင္ပါတယ္.)

4-harmonisation between dry dock and renewal surveys

5-extended intermediate surveys( ITSS မဟုတ္ေတါ႔ဘဲ ITMS ၿဖစ္သြါးပါတယ္။)

6-possible annual examination of tanks/spaces ( tank/space ေတြကို

ႏွစ္စဥ္စစ္တဲ႔အထိၿဖစ္သြါးႏိုင္ပါတယ္။ESP အခ်ိန္မွာစစ္လို႔ အေၿခအေနမေကာင္းရင္)

7-phase-out of continuous hull survey(CHS) arrangements( CHS ကို

မလုပ္ရေတါ႔ပါဘူး)

Enhance survey programme (ESP) ဆိုတါoil tankers and bulk carrier အတြက္

more detailed hull survey requirements on top of special surveys

ၿဖစ္ပါတယ္။

ESP requirements ေတြဟါ oil and chemical tankers ( including combination

carriers) that carry oil in integral tanks, and also bulk carriers, including ore

carriers ေတြအတြက္ၿဖစ္ပါတယ္။

ESP မွာ overall survey, close up survey, TM verification, TM final report and

protective coating စတါေတြပါပါတယ္။

non – ESP ships ေတြကေတါ႔ examination and test ဆိုလံုေလါက္ပါတယ္

Page 29: covered by class( class ) Propulsion & Steering system

ESP ships ၇ဲ႔ report မွာ frame numbers of those tanks with a single

transverse web frame or deck and bottom transverse

စစ္ေဆးေတြ႔၇ွီခ်က္ေတြေ၇း၇ပါမယ္။.

ESP ဟါ hull structure within the cargo tank length နဲ႔ all ballast tanks ေတြ

စစ္ေဆးခ်က္ လုပ္ဖို႔ပါ။ၿပီးေတါ႔ cargo and ballast piping systems, pump rooms ,

cofferdams adjacent to the cargo tanks ေတြလဲပါပါတယ္။

Memorandum on class status မွာ ESP applicable ၿဖစ္ေၿကာင္း ေ၇းထါးပါတယ္။

Survey programme

ESP due date (သို႔ ) မစခင္ ၆ လ အလိုကတည္းက survey programme ကို class

ဆီပုိ႔ေပး၇ပါမယ္။

Copy ကို survey လုပ္မဲ႔ ဆိပ္ကမ္းက local surveyor ကို ပုိ႔ေပး၇ပါမယ္။

ဒီ survey programme ကိုလက္ကိုင္ထါးၿပီး pre survey meeting မွာ owner’s supt,

surveyor, TMs အ ဖဲြ႔ရယ္ ေဆြးေႏြး၇မွာပါ။

ESP SURVEY PROGRAMME မွာေၿဖေပးရမဲ႔ေမးခြန္းေတြ

- Detail of access provision for close up & TMs – close up and TMs

လုပ္ဖို႔ ေန၇ာကို သြါးဘို႔ စီမံခ်က္ေတြ ( ေလွ။raft။ေလွကါး စသၿဖင္႔)

- ဘါကုန္ေတြတင္ေလ႔၇ွိတါၿပတဲ႔ ကုန္တင္တဲ႔ history

- Company သေဘၤာ၀န္ထမ္းေတြ tank ေတြစစ္ေဆးထါးတဲ႔ မွတ္တမ္း

- Hull နဲ႔ပက္သက္ၿပီး PSC စစ္ေဆးေတြ႔ရွိခ်က္ေတြ

- HULL န႔ပဲက္သက္ၿပီး NC (Non conformities )ေတြ

- TMs အဖြဲ႔၇ဲ႔ နာမည္နဲ႔ လိပ္စါ။

Page 30: covered by class( class ) Propulsion & Steering system

Survey programme content

-basic ship information

-main structural plan ( Steel use in tank )

-survey လုပ္ဖို႔ လိုအပ္တဲ႔ ပတ္၀န္းက်င္(tank cleaning,gas freeing,

ventilation စသၿဖင္႔)

-provision of access

-survey လုပ္၇ာမွာသံုး၇မဲ႔ က၇ိယါေတြ

-Close up & TMs လုပ္ဘို႔ေန၇ာေတြနဲ႔ပက္သက္လို႔ owner

၇ဲ႔တင္ၿပထါးတဲ႔ေန၇ာေတြ

- tank pressure testing အတြက္ owner ၇ဲ႔တင္ၿပထါးခ်က္

-အ၇င္တံုးက ၿဖစ္ဖူးတဲ႔႔ပ်က္စီးမွဳ

စတါေတြကိုတင္ၿ႔ပ၇ပါတယ္။

ESP မွာ စစ္မဲ႔ဟါေတြ SURVEY REQUIREMENT

1- OVERALL SURVEY -Cargo tank, ballast tank, FPT,APT, pump

room, fuel oil tank, lube tank, fresh water tank, cofferdam, void

space, machinery space, other space

2- Close up survey –

3- Tank testing

4- Thickness measurement – suspect area, structural members

subject to close up survey,

5- Critical structure area and suspect area

6- Area identified with substantial corrosion from previous survey

7- Hull damage for sister vessel in case of design related damage

Page 31: covered by class( class ) Propulsion & Steering system

8- Report of port state inspection

9- Safety management system

statutory ပက္သက္တဲ႔ survey ေတြအတြက္ ၿခံဳၿပီး ၿပင္ဆင္ထါးသင္႔တါေတြ

၁-fire control

2-fire detecting system

3-fire main & fire pump , emer fire pump\ international shore connection

4-fire hose/ nozzle/ foam applicator/ spanner

5-fix fire fighting control/ piping/ instruction/ marking

6-semi portable & portable service date & fully charged

7-remote stop for fan / accommodation fan stop/ galley power stop

8-closing arrangement of vent ( direction mark )

