Cost and Managerial Accounting -V1_gap Analysis_combinedslides

Embed Size (px)

Citation preview

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    1/24

    0Filename/RPS Number

    Navy ERP/SAP Cost Accounting

    Questions asked of NAVAIR/NAVSUP

    1) What cost visibility do you have with Navy ERP that you didn't have in the legacyenvironment?

    2) Are you using the Navy ERP managerial cost accounting functionality?

    a) If so, how? And, what can you do now that you couldnt in the legacy

    environment?

    b) If not, why? (Didnt know it exist, no need, etc.)

    SAP Question

    What functionality do you offer that Navy ERP is not using, and how can we get them to useit?

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    2/24

    1Filename/RPS Number

    Feedback

    From the Commands

    NAVAIR asked for clarification, asked if we still had the presentation from Phil L.

    NAVSUP said they would get with their Finance Team and get back with me.

    SAP ready and willing to help

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    3/24

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    4/24

    3Filename/RPS Number

    Quick Look gap analysis follows

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    5/24

    4Filename/RPS Number

    GAP Analysis (Components)

    SAP CO Functionality NAVY ERP CO Functionality Gap Results

    Profit Center Accounting Out of scope Yes Full Gap

    Overhead Cost Controlling (Cost Center, Cost

    Element, ABC, Internal Orders)

    In Scope ABC Partial

    Product Cost Controlling (Product Cost by

    Period/order/SO, Standard Cost Estimate,Simultaneous Costing, Period-End Closing,

    Material Ledger/Unit Costing)

    Out of scope Yes Full Gap

    Profitability Analysis (Costing-Based/Account-

    Based)

    Out of scope Yes Full Gap

    Reporting (R/3 Reporting, BW Reporting, Portal

    Solutions)

    In Scope No No Gap

    Enterprising Controlling ( Profit Center

    Accounting, Consolidation, EIS/Business

    Planning)

    In Scope EIS/Business Planning Partial

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    6/24

    5Filename/RPS Number

    GAP Analysis (Reporting for CO)

    SAP CO Functionality NAVY ERP COFunctionality

    Gap Results

    ABAP Listviewer Reporting (COCO--OM, COOM, CO--PCPCTool Offers Set of Generic Functions, Without Programming, Line ItemTool Offers Set of Generic Functions, Without Programming, Line ItemReports, Documents, Analysis of Incorrect Postings, Corrections)Reports, Documents, Analysis of Incorrect Postings, Corrections)

    In Scope No

    CO Summarization Reporting (CO-OM, CO-PC, PS Standardized /

    Flexible Cost Analysis of Cost Objects, Check of Data Consistency)

    In Scope No

    Formatted Reporting with ReportWriter(CO-OM, CO-PC, Target/Actual

    Comparisons, Variances, Support of the Planning Process, AssessmentCycles, Target Costs)

    In Scope No

    Drill Down Reporting (CO-PC, CO-PA, PS, Profitability Analysis for

    Operating Concerns, Reconciliation Reports to look for Posting Anomalies)

    In Scope No

    State-of-the-art Data Warehouse Tool (Web Caching, Web Application

    Designer, Common Meta Data Repository)

    In Scope No

    Predefined Content (Infocubes, Queries, Workbooks and Roles, Ready-to-

    run, Delta Extraction for Line Items)

    In Scope No

    Customer Specific Solution (Data Merge from Different Applications and

    Systems, Flexible Definition of Aggregates, Mass Reporting for Cost

    Centers incl. Automatic User Profile Generation)

    In Scope No

    Role-based Monitoring and Alerting (Cost Center Monitor, Internal OrderMonitor, Internal Activity Allocation Monitor)

    In Scope No

    Integration of Existing Reports (ReportWriter/Painter Reports via iViews,BW Reports via Web Templates)

    In Scope No

    Integration of Business Tasks (Administrative Tasks via ISR CorrectionPosting Request, Master Data Change Request Planning Scenario)

    In Scope No

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    7/24

    6Filename/RPS Number

    Fit/Gap Findings

    0

    0.2

    0.4

    0.6

    0.8

    1

    1.2

    P

    rofit

    C

    en

    ter

    A

    cc

    ounting

    O

    verhead

    C

    os

    t

    C

    on

    trolling

    P

    roduct

    C

    os

    t

    C

    on

    trolling

    P

    rofitability

    A

    na

    lysis

    R

    ep

    orting

    E

    nterprising

    C

    on

    trolling

    NAVY ERP CO

    FunctionalitySAP CO Functionality

    Fit/Gap Findings

    0

    0.8

    0

    01

    0.5

    Profit Center Accounting

    Overhead CostControlling

    Product Cost Controlling

    Profitability Analysis

    Reporting

    Enterprising Controlling

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    8/24

    7Filename/RPS Number

    Fit Results

    Fit Results

    50%

    33%

    17%

    Not Met

    Partially Met

    Fully Met

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    9/24

    8Filename/RPS Number

    Implications & Next Steps

    The fit / gap analysis contained in this document provides the information needed for FMO to

    base their answer to the question regarding the additional capabilities of SAP that the Navy

    ERP can use in cost and managerial accounting. It does notcontain a recommendation to

    FMO, rather presents the facts regarding how well Navy ERP meet the needs of the SAP

    functionalities.

