Upload
mareeba-shire-council
View
213
Download
0
Embed Size (px)
DESCRIPTION
Â
Citation preview
Ordinary Meeting
Council Chambers Date: 18 March 2015
Time: 9:00am
AGENDA
THE ORDINARY MEETING OF THE MAREEBA SHIRE COUNCIL WILL BE HELD AT COUNCIL CHAMBERS, ON WEDNESDAY, 18 MARCH 2015 AND THE ATTENDANCE OF EACH COUNCILLOR IS REQUESTED.
PETER FRANKS CHIEF EXECUTIVE OFFICER
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 3
ORDER OF BUSINESS MEMBERS IN ATTENDANCE APOLOGIES/LEAVE OF ABSENCE/ABSENCE ON COUNCIL BUSINESS BEREAVEMENTS/CONDOLENCES DECLARATION OF ANY MATERIAL PERSONAL INTERESTS/CONFLICTS OF INTEREST CONFIRMATION OF MINUTES BUSINESS ARISING OUT OF MINUTES OF PREVIOUS MEETING DEPUTATIONS AND DELEGATIONS CORPORATE AND COMMUNITY SERVICES ............................................................................... 5
REGIONAL LAND USE PLANNING ............................................................................................ 5 ITEM-1 Application to Lease USL - Lot 358 on OL451 & Lot 40 on AP13736, Parish of
Tinaroo ..................................................................................................................... 5
ITEM-2 Application to enter Irvinebank State School in the Queensland Heritage Register .................................................................................................................. 13
ITEM-3 JM Lund - Reconfiguring a Lot - Subdivision (1 into 2 Lots) - Lot 1 on RP741791 Mines Road, Mareeba - DA/15/0006 ..................................................... 35
GOVERNANCE AND COMPLIANCE ........................................................................................ 49 ITEM-4 Raleigh Street Dimbulah Community Centre .......................................................... 49
FINANCE .................................................................................................................................. 59 ITEM-5 Financial Statements for the Period Ending 28 February 2015 ............................... 59
INFRASTRUCTURE SERVICES .................................................................................................. 67
TECHNICAL SERVICES ........................................................................................................... 67 ITEM-6 Mareeba Cenotaph ................................................................................................. 67
ITEM-7 Bridges Renewal Program - Grove Creek Bridge, Speewah ................................... 73
WORKS..................................................................................................................................... 77 ITEM-8 Infrastructure Services - Works Section - Progress Report - February 2015 ........... 77
WATER & WASTE .................................................................................................................... 85 ITEM-9 Contract FNQ004 Collection & Removal of Ferrous Metal & Used Lead Acid
Batteries - Contractual Matter ................................................................................. 85
ITEM-10 Infrastructure Services - Water and Wastewater Group - Monthly Report - February 2015 ........................................................................................................ 89
ITEM-11 Infrastructure Services - Waste Operations Report - February 2015 ................. 97
Summary of new planning Applications and delegated decisions for the month of february 2015 ....................................................................................................... 103
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 4
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 5
CORPORATE AND COMMUNITY SERVICES
REGIONAL LAND USE PLANNING
ITEM-1 APPLICATION TO LEASE USL - LOT 358 ON OL451 & LOT 40 ON AP13736, PARISH OF TINAROO
DOCUMENT INFORMATION
MEETING: Ordinary
MEETING DATE: 18 March 2015
REPORT OFFICER’S TITLE: Senior Planner DEPARTMENT: Corporate and Community Services
EXECUTIVE SUMMARY
Application has been made to the Department of Natural Resources and Mines (DNRM) for the issue of a lease over land described as Lot 358 on OL451 and Lot 40 on AP13736, Parish of Tinaroo. The proposed use of the land is grazing. DNRM seeks Council's views on the issue of the lease and also whether Council has knowledge of any local non-indigenous cultural heritage values associated with the land.
OFFICER'S RECOMMENDATION
"That Council offer no objection to the issue of a term lease for grazing purposes over land described as Lot 358 on OL451 and Lot 40 on AP13736, Parish of Tinaroo and advise the Department of Natural Resources and Mines that Council has no knowledge of any local non-indigenous cultural heritage values associated with the land."
BACKGROUND
DNRM is currently considering an application to lease unallocated State land described as Lot 358 on OL451 and Lot 40 on AP13736, Parish of Tinaroo. Lot 358 on OL451 has an area of 2,370 hectares and has frontages to Emerald Falls Road, and Tinaroo Creek Road. Both of these roads are formed to gravel standard for their frontage with the subject land. Practical access is also obtained off Henry Hannam Drive however a Sunwater Channel allotment legally separates the subject land from Henry Hannam Drive. Lot 40 on AP13736 has an area of 21.1 hectares and can only be accessed through adjoining Lot 358.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 6
Both lots remain extensively vegetated. A high voltage transmission line traverses Lot 358. Several long term mining leases and an extractive industry are established within Lot 358. Should a lease be granted, it is proposed that the land be used for grazing purposes.
Map Disclaimer: Based on or contains data provided by the State of Queensland (Department of Environment and Resource Management) (2009). In consideration of the State permitting use of this data you acknowledge and agree that the State gives no warranty in relation to the data (including accuracy, reliability, completeness, currency or suitability) and accepts no liability (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 7
Map Disclaimer: Based on or contains data provided by the State of Queensland (Department of Environment and Resource Management) (2009). In consideration of the State permitting use of this data you acknowledge and agree that the State gives no warranty in relation to the data (including accuracy, reliability, completeness, currency or suitability) and accepts no liability (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws. DNRM seeks Council's views on the issue of the lease and also whether Council has knowledge of any local non-indigenous cultural heritage values associated with the land.
LINK TO CORPORATE PLAN
Nil
CONSULTATION
Internal Nil External Nil
LEGAL AND RISK IMPLICATIONS (STATUTORY BASIS, LEGAL AND RISKS)
Nil
POLICY IMPLICATIONS
The subject land is zoned Rural under the Mareeba Shire Planning Scheme 2004. There is no objection to the use of the land for grazing purposes. There are no known non-indigenous cultural heritage values associated with the subject land.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 8
FINANCIAL & RESOURCE IMPLICATIONS
Capital Nil Operating Nil
IMPLEMENTATION/COMMUNICATION
The Department of Natural Resources and Mines will be informed of Council's decision by letter.
ATTACHMENTS
1. Department of Natural Resources and Mines letter dated 5 March 2015 Date Prepared: 9 March 2015
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 9
ATTACHMENT 1
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 10
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 11
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 12
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 13
ITEM-2 APPLICATION TO ENTER IRVINEBANK STATE SCHOOL IN THE QUEENSLAND HERITAGE REGISTER
DOCUMENT INFORMATION
MEETING: Ordinary
MEETING DATE: 18 March 2015
REPORT OFFICER’S TITLE: Senior Planner DEPARTMENT: Corporate and Community Services
EXECUTIVE SUMMARY
The Department of Education and Training (DET) has made application to the Department of Environment and Heritage Protection (DEHP) proposing the entry of the Irvinebank State School on land described as Lot 62 on RP846882 and Lot 10 on RP711014 (access road), situated at High Street, Irvinebank in the Queensland Heritage Register. DET believes that the Irvinebank State School is significant for demonstrating the pattern of development of schools in Queensland and satisfies cultural heritage criteria (a), (d), (f) and (g). These criteria are outlined in the application documentation included as Attachment 1 of this report. DEHP seeks Council's views on the proposed entry.
OFFICER'S RECOMMENDATION
"That Council: 1. offer no objection to the application to enter Irvinebank State School on land described
as Lot 62 on RP846882, situated at High Street, Irvinebank in the Queensland Heritage Register.
2. advise the Department of Environment and Heritage Protection that Lot 10 on RP711014 is a freehold allotment which is not owned by the Department of Education and Training and is not used as an access road to the Irvinebank State School. The access road to the Irvinebank State School is situated immediately to the north-west of Lot 10 on RP711014."
BACKGROUND
DEHP is currently considering an application to enter the Irvinebank State School on land described as Lot 62 on RP846882, situated at High Street, Irvinebank in the Queensland Heritage Register.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 14
Map Disclaimer: Based on or contains data provided by the State of Queensland (Department of Environment and Resource Management) (2009). In consideration of the State permitting use of this data you acknowledge and agree that the State gives no warranty in relation to the data (including accuracy, reliability, completeness, currency or suitability) and accepts no liability (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws.
Map Disclaimer: Based on or contains data provided by the State of Queensland (Department of Environment and Resource Management) (2009). In consideration of the State permitting use of this data you acknowledge and agree that the State gives no warranty in relation to the data (including accuracy, reliability, completeness, currency or suitability) and accepts no liability (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 15
The application also includes Lot 10 on RP711014 which is described in the supporting documentation as containing the school's access road. Council's 2011 aerial imagery clearly indicates that the school's access road is situated immediately to the north-west of Lot 10 on RP711014. The site plan forming part of the DET's application documentation places the school infrastructure too far south, thus incorrectly giving the appearance that the school's access road crosses Lot 10.
LINK TO CORPORATE PLAN
Nil
CONSULTATION
Internal Nil External Nil
LEGAL AND RISK IMPLICATIONS (STATUTORY BASIS, LEGAL AND RISKS)
Nil
POLICY IMPLICATIONS
DEHP seeks Council's views on the application. To be considered properly made, any objection to the proposed listing must be made on the basis that the Irvinebank State School fails to satisfy any of the standard cultural heritage criteria. Council officers are not aware of any strong grounds to argue that the Irvinebank State School on Lot 62 on RP846882 does not meet some relevant heritage criteria. As previously discussed, the application also includes Lot 10 on RP711014 which is described in the supporting documentation as containing the school's access road. Council's 2011 aerial imagery clearly indicates that the school's access road is situated immediately to the north-west of Lot 10 on RP711014. Lot 10 on RP711014 should not be included in the listing of the Irvinebank State School.
FINANCIAL & RESOURCE IMPLICATIONS
Capital Nil Operating Nil
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 16
IMPLEMENTATION/COMMUNICATION
The Department of Environment and Heritage Protection will be informed of Council's decision by letter.