9-fire man outfit

10-load line / safcon

11-manning certificate

12-manoeuvring booklet

13-damage control plan

Page 32: covered by class( class ) Propulsion & Steering system

14-structural fire protection/ fire door/ vent stop

15-vent of machinery space

16-noise protection at E/R

17-engineer alarm is audible at engineer accommodation

18-first start arrangement

19-escape from working space

20- quick closing valve

21-general emergency alarm

22-EEBD & Charge compression air quality certificate

23-computer base maintenance program

24-IG

25-Deck foam system ( foam tank level/ foam sample test certificate/ foam

pump pressure )

Weather deck

1-cargo tank opening / coaming/ PV valve (vent capacity – 1.25 of loading

rate) /flame screen

2-HC gas detector – portable instrument – spare and means of calibration

3-flame of fuel oil tank vent

Page 33: covered by class( class ) Propulsion & Steering system

4-cargo tank venting arrangement/ secondary means of vent

5-electrical equipment at dangerous zone

COP Room

1-no potential sources of ignition

2-acess ladder

3-pump room bulkhead

4-bulkhead penetration sealing arrangement

5-COP/stripping pump/ballast pump leakage

6-exh fan suction ( high & low)

7-pressure gauge & level indicator

8-HC detector

9-pump room bilge alarm

IGG

1-IGG blower check

2-scrubber room vent

3-deck seal

4-N/R V/V

5-soot blower interlock

Page 34: covered by class( class ) Propulsion & Steering system

6-IGG Fan stop – IGG outlet valve close

7-safety of IGG check

FIRE FIGHTING

1-foam

2-fix

ETA emergency towing arrangement

Page 35: covered by class( class ) Propulsion & Steering system

ေအါက္က document ကေတါ႔ ESP ေလ်ာက္ထါးတါၿပန္ၿကား ထါး

တဲ႔DOCUMENT နမူနာပါ။

Attn: Mr.

Dear Sir,

"MT PREMIER" LR NO 8802 ENHANCED SURVEY PROGRAMME (ESP)

1. The submitted ESP Survey Programme and ESP Planning

Questionnaire (planning document) for Special Survey, via our

Singapore office, has been examined and is noted as amended.

2. Please note that the requirements as per Part 1, Chapter 3,

Section 8, including Tables 3.7.3 and 3.7.6, for Special Survey I, of

The Rules and Regulations for the Classification of Ships are to be

complied with as applicable.

3. Please note that the approved service supplier is to be

nominated to perform thickness measurements and proposed

locations where the Special Survey and Docking Survey are to be

Page 36: covered by class( class ) Propulsion & Steering system

held noted. May we remind you that it is now a requirement that the

surveyor be onboard while the thickness measurements are taken, to

the extent necessary to control the process. Prior to the

commencement of any thickness measurements, a planning meeting

is to be held between the attending surveyor, the Owner's

representative and the Thickness Measurement Firm's representative

so as to ensure the safe and efficient execution of the surveys and

thickness measurements to be carried out on board.

4. The proposed locations and extent of Close-up survey and

thickness measurements of ESP Survey Programme is noted. Please

note that these nominated tanks, frame locations and strake

positions of structural areas are also to be proposed and agreed with

the attending surveyor. Arrangements should be in accordance with

Lloyd's Register's Rules and to the satisfaction of the attending

surveyor. May we remind you that for close-up survey the details of

structural components are to be within the close visual range of the

attending surveyor, i.e. normally within hand reach.

5. Where the result of the topside or bottom area assessments at

any/either of the transverse sections mentioned in Section 4 of

appendix 2 of the submitted Survey Programme are found to be

greater than 75% of the allowable limit, then additional transverse

sections are required to be measured forward and aft of 0.5L

amidships.

Page 37: covered by class( class ) Propulsion & Steering system

6. Kindly note that the thickness measurement report to be placed

onboard as part of the ESP documentation must reflect the final and

satisfactory condition of the ship. The report should be suitably

annotated where repairs/ renewals have been subsequently carried

out by either the thickness measurement company or attending

Surveyor.

7. Regarding your intention to carry out thickness measurements

at Yiu Dockyard, Shenzhen, China, it is concluded that arrangements

will be made for a surveyor to be in attendance through our local

offices. The proposed means of access for the carrying out Close-up

survey and thickness measurements noted. Please note that Rafts or

boats may be permitted for the survey of the under deck areas of

tanks or spaces, if the depth of the under deck web plating is 1, 5 m

or less. If the depth of the under deck web plating is greater than 1,5

m, then rafts or boats may be permitted only when the coating of the

under deck structure is in GOOD condition and there is no evidence

of wastage or if a permanent means of access is provided in each

bay to allow safe entry and exit. A permanent means of access is

considered to mean an access direct from the deck via a vertical

ladder and a small platform fitted approximately 2 m below the deck

in each bay. If neither of the above conditions are met, then staging

or another equivalent means is to be provided for the survey of the

under deck areas. (P1 Ch 3, Sect 1.6.8(c))

Page 38: covered by class( class ) Propulsion & Steering system

8. Please ensure all necessary structural plans are available

onboard to assist in the completion of the thickness measurement

report and are provided to the Thickness Measurement Company at

the earliest opportunity to assist in their survey planning and

preparation of draft sketches in advance of attendance, in order not

to delay the survey execution and the subsequent thickness

measurement report submission within ten (10) working days of the

final attendance onboard. May we remind you that a delay in the

thickness measurement report submission may have an impact and

delay in the provision of required ESP documentation as well as

suitable Condition of Class imposed by the attending surveyors.

