24
Country Visit LT 23.10.08 Country Visit LT 23.10.08 Towards a Shared Environmental Information System Towards a Shared Environmental Information System SEIS SEIS Bernt Röndell Bernt Röndell

Country Visit LT 23.10.08 Towards a Shared Environmental Information System SEIS Bernt Röndell

Embed Size (px)

Citation preview

Country Visit LT 23.10.08Country Visit LT 23.10.08

Towards a Shared Environmental Information SystemTowards a Shared Environmental Information System

SEISSEIS

Bernt RöndellBernt Röndell

Country Visit LT 23.10.08Country Visit LT 23.10.08

Outline presentationOutline presentation

• Scope of SEIS and country visits• SEIS components - building blocks • Benefits and costs• Implementation• Next steps

Country Visit LT 23.10.08Country Visit LT 23.10.08

Scope SEIS country visit LTScope SEIS country visit LT

• To exchange ideas about the proposed SEIS concept

• To collect input for the impact assessment of SEIS

• To discuss concerns related to costs and benefits

• To prepare the drafting of the EC implementation plan

Country Visit LT 23.10.08Country Visit LT 23.10.08

Scope SEISScope SEIS

Improve Modernise Streamline

the present informationsystems

Country Visit LT 23.10.08Country Visit LT 23.10.08

AcquisEnv./Sector

Policy(TERM, EERM,AERM,

CSI, SDI)

Strategic Policies

6th EAP SDS(Climate Change/Adaptation

Biodiversity / EcosystemsEnvironment & Health

Sustainable Use of Resources)

1970s 2020

Complianceassessments

Indicatorassessments

Integratedassessments

In- situ In- situ statistics statistics geospatial geospatial modelling modelling

InspireInspire GMESGMES

Evolution of environmental Evolution of environmental information flowinformation flow

Country Visit LT 23.10.08Country Visit LT 23.10.08

Live Information SystemsThe current data flows

Member states Organisations Member states Organisations

MS

MS

MS

MS

MS

EEA

OECD

UNEP

Data reporting

Data reporting

Data reporting

Data reporting

Data reporting

MS

MS

MS

MS

MS

EEA

OECD

UNEP

From Reporting to Online Services

Country Visit LT 23.10.08Country Visit LT 23.10.08

PrinciplesPrinciplesData and information should be

• managed as close as possible to its source;

• collected once and shared with others for many purposes;

• readily available to public authorities and enable them to easily fulfil reporting obligations;

• accesible to enable end-users to make comparisons at the appropriate geographic scale and to participate meaningfully in the development and implementation of environmental policy;

• available to the general public after due consideration of the appropriate level of aggregation, given possible confidentiality constraints, and at national level in the national language(s).

Country Visit LT 23.10.08Country Visit LT 23.10.08

1. SSharing• Political commitment (legislation) • Partnership (win-win)• Networking (connecting)

2. EEnvironmental IInformation• Horizontal integration (content)• Vertical integration (local to global)• Online access - real time• For policy makers and public

3. SSystem• Existing ICT Infrastructure• New e-Services

From EEA’s perspectiveFrom EEA’s perspectiveSEIS is about...SEIS is about...

Country Visit LT 23.10.08Country Visit LT 23.10.08

Data and information services

Reportnet, ICT, Inspire, Kopernikus...

SEIS components – EEA nodeSEIS components – EEA node

em

vir

on

men

tal

data

cen

tres

EEA Data and Information products

Air

Lan

d u

se

Inte

gera

ted

pro

d.

Clim

ate

Ch

an

ge

Bio

div

ers

ity

Soil

Fore

sts

Waste

Wate

r

Natu

ral re

sou

rces

...

Networking, Eionet, Group of 4, EPAs,agreements, country visits...

Country Visit LT 23.10.08Country Visit LT 23.10.08

10 European data centres

Country Visit LT 23.10.08Country Visit LT 23.10.08

Building blocks SEIS

Country Visit LT 23.10.08Country Visit LT 23.10.08

Understanding the contextUnderstanding the context

                                                                                                                                                                                                         

GMES

Inspire

SEIS

Country Visit LT 23.10.08Country Visit LT 23.10.08

Different focus ?Different focus ?