ATTACHMENTS
1. Department of Environment and Heritage Protection letter of 24 February 2015 Date Prepared: 3 March 2015
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 17
ATTACHMENT 1
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 18
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 19
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 20
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 21
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 22
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 23
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 24
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 25
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 26
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 27
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 28
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 29
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 30
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 31
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 32
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 33
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 34
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 35
ITEM-3 JM LUND - RECONFIGURING A LOT - SUBDIVISION (1 INTO 2 LOTS) - LOT 1 ON RP741791 MINES ROAD, MAREEBA - DA/15/0006
DOCUMENT INFORMATION MEETING: Ordinary MEETING DATE: 18 March 2015 REPORT OFFICER’S TITLE: Senior Planner DEPARTMENT: Corporate and Community Services
APPLICATION DETAILS
APPLICATION PREMISES
APPLICANT JM Lund ADDRESS Mines Road, Mareeba
DATE LODGED 5 February 2015 RPD Lot 1 on RP741791
TYPE OF APPROVAL
Development Permit
PROPOSED DEVELOPMENT
Reconfiguring a Lot - Subdivision (1 into 2 lots)
FILE NO DA/15/0006 AREA 9,999m2
LODGED BY Twine Surveys Pty Ltd OWNER JM Lund
PLANNING SCHEME
Mareeba Shire Planning Scheme 2004 (amendment no. 01/11)
ZONE Rural zone
LEVEL OF ASSESSMENT
Code Assessment
SUBMISSIONS n/a
ATTACHMENTS: 1. Proposal Plan/s
EXECUTIVE SUMMARY
Council is in receipt of a development application described in the above application details. The application is code assessable and was therefore not required to undergo public notification. The applicant proposes the subdivision of the subject site into 2 x 4,999m2 allotments, which would separate the site's two (2) existing dwellings. Access to both proposed allotments will be gained via the southern end of Mines Road and Vicary Road. The subject land is mapped as containing Good Quality Agricultural Land (GQAL). The application and supporting material has been assessed against the relevant statutory planning instruments, including the FNQ Regional Plan, the State Planning Policy, and the
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 36
Mareeba Shire Planning Scheme (including codes and policies) and is in conflict with the rural subdivision provisions contained within the Planning Scheme. Both proposed allotments are well under the desired minimum resultant lot size of 60 hectares for land within the Rural Zone (where GQAL). Considering the size of the subject site, it is recognised that the land holds little agricultural potential, however both proposed allotments are still well under the 30 Ha desired resultant lot size for land not mapped as containing GQAL. The development conflicts with an overall intent of the rural zone as it would result in further fragmentation of land within the rural zone and the ad hoc creation of an additional poorly serviced rural lifestyle allotment. Despite the subject land having a total area of only 9,999m2 as well as two (2) existing dwellings, this is not considered to be sufficient grounds to justify approval. Approving this development application on the basis of the two existing dwelling houses would set an undesirable precedent for future subdivision within the rural zone due to the large number of rural allotments that contain multiple established dwelling houses (worker's cottages, caretaker's residences etc). For reasons outlined above, it is recommended that the application be refused.
OFFICER'S RECOMMENDATION
"1. That in relation to the following development application:
and in accordance with the Sustainable Planning Act 2009, the applicant be notified that the application for a development permit for the development specified in (A) is:
Refused by Council for reasons set out in (B).
(A) REFUSED DEVELOPMENT: Development Permit - Reconfiguring a Lot - Subdivision (1 into 2 lots)
APPLICATION PREMISES
APPLICANT JM Lund ADDRESS Mines Road, Mareeba
DATE LODGED 5 February 2015 RPD Lot 1 on RP741791
TYPE OF APPROVAL
Development Permit
PROPOSED DEVELOPMENT
Reconfiguring a Lot - Subdivision (1 into 2 lots)
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 37
(B) ASSESSMENT MANAGER’S REASONS FOR REFUSAL:
That Council consider: 1. The proposed development is in conflict with Part 4, Division 14, 4.78 of the
Rural Zone code:
Building Siting, Scale and Amenity S2 Agricultural activities are protected from incompatible land uses.
PS2.2 Non agriculture or agriculture – intensive uses which adjoin any
agriculture or agriculture – intensive uses are protected from spray drifts by the maintenance of a separation distance of 300 metres between the agriculture or agriculture – intensive uses and the non-agriculture or agriculture – intensive uses.
2. The proposed development is in conflict with Part 4, Division 14, 4.80 of the Rural Zone code:
Reconfiguring a Lot
S1 The viability of the farming industry throughout the shire and Good Quality Agricultural Land, and future opportunities for farming pursuits are not compromised.
PS1.1 Allotments to have a minimum area of 60 hectares and road frontage of 300 metres within the area identified on Agricultural Land Quality Maps S2, S3, S4 and S5; or
PS1.2 Allotments to have a minimum area of 30 hectares and road frontage of 150 metres if outside the area identified on Agricultural Land Quality Maps S2, S3, S4 and S5.
3. The proposed development is in conflict with land use policies 2.4.1, 2.4.2 and 4.6.1 of the Far North Queensland Regional Plan 2009-2031.
4. That there are not sufficient grounds to justify approval of the application, despite the identified conflicts."
THE SITE
The subject land is described as Lot 1 on RP741791, Parish of Tinaroo, County of Nares, situated on Mines Road, Mareeba, approximately 30 metres to the north of the Mareeba Airport. The land has an area of 9,999m2 and a frontage of approximately 240 metres to Mines Road. This section of Mines Road is not maintained by Council and is constructed as a basic dirt driveway standard. Access to the land is obtained off Vicary Road, via this short section of Mines Road.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 38
The land is flat and largely cleared of significant vegetation. Two (2) dwelling houses and multiple sheds are established on the land. Both dwellings are serviced with mains electricity, telecommunications and on site effluent disposal systems. The water supply for the land is sourced via water bore and irrigation water allocation.
Map Disclaimer: Based on or contains data provided by the State of Queensland (Department of Environment and Resource Management) (2009). In consideration of the State permitting use of this data you acknowledge and agree that the State gives no warranty in relation to the data (including accuracy, reliability, completeness, currency or suitability) and accepts no liability (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 39
Map Disclaimer: Based on or contains data provided by the State of Queensland (Department of Environment and Resource Management) (2009). In consideration of the State permitting use of this data you acknowledge and agree that the State gives no warranty in relation to the data (including accuracy, reliability, completeness, currency or suitability) and accepts no liability (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws.
The subject land is used for rural living purposes. Adjoining Lot 2 on RP741791 is zoned Rural and developed with a banana plantation. The Mareeba Airport is zoned Industry. Wylandra Estate is the closest rural residential zoned land, situated approximately 560 metres metres north of the subject land.
BACKGROUND AND CONTEXT Nil
PREVIOUS APPLICATIONS & APPROVALS In February 1985, Council approved Subdivision Application No. 496 for the subdivision of Portion 374 into two lots. The application was approved under the "one off" subdivision clause of Council's Subdivision by-law as it existed at the time. Registered Plan 741791 creating Lots 1 and 2 was registered in September 1985. Lots 1 and 2 on RP741791 are now under separate ownership.
DESCRIPTION OF PROPOSED DEVELOPMENT
The development application seeks a Development Permit for Reconfiguring a Lot - Subdivision (1 into 2 lots) in accordance with the plans shown in Attachment 1.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 40
The applicant proposes the subdivision of the subject site generally in half to create two 4,999.5 square metre allotments. The subdivision would separate the two existing dwellings onto individual allotments. The proposed allotments are as follows:
Proposed Lot 11 - area of 4,999.5 square metres, approximately 121 metres frontage to Mines Road.
Proposed Lot 12 - area of 4,999.5 square metres, approximately 119 metres frontage to Mines Road.
Both proposed allotments will contain an established dwelling house and will utilise existing electricity and telecommunications supplies. Both houses are serviced by separate on-site wastewater disposal systems and both allotments will be supplied with water from either bore or Sunwater irrigation supply. Access to each lot will be gained from Mines Road via two existing crossovers.
REGIONAL PLAN DESIGNATION
The subject site is included within the Regional Landscape and Rural Production Area land use category in the Far North Queensland Regional Plan 2009-2031. The Regional Plan Map 3- ‘Areas of Ecological Significance’ does not identify the site as being of any significance.
PLANNING SCHEME DESIGNATIONS
RELEVANT PLANNING INSTRUMENTS Assessment of the proposed development against the relevant planning instruments is summarised as follows:- (a) Far North Queensland Regional Plan 2009-2031 Assessment against the Regional Plan is required because the plan is not reflected in the planning scheme. The application is assessed as being capable of substantially complying with the relevant provisions of the Regional Plan, provided reasonable and relevant conditions are applied. The following Desired Regional Outcome Land Use Policies are relevant to the assessment of the application:
Strategic Framework designation: Mareeba Dimbulah Irrigation Area
Zone: Rural zone
Overlays Airport and Aviation Facilities Overlay Natural Disaster Bushfire Overlay
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 41
DRO 2.4 Primary Production & Fisheries
Land Use Policy Complies
Comments
2.4.1 Good quality agricultural land is protected from urban development outside the urban footprint.
× The subject site, including the two existing dwellings, is currently on a single title. The proposed development will separate the two dwellings and create an additional rural lifestyle allotment adjacent an actively farmed banana plantation. The operation of this banana plantation does involve the regular use of aerial crop spraying. Creating an additional rural lifestyle allotment (potentially under separate ownership) immediately adjacent an actively farmed rural property will create the opportunity for future land use conflict, placing unwanted pressure on surrounding farmers. While the subdivision may provide benefit to the applicant, there is not considered to be an overriding need in terms of benefit to the community. Although there are already two dwellings on the subject site, these dwellings are under concurrent ownership and would either be occupied by the applicant and his family, or leased out on a non-permanent basis.
2.4.2 Appropriate buffer distances between incompatible uses and agricultural operations on good quality agricultural land are provided through sensitive land use planning in accordance with State Planning Policy 1/92.