9. With regards to tank testing requirements may we refer you to

LR 's Rules and Regulations for the Classification of Ships, Part 1,

Chapter 3, Section 7, Paragraph 7.5.

10. The safety procedures as per the section 'Preparation for

Survey', of the Enhanced Survey Programme (ESP) "Preparation for

Special Survey" booklet, should be implemented accordingly.

11. A copy of this letter and the endorsed Survey Programme

should be placed on board for use by the attending surveyor.

Yours faithfully

Long

For Devolved Classification Executive Lloyd's Register Asia -

Singapore Office

encs

Page 39: covered by class( class ) Propulsion & Steering system

cc : Lloyd's Register EMEA, TGG-Class (+1 copy of ESP)

cc Lloyd's Register ASIA, LR Guangzhou Surveyor (+1 copy of

ESP)

FOR OIL TANKER, ORE/OIL CARRIER & ORE/BULK/OIL

CARRIER

Prior to the development of the Survey Programme, the Survey

Planning Questionnaire should be completed by the Owner/Manager.

It is essential that up-to-date information is provided when

completing this questionnaire.

1. Particulars

Ship name: PREMIER

IMO number: 8802

Flag State: Singapore

Port of registry: Singapore

Owner: TANKERS PTE LTD

Recognized organization (R0): Lloyd's Register

Gross tonnage: 8025

Deadweight (metric tonnes): 11410

Date of delivery: 29.05.2009

A specific Survey Programme shall be worked out in advance of the

renewal Survey by the Owner/Manager in co-operation with Lloyds

Register. The Survey Programme shall be in written format and the

Survey shall not commence until the Survey Programme has been

agreed upon.

Page 40: covered by class( class ) Propulsion & Steering system

Recognised Organisation (RO): This indicates the Classification

Society.

Document no; ESPR12.1_2010_OILOREOIL_OREBULKOIL

fte.yc1S FOR OIL TANKER, ORE/OIL CARRIER & ORE/BULK/OIL

CARRIER

gister

2. Information on access provision for close-up surveys and thickness

measurement

The means of access to the structures subject to close-up

examination and thickness measurement shall be indicated in the

table below. A close-up examination in an examination where the

details of structural components are within the close visual inspection

of the Surveyor, i.e. preferably within reach of hand.

3. Assessment of Corrosion Risk

Page 41: covered by class( class ) Propulsion & Steering system

The information below may assist in the assessment of corrosion risk

and determination of areas subject to close-up examination and

thickness measurement.

History of cargo with H2S content or heated cargo for the last 3 years

together with indication as to whether cargo was heated and, where

available.

Please see attached.

4. Owner's inspections

The owner should provide details of the results of their inspections

over the last 3 (three) years for the tanks/spaces that are subject to

Survey.

Page 42: covered by class( class ) Propulsion & Steering system

Miscellaneous other spaces:

* Inspections by the Owner's personnel during the last 3 years with

reference to structural deterioration in general, leakages in tank

boundaries and piping and condition of the coating and corrosion

protection system (including anodes) if any. A guidance for reporting

is shown in IMO Resolution A.744 (18) (as amended in 2006)

Note: Indicate tanks which are used for oil/ballast

(1) HC = hard coating; SC = soft coating; A = anodes; NP = no

protection

(2) U = upper part; M = middle part; L = lower part; C = complete

(3) G = good; F = fair; P = poor; RC = recoated (during the last 3

years)

(4) N = no findings recorded; Y = findings recorded, description of

findings should be attached to this questionnaire

Page 43: covered by class( class ) Propulsion & Steering system

(5) DR = Damage & Repair; L = Leakages; cv = Conversion

(Description to be attached to this questionnaire)

5. Reports of Port State Control inspections

List the reports of Port State Control inspections containing hull

structural related deficiencies, relevant information on rectification of

the deficiencies:

6. Safety Management System

7. Name and address of the approved thickness measurement

company: MARINE ENGINEERING SERVICES PTF. LTD

33 Kian

Singapore

Tel : +65 6896

Email: operation. adrninkoimarine.com.sg

Name of Owners representative: Syed

Signature....................

Page 44: covered by class( class ) Propulsion & Steering system

Date.................................

Cargo history

1. Particulars

Name of ship: PREMIER

IMO (IR) number: 8802

Type of ship (see Note 1): Oil Products Tanker

Page 45: covered by class( class ) Propulsion & Steering system

Flag State: Singapore

Port of registry: Singapore

Gross tonnage: 8025

Deadweight (metric tonnes): 11410

Length between perpendiculars (m):

Shipbuilder: P.T SHIPYARD - BATAM Yard

Hull number: 80

Recognized organization (R0): Lloyd's Register

RO ship identity: 8802

Date of delivery of the ship: 29.05.2009

Owner: TANKERS PTE LTD

Intermediate / Special Survey: Special Survey No.1

Due date of Intermediate/ Special Survey: 28/05/14

Due date of Docking Survey: 28/05/14

Type of cargoes carried (see Note 2): oil products

Note 1: Oil tanker, Chemical tanker etc.

