Project: Balangkayan Townville Location: Brgy. Cantubi, Balangkayan, Eastern Samar Contractor: J.C. Tayag Builders, Inc. QTY UNIT UNIT COST TOTAL COST TINSMITHRY WORKS Metal Roofing, pre-painted long span Ga. 26 Roofing 36.00 l.m. 250.00 9,000.00 Tekscrew 2" 252.00 pcs 2.00 504.00 9,504.00 Septic Vault Earthworks Excavation 2.70 cu.m 250.00 250.00 Masonry works and Flooring - 4"thk CHB 101.00 pcs 16.00 1,616.00 Cement 7.00 bags 245.00 1,715.00 Sand 0.38 cu.m 450.00 171.00 10mm dia. RSB 12.00 pcs 114.00 1,368.00 G.I. Tie Wire #16 2.00 kl 50.00 100.00 5,220.00 Sub-Total Sub-Total COST DERIVATION DESCRIPTION COST PER UNIT

Costing Septic&Roofing

Embed Size (px)

DESCRIPTION

Sample Costing

Citation preview

Page 1: Costing Septic&Roofing

Project: Balangkayan Townville

Location: Brgy. Cantubi, Balangkayan, Eastern Samar

Contractor: J.C. Tayag Builders, Inc.

QTY UNIT UNIT COST TOTAL COST

TINSMITHRY WORKS

Metal Roofing, pre-painted long span

Ga. 26 Roofing 36.00 l.m. 250.00 9,000.00

Tekscrew 2" 252.00 pcs 2.00 504.00

9,504.00

Septic Vault

Earthworks

Excavation 2.70 cu.m 250.00 250.00

Masonry works and Flooring -

4"thk CHB 101.00 pcs 16.00 1,616.00

Cement 7.00 bags 245.00 1,715.00

Sand 0.38 cu.m 450.00 171.00

10mm dia. RSB 12.00 pcs 114.00 1,368.00

G.I. Tie Wire #16 2.00 kl 50.00 100.00

5,220.00

Sub-Total

Sub-Total

COST DERIVATION

DESCRIPTION

COST PER UNIT