13
County of Los Angeles CHIEF EXECUTIVE OFFICE 713 KENNETH HAHN HALL OF ADMINISTRATION LOS ANGELES, CALIFORNIA 90012 (213) 974-1101 http://ceo.lacou ntY.9 ov WILLIAM T FUJIOKA Chief Executive Offcer Board of Supervisors GLORIA MOLINA First District YVONNE B. BURKE Second District November 6, 2007 ZEV Y AROSLA VSKY Third District DON KNABE Fourth District The Honorable Board of Supervisors County of Los Angeles 383 Kenneth Hahn Hall of Administration 500 West Temple Street Los Angeles, CA 90012 MICHAEL D. ANTONOVICH Fifth District Dear Supervisors: INTERNAL SERVICES DEPARTMENT: REQUEST FOR APPROVAL OF THE ENERGY EFFICIENCY PROJECT SERVICES MASTER AGREEMENT (ALL DISTRICTS - 3 VOTES) IT IS RECOMMENDED THAT YOUR BOARD: 1. Authorize the Director, Internal Services Department (iSO), or his designee, to execute Energy Efficiency Project Services Master Agreements (Master Agreement), with the 24 companies listed on Attachment 1, effective upon execution, and ending October 31, 2015, with two additional one-year renewal options and six month-to-month extensions exercisable by the Director, iSO, or his designee. 2. Authorize the Director, iSO or his designee to execute Agreements with new vendors as the vendors become qualified under the Master Agreement throughout the term of the Master Agreement and execute applicable Agreement amendments when the original contracting entity has merged, been purchased or has otherwise changed. PURPOSE/JUSTIFICATION OF RECOMMENDED ACTIONS On January 16, 2007, your Board approved a Countywide Energy and Environmental Policy to pursue and implement Energy Efficiency Projects at County facilities. iSO will utilize this Master Agreement to provide a pool of readily available pre-qualified, energy efficiency project vendors who, under ISO's management, will perform a variety of "To Enrich Lives Through Effective And Caring Service"

County of Los Angeles CHIEF EXECUTIVE OFFICEfile.lacounty.gov/SDSInter/bos/bc/077176_Internal...Making minor repairs to HV AC system equipment and controls 5. Demand Response Design

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: County of Los Angeles CHIEF EXECUTIVE OFFICEfile.lacounty.gov/SDSInter/bos/bc/077176_Internal...Making minor repairs to HV AC system equipment and controls 5. Demand Response Design

County of Los AngelesCHIEF EXECUTIVE OFFICE

713 KENNETH HAHN HALL OF ADMINISTRATIONLOS ANGELES, CALIFORNIA 90012

(213) 974-1101http://ceo.lacou ntY.9 ov

WILLIAM T FUJIOKAChief Executive Offcer

Board of SupervisorsGLORIA MOLINAFirst District

YVONNE B. BURKESecond District

November 6, 2007 ZEV Y AROSLA VSKYThird District

DON KNABEFourth District

The Honorable Board of SupervisorsCounty of Los Angeles383 Kenneth Hahn Hall of Administration500 West Temple StreetLos Angeles, CA 90012

MICHAEL D. ANTONOVICHFifth District

Dear Supervisors:

INTERNAL SERVICES DEPARTMENT:REQUEST FOR APPROVAL OF

THE ENERGY EFFICIENCY PROJECT SERVICESMASTER AGREEMENT

(ALL DISTRICTS - 3 VOTES)

IT IS RECOMMENDED THAT YOUR BOARD:

1. Authorize the Director, Internal Services Department (iSO), or his designee, to

execute Energy Efficiency Project Services Master Agreements (MasterAgreement), with the 24 companies listed on Attachment 1, effective uponexecution, and ending October 31, 2015, with two additional one-year renewal

options and six month-to-month extensions exercisable by the Director, iSO, or hisdesignee.

2. Authorize the Director, iSO or his designee to execute Agreements with new

vendors as the vendors become qualified under the Master Agreement throughoutthe term of the Master Agreement and execute applicable Agreement amendmentswhen the original contracting entity has merged, been purchased or has otherwisechanged.

