34
Kernkraftwerk Leibstadt 24 rd Meeting IAEA TWG-NPPCI Vienna 22.24.05.2013 Slide 1 Country Report Switzerland 2013 Manfred Märzendorfer NPP Leibstadt Switzerland (KKL)

Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

  • Upload
    ngoque

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 1

Country Report Switzerland 2013

Manfred Märzendorfer NPP Leibstadt Switzerland (KKL)

Page 2: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 2

Content

Swiss key production figures

Major I&C activities in Swiss NPP‘s

Main consequences of Fukushima

Swiss recommendations

Page 3: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 3

NPP‘s - rated power (net) & quota on electricity production

KKG

KKB1+2

KKL

KKM

KKM 373 MW

1972

KKG 985 MW

1979

KKL 1220 MW

1984 Power uprate

KKB 365 + 365 MW

1969 + 1971

53.7 %

Hydro

40,7 %

Nuclear

5,6 %

Other

PSI

2011:

62‘900 GWh

Page 4: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 4

Swiss NPP – Net Production 2000 - 2012

24987 2532025914 25961 25450

22019

26300 26390 26435 2619425275 25700

24477

0

5000

10000

15000

20000

25000

30000

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

GW

h

Page 5: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 5

Swiss NPP – Performance figures 2000 – 2012

Time availability (average)

Energy utilization (average)

Unplanned

Scrams (total)

90.9

2

91.8

6

93.7

2

93.9

8

92.2

6

84.7

2 94.1

6

94.0

0

93.4

3

92.6

2

89.6

0

88.9

8

87.2

8

89.5

6

92.1

8

92.3

0

91.3

2

91.3

2

84.3

2 93.4

6

93.4

8

92.8

8

92.1

0

88.7

8

88.2

6

86.5

6

1 3 2 4 4 2 03 3 3

0 03

0

10

20

30

40

50

60

70

80

90

100

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

%

prolonged outage KKL

(Feedwater Nozzle)

all 3 Scrams I&C related

Page 6: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 6

NPP Beznau - www.nok.ch → Kernenergie

Page 7: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 7

NPP Beznau – I&C-Projects since 2011 (completed)

Plant Process Computer (NEXIS)

- Replacement of the 8.4 WDPF- based Process Information System incl.

AWARE & COMPRO with an Emerson Ovation 3.5 System from Westinghouse

Upgrade of Teleperm XS

- Upgrade of the reactor protection- & control-system from Siemens AREVA from

Release 2.38c to Release 3.6 including deterministic physical barrier regarding

IT-Security

Page 8: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 8

NPP Beznau – I&C-Projects since 2011 (in progress)

Independent Emergency Power Supply (AUTANOVE)

- I&C for emergency dieselgenerators & their auxiliaries etc. COMMON-Q

Diesel-Building North

(photomontage)

Diesel-Building South

(photomontage)

Page 9: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 9

NPP Gösgen - www.kkg.ch

Page 10: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 10

NPP Gösgen – I&C-Projects since 2011 (completed)

Process Control System Modernization

- Bypass control (TUREG-4) Teleperm XS

- Aeroball Flux Measurement (calibration system for PDD‘s)

Plant Process Computer (PRODIS)

- Interface to digital I&C (TUREG-4) via MODBUS-Protocol

- Interface to new Neutron Flux Measurement via Gateway

Page 11: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 11

NPP Gösgen – I&C-Projects since 2011 (in progress, planned)

Process Control System Modernization (LETA)

- Reactor control & power limitation Teleperm XS

- Feedwater control / Emergency feed control Teleperm XS

- Rod control & Rod position display

Plant Process Computer (PRODIS)

- Interface to digital I&C (TUREG-2/3) via MODBUS-Protocol

- Migration to Windows 7

Main Control Room

- 1 to 1 replacement of desk & panel hardware (mosaic technique)

Page 12: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 12

NPP Gösgen – LETA

Closed loop control Limitations

Page 13: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 13

NPP Mühleberg - www.bkw-fmb.ch → Produktion → Unsere Kraftwerke → …

Page 14: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 14

NPP Mühleberg – I&C-Measures since 2011 (completed)

Strengthening Main Cooling Water Supply

Automatic isolation of Auxiliary Cooling Water to Intercooler in Reactor

Building

Flood control

Adaptions together with renewal of Feedwater- and

Recirculationpumpdrives

Page 15: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 15

NPP Leibstadt - www.kkl.ch

Page 16: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 16

NPP Leibstadt – I&C-Projects since 2011 (completed)

PCS - Modernization step 2 (ANIS+ NAMOD)800xA/AC800M

- Demineralization plant - street 1 (Div 10) / street 2 (Div 20)

- 6 new cabinets (replacing 10 old cabinets)

- conventional operator desk replaced by operator stations

- Heating central (steam transformers) Div 10 & 20

- 2 new cabinets (replacing 2 old cabinets and pneumatic control)

- conventional operator panel replaced by operator station

Page 17: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 17

NPP Leibstadt – I&C-Projects since 2011 (completed)

Rod Control & Information System

- Replacement of transponders and display GE OE

Flux Monitoring

- Replacement of SRM- and IRM-Monitoring by a WRM-Solution NUMAC

Page 18: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 18

HVAC-Systems (non safety related):

