GENEAL NOTES Setting out dimensions and sizing of all RC elements and load bearing structure should be taken from Brand Consulting (BC) drawings, project number 11269. Sizing and specification for all M&E equipment should be taken from Silcock Dawson & Partners (SDP) drawings, project number 170083. For all soft and hard landscaping information refer to Landscape Design Architecture (LDA) drawings, project number L1056. REFERENCEING NOTES This drawing should be read in conjunction with all relevant consultants drawings and specifications. Refer to the following drawing series for: L(00) - GA plans, elevations and sections L(10) - Accommodation plans and site strategies L(10) - Fire strategy plans L(16) - Substructure and slab edge setting out L(23) - Brickwork elevations (to be read with main elevations) L(24) - Staircore & communal plans and sections L(35) - Bay studies L(45) - Ceiling plans L(60) - House or apartment type plans L(90) - Site plans and associated external works A(00) - Wall, floor, roof, podium and terrace build - ups A(16) - Substructure detailing A(22) - Internal details (wall junctions, fire stopping) A(24) - Core stair, lift and service riser detailing A(32) - Internal door details A(35) - Envelope detailing A(74) - Bathroom and ensuite types S(31) - Ext. door and window types and schedules S(32) - Internal door types and schedules S(34) - Balcony metalwork, recon stone & brick specials SETTING OUT NOTES Refer to L(90)120 series drawings for setting out of all gridlines and main building corners. _________________________________________________________________________________________ ENVELOPE DIMENSIONING All openings in envelope measured to structural openings, refer to A(31) series drawings for sizes and details. _________________________________________________________________________________________ PARTY & SEPARATING WALL DIMENSIONING All internal setting out of partywalls & communal walls and openings as shown below. See notes below for all dimensions for core, L(24), and unit, L(60), setting out. RC shear wall lining buildups tagged, refer to A(00) series. Setting out of the metal stud/blockwork in walls should be measured off the face of the RC structure as dimensioned in the A(00) buildups. Dimension from outer face of block/stud to stud to nearest gridline Dimension from structural openings in walls to nearest stud/wall return Dimension from centre of MVHR terminal to nearest gridline _________________________________________________________________________________________ INTERNAL UNIT & STAIR CORE DIMENSIONING Refer to L(60) series drawings noted in layouts above for all apartment and house partition and door setting out information. Refer to L(24) series drawings noted in layouts above for all door and partition wall setting out in stair and lift cores. C4.02.17 FED eW 1a REFERENCING TAGS EXT. DOOR & WINDOW TAGS For quantities and types refer to External Door & Window Elevations and Schedules, A(31) & S(31) series. A.L02.105 WE-C3a External Door & Window numbering starts at 01 for each floor from top left corner of each building. Numbering ascends clockwise on each floor Building letter prefix (i.e. A, B, B1, C, I/L, J/K, K/L) Level prefix indicating floor (i.e. B1, L00, L01) Component numbering, individual per floor Ext. door & window type (i.e. WE - S1a, WG - C2, WB - D2) INT. DOOR TAGS For quantities and types refer to Internal Door Elevations and Schedules, S(32) series. For fire performance requirements refer to door schedules and fire strategy plans, S(32) & L(10) series. BUILD - UP TAGS Refer to A(00) series for all external wall, internal wall, floor, ceiling, roof and terrace build - up types with thermal, acoustic and fire requirements as relevant. eW - envelope wall pW - party wall cW - core blockwork wall gW - external fin wall