Transmission LinesUS$ 11,4 millions of sales
Electrical AssembliesUS$ 77,1 millions of sales
3
SubstationsUS$ 13,2 millions of sales
1
2
PROJECTS DONE
Large works, 2004-07
Electrical Nets and polyductsUS$ 19,4 millions of sales
4
LAST TREE YEARS
US$ 121,2 millions of sales
Substations
PROJECTS DONE
Work and DevelopmentUS $2,3 millions
Construction and assembly of Los Maquis 220 KV Substation
Construction and assembly Tap Off El Llano 220 KV
Construction and assembly of Valdivia
Substation’s extension 220 KV
Substations
Colbún US $5,9 millions
Construction and assembly of Minero 220/110 KV Substation
Construction and assembly of Candelaria 220 K Substation
Construction and assembly of Candelaria
Substation’s extension 220 KV
PROJECTS DONE
Substations
CMPC US $2,1 millions
Construction, supply, and assembly of Santa Fe 220/6.6 KV substation
Extension of Pacífico substation 220 KVPROJECTS DONE
EscondidaUS $0,5 millions
Change of 4 switches of 220 KV in Coloso and O´Higgins Port’s substation
ChilquintaUS $1,8 millions
Construction and assembly of one of Agua Santa substation’s position line and Placilla 110/12 KV 25 MVA substation
Transmission Lines
BHP BILLITON US $4,1 millions
Distribution system in 23 KV for Spence deposit
Engineering, Supply, Construction and start up of the electrical supply in 23 KV. Mine Faride of Cerro Dominador Mining
PROJECTS DONE
Transmission Lines
PROJECTS DONE
EFEUS $2,7 millions
Line of 66 KV from Chiguayante (CGE) Substation to Quilacoya (EFE) Substation
Construction and Fitting out in Concepción's zone
Wired up of Force and Control
Transmission Lines
PROJECTS DONE
ChilquintaUS $2,0 millions
Engineering, Supply, Construction and start up of 110 KV Algarrobo – Casablanca Line
Assembly and start up of the second circuit of 110 KV Melipilla-San Antonio Line
Constrution and Assembly of 110 KV Placilla substation’s line
Transmission Lines
Codelco US $1,8 millions
Constrution and Assembly of a subsystem Transmission Line of 110 KV (El Teniente)
Movement of Transmission Lines Towers of 100 KV (Chuquicamata)
PROJECTS DONE
EscondidaUS $0,7 millions
Engineering and Construction of 13,8 KV Mine Loop’s Line
Electrical Assemblies
EFE US $60,0 millions
System of Signposting, Electrification and Communications for Ferreous Line Santiago-Chillán
Construction of 18 Substation
Changing of power’s transformers
Maintenance of primary equipments (switch, desconectador, T/P, T/C and lightningrod)
Implementation of the new DEC in Santiago
Mechanical Independización of passenger’s yiards and load in Patio Alameda
PROJECTS DONE
Electrical Assemblies
Metro S.A.US $14,4 millions
Illumination System and Force for 28 subway stations 4 y 4ª
Illumination systems (33 Km.)
Ventilation System’s Licitation for North Recoleta Extension of Line 2 of Santiago’s subway
PROJECTS DONE
Electrical Assemblies
Costanera norte HighwayUS $1,2 millions
Wire, Channeling and Hookup of Force Cables, Instrumentation and Control inside Costanera Norte tunnel
Transformers and Cables Assembly for MT
PROJECTS DONE
Del Sol HighwayUS $0,5 millions
Monitoring System of the urban section Highway of Sol’s Highway
Electrical nets
and polyducts
Chilectra S.A.US $15,6 millions
Electrical Nets Movements MT and BT of Central Highway
Electrical Nets Movements MT y BT Road project Vespucio Norte
Electrical Nets Movements MT y BT Station 4 of the subway
Electrical Nets Movements MT y BT Road project Vespucio Sur
Polyduct Construction of Arcadia Central Highway
Electrical Nets Movements MT y BT Costanera Norte Road Project
Electrical Nets Movements MT y BT Santiago’s Highway South access
Polyduct Construction of Estoril Costanera Norte
PROJECTS DONE