82
CREATING A PREMIER AFRICAN GOLD PRODUCER 0 Corporate Presentation December 2016

Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

CREATING A PREMIER AFRICAN GOLD PRODUCER

0

Corporate Presentation December 2016

Page 2: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

1

Disclaimer & Forward Looking Statements

CREATING A PREMIER AFRICAN GOLD PRODUCER

Cash cost per ounce and all-in sustaining cash cost per ounce are non-GAAP

performance measures with no standard meaning under IFRS. This

presentation contains “forward-looking statements” including but not

limited to, statements with respect to Endeavour’s plans and operating

performance, the estimation of mineral reserves and resources, the timing

and amount of estimated future production, costs of future production,

future capital expenditures, and the success of exploration activities.

Generally, these forward-looking statements can be identified by the use of

forward-looking terminology such as “expects”, “expected”, “budgeted”,

“forecasts” and “anticipates”. Forward-looking statements, while based on

management’s best estimates and assumptions, are subject to risks and

uncertainties that may cause actual results to be materially different from

those expressed or implied by such forward-looking statements, including

but not limited to: risks related to the successful integration of acquisitions;

risks related to international operations; risks related to general economic

conditions and credit availability, actual results of current exploration

activities, unanticipated reclamation expenses; changes in project

parameters as plans continue to be refined; fluctuations in prices of metals

including gold; fluctuations in foreign currency exchange rates, increases in

market prices of mining consumables, possible variations in ore reserves,

grade or recovery rates; failure of plant, equipment or processes to operate

as anticipated; accidents, labour disputes, title disputes, claims and

limitations on insurance coverage and other risks of the mining industry;

delays in the completion of development or construction activities, changes

in national and local government regulation of mining operations, tax rules

and regulations, and political and economic developments in countries in

which Endeavour operates. Although Endeavour has attempted to identify

important factors that could cause actual results to differ materially from

those contained in forward-looking statements, there may be other factors

that cause results not to be as anticipated, estimated or intended. There

can be no assurance that such statements will prove to be accurate, as

actual results and future events could differ materially from those

anticipated in such statements. Accordingly, readers should not place

undue reliance on forward-looking statements. Please refer to Endeavour’s

most recent Annual Information Form filed under its profile at

www.sedar.com for further information respecting the risks affecting

Endeavour and its business.

Adriaan “Attie” Roux, Pr.Sci.Nat, Endeavour’s Chief Operating Officer, is a Qualified Person under NI 43-101, and has reviewed and approved the technical information in this presentation.

Page 3: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Endeavour Mining Overview

2

Immediate Cashflow from 5 producing mines at low AISC

– 2015 production: 517 koz

– 2016E production: 575-610 koz

– 2015 AISC: US$922/oz

– 2016E AISC: US$870 - 920/oz

Near-Term Growth from 2 attractive projects

– Houndé Project construction started in April 2016, first gold pour expected in Q4-2017

– Ity CIL Project feasibility study demonstrated potential for Ity to become another flagship asset

Long-Term Upside from Exploration – Strategic review outlined potential to find 10-15Moz over the next

5 years at a discover cost of <$15/oz

– Potential to significantly extend mine lives to beyond 10 years

CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 4: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

0

5

10

15

20

25

30

0

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

6,000,000

7,000,000

January-16 February-16 March-16 April-16 May-16 June-16 July-16 August-16 September-16 October-16 November-16

Volume (shares) EDV share price, C$

Share Price Performance

Current shareholder distribution and geographic mix

Ticker TSX:EDV

Shares in Issue 93.4 m

Fully Diluted 95.8 m

Share price C$23.26

Market cap US$1,655m

Net Debt US$14m

Company Profile

La Mancha

29%

Retail

7%

Management

1%

Institutional

63%

3

Board Members

CREATING A PREMIER AFRICAN GOLD PRODUCER

Wayne McManus Non-executive Director

Ian Henderson Non-executive Director

Sebastien de Montessus CEO & President & Director

Naguib Sawiris Non-executive Director

Michael Beckett Chairman, Non-executive Director

Ian Cockerill Non-executive Director

As of November 7th 2016

Olivier Colom Non-executive Director

Livia Mahler Non-executive Director

Page 5: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Sebastien de Montessus

CEO & President & Director

4 CREATING A PREMIER AFRICAN GOLD PRODUCER

Safety First

Lean and Efficient

Operations

Hands-On

Management

Cash flow driven

Adriaan “Attie” Roux

COO

Vincent Benoit

EVP CFO & Corporate Development

Patrick Bouisset

EVP Exploration & Growth

Jeremy Langford

EVP Construction Services

Morgan Carroll

EVP Corporate Finance & General Counsel

Henri de Joux

EVP People & Public Affairs

MANAGEMENT FOCUS LEAN EXECUTIVE MANAGEMENT TEAM

Hands-on Management Model

Page 6: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

CREATING A PREMIER AFRICAN GOLD PRODUCER 5

Strategic Milestones for 2018-2020

+ 900 koz

ANNUAL PRODUCTION

≤ 800$/oz ALL IN CASH COST

10+ year MINE LIFE IN OUR CORE ASSETS

$1,137

$1,010

$922

2010 2011 2012 2013 2014 2015 2016 6+6 2017 2018 2019

Youga, Burkina Faso Nzema, Ghana Tabakoto, Mali

Agbaou, Côte d'Ivoire Ity (Heap Leach), Côte d'Ivoire Karma, Burkina Faso (incl. pre-production)

Houndé, Burkina Faso Ity (CIL), Côte d'Ivoire Group AISC

$870-920

83koz

167koz

220koz

317koz

462koz

517koz

+900koz

575-610koz

<$800

Assumes Ity construction starts H1-2017 and first gold production in 2019 with Heap Leach operation ending once CIL starts

Ity CIL

CLEAR PATH TO BUILD A +900KOZ PRODUCER AT ≤ $800/OZ AISC

2016

Page 7: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

STRATEGIC OBJECTIVE

Create a Premier African Gold Producer with Low-cost and Long Life Mines

20 8 7

900

19 21

750

22 6

600

650

700

5

800

850

4

950

1,000

1,050

1,100

18 13 14 15 16 17 12 11 10 9

Average mine life, years

AISC, $/oz

Endeavour 2016E

Endeavour 2015A

Teranga

Semafo

Resolute

Randgold

Perseus

Nordgold

Newmont Newcrest

Kinross

IAMGOLD

Golden Star

Gold Fields

AngloGold Ashanti

4 Strategic Levers

1 OPERATIONAL EXCELLENCE

PROJECT DEVELOPMENT

UNLOCK EXPLORATION VALUE

PORTFOLIO & BALANCE SHEET MANAGEMENT 2 3 4

Benchmark of West-African Producers

Bubble size represents production

Source: UBS Research, based on 2015A only West-Africa production. Mine life excludes expansion and development projects such as Kinross’ Tasiast Phase 2 and Resolute’s UG project

6 CREATING A PREMIER AFRICAN GOLD PRODUCER

Endeavour (output of strategic

exploration review)

Page 8: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

1) Increased Production 2) Decreased All-in Sustaining Costs

3) Increased Cash Generation 4) Low Lost Time Injury Frequency Rate

2013A

324koz

2016 Guidance

575-610koz

2015A

517koz

2014A

466koz

Production, on a 100% basis in koz

$35m

2015A 2014A

$135m

$85m

2016 Guidance 2013A

$28m

$1,137/oz

2015A

$922/oz

2014A

$1,010/oz

$870-920/oz

2016 Guidance 2013A

AISC, in US$/oz

US$1,392/oz US$1,264/oz US$1,157/oz HI : US$1,150/oz H2: US$1,250/oz

Free cash flow before tax, WC & financing costs, in US$m (realized gold price)

7 CREATING A PREMIER AFRICAN GOLD PRODUCER

Excludes Agbaou, Houndé and Karma capex

OPERATIONAL EXCELLENCE

Proven track record of operating in West-Africa 1

0.27

0.73

First 9-months 2016

2013 2015

1.73

0.76

2014

Lost Time Injury Frequency Rate (Number of LTIs in the Period X 1,000,000)/ (Total man hours worked for the period)

Page 9: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Q3- 2016 First 9 months

of 2016 2016

Guidance Comment

Production (incl Karma)

146koz 416koz 575 - 610koz Q3: +6% over Q2-2016

Growth acceleration expected in Q4

Production on track to be within guidance

All-in Sustaining Costs $898/oz $896/oz $870-920/oz Continued decrease achieved in Q3 with

success of cost reduction programs

Low AISC trend expected to continue in Q4

Free Cash Flow (before tax, WC , financing costs, Houndé and Karma)