PURPOSE/JUSTIFICATION OF RECOMMENDED ACTIONS

On January 16, 2007, your Board approved a Countywide Energy and Environmental

Policy to pursue and implement Energy Efficiency Projects at County facilities. iSO willutilize this Master Agreement to provide a pool of readily available pre-qualified, energyefficiency project vendors who, under ISO's management, will perform a variety of

"To Enrich Lives Through Effective And Caring Service"

Page 2: County of Los Angeles CHIEF EXECUTIVE OFFICEfile.lacounty.gov/SDSInter/bos/bc/077176_Internal...Making minor repairs to HV AC system equipment and controls 5. Demand Response Design

The Honorable Board of SupervisorsNovember 6, 2007Page 2

energy efficiency project services throughout County faciliies. The range of energyefficiency projects to be implemented is identified in Attachment 2 and is describedbelow:

. Lighting, lighting controls and other lighting equipment retrofits

. Heating, Ventilating and Air Conditioning equipment and Controls Retrofits,Facility Retro Commissioning

. Demand reduction technologies such as thermal storage and demand responseprograms

. Renewable power installations utilizing solar and wind technology

. Distributed generation installations

Implementation of Strategic Plan Goals

The recommended action supports the Countywide Strategic Plan Goal Number 1,Service Excellence; Goal Number 3, Organizational Effectiveness; and Goal Number 4,Fiscal Responsibility by effectively managing County resources.

FISCAL IMPACT/FINANCING

Expenditures under the Master Agreement will vary from year to year based on theavailability of funding to implement energy efficiency projects. Projects will be fundedthrough a variety of funding sources including annual budget appropriations,Productivity Investment Fund loans and external sources including the California PublicUtilities Commission (CPUC). For fiscal year 2007/08, the iSO Utiliies Budgetappropriation of $5 million for energy efficiency projects will be used under this MasterAgreement. ISO may also utilize the Master Agreement to implement projects using a$6 million grant received from the CPUC for calendar years 2006 through 2008. AllMaster Agreement expenditures will remain within budgeted appropriations from eachfunding source. Contractors will not be asked to perform services which exceed theamounts, scope of work, and dates specified in each individual work order. iSO wilrequest sufficient appropriation in future years as is necessary.

FACTS AND PROVISIONS/LEGAL REQUIREMENTS

The terms and conditions of the proposed Master Agreement have been approved as toform by County CounseL. The Master Agreement contains the Board's required contractprovisions including those pertaining to consideration of qualified County employeestargeted for layoff as well as qualified GAIN/GROW participants for employmentopenings, and compliance with the Jury Service Ordinance, Safely Surrendered BabyLaw and the Child Support Program.

Page 3: County of Los Angeles CHIEF EXECUTIVE OFFICEfile.lacounty.gov/SDSInter/bos/bc/077176_Internal...Making minor repairs to HV AC system equipment and controls 5. Demand Response Design

The Honorable Board of SupervisorsNovember 6, 2007Page 3

The Master Agreement is not a Proposition A Agreement due to the technical nature ofthe services provided and, therefore, not subject to the Living Wage Program (CountyCode Chapter 2.201). It has been determined that the services under theseAgreements do not impact Board Policy No. 5.030, "Low Cost Labor ResourceProgram," because of the specialized training needed to perform the work.

CONTRACTING PROCESS

On July 24, 2007, iSO released a Request for Statement of Qualifications (RFSQ) forEnergy Efficiency Project Services and posted the solicitation and contractingopportunity announcement on the County's "Doing Business with Us" web site(Attachment 3). To ensure maximum participation of vendors, a Master Agreementinformational brochure was sent to 233 different companies inviting them to a vendor'sconference. A vendor's conference was conducted on August 21 , 2007 and 23 vendorswere represented.

