Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
Corporate Structure
3
76Projects delivered in 76
different countries
1957Established in 1957
We have over 59 years
of experience in
delivering projects that
make a difference
Our history
Transportation Engineering
Hydraulics & Dams
Ports/Airports/Bridge
Buildings & Community Facilities
Our business worldwide
4
Services
Building &
Community Facilities
Hydraulics/
Dams
Energy
Environment
& Agriculture
Europe
Italy / Rome
Italy / Milan
Italy / Palermo
Albania
Middle East
Saudi Arabia
Qatar
Dubai
Abu Dhabi
Kuwait
OmanTurkey
Africa
Algeria
Angola
Uganda
Asia
Armenia
China
No matter whether our clients are
working with us in Dubai or Saudi
Arabia, in one market or many, they
benefit from our international
expertise applied with local
knowledge and insight.
Transportation
Infrastructure
Our activities worldwide
More than
1200Employees
Split by client type
Split by countries area
5
13Branches/Offices
Worldwide
Our activities worldwide
PMC Project Managment Consulting
Supervision
Engineering Design, Planning andFeasibility
Advisory service and monitoring
Techinical Assistance
Transport Infrastructure
Hydraulic & Sanitary
Planning and Building
Environment
Airports/ Ports
Airports/ Ports
Community Facilities
Energy
Split by service type
Split by business stream
6
7
Financial status
-
2,00
4,00
6,00
8,00
10,00
12,00
2011 2012 2013 2014 2015 2016 2017
0,70 2,10
5,60 6,70 7,21 9,17 10,06
EBITDA (mil €) Expected EBITDA (mil €)
-
1,00
2,00
3,00
4,00
5,00
6,00
7,00
2011 2012 2013 2014 2015 2016 2017
0,90 0,60
2,70
6,80
4,90 4,60 5,10
Net Income (mil €) Expected net income (mil €)
-
20,00
40,00
60,00
80,00
2011 2012 2013 2014 2015 2016 2017
22,50 24,50 27,10 34,30 49,70
62,80 70,50
Final Costs (mil €) Expected Costs (mil €)
0
20
40
60
80
100
2011 2012 2013 2014 2015 2016 2017
23,2 26,6 32,7 4153
71,9 80,5
Final Revenue (mil €) Expected revenue (mil €)
A Company that is quickly growing…
8
ENR – Engineering News-Report
The TOP 225 International Design Firms
In the last 3 years, Italconsult climbed 25 positions in the
international ranking:
The CEO Antonio Bevilacqua was invited to express his point of view on
the current and future market conditions: Competition has been getting
more heated in the international market. “The market is evolving, and new
companies from many countries are entering the international markets.”
says Antonio Bevilacqua, CEO of Italy’s Italconsult, “Wide experience and
familiarity with the physical, social and cultural context of the Middle East
countries” is critical for success there. Italconsult has been working in the
region since the 1960s with continuous growing activities.
• 2016 112th
• 2015 128th
• 2014 137th
Our certificatesQUALITY
MANAGEMENT
SYSTEMUNI EN ISO
9001:2008
ENVIRONMENTAL
MANAGEMENT
SYSTEMUNI EN
ISO
14001:2004
HEALTH & SAFETY
MANAGEMENT
SYSTEMOHSAS
18001:2007
Worldwilde Historical Experience
11
Planning for saving the Abu Simbel Temple (for Unesco),
Egypt ,1960
OLD TEMPLE SITE NEW TEMPLE SITE
KEY FACTS
Location:
Abu Simbel, Egypt
Country/Region:
Egypt
Client:
Unesco
12
KEY FACTS
Location:
Mesopotamia Region
Country/Region:
Argentina
Client:
Direction Nacional de Validad
Provided Services:
Preliminary Design
Final Design
Land Communication System in the Mesopotamia Region,
Argentina 1967
13
KEY FACTS
Location:
Thiama Region
Country/Region:
Saudi Arabia
Client:
Ministry of Communications
Provided Services:
Preliminary Design
Final Design
Supervision of works
Completion date:
1987
Structures include:
- 46 Km, single carriageway 2-lane, 3,50 each, of which
21 Km length of descent with a difference in elevation of
1,265 m viaducts/bridges totaling 57,282 m
Tihama region Highway plan,
Saudi Arabia ,1974
14
KEY FACTS
Location:
Muscat
Country/Region:
Oman
Client:
Ministry of Communications Directorate General of Civil Aviation & Metereology
Provided Services:
Preliminary Design
Final Design
Supervision of works
Structures include:
- new aprons
- Upgrading of runways and taxiways
- Studie and design works to the existing pavements
- Upgrading airfield pavement