$41m $100m $135m1

Strong cash generation in Q3

Q4 to benefit from stronger production and start of Karma commercial production

Well on-track to meet Cash Flow guidance

Net Debt (end of period)

$14m n/a Decreased from a net debt position of

$242m at the end of September 2015

8 CREATING A PREMIER AFRICAN GOLD PRODUCER

1 Based on H1 realized gold price of $1,225/oz and $1,250/oz for H2

OPERATIONAL EXCELLENCE Group level performance in line with full year guidance 1

Page 10: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

800

17

950

650

850

700

900

750

20 19 18 15 14 13 11 10 8 7 12 5 9 6 4 3 16 2

$1,000/oz

1,250

1,150

1,100

1,050

1,200

Yaramoko (Roxgold)

Banfora (Gryphon)

Kobada (African Gold Group)

Sissingue (Perseus)

Baomahun (Amara)

Ity CIL (DFS)

Dugbe 1 (Hummingbird)

Wa-Lawra (Azumah)

Yanfolila (Hummingbird )

Mine life, years

Tri-K (Avocet)

Fekola (B2Gold)

Natougou (Semafo)

Mako (Toro)

Bouly (NordGold)

Kalana (Avnel)

Ity CIL (PFS)

West African DFS Stage Projects Benchmark: Mine life and All-in cost (including initial capex)

All-in

Cash

Co

st, $

/oz (A

ISC

+ In

itial C

ap

ex)

Houndé

DFS

CREATING A PREMIER AFRICAN GOLD PRODUCER 9

Significant West African Construction Expertise:

– Core construction team has successfully developed projects together for +10 years

– 7 projects built, $2.4B in capex

– All projects delivered on time and within budget

PROJECT DEVELOPMENT

Houndé and Ity CIL are top tier projects 2

Bubble size represents average annual production = 100koz p.a.

Page 11: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

PROJECT DEVELOPMENT

Houndé is positioned to be Endeavour’s flagship low cost mine

Burkina Faso

Houndé

Ouagadougou

Essakane (IAMGOLD)

Taparko (Nordgold)

Youga (MNG)

Mana (Semafo)

Inata (Avocet)

Bissa Hill (Nordgold)

Yaramoko (Roxgold)

Bomboré (Orezone)

Konkera (Centamin)

Banfora (Gryphon)

Karma

• Construction started in April with first gold pour expected in Q4-2017

- Construction is progressing on-time and on-budget

- Procurement is approximately 60% complete

• 10-year mine life based on current reserves + significant exploration upside

• Average production of 190kozpa at AISC of US$709/oz

• Capex of $328m, inclusive of $47m for owner-mining fleet

• Robust Project with after-tax IRR of +30% at US$1,250/oz

$662/oz

184koz

Year 2

$648/oz

218koz

Year 3

231koz

Year 9 to 10

Average

$645/oz

116koz

$496/oz

Year 5 to 8

Average

$901/oz

Year 4

223koz

265koz

$506/oz

Year 1

AISC/oz Production based on reserves, koz

Exploration upside expected to fill this shortfall

Life of Mine Plan

CREATING A PREMIER AFRICAN GOLD PRODUCER

2

10

Page 12: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Long-life Low Cost Project

• Long 14-year reserves mine life

• Low AISC of $507/oz over first 9 years

• Solid production of 144kozpa over first 9 years

Robust Project Economics (based on $1,250/oz)

• After-tax IRR of 36%

• After-tax NPV5% of $411m

• Quick payback of 2.1 years

Significant improvement expected in H1-2017 Feasibility Study update

• Inclusion of the recent high-grade Bakatouo and Colline Sud discoveries and Verse Ouest

• Additional Resource conversion at Daapleu and Mont Ity

Well-positioned with strong liquidity sources to take final investment decision in H1-2017

11 CREATING A PREMIER AFRICAN GOLD PRODUCER

PROJECT DEVELOPMENT

Ity CIL Feasibility Study demonstrates potential for Ity to become another flagship asset 2

$898/oz

53koz

Years

10 to 14

Year 9

109koz

$638/oz

Year 8

124koz

$554/oz

Year 7

103koz

$608/oz

Year 6

133koz

$622/oz

Year 5

150koz

$582/oz

Year 4

185koz

$500/oz

Year 3

134koz

$608/oz

Year 2

193koz

$409/oz

Year 1

163koz

$477/oz

AISC/oz Production based on reserves, koz

165kozpa at AISC of US$507/oz on average over the first 5 years

Page 13: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

+200 Targets 7,190 km2 10 Mining Leases 42 Exploration Licenses

390 km²

2,140 km²

510 km²

4,150 km²

12 CREATING A LOW COST AFRICAN GOLD PRODUCER

UNLOCK EXPLORATION VALUE

Amongst Largest and Most Promising Portfolios in West Africa 3

Page 14: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

4

3

1

6

5

2

0.5-1.5Moz 0.5-1.0Moz

4.0-6.0Moz

Greater Ity

2.5-3.5 Moz

Houndé

1.5-2.5Moz

True Gold

0.5-1.0Moz

Côte d’Ivoire

Regional

Tabakoto Agbaou

Total Potential to find 10-15Moz over next 5 years Moz

48% 52%

10-15 Moz

Near Mine to Brownfield < 15km

Greenfield

Note: See Investor Day Presentation on EDV website for full details. Based on average gold grade of 2.0-3.5g/t for Greater Ity, 1.8-2.5g/t for Houndé, 2.0-4.0g/t for Tabakoto, 1.0-1.5g/t for TrueGold and 1.5-3.0g/t for Côte d’Ivoire regional. The potential quantity of ounces is conceptual in nature since there has been insufficient exploration to define a mineral resource and since it is uncertain if exploration will result in the targets being delineated as a mineral resource.

13 CREATING A LOW COST AFRICAN GOLD PRODUCER

UNLOCK EXPLORATION VALUE

Exploration Strategic Review Output: Ranking of Potential 3

Page 15: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

$10m

$15m

$25m

$30m

$45m

$55m

$13/oz

$20/oz

$25/oz

$15/oz$15/oz$11/oz

Côte d’Ivoire

Regional

True Gold Agbaou Tabakoto Houndé Greater Ity

Average discovery cost Exploration budget

Annual budget of $35-40m with anticipated average discovery costs <$15/oz

33%

Côte

d’Ivoire

50%

Mali

17%

Burkina

Faso

5-year budget

14 CREATING A LOW COST AFRICAN GOLD PRODUCER

UNLOCK EXPLORATION VALUE

Exploration Strategic Review Output: Low Discovery Costs 3

Page 16: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

2017

9%

100%

7%

21%

24%

9%

31%

9%

4%

2021

100%

12%

7%

43%

27%

6%

2020

100%

13%

2%

35%

35%

6%

2019

100%

10%

4%

21%

20%

26%

20%

2018

100%

7%

3%

25%

20%

22%

23%

True Gold Regional CI Ity Agbaou Hounde Tabakoto

Priorities: 1. Tabakoto due to its short mine life 2. Agbaou to extend oxide mine life 3. Ity to extend HL and Improve CIL case 4. Houndé (once in production) to maintain 250kozpa level after 4th year

Priorities: 1. Ity Greater Area 2. Houndé to prolong mine life 3. Tabakoto and Agabou exploration will be

success driven

15 CREATING A LOW COST AFRICAN GOLD PRODUCER

UNLOCK EXPLORATION VALUE

Exploration Strategic Review Output: What are the priorities? 3

Page 17: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

$1,000/oz

$450/oz

$1,200/oz

$600/oz

$1,100/oz

$950/oz

$900/oz

$800/oz

$550/oz

$650/oz

$1,050/oz

$850/oz

$1,150/oz

$750/oz

$700/oz

$500/oz

Mine life, years

Decreased costs from >1,300/oz

Agbaou (180-195koz)

Nzema (90-100koz)

Tabakoto (155-175koz)

Ity HL (70-80koz)

AISC, US$/oz

Ity HL (70-80koz)

Ity CIL (first 9 years)

Houndé (200koz)

Karma (110-120koz)

Bubble size represents production

Côte d’Ivoire Burkina Faso Ghana Mali

16 CREATING A PREMIER AFRICAN GOLD PRODUCER

Possibility to run HL in Parallel CIL Project

DFS

Mine life as at 2016

4 PORTFOLIO & BALANCE SHEET MANAGEMENT

Increase Overall Quality of our Portfolio

Page 18: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Karma

Siguiri

Tasiast

AISC, US$/oz

Tabakoto (2016E)

Sabodala

Nzema (2016E)