Note 2: Oil, Chemicals, oil products, Other etc

Document no; ESP_R 12.1 _201 O_OILOREOIL_OREBULKOIL

APPENDIX 2

1 1SURVEY PROGRAMME

FOR OIL TANKER, ORE/OIL CARRIER &

1 ORE/BULK/OIL CARRIER

2. General Plan:

Page 46: covered by class( class ) Propulsion & Steering system

PROPOSED LOCATIONS AND EXTENT OF CLOSE-UP SURVEYS ARE

AS FOLLOWS: (The minimum requirements for Close-up survey are

given in Chapter 3 of the Classification Regulations)

1- One web frame ring in a complete ballast tank (NO.3SBT

FR.98(P))

2- One deck transverse in a cargo tank (NO.3COT FR.98 (S))

3- One transverse bulkhead in a complete ballst tank (NO.3SBT

FR.95(P))

4- One transverse bulkhead in a cargo centre tank(NO.2 COT FR. 121

PIS)

5- One transverse bulkhead in cargo wing tank (NO.3COT FR.95 (S))

4. Thickness Measurement:

Page 47: covered by class( class ) Propulsion & Steering system

PROPOSED LOCATIONS AND EXTENT OF THICKNESS

MEASUREMENT ARE AS FOLLOWS: (The minimum requirements for

thickness measurement are given in Chapter 3 of the Classification

Regulations)

1- One section of deck plating for the full beam of the ship within

0.5L amidships in way of a ballast tank, if any, or a cargo tank used

primarily for water ballast.(FR.95/96)

2- Critical areas, as required by the Surveyor.

The following table should provide details of all cargo holds and tanks

within the cargo length and to also include all water ballast tanks

outside the cargo length with their respective contents type, method

of corrosion protection and condition of coating, if any, in the

holds/tanks.

Page 48: covered by class( class ) Propulsion & Steering system

Important reminders for Owners / Managers and attending

Surveyors.

1. The main structural plans (scantling drawings), including

information regarding the use of high tensile steel, and tank plan are

to be made available on board for the use of the attending

Surveyor(s) and thickness measurement company personnel.

2. The on board documentation required by IMO Resolution A744

(18) and any other supporting documentation is to be made available

on board for the use of the attending Surveyor(s).

3. The Owners / Managers are to ensure that those tanks and spaces

subject to survey are in a clean and gas free condition, with

adequate ventilation, lighting and a safe means of access provided.

Page 49: covered by class( class ) Propulsion & Steering system

Periodical survey reports held in the ESP Hull Survey Records file

shall contain details of any damage experienced by the ship. It is the

responsibility of Owners / Managers to report to LR without delay,

any damage, breakdown, or grounding, which could invalidate the

conditions for which class has been assigned. Further details can be

found in The Rules & Regulations for the Classification of Ships Part

1, Chapter 2, Section 3, 3.4.

9. List of main structural plans.

Please ensure the main structural plans are available for the

attending Surveyor at the time of Survey, including the following:

A) Capacity Plan

Page 50: covered by class( class ) Propulsion & Steering system

B) Midship Section

C) Shell Expansion

D) Longitudinal Bulkheads

E) Any other plans requested by the attending Surveyor

Planning of survey

Planning of survey is done by two methods

1-mandatory min survey programme

Page 51: covered by class( class ) Propulsion & Steering system

This programme is worked out for a ship, taking into account the

mandatory min requirements for overall exam, close up survey and

thickness measurements, that have been prescribed by classification

society. Preparation to be carried out for the survey, such as access,

cleaning/descaling, lighting, gas freeing and survey equipment are also

described.

2-survey based on survey planning document( ေဖၚၿပခဲ႔တဲ႔ ESP Document က

ဒီအမ်ိဳးအစါးပါ။)

The survey planning document identifies critical structural areas on an

individual ship, which are high risk. These areas are based on the vessel’s

structural features, its operational features and its damage/repair history.

It stipulates the location, extent and means of close up exam of the area

The planning document is to contain

Main particular of the ship

Plan of tanks/holds with information on their use, cathodic protection and

condition of coating

Corrosion risk nomination of tanks

Design risk nomination of structure

Tanks and area nomination of close up exam

Structure and section nominate for thickness measurement

Page 52: covered by class( class ) Propulsion & Steering system

List of acceptable corrosion allowance for different structure

Risk nomination is an assessment and evaluation of the risk of

deterioration of structures. It takes into account

Design feature such as use of high tensile steel

Local details such as local stresses and local stress concentration

History of ship with regard to corrosion, buckling, cracking, repairs carried

out to and spare parts use on that particular ship as well as sister ships

Information on use of tanks and condition of paint and cathodic protection

on different ship from the office

ESP documentation must not be removed from ship and must remain on board for the entire life of the ship

Page 53: covered by class( class ) Propulsion & Steering system

ဒါေၿကာင္႔ ESP document ကို class rule နဲ႔ေ၇ာ၊ IMO Res A 744(18) အ၇ေ၇ာ

စစ္ေဆးအတည္ၿပဳ၇မွာၿဖစ္ပါတယ္။

ဒါေၿကာင္႔ ESP Documemt မွာ ပါတဲ႔ ဟါေတြကေတါ႔

- Survey report ,TM Report .Executive summary (ရိွသမ် report

ေတြအါးလုံး ၿခံဳ ၿပီး ေကါက္ခ်က္ခ်တဲ႔ ဟါ ) ေတြပါတဲ႔ SURVEY FILE

- ယခင္ repair history

- Cargo and Ballast history

- Structure defect နဲ႔ဆိုင္တဲ႔ report ေတြ

- Bulkhead နဲ႔ piping ေတြ leakage ၿဖစ္တဲ႔ report ေတြ

- Coating အေၿခအေန။corrosion protection system ၇ဲ႔အေၿခအေနေတြ

- Critical areas နဲ႔ ဆိုင္တဲ႔ information ေတြ

- Agree survey programme

ESP statement – if required, an ESP statement can be issued between the

completion of the special survey and the issue of the ESP documentation.