Construction of Civil Aprons, upgrading of runways, taxiways, airfield pavement at Seeb
International Airport
Oman
PMC & Buildings
KAP 4 - Engineering Consultancy Services for reviewing the design and supervising the
implementation of H.M King Abdullah Bin Abdul Aziz Security Headquarters Development Project
Saudi Arabia
KEY FACTS
Location:
Kingdom of Saudi Arabia
Country/Region:
All the Kingdom divided in 16 Areas
Client:
Ministry of Interior of KSA
Provided Services:
• Project Management Consultancy
• Design Review
• Supervision of works
Duration:
36 months
Achievements/Responsibilities:
• Contractors have a “Design & Build” Contract, ITC
on Client behalf supervises all the activities of the
Contractors reviewing and approving from Preliminary
until Final Design and Shop drawings
• ITC representing the Client ensures that Contractors
comply with timing and costs
• ITC leads the management for assessing and
avoiding risks, assuring quality, maintaining health
and safety standards
KEY FACTS
Built-up Area:
1,564,279 M2
Number of Buildings:
380 Buildings
Type of Buildings:
24 Projects divided in:
10 Directorates
6 Dormitories
7 Sport Training Centre
1 Infrastructure Project
Construction Cost:
2,053,000,000.00 US$
Staff:
ITC Team is composed of 388 personnel divided in a
central Head Office of 50 persons and 338 Site
personnel. The Head Office will be responsible for the
entire administrative supervision and management, cost
control, technical assistance, and support services.
KAP 4 - Engineering Consultancy Services for reviewing the design and supervising the
implementation of H.M King Abdullah Bin Abdul Aziz Security Headquarters Development Project
Saudi Arabia
KAP 4 - Engineering Consultancy Services for reviewing the design and supervising the
implementation of H.M King Abdullah Bin Abdul Aziz Security Headquarters Development Project
Saudi Arabia
26
CONSTRUCTION MANAGEMENT in Head Office
SITE MANAGER
ENGINEERS (Civil, Architectural, Electrical, Mechanical, Road, Planning, QA/QC, IT, Communication, QS)
INSPECTORS (Civil, Architectural, Electrical, Mechanical, Safety, Land Surveyor)
ADMINISTRATIVE SUPPORT
187
90
45
6
CONSTRUCTION SUPERVISION STAFF
SUPERVISION OF WORKS (85%)
DESIGN REVIEW (10%)
PMC (5%)
16
338 Personnel on Site
6 Personnel in Head Office
KEY FACTS
Location:
Kingdom of Saudi Arabia
Country/Region:
All the Kingdom divided in 5 Areas and 17 Sectors
Client:
Ministry of Interior of KSA
Provided Services:
• Project Management Consultancy
• Design Review
• Supervision of works
Duration:
48 months
Achievements/Responsibilities:
• Contractors have a “Design & Build” Contract, ITC
on Client behalf supervises all the activities of the
Contractors reviewing and approving from Preliminary
until Final Design and Shop drawings
• ITC representing the Client ensures that Contractors
comply with timing and costs
• ITC leads the management for assessing and
avoiding risks, assuring quality, maintaining health
and safety standards
KAP 5 - Engineering Consultancy Services for reviewing the design and supervising the
implementation of H.M King Abdullah Bin Abdul Aziz Security Headquarters Development Project
Saudi Arabia
KAP 5 - Engineering Consultancy Services for reviewing the design and supervising the
implementation of H.M King Abdullah Bin Abdul Aziz Security Headquarters Development Project
Saudi Arabia
369 SITES |
BUILDINGS
5 AREAS17 SECTORS
582
TOTAL STAFF
KEY FACTS
Project Area:
2,051,562 M2
Number of Buildings:
369 Buildings
Type of Buildings:
1 King Fahad Security College
28 Accommodations and Facilities for Security Forces
10 Girls School Compounds
145 Police Stations & Traffic Units
65 Civil Affairs & Civil Defense buildings
47 General Investigation Offices
20 Border Centers
20 Drugs Control Units
24 National Information Centers and Passport Buildings
8 Special Security Forces Camps
Construction Cost:
approx. 3,500,000,000.00 US$
Staff:
ITC Team is composed of 582 personnel divided in a
central Head Office of 73 persons and 509 Site
personnel. The Head Office will be responsible for the
entire administrative supervision and management, cost
control, technical assistance, and support services.