17

50

100

150

200

250

300

350

400

450

500

550

600

500 550 600 650 700 750 800 850 900 950 1,000 1,050 1,100 1,150 1,200 1,250 1,300 1,350

Tarkwa

Akyem

Agbaou (2016E)

Bissa

Gounkoto Mana

Loulo

Chirano

Syama

Morila

Lefa

Tongon

Wassa

Edikan

Sadiola

Ahafo

Bonikro

Essekane

Iduapriem

Bogoso/Prestea

Damang

Ity HL

Ity CIL

Pro

du

ctio

n, k

ozp

a

Houndé, Ity, and Karma are respectively based on first 4, 5, and 5 year averages. Peer group based on 2015A. Source: UBS research

Lowest cost mines Highest cost mines

Houndé

CREATING A PREMIER AFRICAN GOLD PRODUCER

~1/5 of 2019 EDV production

~4/5 of 2019 EDV production

West African Mines Benchmark

4 PORTFOLIO & BALANCE SHEET MANAGEMENT

Creating one of West-Africa’s lowest cost asset portfolios

Page 19: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Significant reduction in Net Debt since the beginning of the year

‒ $65m cash injection received from La Mancha in May following the True Gold transaction close

‒ $104m of net proceeds from bought deal financing to accelerate organic growth and exploration

‒ $100m voluntary repayment made under the $350m revolving corporate facility

18

End of Sept 2015

End of Sept 2016

$14m

0.1x

End of June 2016

$83m

1.7x

2014 (year-end)

$254m

1.8x

$242m

Net Debt to trailing 12-month Operating EBITDA ratio Net debt

Liquidity and Financing Sources

0.5x

Strong liquidity and financing sources to fund remaining Houndé capex spend of roughly $270m

Further headroom potential to fund Exploration and Ity CIL with free cash flow

$397m

Undrawn RCF of $210m

$50m Equipment Financing

Cash Position of $137m

As of September 30th, 2016

Net debt = Cash less drawn RCF, leases & drawn equipment financing RCF of $350 million, maturity date March 2020, semi-annual reductions commencing September 2018, annual interest based on LIBOR + a 3.75% to 5.75% margin

4 PORTFOLIO & BALANCE SHEET MANAGEMENT

Healthy financial structure

Page 20: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

19 CREATING A PREMIER AFRICAN GOLD PRODUCER

HEALTHY FINANCIAL STRUCTURE

Well positioned to fund growth 4

Objective to keep leverage in a maximum range of 0.5x-1.0x

US$137m

US$210m

US$50m

US$271m

US$306m

c. $580m

Remaining Houndé project costs (as of 30/09/2016)

Ity CIL project costs

Funding requirements

Liquidity Sources

Undrawn RCF

Existing cash balance

Houndé Equipment Financing

Ity Equipment Financing (expected)

Potential liquidity buffer (@ $1,250/oz)

As of end September 2016

Based on current economic conditions, Endeavour can self-finance Houndé and Ity

Room to manoeuvre between debt and own cashflow

• Cash flow from current mine operations 2017-2018 (@$1,250/oz), including Houndé and Karma

• Hedging collar (between USD1,200-1,400/oz) covering c. 50% of production from Apr 16 to Sept 2017 protects cash flows while Ity and Houndé are being built

Page 21: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Key Value Drivers 2016 Achievements to Date

Portfolio Management

• Dynamic portfolio management to improve quality of portfolio • Youga sold in March (end of life, high cost operation)

• Karma acquired in April (Long mine life, low-cost operation)

Deleverage Balance Sheet

• US$230m additional equity • Net Debt positon reduced to US$14m

Fund Houndé Project

• Houndé fully financed due to improved balance sheet and cash from operations

• Construction launched in April

Exploration Strategy

• Exploration now an integral part of the strategy (published in November)

• Long-term exploration strategy outlines potential to find 10-15 Moz and extend mine lived beyond 10 years

Enhance Investor Relations

• Clarify equity story • Increased management presence and marketing • Improved transparency

Improve Governance

• New CEO appointed in June 2016 • Rationalization of offices (Corporate in London and Operations in Abidjan)

• Strengthened board with the appointment of 2 new independent directors • Additional governance improvements under consideration

Scorecard of value drivers set at the beginning of the year

On-Going

On-Going

20 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 22: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

21 CREATING A PREMIER AFRICAN GOLD PRODUCER

Near-Term Growth

from Projects

Immediate Cashflow

from Production

Long-Term Upside

from Exploration

Endeavour now offers exposure to both near and long-term growth potential, in addition to current production

Investment Highlights

with an accomplished management team and a healthy balance sheet

Page 23: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

CREATING A PREMIER AFRICAN GOLD PRODUCER

Details by Mine and Project

Page 24: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

23

Agbaou Mine – Côte d’Ivoire

Recent and Upcoming catalysts

Accomplished

- Record year in 2015, up 23% YoY

- Fully repaid shareholder loans in <2 years, in Nov 2015

- 2015 drill results confirmed oxide mineralization extensions

Upcoming

- Continue to benefit from the soft ore with high potential to add oxide reserves

- Secondary crusher successfully commissioned in July, providing increased processing flexibility

Quick Facts (on 100% basis)

Ownership 85% EDV, 10% Côte d’Ivoire, 5% SODEMI

Resources (incl. of Reserves)

M&I: 14.4Mt @ 2.5 g/t for 1.180Moz Inferred: 1.2Mt @ 1.7 g/t for 0.065Moz

Reserves 13.2Mt @ 2.4 g/t for 1.027Moz

Processing Rate Up to 2.2 Mtpa Gravity/CIL plant - oxides;

1.6 Mtpa fresh ore

Gold Recovery Achieving 97% at present; 92.5% design

Mining Type Open Pit – Contractor Mining (BCM)

Production

AISC (mine-level)

2014A– $621/oz

2015A – $576/oz

2016F – $550-600/oz

Expected Mine Life 7 years from current Reserves

Royalty 3% - 5% sliding scale

Corporate Tax 25% (5 year corporate tax holiday)

2016F

2014A

2015A

180-195koz

181koz

147koz

Agbaou Mine

Abidjan

Ity Mine

Côte d’Ivoire

CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 25: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

24 CREATING A PREMIER AFRICAN GOLD PRODUCER

Agbaou Mine – Côte d’Ivoire

Production and AISC

46koz

$525

Q1-2016

43koz

$525

Q4-2015

52koz

$537

Q3-2015

44koz

$583

+12%

Q4-2016E Q3-2016

49koz

$550

Q2-2016

AISC, US$/oz Production, koz

Q3-2016 Insights

• Production increased over the previous quarter despite the negative impact of the rainy season

• Higher gold grades and gold-in-circuit balance optimization compensated for lower processed tonnage and recovery rate

• Transitional ore processed in Q3-2016 represented 15% of total ore

Q4-2016 Outlook

• Production expected to increase due to:

‒ Improvement after end of cyclical effect of rainy season

‒ Benefit of mixing higher grade transitional ore

Insight: Benefit of higher grades

709kt743kt654kt

748kt746kt

2,21 g/t2,15 g/t

2,05 g/t2,05 g/t2,00 g/t

Q4-2016E Q3-2016 Q2-2016 Q1-2016 Q4-2015 Q3-2015

Grade milled, g/t Au Tonnes milled, kt

Page 26: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Agbaou Site Map

25

Agbaou Exploration

• In 2016, exploration is focused on the North pit and South pit extensions, the Agbaou South target, and on generating targets beyond the current resource boundaries

• Drilling based on previous geophysics surveys and soil geochemistry results commenced in April 2016

• More than 12,900 meters had been drilled by the end of September, representing approximately 25% of the exploration program

• Initial results suggest the extension of mineralized zones which will be further investigated by additional drilling

• Program expected to be completed by mid-2017

CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 27: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Agbaou Numerous Gold in soil anomalies over Mag

> 50 ppb

26 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 28: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Agbaou Exploration – 5 years targets

Côte d’Ivoire

Auger & RC drilling

27 CREATING A LOW COST AFRICAN GOLD PRODUCER

Page 29: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Agbaou – Exploration Potential

• 2013-2015 : Successful Drilling limited to infill drilling and immediate trend extension to renew resources and compensate for reserves depletion. As such, no preparation of future targets was done (nearly no inferred left)

• Current drill program is focused on new targets and definition of new inferred resources to be converted in 2017/2018 into indicated resources & reserves

• Known targets on the Agbaou Exploitation license have the potential to replace the production for a few additional years

• A brownfield exploration campaign of targets located in Agbaou Exploration License (at less than 20 km of the Agbaou mill) has started in 2016. Any new deposit discovered on this license also has the potential to further extend the mine life

Targeting discovery of between 0.5 to 1.5 Moz at an average cost of $25/oz over the next 5 years with a budget of ~$25M to extend mine life to 10 years*

*Targeting to discover between 0.5 to 1.5 Moz with average grade between 2 and 3 g/t Au. The potential quantity of ounces is conceptual in nature since there has been insufficient exploration to define a mineral resource and since it is uncertain if exploration will result in the targets being delineated as a mineral resource.