pC - core stud partition pD - dwelling partition cL - ceiling type gF - floor type pF - podium type rF - roof type BALCONY / TERRACE TAGS Refer to S(34) series for balcony /terrace typical elevations, schedules and locations. Balcony / terrace type Core letter prefix (i.e. A2, B, I, L) Floor level (i.e. BM, 00, 01, 02) Door number based on area/room Door type, see type sheet S(32)01 Communal Door type, (please note that all house and flat internal door tags are not shown on GA plans, refer to L(60)s specified ) Apartment SYMBOL LEGEND Vertical rainwater pipe Two - way parapet outlet with pipe and hopper connecting to RWP Soil and vent pipe Stub stack Air admittance valve Gully to showers / bin stores / plantrooms - spec varies Dry riser outlet Dry riser inlet Automatic opening vent, refer to L(10) fire drawings Vertical movement joint as per S.E. details, refer to L(23) elevations for setting out to grid MVHR extract 2550mm FFL to underside of terminal, set out to nearest grid MVHR intake 2550mm FFL to underside of terminal, set out to nearest grid Ancon WP3 windposts - refer to S.E. drawings for spec and details Brick specials - refer to S(34)20s for indicative sizes RWP RWO SVP SS DRO AOV FG ESTATE KEY PLAN PLOT TAGS Refer to L(10) series for overall building accommodation information in floor plan keys and a schedule breakdown. Plot number Plot tenure (i.e. PRI, PRS), Plot size (i.e. 1B2P, 2B3P), Drawing reference number Flat type (i.e. Type A, Type B), Flat handing (where relevant) Overall flat area Type 01 (h) - 80 PRI, 1B2P - L(60)100 101 N I - L B - C A Quay R oad Highbridge Road North Circular Road (A406) Fleet Road River Roding FH1 BT-1a DR1 AAV WP BS FIRE STOPPING NOTES All items noted below are to be installed in strict accordance with manufacturer's requirements, technical data sheets and specifications. MVHR intake and extract terminals (refer to 'Symbol Legend' adjacent) to have fire stopping as duct penetrates inner leaf of wall construction. ARC Party Wall (PW200) vertical, or similar approved, fire stopping between external walls. All should achieve the same fire rating as the compartment wall/floor adjacent (2hr achieved). Where noted on the plans internal fire stopping is needed to close 25mm cavity of wall separating ancillary spaces. Refer to notes adjacent, Fire Strategy notes and A(22) series drawings. 2500 2500 2500 BC.20 BC.20 BC.T BC.T BC.S BC.S BC.R BC.R BC.Q BC.Q BC.K BC.K BC.L BC.L BC.M BC.M BC.N BC.N BC.P BC.P BC.1 BC.1 BC.2 BC.2 BC.3 BC.3 BC.4 BC.4 BC.5 BC.5 BC.6 BC.6 BC.7 BC.7 BC.8 BC.8 BC.9 BC.9 BC.10 BC.10 BC.11 BC.11 BC.12 BC.12 BC.13 BC.13 BC.14 BC.14 BC.15 BC.15 BC.16 BC.16 BC.17 BC.17 BC.18 BC.18 BC.19 BC.19 BC.A BC.A BC.B BC.B BC.C BC.C BC.D BC.E BC.E BC.F BC.F BC.G BC.G BC.H BC.H BC.J BC.J + 6.000 + 6.000 + 6.300 + 6.300 + 6.300 + 6.300 + 6.300 + 6.300 + 6.300 + 6.300 + 6.300 + 6.300 + 6.300 + 6.300 + 6.300 + 6.300 + 6.300 + 6.300 + 6.300 + 6.300 + 6.300 Type BC - 08* - 77 m² PRI, 1B2P - L(60)208 262 Type BC - 09* - 78 m² PRI, 2B4P - L(60)209 263 Type BC - A - 40 m² PRI, 3B6P - L(60)250 257 Type BC - A - 40 m² PRI, 3B6P - L(60)250 258 Type BC - A - 40 m² PRI, 3B6P - L(60)250 259 Type BC - A - 40 m² PRI, 3B6P - L(60)250 260 Type BC - A - 40 m² PRI, 3B6P - L(60)250 261 Cycle 152 m² Energy Centre 293 m² Retail Unit 6 98 m² Refuse 120 m² Entrance 12 m² Type BC - 01* - 62 m² PRI, 1B2P - L(60)201 144 Water Tank Rm 52 m² Cycle 70 m² Refuse 21 m² Cycle 72 m² Refuse 74 m² Alt. Switch Rm 14 m² Substation 21 m² Retail Refuse 10 m² Car Park Elec Switch Rm 14 m² L(00)245 1 L(00)244 2 L(00)242 1 L(00)243 2 L(00)243 3 1 L(00)281 1 L(00)282 1 L(00)283 2 L(00)283 B.C00.19 CB1 B.C00.18 CL1 B.C00.17 CB1 B.C00.16 CB1 B.C00.15 PS1 B.C00.09 PS1 B.C00.11 CS1 B.C00.01 CS2 B.C00.14 PS1 C.C00.16 PD1 C.C00.13 CL1 C.C00.01 CS2 B.C00.10 CS1 DRO DRO DRI DRI DRI