Cost Estimation System CES Implementation at NDOR TUG 2006

Cost Estimation System CES Implementation at NDOR TUG 2006

Embed Size (px)

Citation preview

Page 1: Cost Estimation System CES Implementation at NDOR TUG 2006

Cost Estimation System CES

Implementation at NDOR

TUG 2006

Page 2: Cost Estimation System CES Implementation at NDOR TUG 2006

NEBRASKANEBRASKA

Page 3: Cost Estimation System CES Implementation at NDOR TUG 2006

Diverse RoadwaysDiverse Roadways

Page 4: Cost Estimation System CES Implementation at NDOR TUG 2006

BackgroundBackground

• Nebraska’s State Highway program is an estimated $350,000,000

• Nebraska’s Lettings consist of 250+

contracts per year

• Nebraska has 400+ active contracts at

any given time

Page 5: Cost Estimation System CES Implementation at NDOR TUG 2006

BackgroundBackground

• Centralized Estimating section5 Estimators

50 + years of experience

• Bid Based Estimates Currently using PES generate bid based prices

Only able to use one bid history

Page 6: Cost Estimation System CES Implementation at NDOR TUG 2006

• NDOR is having to adjust schedule of program due to price instabilities

• Management wanted to factor inflation at the project level into decision making processUse inflation to get a better idea of total project

price as you move projects in the schedule

• Open up possibility to use cost sheets to validate prices

NeedsNeeds

Page 7: Cost Estimation System CES Implementation at NDOR TUG 2006

• CES is a tool for the complete life cycle of the estimation of a project

• Ability to use multiple Bid Histories and group items based on type of Contract

• Allows the estimator to work more efficiently

• Integral component of Trns•port systemmaintains the integrity of the estimate prices

allows for snapshot capability at any point in the life cycle

Why CESWhy CES

Page 8: Cost Estimation System CES Implementation at NDOR TUG 2006

Trns•port Modules Trns•port Modules

SiteManagerSiteManager

Estimation

BAMS/DSS Data Warehouse

Bid LettingsProjects & Proposals

ExpediteExpedite

CESCES

Construction

LASLASPESPES

SiteManagerMaterials

SiteManagerMaterials

Page 9: Cost Estimation System CES Implementation at NDOR TUG 2006

Project begins in CESLong Range estimates - project-level

estimates based on project work types and their major cost groups

Item-level estimates - bid item estimates derived from bid histories

• Export to PES

• Snapshots taken to track evolution of the estimate

WorkflowWorkflow

Page 10: Cost Estimation System CES Implementation at NDOR TUG 2006

• Called Info TechKathy Yelle and troops

• Developed Contract Agreement 1.75 service units

Pre-work on developing bid histories

3 days on-site implementation and discussion

3 days on-site training and discussion

Who ya gonna call…Who ya gonna call…

Page 11: Cost Estimation System CES Implementation at NDOR TUG 2006

• Market areas help define your price indexes

Same types of items - Same types of jobs

• Market Types (redefined in 2004)Asphalt

Concrete

Structures

Districts

Market Areas - DSSMarket Areas - DSS

Page 12: Cost Estimation System CES Implementation at NDOR TUG 2006

• Project begins in CESLong Range estimates - project-level estimates based

on project work types and their major cost groups

Item-level estimates - bid item estimates derived from bid histories

• Export to PES

• Snapshots taken to track evolution of the estimate

Market Areas - DSSMarket Areas - DSS

Page 13: Cost Estimation System CES Implementation at NDOR TUG 2006

Market Areas - DSSMarket Areas - DSS

Page 14: Cost Estimation System CES Implementation at NDOR TUG 2006

• Project begins in CESLong Range estimates - project-level estimates based

on project work types and their major cost groups

Item-level estimates - bid item estimates derived from bid histories

• Export to PES

• Snapshots taken to track evolution of the estimate

Market Areas - DSSMarket Areas - DSS

Page 15: Cost Estimation System CES Implementation at NDOR TUG 2006

Market Areas - DSSMarket Areas - DSS

Page 16: Cost Estimation System CES Implementation at NDOR TUG 2006

Bid Histories - DSSBid Histories - DSS

• Using HIREG to develop based on Market area and Time - Input

Time - 3 year, 2 year, 18 months, 1 year

• Determined type of observations to include - Input

low bid, low 3 bids, all bids

minimum of occurrences

• Bid Histories -OutputWeighted Averages

Regressions

Page 17: Cost Estimation System CES Implementation at NDOR TUG 2006

• Two Days UserHigh level - Navigation, Shortcuts, best

practices

More detailed level – Utilizing multiple libraries, standard task, snapshots

• One Day System AdministratorHigh level - Navigation, User Roles

More detailed level – Creating and maintaining libraries

Basic TrainingBasic Training

Page 18: Cost Estimation System CES Implementation at NDOR TUG 2006

Basic TrainingBasic Training

Page 19: Cost Estimation System CES Implementation at NDOR TUG 2006

Basic TrainingBasic Training

Page 20: Cost Estimation System CES Implementation at NDOR TUG 2006

Retirement…???Retirement…???

Page 21: Cost Estimation System CES Implementation at NDOR TUG 2006

• CES to PES ExportWorking with TTF, Info Tech and other

Agencies

• Customize Screens

• Create ReportsDetail estimate report with inflation

To DoTo Do

Page 22: Cost Estimation System CES Implementation at NDOR TUG 2006

QuestionsQuestions