CONSTRUCTION MANAGEMENT in Head Office
17 SITE MANAGER + 9 DEPUTY SITE MANAGER
ENGINEERS (Civil, Architectural, Electrical, Mechanical, Road, Planning, QA/QC, IT, Communication, QS)
INSPECTORS (Civil, Architectural, Electrical, Mechanical, Safety, Land Surveyor)
ADMINISTRATIVE SUPPORT
KAP 5 - Engineering Consultancy Services for reviewing the design and supervising the
implementation of H.M King Abdullah Bin Abdul Aziz Security Headquarters Development Project
Saudi Arabia
PMC
DESIGN REVIEW
CONSTRUCTIONSUPERVISION
10 personnel
55 personnel
517 personnel
26
253
179
51
GEOGRAPHICAL DISTRIBUTION OF 17 SECTORS
CONSTRUCTION SUPERVISION STAFF
8
KAP 5 - Engineering Consultancy Services for reviewing the design and supervising the
implementation of H.M King Abdullah Bin Abdul Aziz Security Headquarters Development Project
Saudi Arabia
QUALITY MANAGEMENT ON SITE
How ITALCONSULT ensures that the quality defined in Head Office is enforced on 17 Sector Offices on Site
1 SR CIVIL ENGINEER
1 SR ARCHITECT ENGINEER
1 SR ELECTRICAL ENGINEER
1 SR MECHANICAL ENGINEER
A
U
D
I
T
T
E
A
M
QA/QC MANAGER5 AREA
MANAGERSINTERNAL AUDIT
• Based in HO but directly responsible
of 17 Site QA/QC Engineers, doing
regularly visits on site
• Defines daily and weekly reports to
be delivered by Site QA/QC
Engineers
• Authorised to represent the PM on
all quality matters and to delegate
as necessary to make sure that
quality management is effectively
and efficiently implemented
• Works with assigned resources to
monitor that project products and
services meets the Client’s quality
expectations and Contracts
requirements
• Each Area Manager is directly
responsible for the activities on site
• AM have daily contavt with their Sector
Managers and receive daily
photographical report with sites
development
• ITC organized 5 teams of Internal
Audit from the Head Office to do
regular Site inspections
• The audit process aims to report
good practice and observations in
addition to identifying any non-
compliant activities or work5 AREAS – 17 SECTORS (369 SITES)
Area A – 6 Secorts (109 Sites)
Area B – 2 Secorts (46 Sites)
Area C – 3 Secorts (84 Sites)
Area D – 4 Secorts (80 Sites)
Area E – 2 Secorts (50 Sites)
23
KEY FACTS
Location:
Dubai
Country/Region:
United Arab Emirates
Client:
Dubay Municipality
Provided Services:
Engineering Studies Detailed Surveys & Investigations
Preparation of Detailed Project Reports and Drawings
Preparation of Tender documents as per FIDIC Conditions
Invitation & Evaluation of Tender Documents
Construction Supervision involving inter alia:
a)inspections and measurements of works
b)checking and certification of Contractors’ works and
preparation of bills for payment
c)settlement of claims
d)progress monitoring and quality control e)control during
Defects Liability Period
Contract Management
Advising Client on financial matters pertaining to the
operation of contract agreement
Departments of Customs Headquarters and Customs Documentation Building,
United Arab Emirates
Transport Infrastructure
25
KEY FACTS
Location:
Sicily
Country/Region:
Italy
Client:
Consorzio per le Autostrade Siciliane CAS
Provided Services:
Design
Supervision of works
Completion date:
2005
Structures include:
-30.6 km total length
-2 carriageways with 2 lanes 3.75 m each, for a total
Roadway of 27 km
-3 interchanges
-16 tunnels
-17 viaducts/bridges totaling 7,000 m
Palermo-Messina Highway A20,
Italy, 2005
26
KEY FACTS
Location:
Squillace- Simeri Crichi
Country/Region:
Italy
Contracting Authority:
ANAS S.p.A. (National Road Authority)
General Contractor:
CO.MERI S.p.A. (Astaldi S.p.A.)
Provided Services:
Design
Supervision of works
Completion date:
On going
Megalotto 2, 106 Jonica National Road, Section Squillace Interchange – Simeri Crichi
Italy, 2007
27
KEY FACTS
Location:
Paulizzi Caulonia
Country/Region:
Italy
General Contractor:
AR.GI S.c.p.A. (Astaldi S.p.A)
Contracting Authority:
ANAS S.p.A. (National Road Authority)
Provided Services:
Design
Supervision of works
Completion date:
On going
106 Jonica National Road, Section Palizzi-Caulonia, Lots VI-VII-VIII
Italy, 2010
28
KEY FACTS
Location:
Salerno- Reggio
Country:
Italy
Contracting Authority:
Anas S.p.A.