Cleaner's Cpd 5 m² Energy Centre 293 m² Boat Welfare 17 m² 2475 3713 4500 3500 3975 5410 3713 2813 4900 5208 3895 2475 3713 4500 3500 3975 5410 3713 2813 2813 2985 5288 4500 3090 3373 2988 2138 2813 2985 11640 2813 2985 5288 4500 3090 3373 2988 2138 eW 3a cW 2a pW 5c pW 5a eW 1a eW 1a eW 1a eW 3b gW 2a gW 2e gW 2e eW 3b eW 3b eW 3a eW 3b eW 4a eW 3b eW 3b eW 3b gW 2e eW 1a eW 1a eW 1a eW 3b cW 2a cW 2a eW 3b cW 3a eW 3b eW 3b eW 3b cW 2a eW 1a eW 2b eW 1b eW 2b eW 1b eW 1a eW 1a eW 1a eW 1b eW 2b eW 1a cW 3a pW 2a pW 2a WC WC Shower Fountain Plant Rm 12 m² Cpd Head restraint - see A(22)02 & S/Eng 11269 - PH1 - 300 Head restraint - see A(22)02 & S/Eng 11269 - PH1 - 300 Head restraint - see A(22)02 & S/Eng 11269 - PH1 - 300 Head restraint - see A(22)02 & S/Eng 11269 - PH1 - 300 Head restraint - see A(22)02 & S/Eng 11269 - PH1 - 300 WP WP WP WP WP WP WP WP WP B.C00.20 EL1 B.L00.001 BW-1a B.L00.002 LS-1f B.L00.003 BW-2b B.L00.004 BW-2c B.L00.005 BW-2b B.L00.006 WD-2c B.L00.007 PE-1b B.L00.008 BE-4b B1.L00.001 WD-2d B1.L00.002 PE-1a B1.L00.003 WS-2a B1.L00.004 WD-2d B1.L00.005 PE-1a B1.L00.006 WS-2a B1.L00.007 WD-2d B1.L00.008 PE-1a B1.L00.009 WS-2a B1.L00.010 WD-2d B1.L00.011 PE-1a B1.L00.012 WS-2a B1.L00.013 WD-2d B1.L00.014 PE-1a B1.L00.015 WS-2a B-C.L00.001 GR-1a C.L00.001 LG-2f C.L00.002 LS-1e C.L00.003 CE-3b C.L00.004 PE-2a C.L00.005 WD-2c C.L00.006 CE-3b C.L00.007 CE-3b C.L00.008 PE-1b C.L00.009 BE-4b C.L00.010 CE-2b C.L00.011 LS-1g C.L00.012 LS-1g C.L00.013 LS-1g C.L00.014 LS-1a C.L00.015 LS-1c C.L00.016 LG-2h C.L00.017 LS-1g B-C.L00.002 VR-1i B-C.L00.003 VR-1i B-C.L00.004 VR-1i B-C.L00.005 VR-1i B-C.L00.006 VR-1i B-C.L00.007 VR-1i B-C.L00.008 EC-2a B-C.L00.009 EC-1a B-C.L00.011 SS-1a B.L00.009 LG-2g B.L00.010 LG-2g B.L00.011 RB-3a B.L00.012 RB-2a B.L00.013 RB-2b B.L00.014 RB-1a B.L00.015 RB-3a B.L00.016 RB-3a B.L00.017 RB-3a B.L00.018 RB-3a B.L00.019 RB-3a B.L00.020 CE-2a B.L00.021 LS-1f B.L00.022 LG-1e B.L00.023 LS-1f B.L00.024 BW-2b B.L00.025 BW-2b B.L00.026 BW-2a 1115 2035 890 1360 3140 1360 1678 2373 2015 1360 2015 1360 1678 113 1023 1115 2373 900 328 1115 2598 1115 1023 8983 1395 25958 11465 225 5523 225 3590 2035 778 1360 3028 1360 2015 1360 1115 1360 2015 1360 4490 1360 553 1698 778 1115 1360 5053 113 1023 1228 2373 1685 330 2373 1035 395 923 1360 890 1360 1565 1360 665 910 778 1037 4735 2015 778 1023 1800 303 778 1248 1565 2035 778 1360 675 553 910 1115 1360 1115 2035 113 395 100 395 113 2035 1340 2710 1228 4960 890 2035 1790 1135 1565 1585 1115 1585 1115 1585 1115 1585 1115 1585 1115 1585 1125 302 553 685 1115 1360 1115 1360 1115 1360 1115 1360 1790 1360 1115 1360 1340 2373 103 900 1360 1115 1360 1115 1360 1115 1360 1115 1360 1228 1585 103 430 695 1340 778 2035 303 9303 3150 150 922 380 3593 380 13065 2921 380 3073 250 4520 250 12087 12642 10242 1620 225 2125 5968 380 6440 2770 490 17038 8093 225 11862 778 1360 1763 300 4623 2000 425 1545 142 2843 195 2780 1545 L(00)241 1 L(00)244 1 L(00)242 2 L(00)242 1 L(00)243 4 L(00)245 2 0.4 perm. vent at high level to louvre Refer to L(24)401 for Main Entrance Elevations Refer to L(24)401 for Main Entrance Elevations Entrance 9 m² Fire stop to close 25mm cavity, refer to Fire Strategy & A(22) series details Fire stop to close 25mm cavity, refer to Fire Strategy & A(22) series details Fire stop to close 25mm cavity, refer to Fire Strategy & A(22) series details Fire stop to close 25mm cavity, refer to Fire Strategy & A(22) series details Fire stop to close 25mm cavity, refer to Fire Strategy & A(22) series details Fire stop to close 25mm cavity, refer to Fire Strategy & A(22) series details Fire stop to close 25mm cavity, refer to Fire Strategy & A(22) series details Fire stop to close 25mm cavity, refer to Fire Strategy & A(22) series details Refer to L(24)205 for Boat Welfare RWP GUL SS GUL SS AAV SS SS AAV SS GUL FDP FGC AAV SS SS SVP GUL SS Water RDP SS LV Gas GUL GUL GUL GUL GUL GUL GUL GUL RDP LV LV LV RDP GUL FDP AAV RDP AAV RWP FDP SS GUL GUL FDP RWP SS SS SS SS SS Refer to the following SDP drawings for setting out of all incoming services into entry pit and finish of pit within energy centre. 