Since the release of the RFSQ, 29 responses have been received and reviewed forcompliance with the RFSQ. Minimum requirements identified in the RFSQ included 2years experience within the last 3 years in the category for which the vendors wereattempting to qualify. Twenty-four vendors (Attachment 1) were determined to bequalified and are being recommended for the Master Agreement. Five vendorssubmitted an incomplete Statement of Qualifications (SOQ) and the Department isworking with these vendors to remedy the omissions and determine if they are qualifiedfor an Agreement. Community Business Enterprise Program information for eachrecommended vendor is identified in Attachment 4. Two vendors are certified as aLocal Small Business Enterprise (LSBE). Contractors were selected without regard togender, race, creed, color or national origin for award of a Master Agreement.

New vendors may qualify for a Master Agreement at any time by submitting an SOQ.These vendors will be added to the Master Agreement if they meet the minimum

requirements as identified in the RFSQ. Thereafter, they will be solicited undercompetitive conditions to provide energy efficiency project services under work ordersexecuted by iSO.

Approval of the Master Agreement does not guarantee a contractor any minimumamount of business. The County only incurs an obligation as individual work orders areissued. All active contractors can bid on services and receive work order solicitationsreleased in the Master Agreement categories where the contractor has been pre-qualified. Work order awards will be made to the lowest priced qualified contractorunless other selection criteria are set forth in the work order availabilty notice.Contractors certified as a Local Small Business Enterprise (LSBE) will receive the 5%LSBE preference on their individual work order bids.

Page 4: County of Los Angeles CHIEF EXECUTIVE OFFICEfile.lacounty.gov/SDSInter/bos/bc/077176_Internal...Making minor repairs to HV AC system equipment and controls 5. Demand Response Design

The Honorable Board of SupervisorsNovember 6, 2007Page 4

IMPACT ON CURRENT SERVICES (OR PROJECTS)

The Master Agreement supports the goals of the County's Energy and EnvironmentalPolicy. Approval of the Master Agreement will greatly enhance ISO's ability to achievethe stated Policy goal of a 20% energy consumption reduction by 2015. Reducingenergy consumption means greater County funding is available to provide other criticalservices to County constituents.

CONCLUSION

The Executive Office, Board of Supervisors, is requested to return one stamped copy ofthe approved Board letter to the Director, ISO.

Respectfully submitted,~~lh-Wiliam T FujiokaChief Executive Officer

WTF:LN:DLGS:CL:dc

Attachments (4)

c: County Counsel

Director, Internal Services Department

Energy Effciency Project Services Master Agreement.bl

Page 5: County of Los Angeles CHIEF EXECUTIVE OFFICEfile.lacounty.gov/SDSInter/bos/bc/077176_Internal...Making minor repairs to HV AC system equipment and controls 5. Demand Response Design

ATTACHMENT 1Page 1 of 2

ENERGY EFFICIENCY PROJECT SERVICES MASTER AGREEMENTQUALIFIED VENDORS AND CATEGORIES

CogenerationRenewable Design and Demand Demand Miscellaneous

Retrofits Resources Installation of Commissioning Response Reduction Office Control(Design and and a plant or and Retro- Design Design and SystemsInstallation) Distributed Integration Commissioning and Installation Design and

Generation into Existing Installation InstallationVendor Name Site

1 X X X X XAmeresco, Inc.Arch itectural

2 Energy XCorporationArup North

3 America X X XLimited

4 California X XRetrofit, Inc.

Centrifugal5 Technologies, X

Incorporated

6 Chevron X X X X X X XU.S.A., Inc.

7 DMJM + Harris, X X XInc.

B EMC X X X XEngineers, Inc.

