35
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis

Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis

Embed Size (px)

Citation preview

Council Rock High School South

Seth GlinskiConstruction Management

Spring 2003 Thesis

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Introduction Existing Conditions Structural Redesign Wall System Redesign Analysis Delivery Method

Analysis Recommendations

Agenda

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

IntroductionBuilding Overview

Building Architecture• 360, 000 SF Total Area• Two stories of classrooms• Large Auditorium and Gymnasium AreasSite Development• Full outdoor Tennis and Basketball Facilities• ¼ mile Track• Football, softball and baseball fields throughout site• Two road relocations

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

IntroductionConstruction Overview

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Construction Started – July 2000Scheduled Completion – September 2002

Total Cost: $74 millionBuilding Only: $40 million

Design-> Bid-> Build

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

IntroductionSite Overview

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

•Northampton Township, PA

•Suburb of Philadelphia

•Surrounding Neighborhoods

•Formerly Farmland

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

IntroductionOwner Overview

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

- 95% of students pursue higher education- Mean SAT score of 531.7V, 573.1M- 28 National Merit commendations

Current High School – Designed for 2000 students

Current Enrollment - 3000

One of the most affluent school districts in PA

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Existing ConditionsContract Overview

IntroductionExisting

ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

•Public Job

•Lump Sum

•Lowest Bidder

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Existing ConditionsOriginal Estimate

IntroductionExisting

ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Existing ConditionsOriginal Schedule

IntroductionExisting

ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

July 2000 – September 2002

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Existing ConditionsOriginal Cash Flow Chart

IntroductionExisting

ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Structural RedesignOverview of Original Design

IntroductionExisting ConditionsStructural

RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Structural RedesignOverview of Original Design

IntroductionExisting ConditionsStructural

RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Load-bearing CMU Block Walls

8” Hollow Core Plank

Concrete Slab

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Structural RedesignOverview of Original Design

IntroductionExisting ConditionsStructural

RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Why use this system?•Durability

•Acoustics

•Cost

•Ease Of Construction

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Structural RedesignSteel Design

IntroductionExisting ConditionsStructural

RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

•Concrete Spread Footings

•Steel Columns

•Steel Beams

•Lightweight Concrete Slab on Metal Deck

•Metal Non-Loadbearing Studs

Steel System Elements

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Structural RedesignSteel Design

IntroductionExisting ConditionsStructural

RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Assumptions•Live Load = 50 psf

•Dead Load = 30 psf

•Steel Strength = 50 ksi

•Concrete Strength = 3 ksi

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Structural RedesignSteel Beam Layout

IntroductionExisting ConditionsStructural

RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Structural RedesignSteel Design

IntroductionExisting ConditionsStructural

RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Wall SystemOverview

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Option 1 : Non-loadbearing concrete block

Option 2 : Gypsum Wall Board

Time ??

Cost ??

Durability ??

Acoustics ??

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Wall SystemFiberock

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

•Easy to Install•Ample Fire Rating

Very High Impact Abuse Resistant Gypsum Wallboard

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Wall SystemAcoustics

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

TL = 10 log (1/ τ)

TL = Transmission Lossτ = Transmission

Coefficient.

•Good Acoustics Necessary to Provide an Appropriate Environment for Learning

•Sound Transmission Between Classrooms is Vital

Transmission Loss Equation

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Wall SystemAcoustics

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

TL = 10 log (1/ τ)

TL = Transmission Lossτ = Transmission Coefficient.

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Redesign AnalysisSchedule

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Original Design – CMU/Plank Construction

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Redesign AnalysisSchedule

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Redesigned Steel Schedule

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Redesign AnalysisSchedule

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Start DateDec. 1Dec. 1

SystemOriginal

Proposed

Completion DateNov. 12May 21

•Proposed System Saves 6 months

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Redesign AnalysisCost

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Original Design Estimate

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Redesign AnalysisCost

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Steel Redesign Estimate

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Redesign AnalysisCost

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Original Design - $2,053,378Steel Redesign - $1,696,437

Savings = $356,941

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

Redesign AnalysisConstructability

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Cranes?•Already 2 On Site•Needed for Plank Installation

Sequencing?•Divide by section•Divide by floor

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Delivery Method AnalysisCouncil Rock Contract Structure

Pennsylvania State Law Requires CM

19 Prime Contractors

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Delivery Method AnalysisContract Structure in Other States

General Contractor Runs Construction Process

Electrical, Plumbing, HVAC Contractors

Subcontractors

Owner Manages the Project Without Assistance

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Delivery Method AnalysisAdvantages of CR’s Structure

•Construction Knowledge Brought to

the Owner

•Value Engineering During Design

•CM Doesn’t Hold Contracts

•Planning and Public Relations by the

CM

•Managing Change Orders, Submittals,

RFI’s

•Fulltime On-site Supervision

•Smaller Bid Packages Promote

Lower/Local Bids

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Delivery Method AnalysisDisadvantages of CR’s CM Structure

•Contractor Bickering/ Finger-

pointing

•Lowest Bidder = Bad

Estimator

•Inability to Select Based on

Factors Other than Price

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

RecommendationsConclusion

Steel Redesign• Saves Time• Saves MoneyWall Redesign• Saves Time• Similar PerformanceConstruction Manager• Saves Money• Improved Management• It’s the Law

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Acknowledgements

The Architectural Engineering Faculty of Penn State

The Architectural Engineering Class of 2003

Donald Alderfer

Ted Kryven

Michael Holland

My Family and Friends

Seth GlinskiConstruction Management Option

Spring 2003 Thesis

IntroductionExisting ConditionsStructural RedesignWall SystemRedesign AnalysisDelivery Method

AnalysisRecommendations

Questions