This is statement to the owner confirming that special survey has been

completed and the requirements of IMO Res A744(18) have been covered

by the classification society’s rule.

Survey လုပ္လို႔ ေတြ႔၇ွိခ်က္အ၇ - IMO Res A 744(18) နဲ႔ကိုက္ညီပါတယ္လို႔

ေပးထါးတဲ႔ ESP Statement

Close-up surveys

One of the fundamental differences between ESP hull survey requirements

and the previous hull survey regime, is the requirement for close-up

Page 54: covered by class( class ) Propulsion & Steering system

surveys of the structure. This concept now also been adopted for dry

general cargo ship.

According to Lloyd’s register definition of a close up survey, this should be

carried out from distance not more than an arm’s reach away from the

surveyor.

Preparation for surveys (for all kinds of survey)

Survey လုပ္ဖို႔ၿပင္ဆင္ထါး၇မဲ႔အခ်က္ေတြ

လုပ္ဖို႔သင္႔ေလ်ာ္မဲ႔ေန၇ာ။အခ်ိန္၊ေ၇ြးပါ။ surveyor

နဲ႔ေဆြးေႏြးပါ။(လုပ္ထံုးလုပ္နည္းအသစ္ေတြ၇ိွ၊မ၇ွိ)

Survey check list၊ memoranda item, condition of class ေတြ စစ္ပါ။ survoyer

တေယါက္ထဲနဲ႔လံုေလါက္လါး ၿကည္႔ပါ။ဥပမာ - ညဖက္ cargo equipment / crane

Page 55: covered by class( class ) Propulsion & Steering system

ေတြ survey လုပ္ဖုိ႔မလြယ္ပါဘူး

ပ်က္တါမၿပင္ခင္ SURVOYER နဲ႔ေဆြးေႏြးပါ. Welding technic,NDE,heat treatment

ေတြမွန္ဖုိ႔

Certified spare ဟုတ္ မဟုတ္ စစ္ပါ။MED Certificate ၇ိွ equipment ေတြကို အခ်ိဳ႔

non-EU flag ေတြက လက္မခံပါဘူး။

Survey ေတြအမ်ားၿကီး တခါတည္းလုပ္၇င္ အါးလုံး chk list တခုတည္းၿဖစ္ေအါင္

ေ၇းဆြဲပါ။ဘါၿပီးဘါလါမယ္ဆိုတါ surveyor နဲ႔ တိုင္ပင္ပါ။

Class,statutory & servicing certificate ေတြကို အစီအစဥ္တက် ၿပင္ဆင္ထါးပါ။

Page 56: covered by class( class ) Propulsion & Steering system

test date ၊ data ေတြ machinery ေတြေပၚမွာ ေ၇းထါး၇ဲ႔လါး။L/B Fall renewal date

ေ၇းထါးလါး

ဥပမာ ဘိုြင္လါကိုစစ္မယ္ဆို cool down / cleaned/mounting open လုပ္ၿပီး /stage

ဆင္ၿပီး။rescue equipment ေတြအသင္႔

SS planning document ေတြ ၆ လအၿကိုလုပ္ပါ

Page 57: covered by class( class ) Propulsion & Steering system

Tank testing လုပ္၇င္ ေဘး tank ေတြ အၿပည္႔ၿဖည္႔ၿပီး surveyor ကို ေခၚပါ။ဒီ tank

testing ကို dock မတက္ခင္ ၁၅ လ အလိုက စၿပႏုိင္ပါတယ္။

Close up နဲ႔ TMs ကို တခ်ိန္တည္းလုပ္ပါ။

TMs result ကို SS မၿပီးခင္ ယူပါ။(သံၿပားလဲဖုိ႔လို၇င္ လြယ္ေအါင္)

Rafting လုပ္၇င္ spare boats / raft ေဆါင္ထါးပါ

ပန္ကါေတ၊ြပဲ႔ေတြ။ေက်ာက္ၿကိုးေတြ ၿပင္၇င္ material / heat treatment / weld

ability ေတြသိေအါင္လုပ္ပါ။ ဥပမါ- U3 Chain cable က chain pin ကို WELDING

ေဆၚ၇င္ post weld heat treatment လုပ္၇ပါတယ္။

Page 58: covered by class( class ) Propulsion & Steering system

Ship staff ေတြကို structure/machinery/equipment ေတြေကါင္း။မေကါင္း

အၿမဲစစ္ေနပါေစ

SE1/C11 chk list ေတြကို ship staff ေတြသုံးခုိင္းပါ။

ၿပင္ဖို႔ လို၇င္ ၇ံုးပိတ္၇က္နဲ႔မတိုက္ေအါင္ ဂ၇ုစိုက္ပါ။

2 Renewal survey

2.1 General 2.1.1. The renewal survey may be commenced at the fourth annual survey and be progressed during the succeeding year with a view to completion by the fifth anniversary date.

2.1.2. As part of the preparation for the renewal survey the survey programme should be dealt with in advance of the renewal survey. The thickness measurement should not be carried out before the fourth annual survey.

Page 59: covered by class( class ) Propulsion & Steering system

2.1.3. The survey should include, in addition to the requirements of the annual survey, examination, tests and checks of sufficient extent to ensure that the hull and related piping as required in 2.1.5 is in a satisfactory condition and is fit for its intended purpose for the new period of validity of the Cargo Ship Safety Construction Certificate, subject to proper maintenance and operation and to renewal surveys being carried out.