9 X X X XEnovity, Inc.The GuerraCompanies

10 d.b.a Executive XLightingServicesFaciliy

11 Dynamics X XEngineering

12 Farnsworth XGroup Inc.Faith Com Inc.

13d.b.a FCI

XManagementConsultants

14 X XGlumac

15 Intergy X X X X X XCorporationKeithly Barber

16 Associates, XInc.

Page 6: County of Los Angeles CHIEF EXECUTIVE OFFICEfile.lacounty.gov/SDSInter/bos/bc/077176_Internal...Making minor repairs to HV AC system equipment and controls 5. Demand Response Design

ATTACHMENT 1Page 2 of 2

ENERGY EFFICIENCY PROJECT SERVICES MASTER AGREEMENTQUALIFIED VENDORS AND CATEGORIES

CogenerationRenewable Design and Demand Demand Miscellaneous

Retrofits Resources Installation of Commissioning Response Reduction Office Control(Design and and a plant or and Retro- Design and Design and SystemsInstallation) Distributed Integration Commissioning Installation Installation Design and

Generation into Existing InstallationVendor Name SiteMarketableEngineered

17Projects, LLC.

Xd.b.aMarketableVentures

18 XMBO, Inc.

19 XMEDG, LLC.

20 Noresco X X X X X X XHoldings, Inc.

21 Southern CA XBoiler, Inc.

22 Syska Henessy XGroup, Inc.

23 TMCX XCalifornia, Inc.

TMAD Taylor &24 Gaines X X X X X

Engineers

Page 7: County of Los Angeles CHIEF EXECUTIVE OFFICEfile.lacounty.gov/SDSInter/bos/bc/077176_Internal...Making minor repairs to HV AC system equipment and controls 5. Demand Response Design

ATTACHMENT 2Page 1 of 2

ENERGY EFFICIENCY PROJECT SERVICES MASTER AGREEMENTCATEGORIES

1. Retrofits (Design and Installation)

. Lighting (including audits, energy savings calculations and retrofits)

. Lighting Controls (including programmable controls, occupancy sensors)

. HVAC Retrofits (chillers, installation of VFD's, premium efficiency motors/pumps, stateof the art control systems; includes comprehensive audit, design and installation)

. Carbon Monoxide sensors (audit, design, installation)

. Boiler Replacements /Boiler Controls

2. Renewable Resources and Distributed Generation (non-combined heat and power (CHP)application) Design and Installation

. Solar power application

. Wind power application

. Fuel Cells application

. Small Cogen plant or integration into existing site

. Micro turbines plant or integration into existing site

3. Cogeneration (any combined heat and power application) Design and Installation of a Plantor Integration into Existing Site:

. Engines

. Gas Turbines

. Renewable resources and distributed generation in CHP application

4. Commissioning and Retro-Commissioning:

. Facility audits

. Facility energy consumption benchmark reporting

. Facility energy consumption systems operations modeling

. Programming facility HV AC system operations

. Making minor repairs to HV AC system equipment and controls

5. Demand Response Design and Installation

. Lighting and lighting control systems

. HV AC control systems

. Other equipment controls

Page 8: County of Los Angeles CHIEF EXECUTIVE OFFICEfile.lacounty.gov/SDSInter/bos/bc/077176_Internal...Making minor repairs to HV AC system equipment and controls 5. Demand Response Design

ATTACHMENT 2Page 2 of 2

ENERGY EFFICIENCY PROJECT SERVICES MASTER AGREEMENTCATEGORIES

6. Demand Reduction Design and Installation

. Thermal storage

. Power reduction controllers

. Mechanical and electrical storage devices

7. Miscellaneous Office Control Systems Design and Installation

. Plug load/workstation controls

. PC network controls

Page 9: County of Los Angeles CHIEF EXECUTIVE OFFICEfile.lacounty.gov/SDSInter/bos/bc/077176_Internal...Making minor repairs to HV AC system equipment and controls 5. Demand Response Design

ATTACHMENT 3

Bid Detail Information

Bid Detail InformationBid Number: 103919

Bid Title: Energy Effciency Project Services Request for Statement of QualificationsBid Type: Service

Department: Internal Services DepartentCommodity: ENERGY CONSERVATION SERVICES (INCLUDING AUDITS)

Open Date: 7/24/2007

Closing Date: Continuous

Bid Amount: $ 00,000Bid Download: Available

Bid Description: The purpose of this Request for Statement of Qualifications (RFSQ) is to obtain qualified vendors to ensure that theCountywide Energy and ENvironmental Policy objective of 20% reduction of energy consumption in County facilitiesis met by the year 2015.