Provided Services:
Final Design
Mitigation measures and assistance during
constructions
Supervision of works
Completion date:
On going
Macro-Lot 3, A3 Salerno Reggio Calabria Highway, Design of the upgrading and
improvement works, Italy, 2010
29
KEY FACTS
Location:
Roseto -Capo Spulico
Country/Region:
Italy
General Contractor:
SIRJO S.C.p.A (J.V. Impregilo S.p.A. – Astaldi S.p.A.)
Contracting Authority:
ANAS S.p.A. (National Road Authority)
Provided Services:
Preliminary and Final Design
Supervision of works
Completion date:
On going
3RD Megalotto 106 Jonica National Road, Interchange National Road 543 to Roseto Capo
Spulico, Italy, 2010
30
KEY FACTS
Location:
Sicily
Country/Region:
Italy
Client:
Provincia Regionale di Agrigento
Provided Services:
Environmental Impact Study
Design
Supervision of works
Completion date:
2004
Structures include:
-33.8 km total length
-2 carriageways with 2 lanes 3.75 m each
-9 interchanges
-2 tunnels with total length of 330 m
-20 viaducts and bridges
Doubling of the National Road 640 Porto Empedocle pk10+200 to pk 44+100
Italy, 2002
31
KEY FACTS
Location:
Sicily
Country/Region:
Italy
Client:
Empedocle 2 S.p.A.
Provided Services:
Preliminar Design
Final Design
Supervision of works
Completion date:
On going
Doubling and upgrading of the National Road No. 640, Agrigento-Caltanissetta
Italy, 2010
32
KEY FACTS
Location:
Sicily
Country/Region:
Italy
Client:
Consorzio per le Autostrade Siciliane, CAS
Provided Services:
Design
Supervision of works
Completion date:
2008
Syracuse-Gela Highway, Section Cassibile Interchange – Rosolini Interchange
Italy, 2008
33
KEY FACTS
Location:
Sicily
Country:
Italy
Client:
Anas S.p.A.
Provided Services:
Design
Supervision of works
Completion date:
December 2010
Structures include:
-24.6 km total length
-2 carriageways with 2 lanes
-3 interchanges
-8 twin-tubes
-12 viaducts/bridges totaling
4,200 m
Catania – Syracuse Highway,
Italy, 2010
34
KEY FACTS
Country:
Italy
Client:
S.C.F. Infrastrutture S.r.l.
Contracting Authority:
Consortile ASR20 S.c.a.r.l. (Tecnis S.p.A.)
Provided Services:
Final Design
“Stretch – D”
Completion date:
2012
Pedemontana Lombarda Highway,
Italy, 2012
35
KEY FACTS
Country:
Albania
Client:
Ministry of Transport – General road Directorate
Provided Services:
Engineering studies, including evaluation of possible
variants
Detailed Surveys & Investigations
Environmental Impact study
Safety audit
Supervision of works
Completion date:
2008
Consulting Services for Design & Preparation of Works Documents for the Reps- Thirra
Road Section 2, Albania
36
KEY FACTS
Location:
Dubai
Country/Region:
United Arab Emirates
Client:
Municipality of Dubai
Provided Services:
Definition of alternative solutions, comparison of solutions,
environmental and visual impact analysis
Selection of solutions
Preparation of Detailed Project Reports
Preparation of Tender documents as per FIDIC Conditions
Invitation & Evaluation of Tender Documents
Construction Supervision for:
a) measurement of works
b) certification of Contractors works and preparation of bills
for payment
c) settlement of claims
d) progress monitoring and quality control
Contract Management
Maintenance works
Dubai Trade Centre Interchange
United Arab Emirates
37
KEY FACTS
Location:
Dubai
Country/Region:
United Arab Emirates
Client:
Municipality of Dubai
Provided Services:
Preliminary Design,
Final Design,
Supervision of Works
Access Road to Sheikh Zayed Road
United Arab Emirates
38
KEY FACTS
Location:
Abu Dhabi
Country:
UAE
Client:
Public Works Department Emirate of Abu Dhabi
Provided Services:
Engineering studies
Detailed Surveys & Investigations
Preparation of Detailed Project Reports
Drawing Preparation of Tender documents as per
FIDIC Conditions Construction Supervision
Contract Management
Environmental Impact study
Safety audit
Supervision of works
Abu Dhabi – Al Ain Expressway,
United Arab Emirates
39