    In either case, additional assessment based on scenarios, processes and steps is needed toobtain a comprehensive fit/gap analysis findings. FMO leadership should begin to consider

    how these vital assessment activities would be executed in conjunction with the ongoing

    requirements compliance project.

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    10/24

    9Filename/RPS Number

    Controlling

    Reporting

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    11/24

    10Filename/RPS Number

    Integrated Labor Reporting

    RCO1046_R001 Integrated Labor Reporting:

    Gross Pay Error Report (RCO1046_R001)

    Status report on the disposition for each line item within the gross pay file (GPF) processing(Error, Failure, Repaired, Process, etc.)

    CATSDB-Gross Pay File Comparison (RCO1047_R001)

    Compares entries in the CATSDB table and entries coming from the GPF.

    Labor History Report (RCO1048_R001)

    Five report layouts in total detailing the employee, hours, dollars, overhead allocation,projects, etc.:

    Direct projects

    Overhead projects

    Sorted by Employees and projects worked

    Summary by Employee

    Display of all available fields

    Military End Strength (RCO1050_R001)

    Military headcount by cost center and pay grade

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    12/24

    11Filename/RPS Number

    Actual Labor Reconciliation Report (RCO1051_R001)

    The report provides a reconciliation between accelerated leave accrued and leave takenalong with accelerated fringe accrued and fringe paid.

    Summary of Actual-Stabilized Labor by Pay Band(RCO1052_R001)

    This report will be used to formulate standard direct labor rates using actual earnings

    information, and to track, project, and report stabilized labor variances for each paygrade/step for the annual rate.

    Civilian Hours Summary Work Year (RCO1056_R001)

    The report provides manpower (civilian, military, foreign national, or total) informationstated in man-years, summarized by department, and division. The selection criterion isdown to the personnel number and performing cost center.

    Integrated Labor Reporting contd.

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    13/24

    12Filename/RPS Number

    Net Operating Results (NOR) Report (RCO1082_R001)

    The NOR report is used to identify the various levels of overhead, capturing the labor hoursand work years, applied revenue, overhead expenses and stabilized direct labor ratevariance by competency department level breakout.

    Net Operating Results (NOR) Labor Report

    Net Operating Results (NOR) Summary Report by Department

    Net Operating Results (NOR) Detailed Report

    NOR (Net Operating Results) Report

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    14/24

    13Filename/RPS Number

    DCPS Gross Pay File Reconciliation

    Standard Labor Rate v. Gross Pay File

    This report will compare the entries created by the gross pay file and the postings to the direct

    and reimbursable projects within SAP through the direct activity allocations.

    Defense Daily Expenditure File v. Gross Pay File

    This report will compare the entries from the gross pay file and the DDEF file. It will validate

    the accuracy between the labor expensed-not paid and the labor disbursement amount

    coming from Treasury.

    .Report Format to be Determined

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    15/24

    14Filename/RPS Number

    Undistributed Labor Transaction

    RCO1004_R005 Undistributed Labor Error Reports

    Allows End user to generate reports on Labor Transfer errors (CATA) to PS or COObjects

    These are errors which are were not caught by Timesheet validations

    Availability Control

    Activity Type/Rate validity dates

    Order/Project currently being processed

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    16/24

    15Filename/RPS Number

    DONIBIS

    RFI1009_I001 DONIBIS:

    The requirement is for Navy ERP to provide an automated file to DONIBIS (DONIndustrial Budgeting Information System) containing all the data needed to satisfy thefinancial and non-financial data requirements for monthly, semi-annual and annualworking capital fund reporting.

    SAP will produce the file in a TXT format, which will be manually uploaded into theDONIBIS system. The DONIBIS reporting is still based on the old Navy chart ofaccounts (Navy four-digit GLA) and not on the new USSGL.

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    17/24

    16Filename/RPS Number

    SSR

    RCO1057_R001 SSR:

    The purpose of this program is the following:

    Executes custom table generation/update

    produces reports based upon user input

    Output options

    SSR/Carryover Detail

    Extended Carryover Detail

    New Orders Detail

    SSR/Carryover by UIC

    SSR/ Carryover by Cost Center

    Standard Summary Sources of Revenue Report

    Expanded Summary Sources of Revenue Report

    Additional options (check box):

    Exclude carryover exceptions (Y/N)

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    18/24

    17Filename/RPS Number

    Cost Experience Report

    RCO1049_R001 Cost Experience Report

    WCF report Includes Commitments, Obligations, Costs and Hours by Expense Category:

    Direct

    CPP

    G&A

    Indirect

    Service Center

    Total

    Includes Costs by Object Class

    Report can be generated at total activity level, department level, division level or cost

    center level by Expense Category and/orObject Class breakout

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    19/24

    18Filename/RPS Number

    Master Data Reports (Cost Elements, Cost Cents, Activity Types, & Internal Orders)