2.1.4. All cargo tanks, ballast tanks, pump-rooms, pipe tunnels, cofferdams and void spaces bounding cargo tanks, decks and outer hull should be examined, and this examination should be supplemented by thickness measurement and testing as deemed necessary, to ensure that the structural integrity remains effective. The examination should be sufficient to discover substantial corrosion, significant deformation, fractures, damages or other structural deterioration.

2.1.5. Cargo piping on deck, including crude oil washing (COW) piping, and cargo and ballast piping within the above tanks and spaces should be examined and operationally tested to working pressure to attending surveyor’s satisfaction to ensure that tightness and condition remain satisfactory. Special attention should be given to any ballast piping in cargo tanks and cargo piping in ballast tanks and void spaces, and surveyors should be advised on all occasions when this piping, including valves and fittings, are open during repair periods and can be examined internally.

2.2 Dry-dock survey

2.2.1. A survey in dry-dock should be a part of the renewal survey. There should be a minimum of two inspections of the outside of the ship’s bottom during the five-year period of the Safety Construction Certificate. In all

Page 60: covered by class( class ) Propulsion & Steering system

cases, the maximum interval between bottom inspections should not exceed 36 months.

2.2.2. For ships of 15 years of age and over, inspection of the outside of the ship’s bottom should be carried out with the ship in dry dock. For ships of less than 15 years of age, alternate inspections of the ship’s bottom not conducted in conjunction with the renewal survey may be carried out with the ship afloat. Inspection of the ship afloat should only be carried out when the conditions are satisfactory and the proper equipment and suitably qualified staff is available.

2.2.3. If a survey in dry-dock is not completed in conjunction with the renewal survey or if the 36 month maximum interval referred to in 2.2.1 is not complied with, the Cargo Ship Safety Construction Certificate should cease to be valid until a survey in dry-dock is completed.

2.3 Tank corrosion prevention system

. Where provided, the condition of the corrosion prevention system of cargo tanks should be examined. A ballast tank where a protective coating is found in POOR condition and it is not renewed, or where soft coating has been applied, or where a protective coating has not been applied from the time of construction, the tank in question should be examined at annual intervals. Thickness measurement should be carried out as deemed necessary by the surveyor.

2.4 Extent of Overall And Close-up Surveys

2.4.1. An overall survey of all integral tanks and spaces should be carried out at the renewal survey.

Page 61: covered by class( class ) Propulsion & Steering system

2.4.2. The requirements for close-up surveys at the renewal survey are given in annex 1.

2.4.3. The surveyor may extend the scope of the close-up survey as deemed necessary taking into account the maintenance of the tanks under survey, the condition of the corrosion prevention system and also in the following cases:

.1. in particular, tanks having structural arrangements or details which have suffered defects in similar tanks or on similar ships according to available information;

.2. in tanks which have structures with reduced scantlings in association with a corrosion prevention system approved by the Administration.

2.4.4. For areas in tanks where coatings are found to be in GOOD condition as defined in 1.2.10, the extent of close-up surveys according to annex 1 may be specially considered by the Administration.

2.5 Extent of thickness measurements

2.5.1. The requirements for thickness measurements at the renewal survey are given in annex 2.

2.5.2. Where substantial corrosion as defined in 1.2.8 is found, the extent of thickness measurements should be increased in accordance with the requirements of annex 4.

2.5.3. The surveyor may extend the thickness measurements as deemed necessary.

Page 62: covered by class( class ) Propulsion & Steering system

2.5.4. For areas in tanks where coatings are found to be in GOOD condition as defined in 1.2.10, the extent of thickness measurements according to annex 2 may be specially considered by the Administration.

2.5.5. Transverse sections should be chosen where the largest reductions are suspected to occur or are revealed from deck plating measurements.

2.5.6. In cases where two or three sections should be measured, at least one should include a ballast tank within 0.5L amidships.

2.6 Extent of tank pressure testing

2.6.1. The requirements for tank pressure testing at the renewal survey are given in annex 3.

2.6.2. The surveyor may extend the tank pressure testing as deemed necessary.

2.6.3. Generally, the pressure should correspond to a water level to the top of access hatches for cargo tanks, or top of air pipes for ballast tanks.

ေအါက္ကTABLE ေတြက ESP SHIP

ေတြအတြက္သက္တမ္းအလိုက္လုပ္၇မဲ႔ဟါေတြပါ။

Annex 1 - Minimum Requirements for Close-Up Survey at Renewal Survey of Double Hull Oil Tankers

Page 63: covered by class( class ) Propulsion & Steering system

Age ≤ 5 years 5<age≤10 years 10<age≤15 years

Age>15 years

1 2 3 4

One web frame (1), in a complete ballast tank (see Note 1)

All web frames (1), in a complete ballast tank (see Note 1) The knuckle area and the upper part (5 m approximately) of one web frame in each remaining ballast tank (6)

All web frames (1), in all ballast tanks

As for ships referred to in column 3

Additional transverse areas as deemed necessary by the Administration

One deck transverse, in a cargo oil tank (2)

One deck transverse, in two cargo oil tanks (2)

All web frames (7), including deck transverse and cross ties, if fitted, in a cargo oil tank

One web frame (7), including deck transverse and cross ties, if fitted, in each remaining cargo oil tank

Page 64: covered by class( class ) Propulsion & Steering system

One transverse bulkhead (4), in a complete ballast tank (see Note 1)

One transverse bulkhead (4), in each complete ballast tank (see Note 1)

All transverse bulkheads, in all cargo oil (3) and ballast (4) tanks

One transverse bulkhead (5) in a cargo oil centre tank

One transverse bulkhead (5), in two cargo oil centre tanks

One transverse bulkhead (5), in a cargo oil wing tank (see Note 2)