× Although SPP 1/92 lapsed in December 2012, its principles are still reflected in the Regional Plan and Planning Scheme and remain relevant to the assessment of this application. As mentioned above, the proposed development would result in the creation of an additional rural lifestyle allotment. Given the size and shape of the proposed allotments, Appropriate buffering in accordance with the lapsed SPP could not be achieved on either allotment.
DRO 2.6 Rural Subdivision
Land Use Policy Complies Comments
2.6.1 Further fragmentation of agricultural land in the regional landscape and rural production area is avoided to maintain economically viable farm lot sizes.
The subject site is situated within the RLRPA and is mapped as containing GQAL under the Planning Scheme Mapping. However, the site contains an area of just 9,999m
2 and is therefore considered to have little to no
agricultural viability at its current capacity.
The proposed development is not considered to be in conflict with Land Use Policy 2.6.1.
DRO 4.6 Rural Residential Development
Land Use Policy Complies Comments
4.6.1 New rural residential development is located in rural living areas.
× The FNQ Regional Plan defines rural residential purposes as follows: Rural residential purposes: residential purposes involving single dwellings on lots greater than 2500 square metres. Proposed Lots 11 and 12 with areas of 4,999.5 square metres each, can reasonably be considered as rural residential development. The subject land does not fall with the Rural Living area as identified under the repealed Far North Queensland Regional Plan 2009-2031 State Planning Regulatory
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 42
Provisions. The closest segment of rural living area to the subject land is Wylandra Estate, approximately 550 metres to the north.
DRO 7.1 Protection of Waterways, Wetlands and Water Quality
Land Use Policy Complies Comments
7.1.1 Development is planned, designed, constructed and managed in accordance with best practice environmental management to protect environmental values and meet water quality objectives of the Environmental Protection Policy (Water) 1997 (EPP Water) for regional surface water, groundwater and wetlands.
As both proposed lots would contain established dwelling houses, the development would be unlikely to have any further significant impact on water quality.
(b) State Planning Policies The Department of State Development, Infrastructure and Planning has introduced a single State Planning Policy (SPP) to replace the various SPP's previously in place. As such, this State Planning Policy is not reflected in the Planning Scheme and is therefore applicable to the assessment of the application. An officer assessment of the proposed development against the provisions contained within the SPP has been undertaken and it is not considered to be in conflict with any relevant aspect of the SPP.
Queensland State Planning Policy - July 2014
State Interest Complies Assessment Requirements & Comments
Natural hazards
A development application for a material change of use, reconfiguring a lot or operational works on land within:
(1) a flood hazard area, or
(2) a bushfire hazard area, or
(3) a landslide hazard area, or
(4) a coastal hazard area.
For all natural hazards:
Development:
(1) avoids natural hazard areas or mitigates the risks of the natural hazard, and
(2) supports, and does not unduly burden, disaster management response or recovery capacity and capabilities, and
(3) directly, indirectly and cumulatively avoids an increase in the severity of the natural hazard and the potential for damage on the site or to other properties, and
(4) avoids risks to public safety and the environment from the location of hazardous materials and the release of these materials as a result of a natural hazard, and
(5) maintains or enhances natural processes and the protective function of landforms and vegetation that can mitigate risks associated with the natural hazard, and
Comment
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 43
The subject land is flat and is not located within a flood hazard area. The land is located within a medium bushfire hazard area, however, if the reconfiguration is approved, both proposed lots would contain an established dwelling house. The reconfiguration will not result in an increase in the number of persons living or working in a natural hazard area. The development can be conditioned to minimise the risk of bushfire hazard.
Strategic airports and aviation facilities
A development application that involves land located within a local government area that contains or is impacted by a strategic airport identified in Table 2: Strategic airports (Part D) or an aviation facility identified in Appendix 1 of SPP Guideline: Strategic airports and aviation facilities if the development involves:
(1) a material change of use of premises which will result in work encroaching into the operational airspace of a strategic airport and is at least 12 metres high, or
(2) building work not associated with a material change of use mentioned in paragraph (1) that will result in work encroaching into the operational airspace of a strategic airport and is at least 12 metres high, or
(3) a material change of use of premises or reconfiguring a lot where any part of the land is within the 20 ANEF contour, or greater, for a strategic airport, or
(4) a material change of use of premises or reconfiguring a lot where any part of the land is within the public safety area of a strategic airport, or
(5) a material change of use of premises where any part of the land is within the lighting area buffer zone of a strategic airport, or
(6) a material change of use of premises where any part of the land is within the wildlife hazard buffer zone of a strategic airport, or
(7) a material change of use of premises which will result in work encroaching into the building restricted area of an aviation facility
12, or
(8) building work not associated with a material change of use mentioned in paragraph (7) that will result in work encroaching into the building restricted area of an aviation facility
12.
Development:
(1) complies with the SPP code: Strategic airports and aviation facilities (Appendix 4).
Comment
The Mareeba Airport is a Strategic Airport for the purpose of the SPP. The subject land is located immediately opposite the Mareeba Airport on the northern side of Vicary Road. The proposed development is for reconfiguring a lot only. There is no material change of use aspect. The subject land is located 75 metres north of the mapped 20 ANEF noise contour and is not located within a public safety area. The proposed reconfiguration would not conflict with this aspect of the SPP.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 44
(c) Mareeba Shire Planning Scheme 2004 (amendment no. 01/11) Relevant Development Codes
The following Development Codes are considered to be applicable to the assessment of the application:
Part 4, Division 14 Rural Zone Code Part 5, Division 8 Natural Disaster - Bushfire Overlay Code Part 6, Division 12 Reconfiguring a Lot Code
The application included a planning report and assessment against the planning scheme. An officer assessment has found that the application conflicts with several relevant acceptable solutions (or probable solutions/performance criteria where no acceptable solution applies) of the relevant codes set out below.
Relevant Codes Comments
Rural Zone Code The application can be conditioned to comply with the relevant acceptable/probable solutions contained within the code apart from the following:
Building Siting, Scale and Amenity - Specific Outcome S2 and Probable Solution PS2.2
Reconfiguring a Lot - Probable Solution PS1.1 & PS1.2
Refer to Planning Discussion section of report.
Natural Disaster Bushfire Overlay Code
The application can be conditioned to comply with the relevant acceptable/probable solutions contained within the code.
Reconfiguring a Lot Code The application can be conditioned to comply with the relevant acceptable/probable solutions contained within the code.
(e) Planning Scheme Policies/Infrastructure Charges Plan The following planning scheme policies are relevant to the application: No. 1 - Water Supply (Outside Reticulated Water Supply Area) At present the subject site gains water supply via an on-site bore and via the irrigation channel network. Should Council approve the application against this assessing officer's recommendation, it is recommended that conditions be attached to any approval requiring a potable water supply be provided to each proposed allotment. No. 4 - Development Manual The section of Mines Road between Vicary Road and the access to the existing dwelling houses does not meet the FNQROC Development Manual standard. If the development was to be approved, it should be conditional upon the upgrading of this section of Mines Road to FNQROC Development Manual standard.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 45
Due to the narrowness of the subject land and the proximity of the dwelling houses to Mines Road, a bitumen sealed road is suggested. (f) Adopted Infrastructure Charges Notice Roadworks The proposed subdivision is sought to separate the two existing dwellings established on the site. As such, both proposed allotments will contain an established dwelling and the development will therefore not result in any increase in vehicle traffic movements on Council's local area road network. An Augmentation of the Road Network Contribution is not considered necessary in this instance. Parks The proposed subdivision is sought to separate the two existing dwellings established on the site. As such, both proposed allotments will contain an established dwelling and the development will not result in an increase in population density or demand on Council's parklands and open space. An Open Space Contribution is not considered necessary in this instance. REFERRALS Concurrence This application did not trigger referral to any Concurrence Agencies. Advice This application did not trigger referral to any Advice Agencies. Internal Consultation Development Engineering - Access/road construction standards PLANNING DISCUSSION Noncompliance with the relevant acceptable/probable solutions outlined in the table above are summarised as follows: Rural Zone Code 4.78 Building Siting, Scale and Amenity
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 46
S2 Agricultural activities are protected from incompatible land uses. PS2.2 Non agriculture or agriculture – intensive uses which adjoin any agriculture or
agriculture – intensive uses are protected from spray drifts by the maintenance of a separation distance of 300 metres between the agriculture or agriculture – intensive uses and the non-agriculture or agriculture – intensive uses.
Comment The subject land adjoins an intensive banana plantation. The reconfiguration will increase the number of non-agricultural lots and likely the number of non-agricultural land owners adjoining this intensive banana plantation. There is insufficient area and distance available within the subject land to provide a suitable separation distance/vegetation buffer. Increasing the number of non-agricultural land owners who adjoin intensive agricultural uses will increase the potential for land use conflict complaints. The proposed reconfiguration does not protect the agricultural activities.
4.80 Reconfiguring a Lot S1 The viability of the farming industry throughout the shire and including Good Quality
Agricultural Land, and future opportunities for farming pursuits are not compromised. PS1.1 Allotments to have a minimum are of 60 hectares and road frontage of 300
metres within the area identified on Agricultural land Quality Maps S2, S3, S4 and S5; or
PS1.2 Allotments to have a minimum area of 30 hectares and road frontage of 150
metres if outside the area identified on Agricultural Land Quality Maps S2, S3, S4 and S5.
Comment The existing allotment at approximately 1 hectare in area is well below the minimum lot size nominated by PS1.1 and PS1.2. The subject land adjoins an intensive banana plantation. The reconfiguration will increase the number of non-agricultural lots and likely the number of non-agricultural land owners adjoining this intensive banana plantation. There is insufficient area and distance available within the subject land to provide a suitable separation distance/vegetation buffer. Increasing the number of non-agricultural land owners who adjoin intensive agricultural uses will increase the potential for land use conflict complaints. The proposed reconfiguration does not protect the agricultural activities and could compromise neighbouring farming pursuits/opportunities in the future.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 47
Although the subdivision may benefit the applicant, there is not considered to be any overriding benefit to the community or to Council as a result of the development. Having multiple dwellings on a single rural allotment is not adequate justification to further fragment rural land and if approved, would set a negative precedent for future subdivision in rural areas, especially considering the large number of rural allotments within the Shire that contain multiple dwellings. The proposed development conflicts with probable solutions PS1.1 and PS1.2, and Specific Outcome S1.