28 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 30: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Quick Facts (on 100% basis)

Ownership 80-90% Endeavour depending on pit, remainder government of Mali

Resources (incl. of Reserves)

M&I: 18.5Mt @ 3.1 g/t for 1.844Moz Inferred: 9.0Mt @ 3.6 g/t for 1.023Moz

Reserves 6.4Mt @ 3.5 g/t for 0.725Moz

Processing Rate 1.4 Mtpa Gravity/CIL Plan

Gold Recovery 92% - 95%

Mining Type Tabakoto (UG), Segala (UG) & Kofi C Open Pit Mine

Production

AISC (mine-level)

2014A– $1,335/oz

2015A –$1,067/oz

2016F – $970-1,050/oz

Expected Mine Life 4+ years from current Reserves

Royalty 6%

Corporate Tax 30%

29

Tabakoto Mine – Mali

Recent and Upcoming catalysts

Accomplished

- In 2013 the mill was expanded from 2,000 tpd to 4,000 tpd

- Segala ore production commenced in Q2 2014 and to full production by Q4 2014

- Kofi C deposit commenced production in Q1 2015

- In 2015, switch to owner and contractor fleet resulting in increased productivity

Upcoming

- Continue to optimize operation and reduce costs

- Considerable potential to expand and replace reserves

2014A

2016F 155-175koz

2015A 152koz

127koz

Tabakoto Mine

Bamako

Mali

CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 31: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Tabakoto Mine – Mali

30 CREATING A PREMIER AFRICAN GOLD PRODUCER

Production and AISC Q3-2016 Insights

• Improved mine performance with ~10% increase in ore tonnage extracted (for both open pit and underground)

‒ First time mine extraction over-performs mill throughput in over a year

• Production decreased over the previous quarter due to:

‒ Reduced mill throughput caused by maintenance shutdowns

‒ Planned decreased in grade at Segala which is expected to increase in Q4 ( 2.75g/t in Q3 vs 3.2g/t in Q2)

Q4-2016 Outlook

• Higher production and lower costs expected due to

‒ Increased mill throughput

‒ Higher grades at Segala

‒ Improved mining after end of cyclical effect of rainy season

$1 071$1 061$1 071$1 032$1 119

+2%

Q4-2016E Q3-2016

37koz

Q2-2016

39koz

Q1-2016

39koz

Q4-2015

42koz

Q3-2015

36koz

AISC, US$/oz Production, koz

Mine output out-perfomed mill throughput

CREATING A PREMIER AFRICAN GOLD PRODUCER

398kt368kt380kt

352kt

500kt

381kt399kt406kt392kt

408kt

Q4-2016E Q3-2016 Q2-2016 Q1-2016 Q4-2015 Q3-2015

Processed grades, g/t Au Tonnes Processed, kt Tonnes Mined, kt

3.11 g/t 3.31 g/t 3.10 g/t 3.53 g/t

2.99 g/t

Page 32: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Tabakoto Site Map

31

Tabakoto Mine – Exploration

• At Kofi B North a 244 hole RC drilling program and a 1,311 hole auger drilling program have been completed since the beginning of the year

• Analytic drill currently being analyzed

Kreko

Fougala

Kofi B North

• A first shallow RC program of 334 holes was completed on the Tabakoto, Fougala and Kreko targets which confirmed two mineralized trends

• A second phase drill program has been launched on Fougala and Kreko

CREATING A PREMIER AFRICAN GOLD PRODUCER

• On the open-pit targets, a total of 72,900m of drilling (both RC and DD) and 1,311 Auger holes have been completed since the start of the year

• The underground exploration programmes are ongoing with 22,400 metres of DD drilled so far this year at Tabakoto UG and Segala UG mines

Page 33: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

75 targets identifIed, 7 Priority 1 (2017)

Areas under transported cover identifIed

Tabakoto Surface Target priority ranking

Segala S

Kreko

Fougala

Dioulafoundou S

Famakan

Reg. Explo

Yatia SE

Sanou Sira

Dabo S

Sanou Sira S

32 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 34: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

KOFI Land Package Main Target Areas

Auger drilling

RC drilling

33 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 35: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Mali Exploration – Tabakoto and Kofi Land Packages

Targeting discovery of between 1.5 to 2.5 Moz at an average cost of $15/oz over the next 5 years with a budget of ~$30M*

*Targeting to discover between 1.5 to 2.5 Moz with average grade between 2 and 4 g/t Au. The potential quantity of ounces is conceptual in nature since there has been insufficient exploration to define a mineral resource and since it is uncertain if exploration will result in the targets being delineated as a mineral resource.

34 CREATING A PREMIER AFRICAN GOLD PRODUCER

• Main focus is on finding new additional open pit resources within a short distance to the Tabakoto mill within within18 to 24 months to replace Kofi C and further Kofi B/A Linear/ Betea production while pursuing exploration near Kofi C/B/A

• Aggressive Tabakoto surface exploration was initiated at mid-2016 (Ongoing Kreko and Fougala trend exploration)

• Ongoing large exploration program over Kofi Blocks

• Due to its “on trend” position with Loulo type deposits, we will be targeting a new large discovery in Kofi North, along this trend with the potential be a standalone operation since it is located more than 40 km away from Tabakoto facilities

• While proven continuation at-depth, a prudent evaluation of the underground potential as been set at 200-300koz for the next 2-3 years. Afterwards, although mineralizations continue at depth, additional exploration will be based on economic viability of the production

Page 36: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Quick Facts (on 100% basis)

Ownership 55% EDV, 30% SODEMI, 10% Côte d’Ivoire, 5% private investor

Resources (HL + CIL) (incl. of Reserves)

M&I: 61.4Mt @ 1.6 g/t for 3.106Moz Inferred: 14.1Mt @ 1.5 g/t for 0.687Moz

Reserves (HL+CIL) 30.4Mt @ 1.7 g/t for 1.6Moz

Processing Rate 950ktpa HL

Gold Recovery 81%

Mining Type Open pit / Heap Leach

Production

AISC (mine-level) 2016F – $800-850/oz

Mine life 3 years from current Reserves + addition potential

Royalty 3% - 5% sliding scale

Corporate Tax 25%

35

Ity Mine – Côte d’Ivoire

Recent and Upcoming catalysts

Accomplished

- Gained majority ownership in 2014

- Producing at historic highs (+50% since 2012 level)

- Increased heap leach capacity from 0.6mtpa to 1.0mtpa

- Increased M&I resources since 2011 from 0.2Moz to 2.9Moz plus 0.5Moz Inferred

Upcoming

- Continued exploration success to prolong heap leach life at current production level

- DFS for CIL project published on November 10, 2016 outlines potential to become core low-cost asset

- Potential to increase ownership

2015A 81koz

2016F 70-80koz

Agbaou Mine

Abidjan

Ity Mine

Côte d’Ivoire

CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 37: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

36

Ity Mine – Côte d’Ivoire

Q4-2016E Q3-2016

15koz

$724

Q2-2016

21koz

$775

Q1-2016

22koz

$710

Q4-2015

19koz

$621

Q3-2015

17koz

$628

AISC, US$/oz Production, koz

Q3-2016 Insights

• As guided, production decreased due to the impact of the rainy season:

‒ Lower Stacked Tonnage

‒ Decreased grades due to processed lower grade stockpiles during rainy season

‒ Higher mining costs due to more water pumping, etc

Q4-2016 Outlook

• Production expected to increase due to cyclical nature of rainy season

• Maiden resource estimate expected for Bakatouo and Colline Sud discoveries – potential to both extend heap leach mine life and improve Ity CIL project

• CIL DFS on track for Q4-2016

Production and AISC

Ity mine extraction

271kt304kt303kt

247kt280kt

1,90 g/t2,10 g/t

2,53 g/t

2,10 g/t1,95 g/t

Q4-2016E Q3-2016 Q2-2016 Q1-2016 Q4-2015 Q3-2015

Grade milled, g/t Au Tonnes stacked, kt

CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 38: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Summary of Independent Feasibility Study for CIL Project

Life of Mine Production

Strip ratio, w:o 2.1

Tonnes of ore processed, Mt 41.0 Mt Grade processed, Au g/t 1.42 g/t

Gold content processed, Moz 1.88Moz

Gold recovery, % 83%

Gold production, Moz 1.56Moz

Mine life, years 14 years

Average annual gold production, koz 114Koz

AISC, $/oz $603

Capital Cost

Upfront capital cost, $m $282m

Equipment lease $25m

Economic Returns base on US$1,250/oz

After-tax Project NPV5%,$m 411

After-tax Project IRR, % 36%

Payback, years 2.1

Lead Consultant:

Contributions from:

Source: Ity CIL Feasibility Study

37 CREATING A PREMIER AFRICAN GOLD PRODUCER

Ity CIL Project DFS highlights Independent CIL Feasibility Study prepared by:

Page 39: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Significant Improvement Expected in Updated Feasibility Study

H1-2017 update expected to include:

• Recent high-grade Bakatouo and Colline Sud discoveries

• Verse Ouest following recently completed infill drilling program

• Additional Resource conversion at Daapleu and Mont Ity based planned infill drilling program

Significant opportunity beyond the potential to delineate additional resources at known deposits and make new discoveries

38 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 40: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Additional Potential for Resource Conversion

Deposits on a 100%

basis. Resources are

inclusive of reserves.