KEY FACTS
Location:
Abu Dhabi
Country:
UAE
Client:
Abu Dhabi Municipality
Provided Services:
Engineering studies
Detailed Surveys & Investigations
Preparation of Detailed Project Reports
Drawing Preparation of Tender documents as per
FIDIC Conditions Construction Supervision
Contract Management
Project: Dualling of East Bani Yas – El Heeliyah Road
United Arab Emirates
40
KEY FACTS
Location:
Constantine
Country/Region:
Algeria
Client:
Agence Nationale des Autoroutes
Provided Services:
Control and approval of working drawings;
Supervision of works;
Technical assistance
Structures include:
• total length 339 Km, 2 carriageways with 3 lines,
3,50 each, plus shoulders and median about 5,0 large,
for a total roadway with 31,0 m
• 20 interchanges
• 3 twin-tubes totaling 4,6 Km, ranging from 295 m to
2,500 m, plus 1 artificial 200 m long
• 48 viaducts totaling 5,1 Km, average lenghts: 130 m
for viaducts and 35 m for bridges, 35 m spans
Construction works of the East-West Highway, Lot East
Algeria
41
KEY FACTS
Location:
Southern Yunnan
Country/Region:
China
Client:
Agence Nationale des Autoroutes
(National Highways Authority)
Provided Services:
Technical assistance
Construction contract management
Supervision of works
Training
Completion date:
June 2003
Structures include:
- 463 viaducts/bridges totaling 57,282 m
-147 km total length
- 2 carriageways with two lanes
- 8 interchanges
Southern Yunnan Road Development Project, Yuanjiang-Mohei Expressway,
China
42
KEY FACTS
Location:
Palermo, Sicilia
Country/Region:
Italy
Client:
Amat Palermo S.p.a.
Completion Date:
December 2015
Structures include:
• total length 18.3 Km
• Line 1 5.5 km with two lanes and 0.552 Km on one
rail, with 15 stops
• Line 2 4.972 Km of two lanes with 13 stops
• Line 3 a 1.436 Km of two lanes and 2 stops
• Line 3 b 5.843 Km on loop of one lane and 14 stops
• 2 viaducts one of this is a bimodal arched bridge
• 3 pedestrian bridges
• Supervision of Woks
• PMC
Project & Construction Management for the realization of three new Tramways In Palermo
Italy, 2015
KEY FACTS
Location:
Dubai
Country/Region:
United Arab Emirate
Client:
Dubai Municipality
Provided Services:
Preliminary Studies
Improvements of Al Shindagha Corridor
Dubai, 2015
Hydraulic & Dams
KEY FACTS
Location:
Different cities
Country/Region:
Saudi Arabia
Client:
Ministry of Water & Electricity
Provided Services:
Studies and Surveys,
Planning Studies,
Detailed Engineering Studies,
Engineering Design
Investigations and Engineering Design for Threated Wastewater, Reause in the KSA
Saudi Arabia
KEY FACTS
Location:
Al Maha
Country/Region:
United Arab Emirates
Client:
H.H. Sheikh Zayed Private Department
Provided Services:
Preliminary Design,
Detailed Design,
Construction Supervision,
Commissioning,
Supervision during warranty period
Irrigation Pumping Station at Al Maha
United Arab Emirate
KEY FACTS
Location:
Abu Dhabi
Country/Region:
United Arab Emirates
Client:
Abu Dhabi Water and Electricity Authority
Provided Services:
Concept Study,
Preliminary Design,
Detailed Design,
Construction Supervision,
Commissioning,
Supervision during warranty period
Potable Water Supply to New Dhow Harbour and Market
United Arab Emirate
KEY FACTS
Location:
Liwa
Country/Region:
United Arab Emirates
Client:
Abu Dhabi Water and Electricity Authority
Provided Services:
Preliminary Design,
Final Design
Water Supply Scheme for Different Areas Within Liwa Township
United Arab Emirate
KEY FACTS
Location:
Castreccioni
Country/Region:
Italy
Client:
Consorzio di Bonifica dei Bassi Bacini del Musone,
del Potenza e del Chienti
Provided Services:
Final Design
Castreccioni Dam on the Musone River
Italy, 2015
KEY FACTS
Location:
Caulonia
Country/Region:
Italy
Client:
Consorzio di Bonifica di Caulonia
Provided Services:
Final Design
Castreccioni Dam on the Musone River
Italy, 2015
Thank you
If you’d like to find out more visit:
www.italconsult.com