Conclusion It is considered that the application holds significant conflicts with both the Mareeba Shire Planning Scheme and the FNQ Regional Plan. Furthermore, there are not sufficient grounds to justify approval despite the evident conflicts. The application is recommended for refusal. Date Prepared: 25 February 2015
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 48
ATTACHMENT 1 APPROVED PLANS (ECM VS 3634097)
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 49
GOVERNANCE AND COMPLIANCE
ITEM-4 RALEIGH STREET DIMBULAH COMMUNITY CENTRE DOCUMENT INFORMATION
MEETING: Ordinary
MEETING DATE: 18 March 2015
REPORT OFFICER’S TITLE: Manager Development & Governance DEPARTMENT: Corporate and Community Services
EXECUTIVE SUMMARY
This report deals with the small subdivision carried out in Raleigh Street, Dimbulah some six (6) years ago to provide a number of lots for commercial purposes, and correspondence received from the Dimbulah Community Centre putting forward options for the development of a new Community Centre in Dimbulah. The report recommends that Council give consideration to making land within the subdivision available for the development of a new Community Centre.
OFFICER'S RECOMMENDATION
"That, subject to the appropriate planning processes being undertaken and full grant funding being available for the construction of a new Community Centre at Dimbulah, Council agree in principle to: 1. The reconfiguration of Lot 4 on SP198052, Parish of Masterton, County of Hodgkinson into two lots with frontages of 43 metres and 10 metres and areas of 1,002m² and 233m² respectively; 2. The making of the larger lot with an area of 1,002m² available for the development of the new Community Centre."
BACKGROUND
As a result of requests from the Dimbulah Chamber of Commerce for more commercial land in the Dimbulah CBD, the former Mareeba Shire Council (prior to amalgamation) decided to purchase land in Raleigh Street adjacent to the rail corridor, new Post Office and Information Centre for this purpose. The property was approved for development into six allotments as per the attached Survey Plan SP198052 and the development was carried out during amalgamation in 2009 by the Tablelands Regional Council. One of the lots was subsequently sold via the tender process, however, there has been a concern that the lot layout for the six lots was not ideal for commercial purposes and that the lots remaining should be reconfigured into a more appropriate layout.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 50
Options for the reconfiguration of the lots were prepared by Council's Surveyor (excluding Lot 1 which contains the park and Information Centre) and these options are attached. Some of the options include Lot 5 in the reconfiguration, however, this is the lot that has been sold and Council no longer has any ability to reconfigure this lot. The three lots available for reconfiguration are therefore lots 2, 3 and 4. Lots 2 and 3 have frontages of 10 metres and an area of 233m² each and lot 4 has a frontage of 53 metres and an area of 1,235m². Council has recently been approached by the Dimbulah Community Centre in relation to the development of a new Community Centre for Dimbulah as the existing facility has outgrown the limited space available to it. Two options have been put forward by the Community Centre, one being to build a new centre on lot 4 in Raleigh Street and the other to extend onto the existing Dimbulah Memorial Hall. In relation to lot 4 in Raleigh Street, it is considered that if Council is agreeable in principle to the proposal to construct a new Community Centre on this site, the area of the lot could be reduced to approximately 1,000m² and an additional lot with a frontage of 10 metres created adjacent to lots 2 and 3. This would then create three small lots with a frontage of 10 metres each which could then have the flexibility to be further reconfigured if necessary to meet particular commercial requirements eg 1 large lot x 699m²; 2 lots x 350m²; 1 lot x 233m² plus 1 lot x 466m². Subject to the Community Centre being successful in obtaining grant funding for their proposal and then proceeding with the project, an appropriate tenure arrangement would need to be negotiated for the use of the land, possibly a long term leasing arrangement.
LINK TO CORPORATE PLAN
COM 3 - Encourage the building of strong partnerships with community, private sector and government so as to build community capacity and develop strategies to encourage and support leadership and self-responsibility in the community.
CONSULTATION
Internal External Nil
LEGAL IMPLICATIONS (STATUTORY BASIS, LEGAL, RISKS)
Council would normally be required to go through a tender or auction process to dispose of land (including the lease of land), however, under the provisions of section 236(b) of the Local Government Regulation 2012, a local government is able to dispose of a valuable non-current asset (land) to: (i) a government agency; or (ii) a community organisation without going through the tender or auction process.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 51
POLICY IMPLICATIONS
NIL
FINANCIAL & RESOURCE IMPLICATIONS
There will be some costs (around $1,000) associated with the reconfiguration of the lots and development of appropriate tenure arrangements should Council agree to the proposal. In relation to the actual construction of a new Community Centre, Council's current budget situation does not allow for projects of this nature and unless this situation improves significantly, the project will have to be totally reliant on external grant funding.
IMPLEMENTATION/COMMUNICATION
Advice of Council's decision will be forwarded to the Dimbulah Community Centre.
ATTACHMENTS
1. Copy of Survey Plan SP198052. 2. Copy of options put forward by Council's Surveyor for the reconfiguration of the lots
fronting Raleigh Street. 3. Letter from the Grants Officer, Dimbulah Community Centre, putting forward options
for development of a new Community Centre in Dimbulah. Date Prepared: 9 March 2015
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 52
ATTACHMENT 1
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 53
ATTACHMENT 2
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 54
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 55
ATTACHMENT 3
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 56
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 57
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 58
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 59
FINANCE
ITEM-5 FINANCIAL STATEMENTS FOR THE PERIOD ENDING 28 FEBRUARY 2015
DOCUMENT INFORMATION
MEETING: Ordinary
MEETING DATE: 18 March 2015
REPORT AUTHOR/ OFFICER’S TITLE: Manager Finance DEPARTMENT: Corporate & Community Services
EXECUTIVE SUMMARY
The purpose of this report is to provide Council with an overview of financial matters for the period 1 July 2014 to 28 February 2015.
OFFICER'S RECOMMENDATION
"That Council note the financial report for the period ending 28 February 2015 and endorse the emergency purchases."
BACKGROUND
Financial Summary Each month, year to date financial statements are prepared in order to monitor actual performance against budgets. For the period ending 28 February 2015, Council shows an operational surplus of $14,508,689 compared to a budgeted YTD surplus of $12,155,213. The budget now reflects the Three Month Budget Review as adopted by Council at the 17 December 2014 meeting. One-off de-amalgamation costs for the purpose of this report are excluded. These costs are funded from the Queensland Treasury Corporation Working Capital Facility which has a repayment due date of 30 June 2015. It should be noted that Council's cash position is currently $21,308,170 and this represents an initial transfer of $17,000,000 from TRC. A final cash transfer (including interest) will take place on finalisation of the 31 December 2013 financial statements and will be based on the methodology provided in the Crowe Horwath report. The final Crowe Horwath report has been referred to the Minister.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 60
Capital Expenditure Total capital expenditure of $10,332,203 (including commitments) has been spent for the period ending 28 February 2015 against the annual budget of $12,892,876. The graph below illustrates actual YTD expenditure and committed costs against the annual budget. Income Analysis Total income (including capital income of $1,871,132) for the period ending 28 February 2015 is $46,432,785 compared to the YTD budget of $43,131,002.
February 2015 - Snapshot
Total Operating Income $ 44,561,653 Total Operating Expenditure $ 30,052,964 Operating Surplus $ 14,508,689 Total Capital Income (grants, developer contributions) $ 1,871,132
Net Result - Surplus $ 16,379,821
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 61
The graph below shows actual income against budget for the period ending 28 February 2015.
Variances to note are:
1. $116k of actual income relates to animal registrations and licence renewals, which all belong in July 2014; however the budget has been apportioned equally across 12 months. Also contributing to the favourable variance is the Mareeba Mausoleum & Memorial cemetery income which is $61K higher than YTD budget.
Description
Actual YTD Budget YTD Note
Net Rates & Utility Charges 25,705,740 24,889,012
Fees & Charges 906,726 689,619 1
Operating Grants, Subsidies & Contributions 6,658,466 6,374,871
Interest Received 285,011 384,057
Works for Third Parties 8,243,857 7,224,311 2
Other Revenue 2,761,853 2,547,417 3
Capital Income 1,871,132 1,021,716 4
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 62
2. The favourable variance relates to the majority of the Department of Main Roads major projects being already completed, however, YTD budget has been apportioned monthly. February RMPC claim estimated at $88K is yet to be lodged.
3. Favourable variances across a number of business sections, majority relating to the
waste fund.
4. $510k relates to developer contributions. Capital grants of $1.3M relates mainly to the construction of the pump station at Ibis Dam ($54k), the Mareeba Sewerage Treatment Plant upgrade ($30k), Chillagoe Water supply ($236k), Roads to Recovery ($577k) and TIDS ($317k).
Expenditure Analysis
Total expenses for the period ending 28 February 2015 is $30,052,964 compared to the YTD budget of $29,954,074. The graph below shows actual expenditure against budget for the period ending 28 February 2015.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 63
Loan Borrowings
Council's loan balances as at 28 February 2015 are as follows:
Rates and Sundry Debtors Analysis
Rates and Charges The total rates and charges payable as at 28 February 2015 is $13,601,422.03. Rates were levied on 17 February 2015 for the six (6) months January to June 2015 with the discount period closing on 20 March 2015. Total Gross Rates and Charges levied for the 6 month period was $13,147,136.55. Collection House collected $91,525 for the month of February. The outstanding amount for properties currently with debt collection is $356,036.13. Sundry Debtors
The total outstanding for Sundry Debtors as at 28 February 2015 is $1,722,722.87 which is made up of the following:
Procurement Two (2) emergency purchases were recorded for January as follows: Order Number
Quotation Process
Order Date
Supplier Name Order Amount
Reason
PWK01656 EMERGENC 9/2/2015 Mount Carbine 17,050 Extra materials required
Description
Actual YTD Budget YTD Note
Employee expenses 10,091,183 10,432,925
Materials & Services 13,959,006 13,642,702
Depreciation expenses 5,888,382 5,764,053
Finance & Borrowing costs 114,393 114,394
QTC Loans $2,068,568
De-amalgamation working capital facility
$5,095,102
Current 30 days 60 days 90 + days $774,092.90 $15,693.22 $11,561.14 $921,375.61
44.94% 0.91% 0.67% 53.48%
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 64
Quarries on a repair site on the highway
PWK01675 EMERGENC 12/2/2015 Mount Carbine Quarries
14,025 Extra materials required on a repair site on the highway
LINK TO CORPORATE PLAN
Nil
CONSULTATION
Internal Director Corporate & Community Services Financial Accountant External Nil
LEGAL IMPLICATIONS (STATUTORY BASIS, LEGAL RISKS)
Section 204 of the Local Government Regulation 2012 requires the financial report to be presented to local government…if the local government holds its ordinary meetings more frequently (than once per month) - to a meeting in each month.