Probable Reserves Indicated Resources Inferred Resources

Tonnage Grade Content Tonnage Grade Content Tonnage Grade Content

(Mt) (Au g/t) (Au koz) (Mt) (Au g/t) (Au koz) (Mt) (Au g/t) (Au koz)

Open Pits

Daapleu 19.3 1.51 936 19.9 1.51 965 4.3 1.15 160

Mont Ity / Ity Flat 3.8 2.19 268 7.5 2.19 527 11.1 1.92 684

Gbeitouo 2.6 1.35 112 2.9 1.35 124 0.3 1.48 13

Walter 1.9 1.22 73 2.1 1.21 81 0.7 1.32 28

Zia NE 4.8 1.24 192 7.7 1.31 325 4.0 1.39 179

Bakatouo - - - 4.8 3.07 475 0.8 2.86 70

Colline Sud - - - 0.6 2.13 40 0.5 2.53 38

Total Open Pits 32.4 1.52 1,580 45.4 1.73 2,537 21.7 1.68 1,172

Existing Stockpiles

Aires 5.8 1.09 202 5.8 1.09 202 0.2 0.78 6

Teckraie 2.8 1.07 97 2.8 1.07 97 0.1 0.55 2

Verse Ouest - - - - - - 8.4 0.85 230

Total Stockpiles 8.6 1.08 300 8.6 1.08 300 8.7 0.85 238

Total 41.0 1.42 1,880 54.1 1.63 2,837 30.4 1.44 1,410

Potential includes:

• The recently discovered Bakatouo and Colline Sud deposits and the results from the ongoing 11,700 meter reverse-circulation (“RC”) and diamond-drilling (“DD”) program to test their extensions and conduct infill drilling.

• Further resource conversion potential on both Daapleu and Mont Ity following the completion of the planned 33,000 meter in-fill drilling program

• Inclusion of Verse Ouest following the recent completion of the in-fill drilling program

39 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 41: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

40 CREATING A PREMIER AFRICAN GOLD PRODUCER

Ity Mine – Exploration: High-grade Bakatouo discovery

September 2016

Indicated Inferred Cutoff Grade g/t

Pit Shell Constraint $ kt g/t Au koz kt g/t Au koz

All Ore 4 807 3.07 474 188 2.87 70 0.50 $ 1 500

4 632 3.13 466 645 2.95 61 0.50 $ 1 250

Oxide / Transitional Ore

1 373 3.73 165 170 4.19 23 0.50 $ 1 500

1 317 3.81 161 153 4.40 22 0.50 $ 1 250

Page 42: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

41

Ity Mine – Exploration

• In 2016, exploration is focused on drilling previously identified oxide targets to prolong the life of the heap leach operation and drill new targets with the aim of delineating additional resources for the CIL project

• High-grade maiden resource totaling 515koz of Indicated and 108koz of Inferred on the recently announced Bakatouo and Colline Sud discoveries

• An additional drilling campaign is expected to commence in November on Bakatouo to test its extensions, while exploration is on-going on other nearby targets

• A large auger drilling program was completed and successfully identified several new targets, which will be drilled in the second half of 2016 and in 2017

Ity Mine Drilling Targets

CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 43: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Ity: New High Quality Near Mine Exploration Targets

42 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 44: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Greater Ity: 2017-2021 Exploration Program in Tiepleu/Floleu

10 km radius Côte d’Ivoire

Auger drilling

RC drilling

43 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 45: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

44

Ity Mine – Exploration 80km underexplored Birimian corridor

CREATING A PREMIER AFRICAN GOLD PRODUCER

• Endeavour consolidated an 80km underexplored Birimian corridor on-trend with its Ity mine in Côte d’Ivoire

• Significantly increased its holdings in the Ity district from 178km² to 664km2.

• The new Floleu (104km2) and Toulepleu (382km2) exploration tenements were obtained on a 100% ownership basis

• The previously 55%-held Tiepleu tenement (153km2) was re-obtained on a 100% basis.

Ity Mine Birimian corridor

Page 46: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Greater Ity Regional Gold in Soil (> 100 ppb) Anomalies

Birrimian meta sediments and green belt

Gnamapleu Granite-Gneiss

No Geochemical data at all No Exploration

Historical Sparse 400x100m Grid on PR462 Except on few selected targets

PR558 Le Plaque Area Several Targets

GBAMPLEU

Mt BA Area Several targets

GUEYA area Several targets

PR609 East Cavally Several Targets

45 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 47: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Greater Ity: 2017 – 2021 Exploration Targets Toulepleu

Auger drilling

RC drilling

46 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 48: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

EDV Controlled Greater ITY TREND SEMAFO Controlled MANA TREND

How significant is Greater Ity area?

SEMAFO Mana (BF) vs EDV Greater Ity (CI) trend size comparison

47 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 49: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Potential of Greater Ity Exploration

• Numerous high Potential targets have been identified within the Greater Ity area

• The whole controlled 80 km trend will be covered by an airborne geophysical survey for target generation in late 2016 (Mag/Spectro/VTEM ~700 Km2)

• The exploration blocks contiguous with Ity Exploitation license have the potential for multi-millions ounce deposits or group of deposits which may constitute future stand alone operations (heap leach and or CIL)

• While Endeavour controls some 700 km² of Birimian grounds with similar geology around Ity, the targeted new ounces only represent the same number of ounces that have been already produced and discovered over the 35 km² of the mine present footprint.

Targeting discovery of between 4 to 6 Moz at an average cost of $11/oz over the next 5 years with a budget of ~$55M*

*Targeting to discover between 4 to 6 Moz with average grade between 2.0 and 3.5 g/t Au. The potential quantity of ounces is conceptual in nature since there has been insufficient exploration to define a mineral resource and since it is uncertain if exploration will result in the targets being delineated as a mineral resource.

48 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 50: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

49

Nzema Mine – Ghana

Recent and Upcoming catalysts

Accomplished

- Increased levels of purchased ore availability is strategically being used to improve the mine’s economics, operating margins and in the preservation of the mine’s reserves in-situ

Upcoming

- Benefit from accumulated ore stockpiles and increased purchased ore

- Nzema pushback ($13 million) in 2016 should give access to higher grades

Quick Facts (on 100% basis)

Ownership 90% EDV, 10% government of Ghana

Resources (incl. of Reserves)

M&I: 34.6Mt @ 1.3 g/t for 1.490Moz Inferred: 5.9Mt @ 1.3 g/t for 0.244Moz

Reserves 4.7Mt @ 2.4 g/t for 0.356Moz

Processing Rate 1.6 Mtpa Gravity/CIL plant

Gold Recovery 91% to 75% depending on ore type

Mining Type Open Pit – Contractor Mining (BCM)

Production

AISC (mine-level)

2014A– $1,036/oz

2015A – $1,064/oz

2016F – $1,050 -1,125/oz

Expected Mine Life 4 years from current Reserves

Royalty 5% (+1% 3rd party at Adamus pits)

Corporate Tax 35%

90-100koz

110koz

2014A 115koz

2015A

2016F

Accra Nzema Mine

Ghana

CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 51: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Nzema Mine – Ghana

50 CREATING A PREMIER AFRICAN GOLD PRODUCER

Q4-2016E Q3-2016

24koz

$1,136

Q2-2016

20koz

$1,266

Q1-2016

20koz

$1,158

Q4-2015

23koz

$1,133

Q3-2015

27koz

$1,011

AISC, US$/oz Production, koz

Production and AISC Q3-2016 Insights

• Improving production and AISC profile due to:

– Continued ramp-up of purchased ore at better grades from more suppliers

– Better grades from Adamus pit, ahead of cut-back completion

– Contribution of Nugget Hill deposit despite its lower associated recovery rates

• Adamus pit push-back progressing on budget and on schedule with 3Mt out of 4.6Mt completed

• AISC has improved but remains high due to impact of processing lower grade stockpiles to fill the mill while cut-back is in progress, and lower contribution from purchased ore.