Contact Name: Ana DavilaContact Phone#: (323) 881-5178

Contact Email: aclavila((visd.lacountv.covLast Changed On: 8/16/20076:33:45 AM

Back to Last Window

Page 10: County of Los Angeles CHIEF EXECUTIVE OFFICEfile.lacounty.gov/SDSInter/bos/bc/077176_Internal...Making minor repairs to HV AC system equipment and controls 5. Demand Response Design

CO

UN

TY

OF

LO

S A

NG

ELE

SC

OM

MU

NIT

Y B

US

INE

SS

EN

TE

RP

RIS

E P

RO

GR

AM

(C

BE

)Attachment 4

EN

ER

GY

EF

FIC

IEN

CY

PR

OJE

CT

SE

RV

ICE

S M

AS

TE

R A

GR

EE

ME

NT

QU

ALI

FIE

D V

EN

DO

RS

u...

FIR

M I

N~6

RM

P.T

ì()N

...

I................. .'.

. . A

ititè

iUra

l E

nérg

l' A

i(p;N

orth

Ane

rica,

'....

......

.(.

Cei

ltifu

gal T

echn

olog

ies.

Che

vron

U.S

.A.,l

nc:.

......

..-...

......

.....

.....(

.. ..

I ...

...'..

. Ccii'bralión

'Lim

ited

. . ..

..'.

caiff

omia

Ret

rofi,

Inc.

m'.

Inc.

....

Dl\J

M+

l;an

is,li

ic.

Cul

tura

l/Eth

nic

Com

posi

tion

% o

f Ow

ners

hip

% o

f Ow

ners

hip

% o

f O

wne

rshi

p%

of

Ow

ners

hip

% o

f O

wne

rshi

p%

of O

wne

rshi

p%

of

Ow

ners

hip

(fB

lack

/Afr

ican

Am

eric

an0%

0%0%

0%0%

0%0%

0:H

ispa

nic/

Lat

in A

mer

ican

0%0%

0%0%

0%0%

0%w Z

Asi

an A

mer

ican

0%0%

0%0%

0%0%

0%I- 0:

0%0%

0%I

Pub

licly

I0%

I Publicly I

IP

ublic

ly ~

ifA

mer

ican

Ind

ian/

Ala

skan

Ùì

All

othe

rs10

0%10

0%10

0%I

Tra

ded

r10

0%L

Tra

ded

I-I

Tra

ded

0:0%

wW

omen

(in

clud

ed a

bove

)0%

0%0%

0%0%

0%z ~

Num

ber

Num

ber

Num

ber

Num

ber

Num

ber

Num

ber

Num

ber

0N

umbe

r of

ow

ners

/par

tner

s1

413

131

00

Num

ber

Num

ber

Num

ber

Num

ber

Num

ber

Num

ber

Num

ber

Bla

ck/A

fric

an A

mer

ican

60

00

00

70:

His

pani

c/L

atin

Am

eric

an1

00

00

028

w C)

Asi

an A

mer

ican

60

00

00

34o: :z

Am

eric

an I

ndia

n/A

lask

an0

00

00

00

o: :254

012

132

045

8A

ll ot

hers

Wom

en (

incl

uded

abo

ve)

120

50

00

42

Bla

ck/A

fric

an A

mer

ican

130

00

00

141

U.

His

pani

c/L

atin

Am

eric

an9

312

120

017

3U

.21

721

~A

sian

Am

eric

an21

00

268

(fA

mer

ican

Ind

ian/

Ala

skan

60

00

00

8

All

othe

rs28

876

5151

80

1055

Wom

en (

incl

uded

abo

ve)

560

230

00

440

TO

TA

L #

OF

EM

PLO

YE

ES

405

9010

911

011

021

72

BU

SIN

ES

S S

TR

UC

TU

RE

Cor

pora

tion

Cor

pora

tion

Cor

pora

tion

Cor

pora

tion

Cor

pora

tion

Cor

pora

tion

Cor

pora

tion

Cou

ntv

Cer

tific

atio

n

CB

E

LSB

E'

OT

HE

R C

ER

TIF

YIN

G A

GE

NC

Y

'Tot

al n

umbe

r of

LS

BE

com

pani

es is

two

(2).