POLICY IMPLICATIONS
Information has been provided to achieve compliance with Council's Procurement Policy.
FINANCIAL & RESOURCE IMPLICATIONS
Capital Nil Operating Nil
IMPLEMENTATION/COMMUNICATION
Nil
ATTACHMENTS
1. Financial Statements - February 2015
Date Prepared: 6/03/2015
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 65
ATTACHMENT 1
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 66
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 67
INFRASTRUCTURE SERVICES
TECHNICAL SERVICES
ITEM-6 MAREEBA CENOTAPH DOCUMENT INFORMATION
MEETING: Ordinary
MEETING DATE: 18 March 2015
REPORT OFFICER’S TITLE: Manager Technical Services DEPARTMENT: Infrastructure Services, Technical Services Group
EXECUTIVE SUMMARY
Council officers have identified a number of maintenance issues at the Mareeba Cenotaph which require rectification. These are:
damaged black tiles to the base of Cenotaph;
damaged lettering in the marble panels;
painting / cleaning of the soldier at the top of the Cenotaph;
painting of the field guns. This report provides various options and cost of refurbishment for each of the four components which go to make up the Cenotaph and its surrounds.
OFFICER'S RECOMMENDATION
"That Council give approval to:
replace the tiles at the base of the Mareeba Cenotaph;
replace the lettering on the marble panels;
paint the field guns insitu using Council staff with funding to be provided from developers contributions for parks in the Mareeba district."
BACKGROUND
The Anzac Memorial in Mareeba is located at Anzac Park on Byrnes Street, Mareeba and comprises of the main Cenotaph monument flanked by two (2) field guns. The Cenotaph consists of the tiled base, the main column on which names of the fallen are displayed on white marble and the soldier statue located at the top. Two (2) field guns are located in the park and on either side of the Cenotaph.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 68
The circular base of the Cenotaph is covered with black tiles with the majority being cracked or damaged. These tiles need replacing. Replacement with tiles similar to the existing but of a stronger material, more suitable to the local environment, will cost in the order of $3,500. Some of the black letters etched into the white marble panels on the column are missing and need to be replaced. A quote for $4,555 has been received to replace the missing letters, however this does not include temporary fencing or work platform. Therefore an allowance of approximately $5,000 would need to be made for this work to proceed. The soldier statue appears in relatively good order and only requires cleaning at this time. Should painting be required in the future indicative costs range from $600 to $1,200. The field guns paint work is badly scratched and requires repainting. Quotes for this work range from $6,000 to $11,200. Both quotes require the guns to be removed from site and in the case of the more expensive quote, the guns are proposed to be sandblasted prior to painting. No allowance has been made for traffic control while a crane is in operation and this is likely to add a further $1,000 to the above quotes. A possibly less expensive option is to use Council carpenters to lightly sand and repaint the guns on site. This is not likely to achieve the same standard of finish as would be obtained by having the guns professionally treated. However given the location and the likelihood of on-going damage, this option may be the most cost effective at this time. A cost for this work to be carried out by Council staff has been estimated to be in the order of $1,500. It is proposed that the above works could be funded from the anticipated operational budget surplus from the 2014/2015 budget.
LINK TO CORPORATE PLAN
COM 4 Encourage vibrant and active community participation in festivals and events, arts culture and natural heritage activities that celebrate the community and its cultural diversity and enrich lifestyle and encourage tourism.
CONSULTATION
Internal Mayor Chief Executive Officer Facilities Officer Grants and Engagement Project External Mareeba RSL Coordinator MSC Grant - Mapping our Anzac History - Mareeba Shire's Anzac Legacy
LEGAL AND RISK IMPLICATIONS (STATUTORY BASIS, LEGAL AND RISKS)
Nil
POLICY IMPLICATIONS
Nil
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 69
FINANCIAL & RESOURCE IMPLICATIONS
Capital The total cost for this work is expected to be approximately $10,000. Operating Nil Is the expenditure noted above included in the 2014/2015 budget?
This expenditure is not included in the 2014/2015 budget
If not you must recommend how the budget can be amended to accommodate the expenditure Funding is proposed from developers contributions for parks in the Mareeba district.
IMPLEMENTATION/COMMUNICATION
Nil
ATTACHMENTS
1. Photos of the Cenotaph and field guns. Date Prepared: 10 March 2015
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 70
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 71
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 72
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 73
ITEM-7 BRIDGES RENEWAL PROGRAM - GROVE CREEK BRIDGE, SPEEWAH
DOCUMENT INFORMATION
MEETING: Ordinary
MEETING DATE: 18 March 2015
REPORT OFFICER’S TITLE: Strategic Project Officer DEPARTMENT: Infrastructure Services
EXECUTIVE SUMMARY
Deputy Prime Minister and Minister for Infrastructure and Regional Development, Warren Truss, announced on 27 February 2015 that Mareeba Shire Council will receive $425,000 or a maximum of 50% (whichever is the lesser), to upgrade Grove Creek Bridge at Speewah under the Bridges Renewal Program.
OFFICER'S RECOMMENDATION
"That Council note the funding contribution from the Australian Government Department of Infrastructure and Regional Development for the upgrade of Grove Creek Bridge, Speewah and allocate $425,000 matching funding from depreciation and developers contributions in the Capital Works Budget for 2015/2016."
BACKGROUND
The Australian Government has committed $300 million over five (5) years from 2014/2015 to the Bridges Renewal Programme (BRP), with $114 million being committed for Round 1. The objectives of the BRP are to contribute to the productivity of bridges serving local communities, and facilitate safer higher productivity vehicle access. Seventeen bridges across Queensland have been successful in Round 1 of the funding program, including Grove Creek Bridge, Speewah. Mareeba Shire Council will receive $425,000 or a maximum of 50% (whichever is the lesser), to upgrade Grove Creek Bridge at Speewah to a dual lane concrete bridge under the Bridges Renewal Program. A further $425,000 will need to be funded by Council. This funding can be sourced from a combination of developer's contributions ($295,000) and depreciation ($130,000). The upgrade of the bridge will provide safe access into the Speewah community by heavy vehicles which are currently under restriction due to the outcome of a recent engineering assessment of the bridge, which resulted in a 5 tonne load limit and urgent remedial works. To meet the requirements for the funding allocation, construction must commence during the current financial year and will be completed in 2015/2016. During construction, signage will be erected on either side of the bridge to meet the Department of Infrastructure and Regional Development's signage requirements. These signs are similar to those required for the Black Spots programme projects. Council officers will also be required to send monthly progress reports to advise the amount expended, project status and any significant risk
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 74
factors that would affect meeting the next milestone in full. At the end of the project a post-completion report will be submitted and the Department of Infrastructure and Regional Development will then provide the funding amount up to a maximum of $425,000.
LINK TO CORPORATE PLAN
ECON 3 Undertake the management of Council’s assets in accordance with the long term asset management plans developed for all infrastructure asset classes to ensure the Shire's infrastructure networks are maintained and renewed to maximise their long term benefit to industry and the community.
CONSULTATION
Internal Chief Executive Officer Director Infrastructure Services Manager Technical Services Manager Works Senior Environmental Advisor Senior Engagement Officer External A community meeting will be arranged prior to the bridge upgrade works to brief the community on the process and plans.
LEGAL AND RISK IMPLICATIONS (STATUTORY BASIS, LEGAL AND RISKS)
Risk: The upgrade of the Grove Creek Bridge will mitigate the risk of bridge failure and will allow heavy and high productivity vehicles to safely access the community. The current single lane bridge has recently been inspected and a number of issues were identified that required a 5 tonne load limit to be imposed. Environmental: Environmental risks and requirements are being investigated by Council's Senior Environmental Advisor.
POLICY IMPLICATIONS
Nil
FINANCIAL & RESOURCE IMPLICATIONS
Capital This funding significantly reduces the capital burden to Council for replacing and upgrading the Grove Creek Bridge at Speewah. The bridge is at the end of its useful life and would have required replacement regardless of receiving federal government funding. Operating This funding and proposed capital upgrade will reduce the operational and reactive maintenance burden associated with maintaining a bridge in very poor condition and at the end of its useful life.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 75
Is the expenditure noted above included in the 2014/2015 budget?
The capital expenditure will be included in the 2015/2016 budget.
IMPLEMENTATION/COMMUNICATION
A community meeting will be arranged prior to the bridge upgrade works to brief the community on the process and plans.
ATTACHMENTS
1. Letter from the Hon Warren Truss, Deputy Prime Minister and Minister for Infrastructure and Regional Development
Date Prepared: 9 March 2015
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 76
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 77
WORKS
ITEM-8 INFRASTRUCTURE SERVICES - WORKS SECTION - PROGRESS REPORT - FEBRUARY 2015
DOCUMENT INFORMATION
MEETING: Ordinary Meeting
MEETING DATE: 18 March 2015
REPORT OFFICER’S TITLE: Manager Works
DEPARTMENT: Infrastructure Services, Works Group
EXECUTIVE SUMMARY
This report sets out works undertaken by the Transport Infrastructure, Parks and Gardens and Bridge Sections of Infrastructure Services during the month of February 2015.