170083 - SDP - BC - GF - DR - BW - 2000 170083 - SDP - ZZ - ZZ - DR - SS - 5960 Refer to the following SDP drawing for setting out incoming gas into entry pit and finish of pit within retail bin store. 170083 - SDP - ZZ - ZZ - DR - SS - 5965 RWP RWP RWP RWP SVP SVP RWP RWP SVP RWP SVP SS RWP SVP RWP RWP LV B-C.L00.010 EC-3a Refer to L(24)250 for Retail Unit 6 Refer to drawings A(35)52 - 54 for podium stair plans, sections and detials GUL GUL GUL SHS post SHS post 112.5 For offset drainage enclosure detail refer to dwg A(22)32 WP Ramp + 6.300 + 6.000 SS SS SS SS SS SS SS SS SS Refer to L(24)201 for feature wall & postbox elevations and ventilation system panel indicative position Refer to L(24)203 for feature wall & postbox elevations and ventilation system panel indicative position 210 3260 220 2930 220 1494 pW 3a pW 1b pW 3b 290 720 140 86 140 54 3260 220 pW 2a pW 2a pW 3b pW 3b 5367 290 3190 290 pW 5a pW 5a 1217 140 2403 140 1810 290 2598 215 720 140 998 200 998 200 1763 626 2598 215 215 2813 998 100 998 100 1438 140 1425 215 1760 140 cW 2a cW 2a cW 2a 2580 215 cW 2a 215 3498 3575 290 1217 290 2103 pW 3b pW 3b 423 140 C.C00.15 PD1 eW 2b pW 5c pW 5c 262 140 cW 2a 380 498 1223 380 380 22 pW 5c 1230 140 2688 140 2550 290 cW 2a pW 3b pW 3b 290 1126 225 2620 413 2470 pW 3a eW 1b pW 2a 1885 140 57 1155 B.C00.13 CK1 155 998 pW 5b pW 5b 140 870 3005 290 2705 140 200 922 1480 290 pW 5a pW 5a pW 3b 4360 290 pW 5a pW 5c 3248 290 150 998 pW 5a pW 3b pW 3b 1423 290 169 290 380 2162 380 4887 2162 140 2781 380 6436 140 140 1460 23308 2223 220 220 2048 463 220 220 525 pW 1a pW 1a pW 1a pW 1a pW 4a pW 4a pW 4a pW 4a pW 4a pW 4a pW 4a pW 4a cW 2a cW 2a 3930 2339 4548 250 12360 3231 4165 3097 3895 3010 B.C00.04 RD1 B.C00.03 RS3 B.C00.02 RS2 B.C00.06 RD1 C.C00.05 CT2 C.C00.07 CS1 C.C00.08 CK1 C.C00.09 CS1 C.C00.10 CS1 C.C00.11 CS1 C.C00.12 CS1 C.C00.02 RS2 C.C00.03 RS3 C.C00.04 RD1 B.C00.05 CT2 B.C00.08 CS1 B.C00.07 CS1 Refer to L(24)203 for core details Refer to L(24)201 for core details 2475 3713 4500 3500 3975 5410 3713 2813 27890 303 213 303 303 303 778 1360 1115 2035 1115 1360 1340 27778 5973 11465 303 303 8438 303 888 303 44100 38335 1790 1360 1003 1023 890 685 2578 1360 1003 1023 890 685 2578 1360 1003 1023 890 685 2578 1360 1003 1023 890 685 2578 1360 1003 1023 890 685 1435 5765 303 28228 302 660 303 16190 20588 640 GUL cW 2a cW 2a Sprinkler Pump Rm 24 m² 1763 600 C.C00.14 PD1 cW 2a cW 2a 86 140 140 86 708 140 2583 140 cW 3a cW 3a GUL GUL 0.4 perm. vent at high level to louvre 300x250 PCC col, A(35)13 (dim =grid to centre) 710 1. DO NOT SCALE FROM THIS DRAWING 2. ALL DIMENSIONS TO BE CHECKED ON SITE 3. ANY DISCREPANCIES SHOULD BE REPORTED TO THE ARCHITECT / CONTRACT ADMINISTRATOR GENERAL NOTES C Clerkenwell, London EC1V 0DS T: +44 (0)20 7812 8454 A0 STATUS PROJECT CLIENT DRAWING NAME DATE SIZE DRAWN BY CHECK BY SCALE JOB NO. DRAWING NO. REVISION 1 : 100 J CONSTRUCTION NOV 2017 1161 AC SJ L(00)201 Fresh Wharf Barking IG11 7BG Building B - C - Level 00 Countryside Properties Rev Date Description - 2018-07-04 First issue. A 2018-08-14 Issued for Construction. B 2018-08-28 Fire stops & vents shown and noted. C 2018-11-02 Drainage points & notes added. D 2019-01-31 Gate structure upadated. E 2019-04-09 Door type references amended. F 2019-04-25 PDF drawing update on DocElite. G 2019-07-03 Main entrance reference note added. H 2019-08-20 Layouts/door amended following comments. J 2020-03-13 PCC columns added as noted for vertical cavity barriers. MAOV louvres updated and roof fan and enclosures amended.

