Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
Corporate Presentation
November 2017
One of the leading construction
groups in Greece
Greece's largest manufacturer of defense electronics
A major European IT solutions and services group
Intracom Holdings / The Shareholder
Establishment,a member of
Listed in the
Merger with
7th (highest) class certificate of the
Greek contracting enterprises register
Among thetop 5 Greek
Construction companies
Leading company in telecommunications
infrastructure
Development in Renewable Energy
Sources
Real EstateEnergy
PPP & BOT
2012200920011987
20051995 2010 2015
2017
14 Regional Airports
Timeline
Overview
At a glance Activity
7Subsidiaries
4Rep offices
600Employees
Intrakat Group ranks among the top 5 construction companies of Greece
Focused on EU-funded and PPP financed national and regional public works
€ 540 mBacklog (June 2017)
€ 182.4 mTurnover2016
Public vs. Private sector contracts 2016Sales by sector 2016
46.8 47.3
103.7
152
189.1210.2
191.8
127 124.3109.6
153.4 147.6
182.4
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
78%
4%
16% 2%Construction & Telecom infrastructure (€ 143 m)
Renewable energy (€ 6.3 m)
Steel structures (€29 m)
Maintenance (€4.1 m)
40%
60%
Private sector
Public sector
Turnover 2004 – 2016Financial data 2016
Sales distribution
Areas of activity
Infrastructure Building Real estate Industrial & steel structures
Telecom Waste & water treatment
Energy - RES PPP & BOT
Infrastructure / Road construction
Construction of motorways & highways in Northern, Western, Central, Southern Greece
183 km, Eastern Peloponnese Motorway,
Southern Greece
39 km, Arta -Fillipiada highwaydeviation,
Western Greece
3.2km, 2 underpasses, 1 twin span bridge, orbital motorway Egnatia Odos, Thessaloniki, Northern Greece
17 km, Kassandraroad circuit, Chalkidiki,
Northern Greece
51 km, national highway reconstruction, Kavala - Thessaloniki, Egnatia Odos,
Northern Greece
183km
39km
Road Construction
Kiato - Psathopyrgos section railway line, Southern Greece
Infrastructure / Transportation projects
Railway station Oradea, Romania
28.5 km
3,800 m2
Air terminal & maneuvering area, National Airport, Paros island
1,400 m
12,500 m2
Terminal building, public airport, Karpathos island
Infrastructure / Airports
357 m.
€
CONSTRUCTION PROJECTS
STUDIES
Study and construction of expansions
Upgrade of existing airport infrastructure
14 Peripheral Airports
Kavala
Thessaloniki
Kerkyra
Skiathos
Mitilini
Aktion
Kefalonia
Zakynthos
Samos
Mykonos
Kos
Santorini
Rodos
Chania
3.5 km tunnel construction, >15% inclination & hard rock, TBM, Aposelemi Dam reservoir,Crete island
Infrastructure / Water engineering
Eshatia water stream,Athens8ml
m3
km3.5
km3.3
430,000 m³ total & 8,000,000 m³ reservoir volume, Filiatrino dam, Messinia, Southern Greece
Multi level building, Aggelikousis shipping group, Athens
Office building, BSB SA, Athens
Office building Renovation & modernization, Benroubis SA, Athens
Athens Information Technology, Athens
500,000+ m2Built area
17,500 m2
11,150 m2
19,000 m2
30,000 m2
11,150 m2
Building / Offices, professional infrastructure
6,200 m2, ΑΒ supermarket stores Delhaize Group,
Athens & Crete island
14,500 m2
18,000 m2 shopping center, Larissa,
Central Greece
12,500 m2, Lidl
Attica
Building / Shopping centers
14,500 m2, Leroy Merlin building, Thessaloniki,
Northern Greece
18,000 m2
12,500 m2
16,000 m2, supermarket stores LidlThessaloniki
Renovation, Biological Institute of Bucharest, Romania
Centre for Education and Sciences, Societyfor the Promotion of Education & Learning,Patra
“Ioannis Karras” nursery school, American College of Greece, 1st building in Greece with LEED Platinum certification, Athens
Architectural award winning public nursery school at Markopoulo, Attica
Four level library building, Athens University of the Fine Arts, Athens
4,500 m2
2,100 m2 7,000 m2
4,740 m25,100 m2
Building / Educational & Cultural buildings
298 beds capacity, 35,000 m2, New Public General Hospital & Psychiatric Hospital, Corfu, Western Greece
243 beds capacity, 33,500 m2, New Public General Hospital & Psychiatric Hospital, Katerini, Northern Greece
213 beds capacity, 28,000 m2, Private General Hospital IASO THESSALIAS, Larissa, Central Greece
200 beds capacity, 17,900 m2, seven levelmaternity hospital REA, Athens
350 beds capacity, 26,000 μ2, Clinical Hospital, Shtip, FYROM
114 beds capacity, 10,000 m2, Ionios Private Clinic, Corfu island, Western Greece
64 beds capacity, 3,000 m2, «Prof.Dr. Dimitrie Gerota» hospital renovation, Bucharest, Romania
60 beds capacity, 7,000 m2, 5 level, Center for Rehabilitation "Theseus“, Athens
30 beds capacity, 3,500 m2, New Psychiatric Clinic, “EVAGELISTRIA” hospital, Tripoli, Southern Greece
22 beds capacity, 3,000 m2, Karpathos island General Hospital,, Southern Greece
Building / Hospitals, health centers
1,500+Beds capacity 138,000 m2
Total built area
• Olympic tennis center, Athens Olympic Sports Complex