OFFICER'S RECOMMENDATION
"That Council receive and note the Infrastructure Services Transport Infrastructure, Parks and Gardens and Bridge Sections - Progress Report for the month of February 2015."
BACKGROUND
Works Group Maintenance Activities Maintenance activities accruing more than $1,000 in expenditure were carried out in February at the following locations:
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 78
The table below shows the current budget position of road maintenance for Mareeba Shire Council.
So far this financial year to the end of February $95,226 has been spent on preparation and line marking work for the 2014/15 reseal and asphalt program. This money will eventually be moved to the appropriate capital works job resulting in a credit to the maintenance budget.
Capital Works Kuranda Community Precinct Car Park
Road Name Activity
Bilwon Road, Biboohra Bitumen patching
Contractor - Chillagoe General operations
Leafgold Weir Road, Dimbulah Road inspections, slashing
Sandy Creek Road, Dimbulah Slashing
Top Eureka Road, Dimbulah Slashing
Veness Road, Dimbulah Slashing
Euluma Creek Road, Julatten Road furniture, slashing
McDougall Road, Julatten Clean inlet/outlets culverts, grading unsealed roads, road furniture, slashing
Pinnacle Road, Julatten General repairs and maintenance, slashing
Sides Road, Julatten Road furniture, slashing
Barron Falls Road, Kuranda Bitumen patching, slashing
Kuranda Heights Road, Kuranda Culvert repairs, slashing
Myola Road, Kuranda Bitumen patching, slashing
Oak Forest Road, Kuranda Bitumen patching, bridge furniture, slashing
Rob Veivers Drive, Kuranda Bitumen patching, concrete footpath maintenance, slashing
Salamone Drive, Kuranda Bridge furniture, slashing
Victor Place, Kuranda Bridge inspections, slashing
Wrights Lookout Road, Kuranda Slashing
Anzac Avenue, Mareeba Bitumen patching, road furniture, road inspections, general repairs and maintenance
Road Name Activity
Chewko Road, Mareeba Bitumen patching, bridge furniture, grading unsealed roads, line marking for reseals, road furniture
Hoolahan Drive, Mareeba Clean inlet/outlets culverts, road inspections
Maria Close, Mareeba Bitumen patching, culvert repairs
Arnold Street, Mt Molloy Slashing
Clacherty Street, Mt Molloy Clean inlet/outlets culverts, road furniture, slashing
Fraser Road, Mt Molloy Grading unsealed roads, slashing
Main Street, Mt Molloy Slashing
Mount Mulligan-Kondaparinga Road, Mt Mulligan
Road furniture, road inspections
L A Road, Mona Mona Slashing
Mutchilba Road, Mutchilba Road inspections, slashing
Springs Road, Paddy's Green Bridge furniture, clean inlet/outlets culverts, road furniture, slashing
Speewah Road, Speewah Clean inlet/outlets culverts, slashing
Location YTD
Actual YTD
Budget Annual Budget
Mareeba Shire Council $2,008,992 $1,916,847 $2,875,271
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 79
Works commenced at the Kuranda Community Precinct Car Park in Arara Street in late January. The works include drainage improvements, concrete footpaths, sealed asphalt car parking, line marking and solar lighting Despite heavy rain the project is progressing well and the car park is programmed to be asphalt sealed the first week in March.
Costin Street Pavement Rehabilitation The design for the Costin Street Pavement Rehabilitation project is finalised and basic estimates and material quotations have been completed. It is estimated that project costs will be $493,000. Works will commence in March with the installation of subsoil drains. Third Party Works PEND-1926 Mossman - Mt Molloy Road Pavement Rehabilitation The above project was started on 02 February, 2015. Works include the excavation and replacement of the existing pavement with cement modified road base and a two coat bitumen seal of eleven sections of the Mossman - Mt Molloy Road. The total area of rehabilitated pavement is 13,200m2. The project is estimated to cost $1.426M and will take 63 working days to complete. A claim for $240,903 excluding GST was submitted to DTMR late February for works completed.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 80
DTMR Routine Maintenance Performance Contract (RMPC) Routine maintenance activities were undertaken during February at the following locations;
Location Activity
Kennedy Highway - Cairns / Mareeba Other bituminous surface work
Kennedy Highway - Cairns / Mareeba Other roadside work
Kennedy Highway - Cairns / Mareeba Pavement repairs, gravel (Mech. < 500m2 per 1km)
Kennedy Highway - Cairns / Mareeba Rest area servicing
Kennedy Highway - Cairns / Mareeba Tractor slashing, urban
Mulligan Highway - Mareeba / Molloy Other surface drain work
Mulligan Highway - Mareeba / Molloy Clean earth and concrete surface drains
Mulligan Highway - Mareeba / Molloy Emergency call out activities - remove fallen tree
Mulligan Highway - Mareeba / Molloy Repair or replace guide markers
Mulligan Highway - Mareeba / Molloy Other surface drain work
Mulligan Highway- Mareeba / Molloy Tractor slashing, rural
Mulligan Highway - Molloy / Lakeland Rest area servicing
Mulligan Highway - Molloy / Lakeland Roadside litter collection - rural
Mulligan Highway - Molloy / Lakeland Other roadside work
Mulligan Highway - Molloy / Lakeland Herbicide Spraying
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 81
The total claim to DTMR for the works listed above for the month of February was $88,662. Parks and Gardens Section
Maintenance Activities Parks and Gardens maintenance activities accruing more than $1,000 in expenditure were carried out in February at the following locations:
Location Activity
Mossman - Mt Molloy Road Emergency call out activities - remove tree over road
Mossman - Mt Molloy Road Emergency call out activities- cut up fallen tree
Mossman - Mt Molloy Road Herbicide spraying
Mossman - Mt Molloy Road Other bituminous surface work
Mossman - Mt Molloy Road Other sign work
Mossman - Mt Molloy Road Other vegetation control works
Mossman - Mt Molloy Road Repair signs (excluding Guide Signs)
Mossman - Mt Molloy Road Roadside litter collection - rural
Mareeba Connection Road Tractor slashing, urban
Herberton - Petford Road Emergency call out activities - assist Police with temp signage
Herberton - Petford Road Herbicide spraying
Mareeba - Dimbulah Road Herbicide spraying
Mareeba - Dimbulah Road Emergency call out activities - remove fallen tree
Mareeba - Dimbulah Road Other bituminous surface work
Mareeba - Dimbulah Road Other roadside work
Mareeba - Dimbulah Road Other vegetation control works
Mareeba - Dimbulah Road Repair or replace guide markers
Mareeba - Dimbulah Road Repair signs (excluding Guide Signs)
Mareeba - Dimbulah Road Surface correction
Mareeba - Dimbulah Road Tractor slashing, rural
Burke Developmental Road Herbicide spraying
Burke Developmental Road Other vegetation control works
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 82
The table below shows the current budget position of Parks and Gardens maintenance for Mareeba Shire Council.
Bridge Section Maintenance Activities Bridge maintenance activities accruing more than $1,000 in expenditure were carried out in February at the following locations:
The table below shows the current budget position of Bridge maintenance for Mareeba Shire Council.
Location
Parks and Gardens, Chillagoe
Basalt Gully and Bi-Centennial Lakes, Mareeba
Mary Andrews Gardens, Mareeba
Byrnes Street Medians, Mareeba
Council Office & Library, Mareeba
Mulligan Highway Approaches, Mareeba
Vaughan Park, Mareeba
Eales Park, Mareeba
Kuranda Parks, Library, CBD and Streets
Tom Mahon Park, Biboohra
Borzi Park, Mareeba
Davies Park, Mareeba
Brady Park, Mareeba
Mareeba Racecourse (Road Reserve), Mareeba
Vains Park, Mt Molloy
Junior Soccer Reserve, Dimbulah
Pony Club, Dimbulah
Mareeba Streets
Anzac Avenue, Mareeba
Corrective Services Labour - Mareeba
Irvinebank Mowing and Maintenance
Biboohra Streets
Location YTD
Actual YTD
Budget Annual Budget
Mareeba Shire Council $996,720 $962,255 $1,437,983
Location
Davies Creek Road Bridge Kuranda
Mona-Mona Big Rooty Creek
Mahogany Ave Culvert Ch .372, Speewah
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 83
LINK TO CORPORATE PLAN
ECON 3 - Undertake the management of Council's assets in accordance with the long term asset management plans developed for all infrastructure asset classes to ensure the Shire's infrastructure networks are maintained and renewed to maximise their long term benefit to industry and the community.
CONSULTATION
Internal Infrastructure Services staff External Nil
LEGAL AND RISK IMPLICATIONS (STATUTORY BASIS, LEGAL AND RISKS)
Nil
POLICY IMPLICATIONS
Nil
FINANCIAL & RESOURCE IMPLICATIONS
Capital Included in 2014/2015 budget Operating Included in 2014/2015 budget Is the expenditure noted above included in the 2014/2015 budget?
Yes
If not you must recommend how the budget can be amended to accommodate the expenditure Nil
IMPLEMENTATION/COMMUNICATION
Advice is provided to residents and businesses affected by any activities.
Location YTD
Actual YTD
Budget Annual Budget
Mareeba Shire Council $440,306 $587,426 $881,139
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 84
ATTACHMENTS
Nil Date Prepared: 10 March 2015
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 85
WATER & WASTE
ITEM-9 CONTRACT FNQ004 COLLECTION & REMOVAL OF FERROUS METAL & USED LEAD ACID BATTERIES - CONTRACTUAL MATTER
DOCUMENT INFORMATION
MEETING: Ordinary
MEETING DATE: 18 March 2015
REPORT OFFICER’S TITLE: Manager Water and Waste DEPARTMENT: Infrastructure Services, Water and Waste Group
EXECUTIVE SUMMARY
The Far North Queensland Regional Organisation of Councils (FNQROC) invited suitably qualified suppliers to tender for the collection and removal of ferrous scrap metal and/or used lead acid batteries across the FNQROC region. The tender was divided into two separable portions, enabling individual Councils and suppliers to participate in either one or both separable portions of the contract.