• Containment systems, Annulus systems

• Reactor auxiliary building, Radwaste

• Spent fuel building

• Turbine building

--------------------------------------------------------

• Heating central completed 2012

Demineralization plant completed 2012

--------------------------------------------------------

Cooling tower makeup water plant

Condensate polishing plant

implementation outage 2013

PCS - Modernization step 2 (ANIS+ NAMOD) 800xA/AC800M

NPP Leibstadt – I&C-Projects since 2009 (in progress)

Page 19: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 19

Local Control Room - Demineralization, Cooling tower make up water

Dismantling operator desk

Demineralization plant

Operator station for Demineralization plant

(& Cooling tower make up water - in future)

Page 20: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 20

Local Control Room - Demineralization, Cooling tower make up water

New I&C components built in in existig cabinets

Page 21: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 21

Local Control Room – Condensate polishing plant

Operator station for Condensate polishing plant

Page 22: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 22

Operator station - overwiew display Condensate polishing plant

Page 23: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 23

NPP Leibstadt – I&C-Projects since 2009 (in progress)

Security Systems (ERSIS)

- Display and alarm management system Simatic S7/Rubin 3C

- Intrusion supervision

- Alarm intercoms, etc.

Fire protection and alarm management (TEBRA)

- Fire alarm management Simatic S7/WIN CC

- Fire protection systems Sinteso FC20xx

Page 24: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 24

NPP Leibstadt – I&C-Projects since 2011 (in progress)

PCS Platform-Upgrade to System Version 5.1 (ANIS+) - new servers and workstations for operator stations (OS)

- WS for OS displaced from MCR into electronic rooms Div. 10 & 20

- „Matrox“ technology to connect monitors, keyboards and mice via FO

- new monitors for OS (format from 4:3 to 16:9)

- new furniture for MCR (optimized for monitor based workplaces)

- new and additional large sccreen displays (format from 4:3 to 16:9)

Training Simulator-Upgrade according platform-upgrade (completed)

- preceding to plant for training purposes

- HW & maintenance optimization by virtualisation of all PCS-servers

Page 25: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 25

NPP Leibstadt – Upgraded Training Simulator

Page 26: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 26

NPP Leibstadt – I&C-Projects since 2011 (in progress)

Reactor Recirculation Pumps with Adjustable Speed Drives (YUMOD) - Speed control, Frequency Converter Supervision Simatic S7

- Cooling water system for Frequency Converters 800xA/AC800M

- HVAC for Frequency Converter & Auxiliaries rooms 800xA/AC800M

Flux Monitoring

- Replacement of APRM-Monitoring NUMAC

Process and Area Radiation Monitoring (NEX)

- New instrumentation for measuring and monitoring

- Improvement of the Activity Monitoring Concept

Page 27: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 27

NPP Leibstadt – I&C-Projects since 2011 (in progress)

Intermediate Storage Building for activated components (ZENT)

- I&C for HVAC systems 800xA/AC800M

- controlled area (zone)

- not controlled area

- Intrusion supervision Simatic S7/Rubin 3C

- access control, CCTV, etc.

- Fire protection Sinteso FC20xx

Page 28: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 28

Measures due to Fukushima Daiichi accident (among others)

I&C

Supervison of spent fuel pool cooling - Temperature- and Level Instrumentation enhancement / hardening

- in progress in all plants

Accident Management

External central storage of severe accident management equipment - common for all Swiss NPP

- earthquake proof, flood protected, accesable by road and helicopter

Emergency power generators, mobile pumps, power cables, coolant hoses, diesel in portable tanks, boric acid to prohibit chain reaction in reactor, tools, protection equipment and measuring devices for radiation protection, fire fighting equipment

Page 29: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 29

Consequence of Fukushima Daiichi accident

Page 30: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 30

Swiss Recommendations – order according priority (1)

Beyond design basis accidents

- a. Design modifications to mitigate severe accidents

- b. Seismic trip systems, severe accident monitoring

- c. Control room operability in severe accident sequences (primary protections,

redundancy)

- d. Improved instrumentation, communication networks, etc.

- e. Improved emergency response plans including command and control, off-

site preparations and off-site support

- f. How far beyond?

- g. Datalinks to regulator

- h. Crisis centres

Page 31: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 31

Swiss Recommendations – order according priority (2)

People” support

- c. Training, pre-job briefing

- d. Knowledge management, knowledge capture and retention, knowledge

presentation

- e. Emergency preparedness special trainings for emergencies and simulations

- i. Reduction of human errors

Cybersecurity

- a. Vulnerability of digital I&C systems in NPPs’ control and safety systems

Page 32: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 32

Swiss Recommendations – order according priority (3)

Standards, requirements and regulations, safety classifications,

definitions

- a. Harmonization and reduction (first, in safety systems only)

- b. Assistance with standards interpretation

- c. Harmonization of definitions

Information management and sharing (medium)

- a. Develop an information sharing system

- b. Lessons learned from incident reporting systems databases

- d. Network of I&C experts

IAEA should take a lead in analysis of I&C operations during and after

Fukushima accident progressions and publish report

Page 33: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 33

Swiss Recommendations – order according priority (4)

Wireless technology in normal operations and accident conditions

Online monitoring, diagnostics and prognostics

- a. How to separate process effects from sensor effects

- b. Adequacy of periodic testing

Page 34: Country Report Switzerland 2013 - Atoms for Peace … Replacement of the 8.4 WDPF- based Process Information System incl. ... - Temperature- and Level Instrumentation ... Wireless

Kernkraftwerk Leibstadt

24rd Meeting IAEA TWG-NPPCI – Vienna 22.– 24.05.2013 Slide 34

I thank you for your kind attention!