weight of deposit(lb/ft)= cross-sectional area x 0.283 x 12
weight of filler metal required (lb)=
weight of filler metal required (lb)=
electrode cost ($/ft)=
weight of filler metal required (lb)=
travel speed(ft/hr)= = x 5
weight of filler metal required(lb/ft)=
flux cost($/ft)=flux price($/lb) x weld metal deposit(lb/ft) x flux ratio
gas cost($/ft)=
gas cost($/weld)=
labor cost($/ft)=
labor cost($/ft)=
deposition rate(lb/hr)=
over head cost($/ft)=
over head cost($/ft)=
power cost($/ft)=