Separable Portion 1 – Ferrous Scrap Metal Separable Portion 2 – Used Lead Acid Batteries Suppliers were also requested to supply information to be used for a Register of Pre-Qualified Suppliers (ROPS) for waste collection and removal services.
The following Councils are involved in Separable Portion 1 – Ferrous Scrap Metal.
• Cairns Regional Council (CRC) • Cassowary Coast Regional Council (CCRC) • Cook Shire Council (CSC) • Croydon Shire Council (Croydon SC) • Douglas Shire Council (DSC) • Mareeba Shire Council (MSC) • Tablelands Regional Council (TRC) • Wujal Wujal Aboriginal Shire Council (WWASC) • Yarrabah Aboriginal Shire Council (YASC)
The following Councils are involved in Separable Portion 2 – Used Lead Acid Batteries.
• Cairns Regional Council (CRC) • Cook Shire Council (CSC) • Douglas Shire Council (DSC) • Mareeba Shire Council (MSC)
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 86
The intent of the contract is that ferrous metal and ULAB stockpiles are managed at acceptable levels and for Councils to achieve a fair and certain return for the value of the materials collected. The invitation received four (4) conforming tenders for both separable portions of the contract which were evaluated by the Tender Evaluation Committee. Sims Metal Management are recommended for both separable portions as they provided the most competitive offering both in terms of value for money and the provision of collection schedules that were considered suitable by all member Councils. The tendered rates provide cost benefit for participating Councils, with significant improvement in the price per tonne for both ferrous metal and used lead acid batteries together with improved service to the region enabled by the provision of pre-agreed service schedules. Whilst there are a number of Councils involved in the collective offer to the market, each Council will have an individual contract with the selected supplier as FNQROC does not have formal delegated authority to contract on behalf of Councils.
OFFICER'S RECOMMENDATION
"That Council: 1. Award Contract FNQ004, separable portion 1, Collection and Removal of Ferrous
Scrap Metal to Sims Metal Management Ltd based on the schedule of rates provided for 12 months from 1 May 2015 to 30 April 2016 with the option for a further 12 month extension.
2. Award Contract FNQ004, separable portion 2, Collection and Removal of Used Lead
Acid Batteries (ULABs) to Sims Metal Management Ltd based on the schedule of rates provided for 12 months from 1 May 2015 to 30 April 2016 with the option for a further 12 month extension.
3. Adopt the Register of Pre-Qualified Suppliers in accordance with the attached supplier
listing for 24 months from 1 May 2015 to 30 April 2017, with the option for a further 12 month extension.
4. Delegate authority to the Chief Executive Officer in accordance with the Local
Government Act 2009 to negotiate, finalise and execute any and all matters associated with these arrangements."
BACKGROUND
In July 2013 the Regional Waste Management Group identified scrap metal as an improvement opportunity, specifically the management of stockpiles and return on investment. There was dissatisfaction at the levels of service provided by current suppliers and also concern over the risks posed by the metal stockpiles accumulating across the region, particularly during cyclone season.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 87
Council officers were experiencing difficulty in getting suppliers to address issues regularly raised regarding the collection and removal of scrap metal and in securing the necessary improvements to their service. FNQROC Procurement were asked to undertake market research in order to better understand the market and data was gathered following discussions with Council officers, other local government agencies and suppliers in order to identify potential opportunities for improving the current individual arrangements in place. The research identified there were limited suppliers in the region and individual Councils were market-takers, competing with one another for scrap metal collection. As a result, Councils experienced a poor level of service from suppliers and a lack of certainty over revenue. In addition, research revealed the situation was impacted by vast fluctuations in the mixed ferrous metal market price, a situation further compounded by the US to AUD exchange rate. The geography of the region, distances between sites, cost and availability of transportation were also cited by suppliers as being problem factors. Suppliers were enthusiastic about the possibility of a regional arrangement, suggesting that a supplier-led collection schedule would enable them to realise a number of efficiency gains and economies of scale. It was also suggested that metal prices be linked to an appropriate rise and fall formula, minimising risk to the supplier and in turn providing some transparency in the return to Councils.
LINK TO CORPORATE PLAN
ECON 3 Undertake the management of Council's assets in accordance with the long term asset management plans developed for all infrastructure asset classes to ensure the Shire's infrastructure networks are maintained and renewed to maximise their long term benefit to industry and the community.
CONSULTATION
Internal Director Infrastructure Services Water and Waste Engineer Supervisor Waste Services External FNQROC FNQROC Board members Member council Waste Managers Member council Waste Coordinators/Technical Officers FNQROC officers undertook the consultation with: Scrap Metal supplier meetings: Newport Recycling – 6 February 2014 Sims Metal Management – 11 February 2014 One Steel – 13 February 2014
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 88
Rail Freight Operator Aurizon Government Agency Environment & Heritage Protection Local Councils Townsville City Council Regional Waste Groups Grampians Regional Waste Management Group, Vic Netwaste, NSW Midwaste, NSW
LEGAL AND RISK IMPLICATIONS (STATUTORY BASIS, LEGAL AND RISKS)
ROPS Risk Management Council is under no obligation to rank the submissions as the financial risk is minimal.
POLICY IMPLICATIONS
Nil
FINANCIAL & RESOURCE IMPLICATIONS
Capital Nil Operating Nil Is the expenditure noted above included in the 2014/2015 budget?
Nil
If not you must recommend how the budget can be amended to accommodate the expenditure Nil
IMPLEMENTATION/COMMUNICATION
Nil
ATTACHMENTS
Nil Date Prepared: 27 February 2015
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 89
ITEM-10 INFRASTRUCTURE SERVICES - WATER AND WASTEWATER GROUP - MONTHLY REPORT - FEBRUARY 2015
DOCUMENT INFORMATION
MEETING: Ordinary
MEETING DATE: 18 March 2015
REPORT OFFICER’S TITLE: Manager Water and Waste DEPARTMENT: Infrastructure Services, Water and Waste Group
EXECUTIVE SUMMARY
The purpose of this report is to summarise Council’s Water and Wastewater activities undertaken by the Infrastructure Services Department during the month of February 2015.
OFFICER'S RECOMMENDATION
"That Council receive and note the February 2015 Monthly Water and Wastewater Report."
LINK TO CORPORATE PLAN
GOV 3 Undertake a whole of Council service level review to establish sustainable operational costs across core local government business and consult with communities. 1. Capital Works Projects
Barang Street, Kuranda - all works now completed.
Arsenic Removal Plant at Chillagoe - Packaged Plant now commissioned and in operation.
Mareeba Industrial Park Water Booster Station - Delay in delivery of the standby generator is holding up completion of the project.
Kuranda Water Reservoir - Telstra phone lines relocated and earthworks currently underway.
Mareeba STP Process Design - underway, initial workshop held with Council officers on Tuesday, 24 February
Mareeba STP Critical Infrastructure Upgrade - Rising Main project design awarded to Jacobs Consulting Engineering. Design work commenced 23 February 2015.
2. Environmental Monitoring - Treatment
Mareeba STP non-compliant. Exceeded the Ammonia maximum limit.
Kuranda STP remains compliant with licence conditions.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 90
3. Budget - Water
Graphical - Revenue
Graphical – Expense
Expenses are higher than normal due to increased electricity charges and bulk water charges. Chemical costs are slightly higher due to the abnormal hot weather experienced through December and January requiring increased chemical dosing for treatment purposes.