Q4-2016 Outlook

• Production and AISC expected to continue to improve with higher Adamus pit grades and continued purchased ore ramp-up

Purchased ore trend

141kt

112kt

79kt84kt

184kt

3,2g/t3,0g/t

3,1g/t

2,9g/t

3,1g/t

Q3-2016 Q2-2016 Q1-2016 Q4-2015 Q3-2015 Q4-2016E

Grade purchased, g/t Ore tonnes puchased, kt

Permit issues

Page 52: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

51

Karma Project – Burkina Faso

Recent and Upcoming catalysts

Accomplished

- First gold production achieved on April 11th 2016

- Started leach pad ore stacking and irrigating in early March 2016

Upcoming

- Benefit of higher grade Rambo pit

- Continued mill ramp-up

Houndé Project

Ouagadougou

Karma Project

Karma Mine Quick Facts (1) (on 100% basis)

Ownership 90% True Gold, 10% Burkina Faso

Resources (incl. of Reserves)

M&I: 75.2Mt @ 1.08 g/t for 2.621Moz Inferred: 65.3Mt @ 1.13 g/t for 2.362Moz

Reserves 33.2Mt @ 0.89 g/t for 0.949Moz

Processing Rate 4.0mtpa Heap Leach

Gold Recovery 87%

Mining Type Shallow open pit and free digging material with no

blasting required, low strip ratio

Avg Annual Production (y 1-5) 110 – 120 kozs @ <$700/oz

Mine life 8 years mine life based on reserves + 2.5 years from

North Kao deposit (inferred resource)

Infrastructure

Easy operation with low power requirements (~4MW)

with six diesel gen-sets.

Water supplied by barrage on river 4 km south of

plant; pumped to holding ponds at site

Tax regime 3% - 5% sliding scale royalty / 17.5% Corporate tax

Financing

• Drawn US$105m out of US$120m gold streaming

facility with Franco-Nevada and Sandstorm Gold

(representing 2.3% cost of capital ay US$1,200/oz

and DFS mine mine)

• Drawn US$6.0m US$10m Auramet loan

CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 53: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Karma Update

CREATING A PREMIER AFRICAN GOLD PRODUCER 52

Q3-2016 Insights

Commercial production declared as at October 1st 2016

Production continued to ramp-up in Q3, currently at annual run-rate of roughly 90koz

Lower production costs to date confirm its ability to be well in line with investment case expectation of low $700/oz

Recovery rate of 90% achieved, higher than 87% in DFS

Shifting mine plan to focus on highest grade Rambo pit, with pre-strip started end of Q3

Outlook

• Production expected to increase in Q4-2016 with benefit of continued increase in Process throughput

• Expected to positively contribute to cash flow in Q4

• Stacking capacity expected to increase to 4.0mtpa by mid-2017 following replacement of front-end and other optimizations. Associated capex to be spent is $32 million, to be incurred over the next 9-months

October

to

December

September

7,381oz

$606

August

6,854oz

$587

July

6,174oz

$612

June

$812

6,026oz

Total Cash Cost, US$/oz Production, koz

Production and Cash Cost

DFS Average life of mine Cash Cost of $672

Process throughput continues to ramp-up

June

4.0 Mtpa

Capacity expected

by Q4-2016

Process optimization

Ramp-up phase

3.0 to 3.2 Mtpa

September Capacity expected

by mid-2017

2.5 Mtpa

1.5 Mtpa

Page 54: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Karma Site Map

Karma - Exploration

• Target: +10 year mine life by year end

• 60,000m program at Kao North started in July, with the aim of extending mine life by +2.5 years

• Program expected to be completed in Q4-2016

CREATING A PREMIER AFRICAN GOLD PRODUCER 53

Page 55: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

KAO NORTH H2-2016 RESOURCES DRILLING

A

A’

45,000m program has been recently been completed with the target of increasing mine life by 2.5 years and reach +10 years by year end

Selected intercepts shown above. Full results are currently being analyzed.

54 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 56: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

KAO North 2016 Drilling Section

A A’

Infill Drilling Confirms Mineralization Continuity

55 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 57: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

2017 Targets: YABONSGO Target (<10km from GG1)

AC

RC

Yabonsgo is one of our next priority target

56 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 58: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

2017 Targets: Rambo West

AC

RC

Granodiorite

sediments

Rambo West is a near-mine obvious target

57 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 59: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Karma Exploration

• New geological understanding and mapping in less than 6 months

• 45,000 m drilling campaign already performed on Kao North to add 2.5 year of mine life by year-end

• Near mine “higher” grades targets to be drilled in 2017 (Yabongso and Rambo West)

• Still ongoing evaluation and ranking of all exploration targets

• Beyond Kao North resource drilling, other exploration targets have potential to add up to 5 additional years of mine life with still on-going evaluations

Targeting discovery of between 0.5 to 1.0 Moz at an average cost of $20/oz over the next 5 years with a budget of ~$15M to extend mine life to 15 years*

*Targeting to discover between 0.5 to 1.0 Moz with average grade between 1.0 and 1.5 g/t Au. The potential quantity of ounces is conceptual in nature since there has been insufficient exploration to define a mineral resource and since it is uncertain if exploration will result in the targets being delineated as a mineral resource.

58 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 60: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Quick Facts (on 100% basis)

Ownership 90% EDV, 10% Burkina Faso

Status Fully permitted, construction launched

Production start date First gold pour expected Q4 2017

Resources (incl. of Reserves)

M&I: 37.9Mt @ 2.1 g/t for 2.551Moz

Inferred: 3.2Mt @ 2.6 g/t for 0.274Moz

Reserves 30.6Mt @ 2.1 g/t for 2.075Moz

Mine Type Open pit

LOM Strip Ratio 8.4

Processing Rate 3.0 Mtpa Gravity / CIL plant

Gold Recovery 93%

Upfront Capital (US$M) $328m, inclusive of $47m for the owner-mining fleet

59

Houndé Project – Burkina Faso

Houndé Project

Ouagadougou

Burkina Faso

Karma Project

LOMP Summary (on 100% basis)

Processing

Total ore processed, Mt 29.7 Gold grade, g/t 2.15 Contained gold, koz 2,057 Recovery rate, % 93% Production, koz 1,906

Operating Costs

Mining costs, $/t moved 2.17

Processing costs, $/t 13.36

Site G&A, $m/yr 9.8

AISC , US$/oz 709

Economic Returns1

Gold Price (US$/oz) $1,150 $1,200 $1,250 $1,300 1,350

After-tax Project NPV (5%) $230 $286 $342 $398 $437

After-tax Project IRR 24% 28% 32% 36% 39%

Payback, years² 2.7 2.4 2.2 2.0 1.8 1Based on 100% equity funding and equipment lease financing ²From production start

CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 61: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

60

Houndé Construction is progressing on-time and on-budget

Significant achievements to date:

Procurement is approximately 60% complete (excluding contingency) and construction is 22% complete overall

Full back-up power station has been tendered with CAT 26MW of redundancy. Financing negotiations underway, expected during Q4

CIL ring beam concrete pour achieved early-Aug, two weeks ahead of schedule

Mining fleet equipment financing signed with Komatsu Ltd., deliveries already on-site, machinery commissioned and operational

Water harvest dam construction completed, water is already being pumped to the water storage dam two months ahead of schedule

Construction of the 300-person permanent accommodation village is 52% complete and on-schedule for completion in Q1-2017

Procurement has been completed for the 38km 91kv overhead power line and clearing commenced as scheduled in Oct 2016

Detailed engineering of the processing facility is progressing ahead of schedule at 65% complete, scheduled to be completed mid-Nov 2016

1,058 personnel including contractors are currently employed on-site, of which over 96% are Burkinabe

Over 800,000 man-hours worked without a Lost Time Injury (LTI) or Medical Treatment Injury (MTI)

The land compensation process has been successfully completed and resettlement is underway, with all approvals in place.