Countryside Properties Fresh Wharf Barking IG11 7BG

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Countryside Properties Fresh Wharf Barking IG11 7BG

GENEAL NOTES

Setting out dimensions and sizing of all RC elements and load bearing structure should be taken from Brand Consulting (BC) drawings, project number 11269.

Sizing and specification for all M&E equipment should be taken from Silcock Dawson & Partners (SDP) drawings, project number 170083.

For all soft and hard landscaping information refer to Landscape Design Architecture (LDA) drawings, project number L1056.

REFERENCEING NOTES

This drawing should be read in conjunction with all relevant consultants drawings and specifications.

Refer to the following drawing series for:• L(00) - GA plans, elevations and sections• L(10) - Accommodation plans and site strategies• L(10) - Fire strategy plans• L(16) - Substructure and slab edge setting out• L(23) - Brickwork elevations (to be read with main elevations)• L(24) - Staircore & communal plans and sections• L(35) - Bay studies• L(45) - Ceiling plans• L(60) - House or apartment type plans• L(90) - Site plans and associated external works

• A(00) - Wall, floor, roof, podium and terrace build-ups• A(16) - Substructure detailing• A(22) - Internal details (wall junctions, fire stopping)• A(24) - Core stair, lift and service riser detailing• A(32) - Internal door details• A(35) - Envelope detailing• A(74) - Bathroom and ensuite types

• S(31) - Ext. door and window types and schedules• S(32) - Internal door types and schedules• S(34) - Balcony metalwork, recon stone & brick specials

SETTING OUT NOTES

Refer to L(90)120 series drawings for setting out of all gridlines and main building corners._________________________________________________________________________________________

ENVELOPE DIMENSIONINGAll openings in envelope measured to structural openings, refer toA(31) series drawings for sizes and details._________________________________________________________________________________________

PARTY & SEPARATING WALL DIMENSIONINGAll internal setting out of partywalls & communal walls and openings as shown below. See notes below for all dimensions for core, L(24), and unit, L(60), setting out.

RC shear wall lining buildups tagged, refer to A(00) series. Setting out of the metal stud/blockwork in walls should be measured off the face of the RC structure as dimensioned in the A(00) buildups.

Dimension from outer face of block/stud to stud to nearest gridline

Dimension from structural openings in walls to nearest stud/wall return

Dimension from centre of MVHR terminal to nearest gridline

_________________________________________________________________________________________

INTERNAL UNIT & STAIR CORE DIMENSIONINGRefer to L(60) series drawings noted in layouts above for all apartment and house partition and door setting out information.

Refer to L(24) series drawings noted in layouts above for all door and partition wall setting out in stair and lift cores.

C4.02.17FED

eW1a

REFERENCING TAGS

EXT. DOOR & WINDOW TAGSFor quantities and types refer to External Door & Window Elevations and Schedules, A(31) & S(31) series.

A.L02.105WE-C3a

External Door & Window numbering starts at 01 for each floor from top left corner of each building.

Numbering ascends clockwise on each floor

Building letter prefix (i.e. A, B, B1, C, I/L, J/K, K/L)

Level prefix indicating floor (i.e. B1, L00, L01)

Component numbering, individual per floor

Ext. door & window type (i.e. WE-S1a, WG-C2, WB-D2)

INT. DOOR TAGSFor quantities and types refer to Internal Door Elevations and Schedules, S(32) series.

For fire performance requirements refer to door schedules and fire strategy plans, S(32) & L(10) series.

BUILD-UP TAGSRefer to A(00) series for all external wall, internal wall, floor, ceiling, roof and terrace build-up types with thermal, acoustic and fire requirements as relevant.

eW - envelope wallpW - party wallcW - core blockwork wallgW - external fin wallpC - core stud partition

pD - dwelling partitioncL - ceiling typegF - floor typepF - podium typerF - roof type

BALCONY / TERRACE TAGSRefer to S(34) series for balcony /terrace typical elevations, schedules and locations.

Balcony / terrace type

Core letter prefix (i.e. A2, B, I, L)

Floor level (i.e. BM, 00, 01, 02)

Door number based on area/room

Door type, see type sheet S(32)01Com

mun

al

Door type, (please note that all house and flat internal door tags are not shown on GA plans, refer to L(60)s specified)

Ap

artm

ent

SYMBOL LEGEND

Vertical rainwater pipe

Two-way parapet outlet with pipe and hopper connecting to RWP

Soil and vent pipe

Stub stack

Air admittance valve

Gully to showers / bin stores / plantrooms - spec varies

Dry riser outlet

Dry riser inlet

Automatic opening vent, refer to L(10) fire drawings

Vertical movement joint as per S.E. details, refer to L(23) elevations for setting out to grid

MVHR extract 2550mm FFL to underside of terminal, set out to nearest grid

MVHR intake 2550mm FFL to underside of terminal, set out to nearest grid

Ancon WP3 windposts - refer to S.E. drawings for spec and details

Brick specials - refer to S(34)20s for indicative sizes

RWP

RWO

SVP

SS

DRO

AOV

FG

ESTATE KEY PLAN

PLOT TAGSRefer to L(10) series for overall building accommodation information in floor plan keys and a schedule breakdown.

Plot number

Plot tenure (i.e. PRI, PRS),Plot size (i.e. 1B2P, 2B3P),Drawing reference number

Flat type (i.e. Type A, Type B),Flat handing (where relevant)Overall flat areaType 01 (h) - 80

PRI, 1B2P - L(60)100

101

S wis721 Lt BT

N

I-L

B-C

A

Quay Road

Highbr

idge R

oad

North C

ircular Road (A406)

Fleet Road

River Roding

FH1

BT-1a

DR1

AAV

WP

BS

FIRE STOPPING NOTES

All items noted below are to be installed in strict accordance with manufacturer's requirements, technical data sheets and specifications.

