COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works 3501 Civic Center Drive Suite 304 San Rafael, CA 94903 415 473 6528 T 415 473 3799 F 415 473 3232 TTY CRS Dial 711 marincounty.org/pw

Photo Credit: Jeff Wong

COUNTY OF MARIN / NATIONAL PARK SERVICE

MUIR WOODS MOU

J U N E 1 4 , 2 0 1 5

Page 2: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 2

MUIR WOODS MOU UPDATE

R E V I E W

• Joint County / NPS presentation

• MOU Summary

oDescription of parking reduction

• Accomplishments Implementing the MOU

oParking restrictions, regulatory

oBollards, physical

oEnforcement

oParking management

• Reservation system update

• Other road & watershed activities

Page 3: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 3

MUIR WOODS MOU UPDATE

M O U S U M M A R Y

• NPS creates reservation system for visitors using

motorize transportation/tour bus operators

• NPS manages the reservation system to reduce peak

attendance and associated traffic/parking demand

• Parking Management Corridor is created by County for

NPS parking permits

• Phased road parking reductions to only 30 spaces within

7 years

• Parking enforcement and controls are enhanced for all of

Muir Woods Road, Sheriff retains authority, NPS adds

staff

• Continue to collaborate to improve Redwood Creek water

quality and environmental conditions

• Work to improve public transit and public messaging

Page 4: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 4

MUIR WOODS MOU UPDATE

R O A D S I D E P A R K I N G R E D U C T I O N S U M M A R Y

0

50

100

150

200

250

300

350

400

450

0 1 2 3 4 5 6 7

Parking South of Bridge

80 Spaces June 1, 2016

YEARS AFTER MOU

Page 5: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 5

MUIR WOODS MOU UPDATE

A C C O M P L I S H M E N T S

• Interagency close coordination and collaboration

oRegular meetings (Sheriff, NPS, Parks, County)

oDesign / build coordination

• NPS parking enforcement authority granted

• Reduced available shoulder parking

oParking ordinance and higher fines

oCo. designed (plans/specs) parking barriers

oNPS constructed bollards to discourage parking

oErosion and sediment controls

• Other site improvements and reservation system

progress (NPS)

Page 6: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 6

MUIR WOODS MOU UPDATE

P A R K I N G C O N T R O L S , R E G U L A T O R Y

Page 7: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 7

MUIR WOODS MOU UPDATE

P A R K I N G C O N T R O L S & E R O S I O N C O N T R O L

Page 8: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 8

MUIR WOODS MOU UPDATE

P A R K I N G C O N T R O L S , C A B L E S

Page 9: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 9

MUIR WOODS MOU UPDATE

F U T U R E R O A D I M P R O V E M E N T S

Road Rehab Project, Federal Land Access Program Grant

• 2.48 miles of new asphalt resurfacing – 24 ft. wide (11-foot

lanes with 1-foot shoulders)

• Slide repairs at various locations

• Approximately 36 culverts identified for repair/replace,

opportunities to decrease sediment load into Redwood Creek

• Environmental and design complete 2017 by FHWA

• Construction scheduled for 2019 by FHWA

• $5 million, design and construct costs

Concrete Bridge (MP 1.90) Replacement Grant

• Build new bridge just downstream of existing

• $2.1 million, design and construct

• Possible combine road bridge construction

Page 10: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 10

MUIR WOODS MOU

F U T U R E R O A D I M P R O V E M E N T S

Page 11: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 11

MUIR WOODS MOU UPDATE

M U I R W O O D S R O A D I M P R O V E M E N T S

• NPS secured funding for project - ~$520,000

• Prepared Stormwater Pollution Prevention Plan (SWPPP)

o Required monitoring throughout project, inspections during

rain events

o Regional Water Quality Control Board site visit on January

15, 2016

o No exceedances or violations during project

• Construction start - January 11

• Project completion - February 25

N P S M i l e s t o n e s

Page 12: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 12

MUIR WOODS MOU UPDATE

M U I R W O O D S R O A D I M P R O V E M E N T S

• Muir Woods Road - Per County design, install:

o 6” posts on Upper Muir Woods Road

o 4” posts on Lower Muir Woods Road (Frank’s Valley Road)

o Stormwater measures

o Shoulder backing to improve safety and prevent further road

edge deterioration

• Conlon Ave. - Per NPS design, install:

