Bil.Element%RM
1Substructures
5.60533,132.58
2Superstructure
35.093,337,568.67
3Finishes
8.27785,844.20
4Fitting and furnishing
N/A
5Services
26.702,540,296.10
6External works
7.40703,254.23
Total Building Cost8,022,491.08
7Preliminaries
1.28122,395.30
8Contingencies (less)
2.32220,000.00
9Provisional Sum
N/A
10
Prime cost sum13.341,269,408.00
TOTAL CONTRACT SUM1009,511,899.08
Location : TerengganuYear: 2004Gross Floor Area: 4,522 mCost/m:Cost index Nov 2004 : 118.4
1.1. Cost of Proposed Building
Location : Taman Universiti Year: 2015Gross Floor Area: 1500 mCost Index Jan 2015: 98.6i. Cost index: x cost/m2(analysis) x RM 2,103.47 = RM1,751.70
ii. Total Cost: Cost /m2(analysis) x Gross Floor Area RM 1,751.7x 1500m2 = RM2,627,560.92,
iii. Add 5% Preliminaries: x RM 2,627,560.92 = RM 131,378.05 =RM131,378.05+ RM 2,627,560.92, =RM 2,758,938.97
iv. Add 3% Contingency: x RM 2,758,938.97= RM 82,768.17 = RM 82,768.17 + RM 2,758,938.97 = RM 2,841,752.14
v. Add 5% External Work: x RM 2,841,752.14= RM 142,087.61 = RM 142,087.61+ RM 2,841,752.14 = RM 2,983,839.75
vi. Total Construction Cost: RM 2,983,839.75
vii. Cost/m2:
= RM 1,989.23