Page

1 o

f4

Page 11: County of Los Angeles CHIEF EXECUTIVE OFFICEfile.lacounty.gov/SDSInter/bos/bc/077176_Internal...Making minor repairs to HV AC system equipment and controls 5. Demand Response Design

CO

UN

TY

OF

LO

S A

NG

ELE

SC

OM

MU

NIT

Y B

US

INE

SS

EN

TE

RP

RIS

E P

RO

GR

AM

(C

BE

)Attachment 4

EN

ER

GY

EF

FIC

IEN

CY

PR

OJE

CT

SE

RV

ICE

S M

AS

TE

R A

GR

EE

ME

NT

QU

ALI

FIE

D V

EN

DO

RS

7,i.,

.....'

....'.

......

.....

"'. ..

.....,

.,..,.

~ ."

....

....

,'....

... .

' ..,.

......

......

......

..' ..

..' .

.....

......

.... .

...'."

.... .

i ...

.... T

heG

uerr

c:?m

p,an

ies

.' ..

.... .

......

.....

. . '.

.....

..,..,

':. ..

... ..

' ....

... "

.... ...,......... ..... . . . ..... .. .' ...... . ..... .' FaClI.D ..amICS . ..... FallhComJnc,.d.b,afCI

......

....F

. IR

M IN

F()

RM

.A...

.....I

.....I

.O. N

.....

......

.....

. EM

C E

ngin

eers

, Inc

, Eno

vlty

,lnc,

d.b

.a. E

xecu

tie L

ight

ing

E.~

,.)T

,..,..

. Fam

swor

t Gro

up; I

nc. M

' .".

.,.,..

....C

....I.

ta"

..'1'

Glu

mac

.....

.,..

. .... . ...... . .... ". . . . ...... .. ... ". Serlicis ngineenng ... .... .. anagern~nL onsun s

......

....,.

...,..

......

. ....

......

......

... ..

......

.. ...

.... .

.....,

......

......

......

. ...

.....

......

.....

..,..

....,.

......

.....

.' ...

. ."

Cul

tura

l/Eth

nic

Com

posi

tion

% o

f Ow

ners

hip

% o

f Ow

ners

hip

% o

f Ow

ners

hip

% o

f Ow

ners

hip

% o

f Ow

ners

hip

% o

f Ow

ners

hip

% o

f Ow

ners

hip

(/ B

lack

/Afr

ican

Am

eric

an 0

% 0

% 0

% 0

% 0

.0%

100

% 0

%ff

His

pani

c/La

tin A

mer

ican

0%

0%

0%

0%

0.0

% 0

% 0

%t:

Asi

an A

mer

ican

0%

0%

0%

0%

0.0

% 0

% 0

%~

Am

eric

an In

dian

/Ala

skan

0%

0%

I P

ublic

ly I

I Pub

licly

I 0.

0% 0

% 0

%~ Ù

5 A

ll ot

hers

100

% 1

00%

I T

rade

d I

I T

rade

d I

100.