One transverse bulkhead (5), in a cargo oil wing tank (see Note 2)

NOTES: (1), (2), (3), (4), (5), (6) and (7) are areas to be subjected to close-up surveys and thickness measurements (see appendix 3 of annex 10). (1) Web frame in a ballast tank means vertical web in side tank, hopper web in hopper tank, floor in double bottom tank and deck transverse in double deck tank (where fitted), including adjacent structural members. In fore and aft peak tanks web frame means a complete transverse web frame ring including adjacent structural members. (2) Deck transverse, including adjacent deck structural members (or

Page 65: covered by class( class ) Propulsion & Steering system

external structure on deck in way of the tank, where applicable). (3) Transverse bulkhead complete in cargo tanks, including girder system, adjacent structural members (such as longitudinal bulkheads) and internal structure of lower and upper stools, where fitted. (4) Transverse bulkhead complete in ballast tanks, including girder system and adjacent structural members, such as longitudinal bulkheads, girders in double bottom tanks, inner bottom plating, hopper side, connecting brackets. (5) Transverse bulkhead lower part in cargo tank, including girder system, adjacent structural members (such as longitudinal bulkheads) and internal structure of lower stool, where fitted. (6) The knuckle area and the upper part (5 metres approximately), including adjacent structural members. Knuckle area is the area of the web frame around the connections of the slope hopper plating to the inner hull bulkhead and the inner bottom plating, up to 2 metres from the corners both on the bulkhead and the double bottom. (7) Web frame in a cargo oil tank means deck transverse, longitudinal bulkhead vertical girder and cross ties, where fitted, including adjacent structural members. Note 1 Complete ballast tank: means double bottom tank plus double side tank plus double deck tank, as applicable, even if these tanks are separate. Note 2 Where no centre cargo tanks are fitted (as in the case of centre longitudinal bulkhead), transverse bulkheads in wing tanks should be surveyed.

Page 66: covered by class( class ) Propulsion & Steering system

အေပၚက ၅ ႏွစ္သါးသေဘၤာတစီး၇ဲ႔ ESP SURVEY အရစစ္ရမဲ႔ CLOSE UP လုပ္ရမဲ႔ေနရာေတြပါ။

Annex 2 - Minimum Requirements for Thickness Measurements at Renewal Survey of Double Hull Oil Tankers

Age ≤ 5 years 5<age≤10 years 10<age≤15 years Age>15 years

1 2 3 4

One section of deck plating for the full beam of the ship within the cargo area

Within the cargo area: each deck plate one transverse section

Within the cargo area: each deck plate two transverse sections (1) all wind and water strakes

Within the cargo area: each deck plate three transverse sections (1) each bottom plateall wind and water strakes

Page 67: covered by class( class ) Propulsion & Steering system

Selected wind and water strakes outside the cargo area

Selected wind and water strakes outside the cargo area

Selected wind and water strakes outside the cargo area

Measurements, for general assessment and recording of corrosion pattern, of those structural members subject to close-up survey according to Annex 1

Measurements, for general assessment and recording of corrosion pattern, of those structural members subject to close-up survey according to Annex 1

Measurements, for general assessment and recording of corrosion pattern, of those structural members subject to close-up survey according to Annex 1

Measurements, for general assessment and recording of corrosion pattern, of those structural members subject to close-up survey according to Annex 1

Suspect areas Suspect areas Suspect areas Suspect areas

(1): at least one section should be within 0,5L amidships.

Annex 3 - Minimum Requirements for Tank Testing at Renewal Survey of Double Hull Oil Tankers

Age ≤ 5 years 5<age≤10 years Age>10 years

1 2 3

All ballast tank boundaries

All ballast tank boundaries

All ballast tank boundaries

Cargo tank boundaries Cargo tank boundaries Cargo tank boundaries

Page 68: covered by class( class ) Propulsion & Steering system

facing ballast tanks, void spaces, pipe tunnels, representative fuel oil tanks, pump rooms or cofferdams

facing ballast tanks, void spaces, pipe tunnels, representative fuel oil tanks, pump rooms or cofferdams

facing ballast tanks, void spaces, pipe tunnels, representative fuel oil tanks, pump rooms or cofferdams

All cargo tank bulkheads which form the boundaries of segregated cargoes

All remaining cargo tank bulkheads

Annex 5 - Minimum Requirements for Overall and Close-Up Survey and Thickness Measurements at Intermediate Survey of Double Hull Oil Tankers

5<age≤10 years 10<age≤15 years Age>15 years

1 2 3

Overall survey of representative salt-water ballast tanks, selected by the attending surveyor (the selection should include fore and aft peak tanks and three other tanks) (see 4.2)

Overall survey of all salt water ballast tanks, including combined cargo/ballast tanks where fitted (see 4.3)

As for renewal survey given in annex 1

Overall survey of at least two representative cargo tanks

As for renewal survey

Page 69: covered by class( class ) Propulsion & Steering system

given in annex 1

Close-up survey in salt-water ballast tanks of:

all web frames (1) in one complete tank (see Note 1) - the knuckle area and the upper part (5 m approximately) of one web frame in each remaining ballast tank (6)

one transverse bulkhead (4) in each complete tank (see Note 1) (see 4.2.3)

As for renewal survey given in annex 1

Close-up survey in two cargo tanks (or two combined cargo/ballast tanks, where fitted): the extent of survey should be based on the records of the previous renewal survey and repair history of the tanks (see 4.3)

As for renewal survey given in annex 1

Thickness measurements of those areas found to be suspect areas, as defined in

Thickness measurements of those areas found to be suspect areas, as defined in 1.2.7, at the

