Project: Balangkayan Townville
Location: Brgy. Cantubi, Balangkayan, Eastern Samar
Contractor: J.C. Tayag Builders, Inc.
QTY UNIT UNIT COST TOTAL COST
TINSMITHRY WORKS
Metal Roofing, pre-painted long span
Ga. 26 Roofing 36.00 l.m. 250.00 9,000.00
Tekscrew 2" 252.00 pcs 2.00 504.00
9,504.00
Septic Vault
Earthworks
Excavation 2.70 cu.m 250.00 250.00
Masonry works and Flooring -
4"thk CHB 101.00 pcs 16.00 1,616.00
Cement 7.00 bags 245.00 1,715.00
Sand 0.38 cu.m 450.00 171.00
10mm dia. RSB 12.00 pcs 114.00 1,368.00
G.I. Tie Wire #16 2.00 kl 50.00 100.00
5,220.00
Sub-Total
Sub-Total
COST DERIVATION
DESCRIPTION
COST PER UNIT