4
5/19/2018 CO_TS_01-07-slidepdf.com http://slidepdf.com/reader/full/cots01-07 1/4 1. Test Script Scenario Description Maintenance of Overhead Master Data – Cost Element, Cost Center, Activity type and SKF Prepared by Janardhan, CO Consultant Test Case ID : UT-CO-01 to 07 Responsibility CO Core team MCM Status Closed Start Date : !!"#$"!#%# inis! Date : !!"#$"!#%# ". Setup Data #n$iron%ent Details Syste% DE& Client %'# Date !%"#$"!#%# Data Ob&ect 'alue ( Code Description Co%%ents and )otes Or*. Data used Controllin* area %### MCM Controllin( area Cost #le%ent +Pri%ary, GL Account is must. Cost #le%ent +Secondary,  Activity type must for Allocation of cost center cost through Assessment Cost Center Proit Center cti$ity Type Statistical /ey i*ure . Test # ec ut ion and Result s

CO_TS_01 - 07

Embed Size (px)

DESCRIPTION

CO_TS_01 - 07

Citation preview

Sample Template for Unit Test Plan

1. Test ScriptScenario Description

Maintenance of Overhead Master Data Cost Element, Cost Center, Activity type and SKFPrepared byJanardhan, CO Consultant

Test Case ID : UT-CO-01 to 07

Responsibility

CO Core team MCMLStatusClosed

Start Date : 22.07.2010Finish Date : 22.07.2010

2. Setup Data

Environment DetailsSystemDEVClient130Date21.07.2010

Data ObjectValue / CodeDescriptionComments and Notes

Org. Data usedControlling area1000MCML Controlling area

Cost Element (Primary)GL Account is must.

Cost Element (Secondary)Activity type must for Allocation of cost center cost through Assessment

Cost Center

Profit Center

Activity Type

Statistical key figure

3. Test Execution and ResultsStep No.Test Step InstructionsSAP Transaction Code Input DataExpected Test ResultOutput / Actual ResultOK / Not OKRemarks

01Creation / Change of Primary Cost elementKA01 (Create) / KA02 (Change)

KA04(Delete)Cost element category

Sales transaction 11

Sales deduction 12,

Other overheads 1.

408403-Extra Wages303101-Extra Income

301501-Extra Discount

301502-Extra Commission

02Creation / Change of Cost CenterKS01 (Create) / KS02 (Change)Create Cost Center, Validity period, Cost Center Category, Hierarchy node, Profit Center,Cost Center-ExtlbrChange of Cost Center Extlbr

03Deletion of cost center (Cost center deletion is year dependent)KS04Execute Test Run

If No entries in current year, Execute production run. Deletion of Cost Center-Extlbr

04Create / Change Cost Center GroupKSH1 (Create) / KSH2 (Change)Cost centers.

Whenever change in CC group is made, change Distribution/ Assessment cycle also if the same is used.Cost Center-ExtraAdmChange Cost Center Group- ExtraAdm

05Create / Change Secondary Cost ElementKA06 (Create) / KA02 (Change)Whether to assess cost of cost center through Assessment, Activity or Overhead rate for other works overheads.

If Assessment, Cost Element Category 42

If Activity C. Element Category 43.Secondary Cost Element-72000016-Extra PowerChange Secondary Cost Element-72000016-Extra Labour

06Deletion of secondary cost elementKA04Execute Test Run

If No entries in current year, Execute production run. Deletion of secondary cost Element-72000016-Extra Labour

07Create / Change Activity Type. Activity type will be used only for ProductionKL01 (Create) / KL02 (Change)UOM of activity (e.g. Hours), cost center Category (e.g. Production,

Allocation for planning

A type category 1

Secondary cost Element.

Price Indicator 1

Allocation for Actuals

A type category Blank Price Indicator 5

Output UOM (e.g. Hours)

Activity Type-ExtlbrChange Activity Type- Extlbr

08Delete Activity Type.KL04Execute Test Run

If No entries in current year, Execute production run. Delete Activity Type- Extlbr

09Create / Change / Delete Statistical Key Figure (Basis of Allocation)KK01 (Create) / KK02 (Change) /KK03DEL(Delete)SKF Name e.g. Production quantity, etc.

UOM MT.

Key Fig. Category Fixed values or Total values.

-To Try total values mode

SKF Name- Extra Labour, UOM-HR, Key Fig. Category- Total Values

10Cost Element GroupKAH1 (Create) / KAH2 (Change)Cost Element.

Whenever change in CE group is made, change Distribution/ Assessment cycle also if the same is used.-Cost Element Group-GRP_EXT

11Profit Center (creation, changes, deletion)KE51 (Create) / KE52 (Change)

Profit Center-EXTADM

12Profit Center GroupKCH1 (create)/ KCH2 change.Profit Center Group-P_VEH

13Internal OrderKO01 (Create)/KO02 (change)To capture the information on vehicles, mobiles etc. Statistical Internal orders requiredInternal Order-RA-GA-11

14Master Data Index Report

Cost Element

Cost Center

Activity Type

SKFKA23

KS13

KL13

KK04

4. Summary of Test Results

Test Passed / Failed :

Passed

Reasons (if failed):

Acceptance by (Name)Acceptance By (Signature)

MD.TARIQUL ALAM

Tested on :22.07.2010Acceptance on:

22.07.2010