As for renewal survey

Page 70: covered by class( class ) Propulsion & Steering system

1.2.7, at the previous renewal survey (see 4.3.5)

previous renewal survey (see 4.3.5)

given in annex 2

Notes: (1), (4) and (6) are areas to be subjected to close-up surveys and thickness measurements (see appendix 3 of annex 3). (1) Web frame means vertical web in side tank, hopper web in hopper tank, floor in double bottom tank and deck transverse in double deck tank (where fitted), including adjacent structural members. In fore and aft peak tanks web frame means a complete transverse web frame ring including adjacent structural members. (4) Transverse bulkhead complete in ballast tanks, including girder system and adjacent structural members, such as longitudinal bulkheads, girders in double bottom tanks, inner bottom plating, hopper side, inner hull longitudinal bulkhead, connecting brackets. (6) The knuckle area and the upper part (5 metres approximately), including adjacent structural members. Knuckle area is the area of the web frame around the connections of the slope hopper plating to the inner hull bulkhead and the inner bottom plating, up to 2 metres from the corners both on the bulkhead and the double bottom. Note 1 Complete ballast tank: means double bottom tank plus double side tank plus double deck tank, as applicable, even if these tanks are separate.

Page 71: covered by class( class ) Propulsion & Steering system

အေပၚက CLASS က ေပးတဲ႔ CRITICAL AREAေတြပါ။

Page 72: covered by class( class ) Propulsion & Steering system
Page 73: covered by class( class ) Propulsion & Steering system
Page 74: covered by class( class ) Propulsion & Steering system
Page 75: covered by class( class ) Propulsion & Steering system
Page 76: covered by class( class ) Propulsion & Steering system
Page 77: covered by class( class ) Propulsion & Steering system
Page 78: covered by class( class ) Propulsion & Steering system
Page 79: covered by class( class ) Propulsion & Steering system
Page 80: covered by class( class ) Propulsion & Steering system

2.2 Dry-dock survey

2.2.1. A survey in dry-dock should be a part of the renewal survey. There should be a minimum of two inspections of the outside of the ship’s bottom during the five-year period of the Safety Construction Certificate. In all cases, the maximum interval between bottom inspections should not exceed 36 months.

2.2.2. For ships of 15 years of age and over, inspection of the outside of the ship’s bottom should be carried out with the ship in dry dock. For ships of less than 15 years of age, alternate inspections of the ship’s bottom not conducted in conjunction with the renewal survey may be carried out with the ship afloat. Inspection of the ship afloat should only be carried out when the conditions are satisfactory and the proper equipment and suitably qualified staff is available.

2.2.3. If a survey in dry-dock is not completed in conjunction with the renewal survey or if the 36 month maximum interval referred to in 2.2.1 is not complied with, the Cargo Ship Safety Construction Certificate should cease to be valid until a survey in dry-dock is completed.

No.133 Guidelines for Pilot Schemes of Extended Interval between Surveys in Dry-Dock - Extended Dry-docking (EDD) Scheme 1 Introduction The intervals between inspections of the outside of the ship's bottom are specified in SOLAS,

Page 81: covered by class( class ) Propulsion & Steering system

IACS Regulations and Classification Society Rules and require a minimum of two inspections to be carried out during the 5 year validity period of the Safety Construction Certificate/Special Survey period. SOLAS Regulation I/10(v) only requires a minimum of two inspections of the outside of the ship’s bottom and does not specify a ship must be drydocked out of the water. IMO Resolution A.1053(27) as amended, “Survey guidelines for the harmonized system of survey and certification”, requires that inspections of the outside of the ship’s bottom should normally be carried out with the ship in a dry-dock. However, it also provides that Administrations may give consideration to alternate inspections being carried out with the ship afloat. This document recommends the acceptance procedure for pilot schemes which extend the interval between surveys in dry-dock. Ships eligible for the Extended Dry-Docking (EDD) scheme should meet the provisions and conditions described in this document. Qualifying ships may be permitted to carry out two consecutive in-water surveys, subject to the conditions described in this document. A minimum of two inspections of the outside of the

Page 82: covered by class( class ) Propulsion & Steering system

ships bottom should be carried out during the renewal period of five years and the intervals between any two inspections shall not exceed 36 months. Pilot schemes which extend the interval between out of water dry-docking surveys are normally tripartite projects between the Owner, Flag Administration and the Classification Society. Acceptance into such a Pilot scheme is subject to the formal written agreement with the ship’s Flag Administration including any additional specific Flag Administration requirements. 2 Application Owners/Managers requesting a ship be considered for the EDD scheme, are to apply to the Classification Society in writing confirming and describing compliance with the requirements and conditions specified in this document. Upon the Owner’s request, the extended interval for each ship will be considered on a case by case basis by the Classification Society. The Society may assist in forwarding the Owner’s application to the Flag Administration. The following ships and ship types are not eligible for the extended dry-docking scheme described in these guidelines: • Passenger Ships; • Ships subject to the Enhanced Survey Program (ESP);

Page 83: covered by class( class ) Propulsion & Steering system

• Ships subject to the Hull Survey Requirements of IACS UR Z7.1; • Ships fitted with propulsion thrusters; • Ships where the propeller connection to the shaft is by means of a keyed taper; • High Speed Craft(HSC). The dry-docking scheme will operate based upon the ship’s age when entering the scheme. For ships already in service, the extended dry-docking scheme may be implemented at any time until a ship reaches 10 years of age. No extensions should be granted for the dry-docking required at the end of each extended dry docking period.