ServicesServicesServices

BusinessBusinessBusiness

Regulation?Regulation?Directive

Infrastructure

Infrastructure

Infrastructure

ContentContentContent

SEISSEISGMESGMESINSPIREINSPIRE

Country Visit LT 23.10.08Country Visit LT 23.10.08

Benefits Benefits • Better legislation – repealing SRD

More consistent and integrated input from Member States

• More efficient trans boundary & EU-level analyses Better-informed policy discussions

• Reduced redundancy in reporting and monitoring efforts Reduction in administrative burden and costs

• Empowerment of citizens Widespread availability of information

• Increased societal knowledge base Increased availability of data for use by researchers

• Better profile for the EU in various global fora

Country Visit LT 23.10.08Country Visit LT 23.10.08

CostsCosts

1. Implementation costs Inspire directive 300 M€/yr (next 10 years - EU)

2. Changes in organisational and business models ? (tbd)

3. Conversion towards interoperable distributed networks ? (tbd)

4. Other?

Country Visit LT 23.10.08Country Visit LT 23.10.08

Group of 4 Group of 4 SEIS Implementation Plan - OutlineSEIS Implementation Plan - Outline• Political commitment around the

principles• Priority to implementation INSPIRE and

further development Kopernikus• Possible legislative proposal• Prioritising data and information needs• Further harmonization of existing

monitoring systems• Centre of EEA’s strategy 2009-2013

Country Visit LT 23.10.08Country Visit LT 23.10.08

Towards a SEIS legal instrument:

Objectives and Scope

• Embody legal commitment to SEIS principles

• Connect existing fragmented reporting mechanisms/systems ..towards e-reporting based on the SEIS

• Ensure timely availability of information and data

• Repeal/streamline obsolete/overlapping requirements

• Exploit opportunities offered by ICT and maximise cost-effectiveness of information-related investments

• Scope: information provided by Member States under Community environmental legislation

Country Visit LT 23.10.08Country Visit LT 23.10.08

Mechanism for information exchange:

Towards a distributed EU eReporting tool

• For all information provided by MSs under Community environmental law, Member States must:

ensure information is made available in electronic form, using available web-based technology

inform Commission which organisation or authority is responsible for making the information available, and where the information can be found.

• This mechanism will replace all existing reporting mechanisms

Country Visit LT 23.10.08Country Visit LT 23.10.08

SEIS nodes

• MSs could be obliged to provide a single national, web-based register providing access to all required information

• Registers to be connected to EU SEIS portal developed by Commission/EEA

• Competent authority to set up, operate, maintain and upgrade register/portal

Country Visit LT 23.10.08Country Visit LT 23.10.08

Reporting performance EEA Priority Data Flows

SEIS in practice at EEA (I)

0

10

20

30

40

50

60

70

80

90

100

2000 2001 2002 2003 2004 2005 2006 2007

Year

%%

of

data

re

port

ed

Country Visit LT 23.10.08Country Visit LT 23.10.08

SEIS in practice at EEA (II)

Country Visit LT 23.10.08Country Visit LT 23.10.08

SEIS in practice at EEA (III)

Country Visit LT 23.10.08Country Visit LT 23.10.08

New EC funded projects New EC funded projects supporting SEIS implementationsupporting SEIS implementation

• NESIS Network to enhance a European

Environmental Shared and Interoperable Information System

• HARMON Baseline assessment of the operational

capacity of the EU27 MS to collect data required for the implementation of the environmental acquis.

Country Visit LT 23.10.08Country Visit LT 23.10.08

Next stepsNext steps

• SEIS Task Force with Member States first meeting (29 Sep 08), next meeting March 09 Candidates 2 subgroups (legal + ICT)

• EEA new strategy 2009-2013 EEA Management Board - 26 Nov 08 Review Eionet

• EC legislative proposal Spring 2009

• SEIS implementation plan EEA/Eionet continuing... EC 2010