MVHR intake and extract terminals (refer to 'Symbol Legend' adjacent) to have fire stopping as duct penetrates inner leaf of wall construction.

ARC Party Wall (PW200) vertical, or similar approved, fire stopping between external walls. All should achieve the same fire rating as the compartment wall/floor adjacent (2hr achieved).

Where noted on the plans internal fire stopping is needed to close 25mm cavity of wall separating ancillary spaces. Refer to notes adjacent, Fire Strategy notes and A(22) series drawings.

2500

2500

2500

BC.20

BC.20

BC.T BC.T

BC.S BC.S

BC.R BC.R

BC.Q BC.Q

BC.K BC.K

BC.L BC.L

BC.M BC.M

BC.N BC.N

BC.P BC.P

BC.1

BC.1

BC.2

BC.2

BC.3

BC.3

BC.4

BC.4

BC.5

BC.5

BC.6

BC.6

BC.7

BC.7

BC.8

BC.8

BC.9

BC.9

BC.10

BC.10

BC.11

BC.11

BC.12

BC.12

BC.13

BC.13

BC.14

BC.14

BC.15

BC.15

BC.16

BC.16

BC.17

BC.17

BC.18

BC.18

BC.19

BC.19

BC.A BC.A

BC.B BC.B

BC.C BC.C

BC.D

BC.E BC.E

BC.F BC.F

BC.G BC.G

BC.H BC.H

BC.J BC.J

+ 6.000

+ 6.000

+ 6.300

+ 6.300

+ 6.300

+ 6.300

+ 6.300

+ 6.300

+ 6.300

+ 6.300+ 6.300+ 6.300+ 6.300+ 6.300

+ 6.300

+ 6.300

+ 6.300

+ 6.300

+ 6.300

+ 6.300 + 6.300

Type BC-08* - 77 m²PRI, 1B2P - L(60)208

262

Type BC-09* - 78 m²PRI, 2B4P - L(60)209

263

Type BC-A - 40 m²PRI, 3B6P - L(60)250

257Type BC-A - 40 m²

PRI, 3B6P - L(60)250

258Type BC-A - 40 m²

PRI, 3B6P - L(60)250

259Type BC-A - 40 m²

PRI, 3B6P - L(60)250

260Type BC-A - 40 m²

PRI, 3B6P - L(60)250

261

Cycle152 m²

Energy Centre293 m²

Retail Unit 698 m²

Refuse120 m²

Entrance12 m²

Type BC-01* - 62 m²PRI, 1B2P - L(60)201

144

Water Tank Rm52 m²

Cycle70 m²

Refuse21 m²

Cycle72 m²

Refuse74 m²

Alt. Switch Rm14 m²

Substation21 m²

Retail Refuse10 m²

Car Park

Elec Switch Rm14 m²

L(00

)245

1

L(00

)244

2

L(00)242

1

L(00)243

2

L(00

)243

3

1L(00)281

1L(00)282

1L(00)283

2L(00)283B.C00.19

CB1B.C00.18

CL1

B.C00.17CB1

B.C00.16CB1

B.C00.15PS1

B.C00.09PS1

B.C00.11CS1

B.C00.01CS2

B.C00.14PS1

C.C00.16PD1

C.C00.13CL1

C.C00.01CS2

B.C00.10CS1

DRO

DRO

DRI

DRI

DRI

Cleaner's Cpd5 m²

Energy Centre293 m²

Boat Welfare17 m²

2475371345003500397554103713281349005208389524753713450035003975541037132813

2813

2985

5288

4500

3090

3373

2988

2138

2813

2985

1164

028

1329

8552

8845

0030

9033

7329

8821

38

eW3a

cW2a

pW5c

pW5a

eW1a

eW1a

eW1a

eW3b

gW2a

gW2e

gW2e

eW3b

eW3b

eW3a

eW3b

eW4a

eW3b

eW3b

eW3b

gW2e

eW1a

eW1a

eW1a

eW3b

cW2a

cW2a

eW3b

cW3a

eW3b

eW3b

eW3b

cW2a

eW1a

eW2b

eW1b

eW2b

eW1b

eW1a

eW1a

eW1a

eW1b

eW2b

eW1a

cW3a

pW2a

pW2a

WC WCShower

Fountain Plant Rm12 m²

Cpd

Head restraint - see A(22)02 & S/Eng 11269-PH1-300

Head restraint - see A(22)02 & S/Eng 11269-PH1-300

Head restraint - see A(22)02 & S/Eng 11269-PH1-300

Head restraint - see A(22)02 & S/Eng 11269-PH1-300

Head restraint - see A(22)02 & S/Eng 11269-PH1-300

WP

WP

WP

WP WP WP

WP

WP WP

B.C00.20EL1

B.L00.001BW-1a

B.L00.002LS-1f

B.L00.003BW-2b

B.L00.004BW-2c

B.L00.005BW-2b

B.L00.006WD-2c

B.L00.007PE-1b

B.L00.008BE-4b

B1.L00.001WD-2d

B1.L00.002PE-1a

B1.L00.003WS-2a

B1.L00.004WD-2d

B1.L00.005PE-1a

B1.L00.006WS-2a

B1.L00.007WD-2d

B1.L00.008PE-1a

B1.L00.009WS-2a

B1.L00.010WD-2d

B1.L00.011PE-1a

B1.L00.012WS-2a

B1.L00.013WD-2d