    Cost Center Accounting (Plan/Actual & Actual/Actual Comparisons, Planning, Pricing, and Line

    Item Reports)

    Internal Order Accounting (Plan/Actual & Actual/Actual Comparisons, Planning,

    Summarization, and Line Item Reports)

    Activity Based Costing (Processes) (Plan/Actual Comparisons, Planning, Pricing,and Line Item

    Reports)

    CO Standard Reports

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    20/24

    19Filename/RPS Number

    List: Processes S_ALR_87011761

    Processes: Actual/plan/variance S_ALR_87011760

    Processes: Breakdown by Partner S_ALR_87011762

    List: Processes S_ALR_87011765

    Bus. Processes: Planning Overview CPBL

    Business Processes: Act. Line Items CPB1

    Business Processes: Plan Line Items CPBP

    Business Processes: Master Data Rep. CP13

    Business Alloc Structure Display CP20

    List: Breakdown by process category S_ALR_87011771

    Area: Orders S_ALR_87013643

    Orders: Actual/plan/variance S_ALR_87012993

    Orders: Current Period/Cumulative S_ALR_87012994

    List: Orders S_ALR_87012995

    List: Orders by Cost Element S_ALR_87012996

    List: Cost Elements by Order S_ALR_87012997

    Orders: Breakdown by Partner S_ALR_87012998

    Orders: Actual/Plan/Commitments S_ALR_87012999

    List: Actual/Plan/Commitments S_ALR_87013000

    CO Standard Reports

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    21/24

    20Filename/RPS Number

    Orders: Actual Yearly Comparison S_ALR_87013001

    Orders: Actual Quarterly Comparison S_ALR_87013002

    Orders: Actual Period Comparison S_ALR_87013003

    Order: Planning Overview KABL

    Orders: Plan Yearly Comparison S_ALR_87013004

    Orders: Plan Quarterly Comparison S_ALR_87013005

    Orders: Plan Period Comparison S_ALR_87013006

    Orders: Actual Line Items KOB1

    Orders: Commitment Line Items KOB2

    Orders: Plan line items KOBP

    Orders: Budget Line Items KOB4

    Display budget document KO2B

    Master Data List Internal Orders KOK5

    Internal Orders: Coll. Displ. SettRu KOSRLIST_OR

    SObj: Actual/Plan/Variance S_ALR_87013007

    SObj: Actual/Plan/Commitment S_ALR_87013008 SObj: Current/Cumulated/Total S_ALR_87013009

    Orders: Breakdown by Period S_ALR_87013010

    Orders: Actual/Plan/Price Variance S_ALR_87013011

    Orders: Actual/Plan/Consumption S_ALR_87013012

    CO Standard Reports

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    22/24

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    23/24

    22Filename/RPS Number

    Cost Centers: Quarterly Comparison S_ALR_87013623

    Cost Ctrs: Fiscal Year Comparison S_ALR_87013624

    Cost Centers: Actual/Target/Variance S_ALR_87013625

    Area: Cost Elements S_ALR_87013626

    Cost Centers: Variances S_ALR_87013627

    Cost Centers: Splitting S_ALR_87013628

    Cost centers: Planning overview KSBL

    Activity Types: Reconciliation S _ALR_87013629

    Activity Types: Plan receivers S_ALR_87013630

    Cost centers: Activity prices KSBT

    Cost Centers: Actual Line Items KSB1

    Cost Centers: Commitment Line Items KSB2

    Cost Centers: Plan Line Items KSBP

    Controlling Documents: Actual KSB5

    Controlling Documents: Plan KABP

    Cost Centers: Master Data Report KS13Cost Elements: Master Data Report KA23

    Activity Types: Master Data Report KL13

    Stat.Key Figures: Master Data Report KK04

    Cost Centers: Rolling Year S_ALR_87013631

    CO Standard Reports

  • 8/2/2019 Cost and Managerial Accounting -V1_gap Analysis_combinedslides

    24/24

    23Filename/RPS Number

    Cost Centers: Average Costs S_ALR_87013632

    Cost Centers: Act./Plan/Var./Prev.Yr S_ALR_87013633

    Cost Centers: Currency Translation S_ALR_87013634

    Area: Actual/Plan 2 Currencies S_ALR_87013635

    Cost Centers: Object Comparison S_ALR_87013636

    Area: Internal Business Volume S_ALR_87013637

    Cost Centers: Curr./Cum./Total Year S_ALR_87013638

    Cost Centers: Act/Target from Summ. S_ALR_87013639

    CCtrs: Period Breakdown Actual/Plan S_ALR_87013640

    CCtrs: Period Breakdown Act./Target S_ALR_87013641

    Cost Centers: Breakdown Resources S_ALR_87013642

    Cost Centers: Cost Component Split S_ALR_87013644

    Stat. Key Figs: Period Breakdown S_ALR_87013645

    Activity Types: Period Breakdown S_ALR_87013646

    Activity Types: Scheduled/Plan S_ALR_87013647

    Area: Actual/Budget/Commitments S_ALR_87013648

    Run Selected Reports KOC2

    CO Standard Reports