Incurred Capex (end of September)

$61m

Committed Capex (end of September)

$170m

Total Capex (incl. $26m contigency)

$328m

Procurement is approximately 60% complete

Pouring Crusher West Wing Wall

CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 62: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Houndé Exploration Upside

61

• The Houndé exploration tenement covers +1,075km² within Burkina Faso’s highly prospective Birimian belt

• Historically, exploration focus mainly on the Vindaloo trends

• At least 15 other significant targets were identified by previous limited drilling campaigns but remain largely untested

– All located within 20km from the planned mill

– High grade targets (+5g/t) will be explored in priority

Potential to Significantly Extend Houndé’s Mine Life

CREATING A PREMIER AFRICAN GOLD PRODUCER

Exploration Targets in Proximity to the Planned Mill

Page 63: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Houndé Exploration: 2017-2021 Main Promising Targets

RC drilling

Auger drilling

62 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 64: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Houndé Exploration – Burkina Faso

• Our Houndé exploration portfolio is located within one of the most prospective areas of the Birimian greenstone belt of Burkina Faso

• Historical exploration already proved the occurrence of multiple major mineralized trends of Vindaloo type within these licences

• At least 15 significant targets were partially tested by previous drilling, and the majority of them remain undeveloped

• All defined exploration targets are located within a 20 km radius of the Houndé mill

• The high grade targets (Bouere, 5 to 6g/t and Kari Pump) will be developed as a priority in 2017

Targeting discovery of between 2.5 to 3.5 Moz at an average cost of $15/oz over the next 5 years with a budget of ~$45M to extend mine life to +15 years*

*Targeting to discover between 2.5 to 3.5 Moz with average grade between 1.8 and 2.5 g/t Au. The potential quantity of ounces is conceptual in nature since there has been insufficient exploration to define a mineral resource and since it is uncertain if exploration will result in the targets being delineated as a mineral resource.

63 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 65: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

CREATING A PREMIER AFRICAN GOLD PRODUCER

Appendix

Page 66: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Endeavour is backed by La Mancha

30% holding

31% holding

Sawiris family’s mining investment vehicle

La Mancha vended-in the Frog’s Leg and White Foil mines

La Mancha then contributed $112m for acquisition of the Cowal mine

Evolution has grown from a ~A$670m market cap to ~A$3.2B, since announcement of strategic partnership

Partnership Announced

La Mancha vended-in the Ity mine and $63m of cash

La Mancha then contributed $65m following the acquisition of Truegold

Participated in bought deal with C$20m Endeavour has grown from a US$250m to a

US$1.8B market cap since announcement of strategic partnership

The Sawiris family is present across various sectors and businesses, ranging from construction and fertilizers to

real estate and telecommunications

Long-term growth supportive investor with focus on creating regional leaders

65

Partnership Announced

CREATING A PREMIER AFRICAN GOLD PRODUCER

0

5

10

15

20

25

30

Sep-15 Dec-15 Mar-16 Jun-16 Sep-16 Dec-16

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

Jan-15 Apr-15 Jul-15 Oct-15 Jan-16 Apr-16 Jul-16 Oct-16

Page 67: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

66

2016 Guidance

(in koz on a 100% basis)

2016 Production 2016 AISC

Guidance Guidance

Agbaou 180 - 195 550 - 600

Tabakoto 155 - 175 970 - 1,050

Nzema 90 - 100 1,050 - 1,125

Ity 70 - 80 800 - 850

Youga 7 - 8 980 - 1,030

Sub-total 502 - 558 820 - 870

Karma (including pre-commercial production*) 50 - 60 750 - 850

Removal of Youga (discontinued operation) (7) - (8) (980) - (1,030)

Total 545 610 810 - 860

Adjusted guidance range 575 - 610 870 - 920

CREATING A PREMIER AFRICAN GOLD PRODUCER

*Assuming 3 months of commercial production

(in US$ millions) Guidance

Revenue (based on production guidance range mid-point) 665

AISC costs (based on AISC guidance range mid-point) (481)

All-in sustaining margin 185

Agbaou secondary crusher ($12m)

(50) Nzema pit wall push-back ($12m)

Non-sustaining exploration ($16m, increased from $14m)

Houndé and the Ity CIL projects ($10m)

Free cash flow before Houndé and Karma

(and before WC, tax and financing costs) 135

Houndé capex (80)

Karma net pre-production (15)

Free cash flow (before WC, tax and financing costs) 40

Revised Guidance assumptions: – gold price forecast increased from $1,150/oz to $1,250/oz for the second half of the year – 3 months Karma commercial production included

Page 68: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

67

Production increased in Q3 with larger lift expected in Q4

CREATING A PREMIER AFRICAN GOLD PRODUCER

Q3-15

122koz

146koz

+36%

Q2-16 Q1-16 Q4-15 Q4-16E Q3-16

138koz

108koz 123koz

Group Production From Continuing Operations, koz (including Karma)

19

42

23

52

22

39

20

43

12

21

39

20

46

20

15

37

24

49

Karma Ity Tabakoto Agbaou Nzema

Production by Mine, koz Q4 Trend

Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3

Q3 production continues to increase in line with guided trends

‒ Q3 production up 36% over the previous year due to addition of Ity and Karma

‒ Continued out-performance of low-cost Agbaou mine, Ramp-up of Karma and better performance of Nzema

‒ Cyclical impact of rainy season in Q3 in Cote d’Ivoire

Q4-2016 expected to be our strongest quarter with increases expected across all mines

‒ End of the rainy season for Agbaou and Ity

‒ Continued ramp-up of Karma with commercial production declared October 1st

‒ Improvement at Nzema already seen in Q3, with further improvements to come

‒ Higher grades and mill throughput at Tabakoto

Page 69: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Continued AISC reduction to low-end of guidance

CREATING A PREMIER AFRICAN GOLD PRODUCER 68

All-in Sustaining Costs, US$/oz

682698690

740

686674

732

826

890 898901889

934908898

946

FY2014

1,010

FY2013

1,137

Q1-15 Q4-15

920

Q2-16 Q3-15

870

Q2-15 Q3-16 Q1-16*

Cash Cost, US$/oz

Continued AISC reduction, US$/oz AISC by mine, US$/oz

621

537

710

525

775

525

724

550

Agbaou Nzema

1,136

1,266

1,158

Tabakoto

1,071 1,133 1,119

Ity

Q4 Trend

*Excluding discontinued Youga operations, according to standards

Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3

Continued AISC decrease in Q3 due to:

‒ Cost reduction programs

‒ Increased production at Agbaou with higher transition ore in ore mill mix

‒ Lower Ity and Nzema costs

AISC performance expected to continue in Q4:

‒ Production improvements across all mines

‒ On-going cost improvements at Nzema, Tabakoto and Ity

‒ Addition of post-commercial production at Karma with Total Cash Cost currently trending at $600/oz

Guidance

1,071 1,161

Page 70: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Cash flow generation is on-track to meet guidance

CREATING A PREMIER AFRICAN GOLD PRODUCER 69

Free Cash Flow: +40% YTD vs 2015, excluding the net positive impact of Karma which will start its commercial production in Q4

Out-performance of low-cost Agbaou and Ity mines in first 9 months of the year strongly contributing to cash flow generation

Free Cash Flow objective well on-track with a stronger Q4 in perspective:

‒ Stronger production at lower AISC is expected

‒ Start of Karma contribution as of October 1 (commercial production start) which had generated a FCF of $9m in Q3

‒ Less non-sustaining capital required as main capital spend is already complete (Agbaou

secondary crusher, Ity DFS, Nzema push-back)

First 9 months ended

2016 2015

(All amounts exclude Youga unless otherwise indicated) US$m US$/oz US$m US$/oz

Gold sold, koz 376 327

Revenue 474 1,260 385 1,178

Total cash costs (259) (690) (227) (694)

Royalties (22) (59) (19) (58)

Corporate costs (16) (43) (13) (40)

Sustaining capex (34) (89) (39) (118)

Sustaining exploration (6) (14) (5) (14)

AISC costs (337) (896) (302) (922)

AISC Margin 137 364 83 256

Less: Non-sustaining capital (20) (52) (17) (53)

Less: Non-sustaining exploration (17) (46) (4) (13)

Operating cash flow from Youga discontinued operation 0 0 12 37

Free cash flow (before Hounde, Karma, working capital, tax & financing costs)

100 265 72 227

Page 71: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Insights:

1. Houndé spend fully on track with capex program

2. + net proceeds from sales +$34m - mining costs capitalized ($21m) - capital expenditure ($13m)

3. Includes Karma and Hounde associated WC

4. WC is expected to reverse in Q4 due to seasonal effect

5. Increased due to Ity inclusion in 2016

6. Includes: $10m hedge settlements, $4m gold collar premiums

7. Pre-acquisition loan to True Gold for Karma Capex

8. + Karma cash acquired +$10m - TGM change of control payments ($6m) - TGM transaction costs ($6m)

9. Combined ex-CEO, BOD and executive level restructuring costs and office consolidation

10. La Mancha for TG acquisition +$65m Option exercises +$13m Bought deal proceeds +$106m Net of SAR and PSU payments ($4m)

Net Free Cash Flow Breakdown

*Includes financial fees, hedge settlements, realized loss on derivative financial instruments, realized foreign exchange loss on cash, and other non-operating cash adjustments.

