Countywide Model SUSMP. July 17, 2008. Topics. SUSMP Timeline Goals Approach to Compliance NPDES Permit Requirements Model SUSMP Features. Model SUSMP Timeline. Goals for SUSMP. Make it easier for applicants to prepare submittals - PowerPoint PPT Presentation
Citation preview
Countywide Model Countywide Model SUSMPSUSMP
July 17, 2008July 17, 2008
TopicsTopics
SUSMP TimelineSUSMP Timeline
GoalsGoals
Approach to ComplianceApproach to Compliance NPDES Permit RequirementsNPDES Permit Requirements Model SUSMP FeaturesModel SUSMP Features
Model SUSMP TimelineModel SUSMP Timeline12/0612/06 Bay Area presentations to Hydromodification Work GroupBay Area presentations to Hydromodification Work Group
5/075/07 Consultant team selectedConsultant team selected
10/0710/07 Discussed Proposed SUSMP Approach with Discussed Proposed SUSMP Approach with Hydromodification Work GroupHydromodification Work Group
11/0711/07 Prepared interim updates to Model SUSMPPrepared interim updates to Model SUSMP
2/082/08 Presented SUSMP Approach to TAC and Water BoardPresented SUSMP Approach to TAC and Water Board
3/083/08 Presented SUSMP Approach to Development CommunityPresented SUSMP Approach to Development Community
4/084/08 Received task order to prepare the SUSMPReceived task order to prepare the SUSMP
5/085/08 Discussed detailed outline and principal issues with Discussed detailed outline and principal issues with Hydromodification Work GroupHydromodification Work Group
6/086/08 Drafts dated June 12 and June 26Drafts dated June 12 and June 26
7/087/08 July 16 draft and July 24 submittalJuly 16 draft and July 24 submittal
Goals for SUSMPGoals for SUSMP
Make it easier for applicants to Make it easier for applicants to prepare submittalsprepare submittals
Make it easier for municipal staff Make it easier for municipal staff to review submittals for complianceto review submittals for compliance
Promote consistent and fair Promote consistent and fair implementation countywideimplementation countywide
Integrate LID, treatment, and hydrograph Integrate LID, treatment, and hydrograph modification management requirementsmodification management requirements
SUSMP Compliance ApproachSUSMP Compliance Approach
Comply with new requirements:Comply with new requirements: Low Impact DevelopmentLow Impact Development TreatmentTreatment Hydromodification managementHydromodification management
Provide options and flexibilityProvide options and flexibility MunicipalitiesMunicipalities DevelopersDevelopers
Create option to use integrated design approach Create option to use integrated design approach Promote consistent and complete presentation Promote consistent and complete presentation of design information and calculationsof design information and calculations
Low Impact Development Low Impact Development D.1.d.(4)D.1.d.(4)
NPDES Permit:NPDES Permit: Use LID site design principlesUse LID site design principles Drain a portion of impervious areas to pervious areasDrain a portion of impervious areas to pervious areas Use permeable surfacesUse permeable surfaces
Model SUSMP—LID Design GuideModel SUSMP—LID Design Guide Guidance for applying site design principles and Guidance for applying site design principles and
using pervious pavementsusing pervious pavements Divide the site into Drainage Management AreasDivide the site into Drainage Management Areas Identify surface cover for each DMAIdentify surface cover for each DMA Account for drainage from each DMAAccount for drainage from each DMA Design criteria for LID features and facilitiesDesign criteria for LID features and facilities Design recommendations learned from experienceDesign recommendations learned from experience
Treatment Controls Treatment Controls D.1.d.(6)D.1.d.(6)
NPDES PermitNPDES Permit Infiltrate, filter, or treat flow from all developed Infiltrate, filter, or treat flow from all developed
portions of the projectportions of the project Select more effective controls including bioretentionSelect more effective controls including bioretention Correctly size and design to achieve MEPCorrectly size and design to achieve MEP
Model SUSMPModel SUSMP LID Design Guide ensures integrated LID design LID Design Guide ensures integrated LID design
meets treatment criteriameets treatment criteria SUSMP specifies selection and design criteria if SUSMP specifies selection and design criteria if
applicant chooses not to use the integrated approach applicant chooses not to use the integrated approach
Hydromodification Hydromodification (D.1.d.10)(D.1.d.10)
NPDES Permit:NPDES Permit: Apply criteria so runoff rates, durations, and Apply criteria so runoff rates, durations, and
velocities are controlled (all projects)velocities are controlled (all projects) Interim criteria for projects 50 acres and upInterim criteria for projects 50 acres and up To be superseded by HMP To be superseded by HMP (D.1.g.)(D.1.g.)
Model SUSMPModel SUSMP Integrated LID design controls runoff ratesIntegrated LID design controls runoff rates Facility designs will be updated for HMPFacility designs will be updated for HMP Option to perform continuous simulationOption to perform continuous simulation
Source Controls Source Controls (D.1.d.(5))(D.1.d.(5))
NPDES Permit:NPDES Permit: Implement source control BMPs to minimize Implement source control BMPs to minimize
pollutants of concernpollutants of concern
Model SUSMP:Model SUSMP: Appendix lists sources to be controlled and Appendix lists sources to be controlled and
specifies the control measures to be usedspecifies the control measures to be used
Implementation Process Implementation Process (D.1.d.(9))(D.1.d.(9))
NPDES Permit:NPDES Permit: Each Copermittee shall implement a processEach Copermittee shall implement a process Identify measures necessary for implementationIdentify measures necessary for implementation
Model SUSMP:Model SUSMP: Acknowledges each municipality will apply Acknowledges each municipality will apply
their own requirementstheir own requirements Provides a general model for preparing Provides a general model for preparing
project submittalsproject submittals Facilitates countywide consistency and Facilitates countywide consistency and
streamlined reviewsstreamlined reviews
Pollutants of Concern Pollutants of Concern (D.1.d.(3))(D.1.d.(3))
NPDES PermitNPDES Permit Local SUSMPs shall include a procedure to identify Local SUSMPs shall include a procedure to identify
Pollutants of ConcernPollutants of Concern
Model SUSMPModel SUSMP Pragmatic approachPragmatic approach Identify Pollutants of Concern countywideIdentify Pollutants of Concern countywide Specify practicable and effective Specify practicable and effective
source controls and treatment controlssource controls and treatment controls Allow for rare circumstances when controls should be Allow for rare circumstances when controls should be
tailored to land use or watershedtailored to land use or watershed
SummarySummary
Pro-active approach to compliance with Pro-active approach to compliance with new NPDES Permit requirementsnew NPDES Permit requirementsFlexibility for municipalities and developersFlexibility for municipalities and developersDetailed support for an integrated design Detailed support for an integrated design option applicable to most developmentsoption applicable to most developmentsPromotes consistency and streamlined Promotes consistency and streamlined preparation and review of submittalspreparation and review of submittalsIncorporates design knowledge and Incorporates design knowledge and lessons learned from LID implementationlessons learned from LID implementation