0% 0

% 1

00%

0: !; W

omen

(in

clud

ed a

bove

) 0%

0%

0%

0%

9.4

% 5

1% 0

%:5 Number Number Number Number Number Number Number

o Number of owners/partners 6 2 0 2 17 2 20

Number Number Number Number Number Number Number

Black/African American 0 0 0 0 4 2 1

ff Hispanic/Latin American 0 0 0 0 2 0 3

~ Asian American 0 3 0 0 0 0 4

~ American Indian/Alaskan 0 1 0 0 0 0 0

:: A

ll ot

hers

4 8

0 0

37

0 32

Women (included above) 2 1 0 0 6 1 10

Black/African American 1 1 0 0 5 9 4

LL Hispanic/Latin American 1 8 0 0 3 6 13

LL .: Asian American 3 7 0 2 1 0 26

~ American Indian/Alaskan 2 0 0 0 0 0 1

Al o

ther

s 60

15

0 38

225

5 9

8Women (included above) 18 5 0 5 69 10 40

TOTAL # OF EMPLOYEES 77 45 0 42 294 24 202

BU

SIN

ES

S S

TR

UC

TU

RE

Cor

pora

tion

Cor

pora

tion

Cor

pora

tion

Cor

pora

tion

Cor

pora

tion

Cor

pora

tion

Cor

pora

tion

Cou

ntv

Cer

tific

atio

n

CB

E LSBE' X

OT

HE

R C

ER

TIF

YIN

G A

GE

NC

Y C

A S

BE

'Tot

al n

umbe

r of

LS

BE

com

pani

es is

two

(2).

Pag

e 2

of 4

Page 12: County of Los Angeles CHIEF EXECUTIVE OFFICEfile.lacounty.gov/SDSInter/bos/bc/077176_Internal...Making minor repairs to HV AC system equipment and controls 5. Demand Response Design

CO

UN

TY

OF

LO

S A

NG

ELE

SC

OM

MU

NIT

Y B

US

INE

SS

EN

TE

RP

RIS

E P

RO

GR

AM

(C

BE

)

EN

ER

GY

EF

FIC

IEN

CY

PR

OJE

CT

SE

RV

ICE

S M

AS

TE

R A

GR

EE

ME

NT

QU

ALI

FIE

D V

EN

DO

RS

Attachment 4

.( ". . ........ .

.....

.M

arke

tabl

e...

.....

......

....

......

......

.

......

.....

......

...K

~ith

IYE

3àr~

erE

ngirï

e!!r

Eld

Pro

ject

s,".

;;;,,,

.,

Sou

ther

n ,C

.....

"'.., ....( c'.' .,..... ........Inte

rgy

Cor

Por

atio

nM

ED

G, L

LC:

Nor

escò

' Hol

ding

s, '.

hie,

i, ....... ................

Ass

ocat

es, I

nc. .

LLC

d;b

:a M

ai-e

tabl

e...

......

...ii.

......

... ..

.....

;. ...

......

......

.....

. ....

...'.

......

..i..

......

ii.d

......

......

......

......

......

......

.....

...

Veò

ture

.s...

.,. ....

.....

......

......

.

Cul

tura

l/Eth

nic

Com

posi

tion

% o

f O

wne

rshi

p%

of O

wne

rshi

p%

of

Ow

ners

hip

% o

f Ow

ners

hip

% o

f Ow

ners

hip

% o

f O

wne

rshi

p%

of O

wne

rshi

p

(/B

lack

/Afr

ican

Am

eric

an0%

0%0%

0%0%

0%1%

0:H

ispa

nic/

Latin

Am

eric

an0%

0%0%

66%

0%0%

26%

w zA

sian

Am

eric

an10

0%0%

0%0%

0%0%

1%I- 0:

0%0%

I Publicly I

8:A

mer

ican

Ind

ian/

Ala

skan

0%0%

0%0%

Ùì

All

othe

rs0%

100%

100%

34%

100%

I Traded

I72

%0: W

Wom

en (

incl

uded

abo

ve)

0%0%

0%0%

51%

0%0%

z ~N

umbe

rN

umbe

rN

umbe

rN

umbe

rN

umbe

rN

umbe

rN

umbe

r0

Num

ber

of o

wne

rs/p

artn

ers

22

23

20

67N

umbe

rN

umbe

rN

umbe

rN

umbe

rN

umbe

rN

umbe

rN

umbe

rB

lack

/Afr

ican

Am

eric

an0

00

00

70

ciH

ispa

nic/

Latin

Am

eric

an0

00

00

120

UJ (.