o Widen driveway to improve safety

o Improve lot design (grading, understrutucture, etc) to reduce

sheetflow and sedimentation

o Install BMP’s

o Install wheelstops and signs

S c o p e o f W o r k

Page 13: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 13

MUIR WOODS MOU UPDATE

M U I R W O O D S R O A D I M P R O V E M E N T S

BEFORE AFTER

M u i r W o o d s R o a d

Page 14: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 14

MUIR WOODS MOU UPDATE

M U I R W O O D S R O A D I M P R O V E M E N T S

BEFORE AFTER

M u i r W o o d s R o a d

Page 15: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 15

MUIR WOODS MOU UPDATE

M U I R W O O D S R O A D I M P R O V E M E N T S

BEFORE AFTER

M u i r W o o d s R o a d

Page 16: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 16

MUIR WOODS MOU UPDATE

M U I R W O O D S R O A D I M P R O V E M E N T S

BEFORE AFTER

M u i r W o o d s R o a d

Page 17: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 17

MUIR WOODS MOU UPDATE

M U I R W O O D S R O A D I M P R O V E M E N T S

BEFORE AFTER

M u i r W o o d s R o a d

Page 18: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 18

MUIR WOODS MOU UPDATE

P A R K I N G E N F O R C E M E N T

• Citations are only a small percentage of the actual parking

contacts made.

• Over 560 citations and approximately $50,000 in Revenue has

been generated with 0% retained by NPS, 77% by County

• Overall compliance is on the rise, both due to awareness,

presence, parking attendants making contacts and managing

Muir Woods lots and parking restrictions

0

50

100

150

200

Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16

Citation Activity

Page 19: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 19

MUIR WOODS MOU UPDATE

P A R K I N G E N F O R C E M E N T

• 1 FTE is equal to about 20 hours of general patrol;

Weekends and holidays are a priority

• Previously operated with 2.5 FTE allocated with 0-1

persons engaged in parking management in our lots only

• Since October with the MOU and added authority we

allocated 3.5 FTE with presence ranging from 1-2 in Muir

Woods area and 1-2 engaged in parking management in

road and lots

• We had an unanticipated level of vacancy in the FTEs for

April and May that has reduced activity, but that will be

improved this month and throughout the summer

• We enter tickets directly into the County’s electronic

citation system and are training more Law Enforcement

Rangers

Page 20: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 20

MUIR WOODS MOU UPDATE

A R R I V A L M A N A G E M E N T

Muir Woods Shuttle

• Last year’s expansion to 7 days per week during peak

season (June-August) continued in 2016

Parking Attendants

• NPS has added attendants to support law

enforcement in ensuring traffic flow and parking

regulation compliance

Changeable Message Signs

• Operating CMS signs during high visitation periods to

inform visitors of lack of parking and congestion

Messaging

• NPS websites, social media, and press releases have

highlighted challenges and encouraged alternative

options

Page 21: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 21

MUIR WOODS MOU UPDATE

O T H E R I M P R O V E M E N T S

C o n l o n A v e

Page 22: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 22

MUIR WOODS MOU UPDATE

O T H E R I M P R O V E M E N T S

C o n l o n A v e - B e f o r e

Page 23: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 23

MUIR WOODS MOU UPDATE

O T H E R I M P R O V E M E N T S

C o n l o n A v e - A f t e r

Page 24: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 24

MUIR WOODS MOU UPDATE

O T H E R I M P R O V E M E N T S

C o n l o n A v e - A f t e r

Page 25: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 25

MUIR WOODS MOU UPDATE

R E S E R V A T I O N S Y S T E M

• After the MOU and EA was finalized in 2015, NPS developed an

internal timeline of project milestones for the reservation system

development. We have consistently stayed on track with this

schedule

• Over this past winter NPS completed the necessary financial

analysis for the reservation system concession contract and worked

on agreement with Marin Transit.

• NPS has determined it is a financially and operationally feasible

opportunity within the target pricing and operational requirements

• Development of the draft Prospectus for the 10-year concession

contract solicitation is underway we anticipate its released to

possible applicants before the end of calendar year 2016

• We remain on track for implementation of the Reservation system in

the second half of 2017, timing dependent on the success of the

solicitation and contracting process

Page 26: COUNTY OF MARIN / NATIONAL PARK SERVICE MUIR WOODS MOU · • Previously operated with 2.5 FTE allocated with 0-1 persons engaged in parking management in our lots only • Since

Department of Public Works Muir Woods Road MOU June 14, 2016 marincounty.org/pw

Slide 26

MUIR WOODS MOU UPDATE

O T H E R E F F O R T S

Upcoming Projects

• Muir Woods Road Sustainable Access Project (June 27th

meeting)

o Redesign of parking and arrival facilities

o Will be consistent with MOU

o Improve stormwater management

o Provide for further removal of parking from Muir Woods

Road

o Improve safety