B1.L00.014PE-1a

B1.L00.015WS-2a

B-C

.L00

.001

GR

-1a

C.L

00.0

01LG

-2f

C.L

00.0

02LS

-1e

C.L

00.0

03C

E-3

b

C.L

00.0

04P

E-2

aC

.L00

.005

WD

-2c

C.L

00.0

06C

E-3

bC

.L00

.007

CE

-3bC.L00.008

PE-1bC.L00.009

BE-4b

C.L00.010CE-2b

C.L00.011LS-1g

C.L00.012LS-1g

C.L00.013LS-1g

C.L00.014LS-1a

C.L

00.0

15LS

-1c

C.L

00.0

16LG

-2h

C.L

00.0

17LS

-1g

B-C.L00.002VR-1i

B-C.L00.003VR-1i

B-C.L00.004VR-1i

B-C.L00.005VR-1i

B-C.L00.006VR-1i

B-C.L00.007VR-1i

B-C.L00.008EC-2a

B-C.L00.009EC-1a

B-C.L00.011SS-1a

B.L00.009LG-2g

B.L00.010LG-2g

B.L00.011RB-3a

B.L00.012RB-2a

B.L

00.0

13R

B-2

b

B.L

00.0

14R

B-1

a

B.L

00.0

15R

B-3

aB

.L00

.016

RB

-3a

B.L

00.0

17R

B-3

aB

.L00

.018

RB

-3a

B.L

00.0

19R

B-3

aB

.L00

.020

CE

-2a

B.L

00.0

21LS

-1f

B.L

00.0

22LG

-1e

B.L

00.0

23LS

-1f

B.L

00.0

24B

W-2

bB

.L00

.025

BW

-2b

B.L

00.0

26B

W-2

a

1115 2035 890 1360 3140 1360 1678 2373 2015 1360 2015 1360 1678 113 1023 1115 2373 900 328

1115259811151023

8983

1395

2595

8

1146

522

555

2322

535

9020

3577

813

6030

2813

6020

1513

6011

1513

6020

1513

6044

9013

6055

3

1698 778

1115136050531131023122823731685330237310353959231360890136015651360665910778

103747352015

778

1023

1800

30377

812

4815

6520

3577

813

6067

5

553 910 1115 1360 1115 2035 113

395

100

395

113 2035 1340 2710 1228 4960 890 2035 1790 1135 1565 1585 1115 1585 1115 1585 1115 1585 1115 1585 1115 1585 1125

302

553

685

1115

1360

1115

1360

1115

1360

1115

1360

1790

1360

1115

1360

1340

2373

103

900

1360

1115

1360

1115

1360

1115

1360

1115

1360

1228

1585

103

430

695

1340

778 2035

303

9303

3150

150

922

380

3593

380

1306

5

2921 380 3073 250 4520 250 12087

1264

2

102421620225212559683806440

2770

490

1703

8

8093 225 11862

778

1360

1763

300

4623

2000

425

1545

142

2843

195

2780

1545

L(00)241

1

L(00

)244

1

L(00)242

2L(00)242

1

L(00

)243

4L(

00)2

45

2

0.4 perm. vent at high level to louvre

Refer to L(24)401for Main Entrance

Elevations

Ref

er to

L(2

4)40

1fo

r M

ain

Ent

ranc

eE

leva

tions

Entrance9 m²

Fire stop to close25mm cavity, refer toFire Strategy & A(22)

series details

Fire stop to close25mm cavity, refer toFire Strategy & A(22)

series details

Fire stop to close25mm cavity, refer toFire Strategy & A(22)

series details

Fire stop to close25mm cavity, refer toFire Strategy & A(22)

series details

Fire stop to close25mm cavity, refer toFire Strategy & A(22)

series details

Fire stop to close25mm cavity, refer toFire Strategy & A(22)

series details

Fire stop to close25mm cavity, refer toFire Strategy & A(22)

series details

Fire stop to close25mm cavity, refer toFire Strategy & A(22)

series details

Refer to L(24)205 for Boat Welfare

RWP

GULSS

GUL

SS

AAV

SS SSAAV

SS GUL

FDP

FGC

AAV

SSSS

SVP

GUL

SS

Water

RDP

SS

LV

Gas

GUL

GUL GUL

GUL

GUL

GUL

GULGUL

RDPLVLVLV

LV

LV

RDP

GUL

FDP

AAV

RDP

AAV

RWP

FDP

SS

GUL

GUL

FDP

RWP

SS

SS

SS

SS

SS

Refer to the following SDP drawings for setting out of all incoming services into entry pit and finish of pit within energy centre.• 170083-SDP-BC-GF-DR-BW-2000• 170083-SDP-ZZ-ZZ-DR-SS-5960