0.00500,000.00
1,000,000.001,500,000.002,000,000.002,500,000.003,000,000.00
MSC Water Income to Month of February
Annual Budget YTD Budget YTD Actual
0.00
500,000.00
1,000,000.00
1,500,000.00
2,000,000.00
2,500,000.00
3,000,000.00
WaterTreatment Plant
Op/Mtce
WaterReticulation
Op/Mtce
WaterDepreciation
Water NCPAdmin Charges
MSC Water Expense to Month of February
Annual Budget YTD Budget YTD Actual
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 91
4. Budget - Wastewater Graphical - Revenue
Graphical – Expense
5. Chlorine Residual Readings
0.00500,000.00
1,000,000.001,500,000.002,000,000.002,500,000.003,000,000.003,500,000.004,000,000.004,500,000.00
Wastewater Rates WastewaterInterest Earned
Const Wks
Wastewater NCPInternal Revenue
Wastewater NCPCommunity Service
Obligation
Wastewater 3rdParty Works
Wastewater SundryIncome
MSC Wastewater Income to Month of February
Annual Budget YTD Budget YTD Actual
0.00
500,000.00
1,000,000.00
1,500,000.00
2,000,000.00
WastewaterTreatment Plant
Op/Mtce
WastewaterReticulation
Op/Mtce
WastewaterDepreciation
Wastewater NCPAdmin Charges
MSC Wastewater Expense to Month of February
Annual Budget YTD Budget YTD Actual
Chlorine Residual Readings 2015Australian Drinking Water Guidelines Maximum 5mg/L
February 2015 Mon 2nd Wed 4th Fri 6th Mon 9th Wed 11th Fri 13th Mon 16th Wed 18th Fri 20th Mon 23rd Wed 25th Fri 27th
Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L) Free Cl (mg/L)
Mareeba Rankine St 1.09 1.40 1.20 1.13 0.82 1.06 1.24 1.46 1.40 1.17 1.13 1.16
Wylandra Drive Mareeba 0.48 0.45 0.74 0.59 0.62 0.42 0.55 0.90 0.64 0.77 0.64 0.60
Gregory Terrace Kuranda 0.79 0.58 0.62 0.59 0.53 0.65 0.56 0.48 0.50 0.56 0.66 0.70
Mason Rd PS Kuranda 0.94 0.64 0.80 0.74 0.70 0.70 0.62 0.55 0.63 0.75 0.79 0.85
Chillagoe 0.28 0.26 0.26 0.28 0.26 0.26 0.36 0.34 0.32 0.32 0.32 0.33
Dimbulah 1.13 1.02 1.06 0.90 0.85 0.72 1.12 0.90 1.12 1.25 1.04 1.01
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 92
6. Mareeba Water Supply Scheme – Operations Data
7. Kuranda Water Supply Scheme - Operations Data
0
100
200
300
400
500
0
2,000
4,000
6,000
8,000
10,000
Jan
Feb
Ma
r
Apr
Ma
y
Jun
Jul
Aug
Sep
Oct
No
v
De
c
Rain
fall (
mm
)
Kilo
litr
es/D
ay
Mareeba WTP - Average Daily Production 2015
Average DailyProduction(kL per Day)
Rainfall (mm)
0
100
200
300
400
500
600
700
0
250
500
750
1,000
1,250
Jan
Feb
Ma
r
Apr
Ma
y
Jun
Jul
Aug
Sep
Oct
No
v
De
c
Rain
fall (
mm
)
Kilo
litr
es/D
ay
Kuranda WTP - Average Daily Production 2015
Average DailyProduction(kL per Day)
Rainfall (mm)
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 93
8. Mount Molloy Water Supply Scheme - Operations Data
0
100
200
300
400
500
600
700
0
250
500
750
1,000
1,250
Jan
Feb
Ma
r
Apr
Ma
y
Jun
Jul
Aug
Sep
Oct
No
v
De
c
Lit
res/D
ay/C
on
necti
on
Kuranda WTP - Average Daily Consumption by Connection
2015
Average DailyConsumption perConnection (L perDay)
Rainfall (mm)
0
100
200
300
400
500
0
25
50
75
100
125
Jan
Feb
Ma
r
Apr
Ma
y
Jun
Jul
Aug
Sep
Oct
No
v
De
c
Rain
fall (
mm
)
Kilo
litr
es/D
ay
Mt Molloy GS - Average Daily Production 2015
Average DailyProduction(kL per Day)
Rainfall (mm)
0
100
200
300
400
500
0
150
300
450
600
750
Jan
Feb
Ma
r
Apr
Ma
y
Jun
Jul
Aug
Sep
Oct
No
v
De
c
Rain
fall (
mm
)
Lit
res/D
ay/C
on
necti
on
Mt Molloy GS - Average Daily Consumption by Connection 2015
Average DailyConsumption perConnection(L per Day)
Rainfall (mm)
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 94
9. Dimbulah Water Supply Scheme - Operations Data
10. Chillagoe Water Supply Scheme - Operations Data
0
50
100
150
200
250
0
100
200
300
400
500
Jan
Feb
Ma
r
Apr
Ma
y
Jun
Jul
Aug
Sep
Oct
No
v
De
c
Rain
fall (
mm
)
Kilo
litr
es/D
ay
Dimbulah WTP - Average Daily Production 2015
Average DailyProduction(kL per Day)
Rainfall (mm)
0
50
100
150
200
250
0
250
500
750
1,000
1,250
Jan
Feb
Ma
r
Apr
Ma
y
Jun
Jul
Aug
Sep
Oct
No
v
De
c
Rain
fall (
mm
)
Lit
res/D
ay/C
on
necti
on
Dimbulah WTP - Average Daily Consumption by Connection 2015
Average DailyConsumption perConnection (L perDay)
Rainfall (mm)
0
100
200
300
400
500
0
50
100
150
200
250
Jan
Feb
Ma
r
Apr
Ma
y
Jun
Jul
Aug
Sep
Oct
No
v
De
c
Rain
fall (
mm
)
Kilo
litr
es/D
ay
Chillagoe BF - Average Daily Production 2015
Average DailyProduction(kL per Day)
Rainfall (mm)
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 95
11. Mareeba Wastewater Treatment Plant - Operations Data
0
100
200
300
400
500
845
850
855
860
865
870
Jan
Feb
Ma
r
Apr
Ma
y
Jun
Jul
Aug
Sep
Oct
No
v
De
c
Rain
fall (
mm
)
Lit
res/D
ay/C
on
necti
on
Chillagoe BF - Average Daily Consumption by Connection
2015
Average DailyConsumption perConnection(L per Day)
Rainfall (mm)
0
60
120
180
240
300
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
Jan
Feb
Ma
r
Apr
Ma
y
Jun
Jul
Aug
Sep
Oct
No
v
De
c
Rain
fall (
mm
)
Kilo
litr
es/D
ay
Mareeba STP - Average Daily Inflow 2015
Average DailyInflow(kL per Day)
Rainfall (mm)
0
60
120
180
240
300
0
250
500
750
1,000
1,250
1,500
Jan
Feb
Ma
r
Apr
Ma
y
Jun
Jul
Aug
Sep
Oct
No
v
De
c
Rain
fall (
mm
)
Lit
res/D
ay/C
on
necti
on
Mareeba STP - Average Daily Inflow by Connection 2015
Average DailyInflow perConnection(L per Day)
Rainfall (mm)
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 96
12. Kuranda Wastewater Treatment Plant - Operations Data
Date Prepared: 6 March 2015
0
150
300
450
600
750
0
100
200
300
400
500
Jan
Feb
Ma
r
Apr
Ma
y
Jun
Jul
Aug
Sep
Oct
No
v
De
c
Rain
fall (
mm
)
Kilo
litr
es/D
ay
Kuranda STP - Average Daily Inflow 2015
Average DailyInflow(kL per Day)
Rainfall (mm)
0
150
300
450
600
750
0
250
500
750
1,000
1,250
Jan
Feb
Ma
r
Apr
Ma
y
Jun
Jul
Aug
Sep
Oct
No
v
De
c
Rain
fall (
mm
)
Lit
res/D
ay/C
on
necti
on
Kuranda STP - Average Daily Inflow by Connection 2015
Average DailyInflow perConnection(L per Day)
Rainfall (mm)
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 97
ITEM-11 INFRASTRUCTURE SERVICES - WASTE OPERATIONS REPORT - FEBRUARY 2015
DOCUMENT INFORMATION
MEETING: Ordinary
MEETING DATE: 18 March 2015
REPORT OFFICER’S TITLE: Manager Water and Waste
DEPARTMENT: Infrastructure Services, Water and Waste Group
EXECUTIVE SUMMARY
The purpose of this report is to summarise Council’s Waste activities undertaken by the Infrastructure Services Department during the month of February 2015.
OFFICER'S RECOMMENDATION
"That Council receive and note the Infrastructure Services, Waste Operations Progress Report, February 2015."
BACKGROUND
The following is a summary of the waste activities undertaken during the month of February 2015.
1. Waste Operations
Recycled materials transported from outlying waste transfer stations to Mareeba waste transfer station this month.
Compaction of material transferred from the Old Mareeba Landfill to Cell 2 (to re-profile surface) completed.
Steel pad area cleaned up and fridge drop off area re-established.
Periodic green waste mulching completed in Kuranda and Mareeba.
All transfer stations and Mareeba landfill are currently operational.
2. Customer Service Waste Statistics The following graph displays customer requests logged in the Customer Request Management (CRM) system during the month of February 2015.
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 98
3. Waste Collected at Each of the Transfer Stations
Waste material collected at each of the waste transfer stations is either deposited directly to the Mareeba landfill, recycled or transported to the SITA facility in Cairns for processing. The following pie charts are separated into waste received as whole units and waste received as accrued tonnage.
\
5
17
3
MAREEBA SHIRE CUSTOMER REQUESTS (Number of Requests)
Missed Service
Repair/Replace
General Enquiries
14
27
4
117
MAREEBA SHIRE WASTE (Number of Units)
Animals
Batteries
Car Bodies
Equivalent Passenger tyres
11 27
520
MAREEBA SHIRE WASTE (Tonnes)
Building & Demolition
Scrap Metal
Domestic Household Waste
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 99
4. Waste to Mareeba Landfill The Mareeba Shire waste shown in the pie chart below is the waste collected at each of the waste transfer stations (Mareeba included), and deposited directly to the Mareeba landfill. The commercial waste shown below is derived from the SITA Bedminster plant in Cairns and deposited into the Mareeba landfill.
5. Revenue The income is derived from:
Commercial disposal (predominantly SITA)
Interest earned
Interest on Constrained Works
Recycling (steel, batteries)
Rates The expenditure is derived from:
Waste administration
Landfill management
Transfer station management
5,923
326
WASTE TO MAREEBA LANDFILL (Tonnes)
Sita Waste
Mareeba Shire Waste to Landfill(Domestic & Commercial)
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 100
6. Financial Operational Budget Information per budget Section Overall Graphical – Revenue
Graphical – Expenditure
LINK TO CORPORATE PLAN
ECON 3 Accordance with the long term asset management plans developed for all infrastructure asset classes to ensure the Shire's infrastructure networks are maintained and renewed to maximise their long term benefit to industry and the community. GOV 3 Undertake a whole of council service level review to establish sustainable operational costs across core local government business and consult with communities.
CONSULTATION
Internal Director Infrastructure Services Waste Staff
0
500,000
1,000,000
1,500,000
2,000,000
DomesticCollections
Unserviced Levy Scrap - NonFerrous Metal
CommercialDisposal
WASTE InterestEarned
Interest - Const'dWorks
MSC Waste Income to Month of February
Annual Budget YTD Budget YTD Actual
0
500,000
1,000,000
1,500,000
2,000,000
Waste Admin Landfills TransferStations
Collection Costs Recycling -Ferrous Metal
Depreciation -Waste
NCP AdminCharges
MSC Waste Expense to Month of February
Annual Budget YTD Budget YTD Actual
Please Note: There are costs associated with mulching green waste wrongly incorporated in the Recycling - Ferrous Metal
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 101
External Nil
LEGAL AND RISK IMPLICATIONS (STATUTORY BASIS, LEGAL AND RISKS)
Nil
POLICY IMPLICATIONS
Nil
FINANCIAL & RESOURCE IMPLICATIONS
Capital Nil Operating Nil Is the expenditure noted above included in the 2014/2015 budget?
Yes
IMPLEMENTATION/COMMUNICATION
Nil
ATTACHMENTS
Nil Date Prepared: 9 March 2015
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 102
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 103
APPENDIX - FOR INFORMATION SUMMARY OF NEW PLANNING APPLICATIONS AND DELEGATED DECISIONS
FOR THE MONTH OF FEBRUARY 2015
Mareeba Shire Council - Agenda Wednesday 18 March 2015
Page 104