• Olympic swimming center, Athens Olympic Sports Complex
• Grandstand & Arena, Olympic Equestrian Centre, Markopoulo, Attica
• Panthessalico stadium, Volos, Central Greece
• Olympiakos FC training center and football field, Piraeus
• Steel structure, Georgios Karaiskakis football stadium, Piraeus
• Steel structure, Tae Kwo Doo, Venue
Building / sport venues, stadiums
6 venues
2004 Olympic Games
70,323 m2, 453 apartments, “Garden Residence” residential and commercial complex, Krakow, Poland
13,136 m2, 46 luxurious apartments and penthouses, Blue Riviera Residential Complex, Agios Konstantinos, Central Greece
11,000 m2 Luxury residences, Greece
2 Luxury Boutique Hotel, Mykonos, Athens
5 Luxury villas, Mykonos
1,450 m2
70,323 m2
300 m2
3,000 m2
Real Estate Development / Hotel & housing complexes
Industrial & steel structuresIndustrial facilities
5 silos, 46m height, slipforming construction&installation of mechanical equipment, HalypsCement Factory Aspropyrgos, Attica
Steel structures, construction, erection & cladding, Lafarge Cement plants, Halkida & Mylaki, Central Greece
PPC, low voltage metering stations for big electricity consumers
B΄ Operational Phase, Thriasion Complex & construction of S.S. Zefiriou
12,000 m2
32,000 m3capacity
Industrial & steel structures / Intrakat plant
Heavyweight steel structures
10,000 tones Annual Production capacity
Steel plant, Larissa, Central Greece
industrial facilities
25,000m2
totalsurface
125,000m2
Prefabricated steel shelters
60,000 m2
Annual Production capacity
Steel towers & masts
10,000 tones
Annual Production capacity
Hot-dip Galvanizing
20,000 tones
Annual Production capacity
Fracasso Hellas, safety barriers
25,000 tones Annual Production capacity 1,200 km
Major clients
Telecommunications projects
>10,000 kmFiber optic networks
> 4,000Base stations
>42Telecommunications centers
Solid and liquid waste management
Joint Venture
WATT
Budget
16.3 m.
Construction period
18 months
Production: 35,000 t/year
Construction of a municipal solid waste treatment plan N. Viotia
Implementing entity: S.W.M.O. of the Region of central Greece
drinking water treatment plant, at Mornos water conduitThiva, Central Greece
36,000 equivalent population,
840 m³/h nominal capacity,
Energy / Waste water treatment projects
wastewater treatment plant, Oinofyta – Shimatari Municipality, Central Greece
25,000 equivalent population
4,000 m³/d volumetric flow,
wastewater treatment plant operation & maintenance Oinofyta – Shimatari Municipality, Central Greece
36,000 equivalent population
5,400 m³/d volumetric flow,
construction of 3rd sewage treatment stage of existing WWTPArgos – Nafplio – N.Kios, Southern Greece
150,000 equivalent population,
22,500 m³/d volumetric flow,
wastewater treatment plant, Aliartos Municipality, Central Greece
20,000 equivalent population
3,000 m³/d volumetric flow,
Energy / Renewable energy
Solar energy
Wind energyServices• Acquisition and management
of licences• Planning & design• Construction & installation • Project management• Systems support
140 MWTotal Experience in Renewable Energy
40MW
100MW
Services• Acquisition and management
of licences• Planning & design• Construction & installation • Project management• Personnel training• Systems support
High pressure natural gas pipeline, part Alexandroupoli –Komotini, construction works, Gazprom-Prometheus Gas SA Northern Greece
Energy / Natural gas
41 km polyethylene & 39 km steel gas distribution networks, 2002-2006 period, Attiki Gas Supply Company
Maintenance services of the natural gas distribution system and its facilities – Northern sector (from Koulato Platamonas & Komotini), DEPA S.A., Northen Greece
300+ km
Polythylenepipeline networks 100+ km
Steel pipeline networks
54km
238 km Polyethylene & 10 km steel distribution network natural gas pipeline, Southern & Central Attica
41km
39km
238km
10km
PPP & BOT
€ 60 m. Broadband Infrastructure in Rural "White" Areas of the Greek territory, association of companies,(Intrakat participation 60%, group participation 100%)
Broadband
€ 48 m.Integrated Passenger Information System and Fleet Management for ETHEL and ILPAP, association of companies,(Intrakat participation 50%, group participation 100%)
Integrated Passenger Information System
€ 844 m.Eastern Peloponnese Motorway, Corinth-Tripoli-Kalamata and Lefktro-Sparta Section, J/V Moreas, (Intrakat participation 13.3%)
Motorways
€ 25.4 m.63,000 tones annual waste capacity, solid waste treatment plant, recycling & composting, Serres Prefecture, Northern Greece,(Intrakat participation 40%)
Waste Management
PPP/ Environmental management
Recycling & Composting of Solid Urban Waste, Prefecture of Serres
, ,
Certificates – ISO
OHSAS 18001:2007 EN ISO 14001:2004 ISO 9001:2008
Design and production of road safety systems
Tourist-residential realestate development
Maintenance, operation, management
Group structure / Subsidiaries
19 km Markopoulou Ave, 19002 Paiania T +30 210 667 4700 E [email protected]
Thank you!