Refer to the following SDP drawing for setting out incoming gas into entry pit and finish of pit within retail bin store.• 170083-SDP-ZZ-ZZ-DR-SS-5965

RWP

RWP

RWP

RWP

SVPSVP

RWPRWP

SVP

RWP

SVP

SS

RWP

SVP

RWP

RWP

LVLVLVLVLV

B-C.L00.010EC-3a

Refer to L(24)250 for Retail Unit 6

Refer to drawings A(35)52-54 for podium stair plans, sections

and detials

GUL

GUL

GUL

SHS post

SHS post

112.5

For offset drainage enclosure detail refer to dwg A(22)32

WP

Ram

p

+ 6.300

+ 6.000

SS SS SS SS

SS SS SS SS SS

Refer to L(24)201 for feature wall & postbox elevations and ventilation system panel indicative position

Refer to L(24)203 for feature wall & postbox elevations and ventilation system panel indicative position

210

3260

220 2930

220 1494

pW3a

pW1b

pW3b

290

720

140

86

140 54

3260

220

pW2a

pW2a

pW3b

pW3b

5367 290

3190

290

pW5a

pW5a

1217 140 2403 140

1810

290

2598

215

720 140

998

200

998 200

1763 626

2598

215

2152813

998

100

998

100

1438

140

1425

215

1760 140

cW2a

cW2a

cW2a

2580

215

cW2a

215 3498

35752901217 290 2103

pW3b

pW3b

423 140

C.C00.15PD1

eW2b

pW5c

pW5c

262 140

cW2a380498 12

2338

0

38022

pW5c

1230

140

2688 140

2550

290

cW2a

pW3b

pW3b

290 1126

225

2620

413

2470

pW3a

eW1b

pW2a

1885 140

5711

55 B.C00.13CK1

155 998

pW5b

pW5b

140

870

3005290

2705

140

200922

1480 290

pW5a

pW5a

pW3b

4360

290

pW5a

pW5c

3248

290

150

998

pW5a

pW3b

pW3b

1423

290

169290

380 2162

380

4887

21621402781380

6436

140

140 1460

2330

8

2223 220 2202048 463 220 220525

pW1a

pW1a

pW1a

pW1a

pW4a

pW4a

pW4a

pW4apW

4a

pW4apW

4a

pW4a

cW2a

cW2a

3930

2339

4548

250

1236

0

3231

4165

3097

3895

3010

B.C00.04RD1

B.C00.03RS3

B.C00.02RS2

B.C00.06RD1

C.C00.05CT2

C.C

00.0

7C

S1

C.C

00.0

8C

K1

C.C00.09CS1

C.C00.10CS1

C.C00.11CS1

C.C00.12CS1

C.C00.02RS2

C.C00.03RS3

C.C00.04RD1

B.C00.05CT2

B.C00.08CS1

B.C

00.0

7C

S1

Ref

er to

L(2

4)20

3fo

r co

re d

etai

ls

Ref

er to

L(2

4)20

1fo

r co

re d

etai

ls

24753713450035003975541037132813

27890

303 213 303

303

30377

813

6011

1520

3511

1513

6013

40

2777

859

7311

465

303

303

8438

303

888 303

44100

38335

1790 1360 1003 1023 890 685 2578 1360 1003 1023 890 685 2578 1360 1003 1023 890 685 2578 1360 1003 1023 890 685 2578 1360 1003 1023 890 685 14355765

303

28228

302 660

303

1619

020

588

640

GUL

cW2a

cW2a

Sprinkler Pump Rm24 m²

1763600

C.C00.14PD1

cW2a

cW2a

8614

0

140

86

7081402583

140

cW3a

cW3a

GUL

GUL

0.4 perm. vent at high level to louvre

300x250 PCC col, A(35)13(dim =grid to centre)

710

1. DO NOT SCALE FROM THIS DRAWING2. ALL DIMENSIONS TO BE CHECKED ON SITE3. ANY DISCREPANCIES SHOULD BE REPORTED TO THE

ARCHITECT / CONTRACT ADMINISTRATOR

GENERAL NOTES

C

Clerkenwell, London EC1V 0DS T: +44 (0)20 7812 8454

A0

STATUS

PROJECT

CLIENT

DRAWING NAME

DATE

SIZEDRAWN BY CHECK BY SCALE

JOB NO. DRAWING NO. REVISION1 : 100

J

CONSTRUCTION NOV 2017

1161

AC SJ

L(00)201

Fresh WharfBarking IG11 7BG

Building B-C - Level 00

Countryside Properties

Rev Date Description

- 2018-07-04 First issue.A 2018-08-14 Issued for Construction.B 2018-08-28 Fire stops & vents shown and noted.C 2018-11-02 Drainage points & notes added.D 2019-01-31 Gate structure upadated.E 2019-04-09 Door type references amended.F 2019-04-25 PDF drawing update on DocElite.G 2019-07-03 Main entrance reference note added.H 2019-08-20 Layouts/door amended following comments.

J 2020-03-13 PCC columns added as noted for verticalcavity barriers. MAOV louvres updated androof fan and enclosures amended.