Asi

an A

mer

ican

10

00

17

0c: :z

Am

eric

an I

ndia

n/A

lask

an0

00

00

10

oe ::0

60

02

7110

All

othe

rs

Wom

en (

incl

uded

abo

ve)

03

00

014

2B

lack

/Afr

ican

Am

eric

an0

00

00

91

LL

His

pani

c/La

tin A

mer

ican

00

10

10

17L

L ~A

sian

Am

eric

an2

00

03

91

Cf

Am

eric

an I

ndia

n/A

lask

an0

00

00

10

All

othe

rs0

40

08

189

38

Wom

en (

incl

uded

abo

ve)

02

00

048

9

TO

TA

L #

OF

EM

PLO

YE

ES

512

30

1730

61

Cor

pora

tion

Cor

pora

tion

LL

CC

orpo

ratio

nC

orpo

ratio

nC

orpo

ratio

nL

LC

BU

SIN

ES

S S

TR

UC

TU

RE

Cou

ntv

Cer

tific

atio

n

CB

E

LSB

E'

X

OT

HE

R C

ER

TIF

YIN

G A

GE

NC

Y

'Tot

al n

umbe

r of

LS

BE

com

pani

es is

two

(2).

Pag

e 3

of 4

Page 13: County of Los Angeles CHIEF EXECUTIVE OFFICEfile.lacounty.gov/SDSInter/bos/bc/077176_Internal...Making minor repairs to HV AC system equipment and controls 5. Demand Response Design

CO

UN

TY

OF

LO

S A

NG

ELE

SC

OM

MU

NIT

Y B

US

INE

SS

EN

TE

RP

RIS

E P

RO

GR

AM

(C

BE

)Attachment 4

EN

ER

GY

EF

FIC

IEN

CY

PR

OJE

CT

SE

RV

ICE

S M

AS

TE

R A

GR

EE

ME

NT

QU

ALI

FIE

D V

EN

DO

RS

.., ~IRMINF()R~ATION

-,-.

-..,

Sýsk

a H

enné

ssfG

roup

,',5'." ..':J'\';':/'"

T~

AD

T¡jx

i~(~

Gai

nes

Inc.

'" ':

'd,

"E

ngin

eers

..: '

Cul

tura

l/Eth

nic

Com

posi

tion

% o

f O

wne

rshi

p%

of O

wne

rshi

p%

of

Ow

ners

hip

(fB

lack

/Afr

ican

Am

eric

an0%

0%0%

i:0%

WH

ispa

nic/

Latin

Am

eric

an0%

6%Z i-

Asi

an A

mer

ican

1%0%

53%

i: ctA

mer

ican

Ind

ian/

Ala

skan

0%0%

0%

Ùì

All

othe

rs99

%10

0%41

%i: W

Wom

en (

incl

uded

abo

ve)

0%0%

0%Z ~

Num

ber

Num

ber

Num

ber

013

Num

ber

of o

wne

rs/p

artn

ers

283

Num

ber

Num

ber

Num

ber

Bla

ck/A

fric

an A

mer

ican

10

00:

His

pani

c/La

tin A

mer

ican

01

1U

J (.A

sian

Am

eric

an5

07

0: :z0

00:

Am

eric

an I

ndia

n/A

lask

an0

::A

ll ot

hers

453

6

Wom

en (

incl

uded

abo

ve)

60

5

Bla

ck/A

fric

an A

mer

ican

520

5

LL

His

pani

c/La

tin A

mer

ican

792

42L

L ~A

sian

Am

eric

an11

30

82

enA

mer

ican

Ind

ian/

Ala

skan

00

1

All

othe

rs36

02

71

Wom

en (

incl

uded

abo

ve)

157

153

TO

TA

L #

OF

EM

PLO

YE

ES

668

1029

8

BU

SIN

ES

S S

TR

UC

TU

RE

Cor

pora

tion

Cor

pora

tion

Cor

pora

tion

Cou

ntv

Cer

tific

atio

n

CB

E

LSB

E'

OT

HE

R C

ER

TIF

YIN

G A

GE

NC

Y

'Tot

al n

umbe

r of

LS

BE

com

pani

es is

two

(2).

Pag

e 4

of 4