70 CREATING A PREMIER AFRICAN GOLD PRODUCER

First 9 months ended

US$m 2016 2015

Free cash flow (before Hounde, Karma, working capital, tax & financing costs)

100 72

Hounde project costs (45) (5)

Karma proceeds from sales less mining costs capitalized and capital expenditure

(1) 0

Change in capital project working capital (24) 0

Free cash flow (before operating working capital, tax & financing costs) 30 68

Working capital changes as per statement of cash flows (19) (21)

Taxes paid (12) (6)

Interest paid (10) (9)

Cash settlements on hedge programs and gold collar premiums and share appreciation rights

(15) (4)

Other (foreign exchange gains/losses and other) (4) (16)

Free Cash Flow before other items (31) 12

Cash received for Youga mineral property interests (net) 22 0

Bridge loan advanced to True Gold (15) 0

True Gold cash acquired, less acquisition COC payments, less acquisition expenses

(2) 0

Restructuring costs (18) 0

La Mancha anti-dilution proceeds with True Gold, Bought Deal proceeds, share option exercises, net of equity linked payments (SARs and PSU’s)

180 0

RCF, debt and lease repayments (109) (42)

Cash inflow for the period 28 (30)

1

2

3

4

7

5

8

9

6

10

Page 72: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Adjusted Net Earnings Breakdown

71

Insights: 1. Youga results are removed due to

disposal of the mine

2. Legacy gold hedge caused losses due to increased 2016 gold price and FX movements

3. Increased due to mark-to-market of EDV share price

4. Non-recurring costs, associated with True Gold transaction, closure of Vancouver and Accra offices, and severance packages

5. Shares outstanding increased due to True Gold acquisition

CREATING A PREMIER AFRICAN GOLD PRODUCER

Nine months ended

(US$m) 30-Sep-16 30-Sep-15

Total net earnings 17 57

Youga discontinued operations 3 (9)

Loss (gain) on financial instruments 20 (3)

Stock-based payments 9 3

Acquisition and restructuring costs 25 0

Deferred income tax expense (recovery) 0 (6)

Adjusted net earnings after tax 74 42

Attributable to non-controlling interests 22 14

Attributable to shareholders of the Corporation 51 29

Weighted average number of outstanding shares (million) 76 41

Adjusted net earnings per share (basic) from continuing operations $0.67 $0.70

1

2

3

4

5

Page 73: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Production and Cost Details by Mine

72 CREATING A PREMIER AFRICAN GOLD PRODUCER

1) Includes waste capitalized 2) Includes waste capitalized adjustment

(on a 100% basis)

Agbaou Nzema Tabakoto Ity

Unit Q3-2016 Q2-2016 Q3-2015 Q3-2016 Q2-2016 Q3-2015 Q3-2016 Q2-2016 Q3 2015 Q3-2016 Q2 2016

Physicals

Total tonnes mined – OP1 000t 6,877 5,918 5,037 2,848 1,852 1,323 1,569 1,704 2,129 948 1,584

Total ore tonnes – OP 000t 651 654 706 222 213 231 160 148 123 200 383

Open pit strip ratio1 W:t ore 9.6 8.0 6.1 11.8 7.7 4.7 8.8 10.5 16.3 3.7 3.1

Total tonnes mined – UG 000t - - - - - - 302 315 377 - -

Total ore tonnes - UG 000t - - - - - - 238 221 255 - -

Total tonnes milled 000t 709 743 746 424 450 450 381 399 408 271 304

Average gold grade milled g/t 2.2 2.2 2.0 2.4 1.6 2.2 3.1 3.3 3.0 1.9 2.1

Recovery rate % 96% 97% 96% 82% 86% 85% 95% 95% 93% 91% 101%

Gold ounces produced oz 49,384 46,295 43,802 24,279 19,800 27,405 37,019 39,372 36,373 15,334 20,729

Gold sold oz 51,308 47,638 43,304 23,526 19,827 28,072 37,324 39,156 37,298 15,349 20,981

Unit cost analysis

Mining costs - Open pit $/t mined 2.3 1.9 2.6 4.2 5.4 5.3 3.8 3.8 3.5 4.1 2.8

Mining costs – Underground $/t mined - - - - - - 52.6 50.0 49.7 - -

Processing and maintenance $/t milled 7.1 7.1 6.0 14.2 12.3 14.0 22.6 21.2 24.4 13.2 15.9

Site G&A $/t milled 4.8 4.6 4.5 6.2 6.3 6.1 12.3 11.3 15.7 13.1 7.1

Cash cost details

Mining costs - Open pit1 $000s 15,550 11,008 13,189 11,857 9,992 6,996 5,892 6,527 7,541 3,878 4,450

Mining costs -Underground $000s - - - - - - 15,880 15,740 18,727 - -

Processing and maintenance $000s 5,043 5,312 4,504 6,032 5,541 6,309 8,600 8,470 9,957 3,588 4,841

Site G&A $000s 3,382 3,396 3,385 2,620 2,837 2,748 4,680 4,519 7,815 3,538 2,154

Purchased ore at Nzema $000s - - - 7,817 5574 8,490 - - - - -

Inventory adjustments and other2 $000s (1,826) 1,038 1,217 (3,911) (670) - (1,666) (2,815) (16,336) (4,003) 1,187

Cash costs for ounces sold $000s 22,149 20,754 22,295 24,415 23,274 24,543 33,386 32,441 27,704 7,001 12,632

Royalties $000s 2,761 2,037 1,748 1,651 1,322 1,768 2,962 2,951 2,493 832 919

Sustaining capital $000s 3,324 2,206 1,187 670 506 2,083 3,610 6,134 8,302 3,276 2,709

Cash cost per ounce sold $/oz 432 436 515 1,038 1,174 874 894 829 743 456 602

Mine-level AISC per ounce sold $/oz 550 525 583 1,136 1,266 1,011 1,071 1,061 1,032 724 775

On a quarterly basis

Page 74: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Production and Cost Details by Mine

73 CREATING A PREMIER AFRICAN GOLD PRODUCER

For the 9 months period ended 2016 and 2015

(on a 100% basis)

Agbaou Nzema Tabakoto Ity3

Unit 9-months 2016 9-months 2015 9-months 2016 9-months 2015 9-months 2016 9-months 2015 9-months 2016

Physicals

Total tonnes mined – OP1 000t 18,864 15,331 6,410 6,707 5,505 6,909 4,630

Total ore tonnes – OP 000t 2,123 2,065 712 1,031 454 383 870

Open pit strip ratio1 W:t ore 7.9 6.4 8.0 5.5 11.1 17.0 4.3

Total tonnes mined – UG 000t - - - - 977 1,227 -

Total ore tonnes - UG 000t - - - - 691 794 -

Total tonnes milled 000t 2,106 1,917 1,333 1,337 1,186 1,195 878

Average gold grade milled g/t 2.2 2.2 1.8 2.3 3.2 3.1 2.2

Recovery rate % 97% 97% 85% 87% 94% 93% 94%

Gold ounces produced oz 138,444 129,633 63,836 87,226 114,933 109,521 58,387

Gold sold oz 139,380 128,921 63,462 87,878 114,750 110,227 58,294

Unit cost analysis

Mining costs - Open pit $/t mined 2.2 2.6 4.8 4.6 3.5 2.7 3.0

Mining costs – Underground $/t mined - - - - 48.5 40.3 -

Processing and maintenance $/t milled 6.7 6.8 12.9 14.8 21.4 22.9 15.2

Site G&A $/t milled 4.7 6.2 6.6 6.7 12.3 15.7 10.2

Cash cost details

Mining costs - Open pit1 $000s 40,883 40,098 30,958 30,702 19,107 18,327 13,998

Mining costs -Underground $000s - - - - 47,356 49,407 -

Processing and maintenance $000s 14,143 12,998 17,151 19,790 25,377 27,344 13,382

Site G&A $000s 9,813 11,866 8,746 8,992 14,568 20,159 8,995

Purchased ore at Nzema $000s - - 17,162 26,250 - - -

Inventory adjustments and other2 $000s (4,873) (4,877) (4,284) (9,640) (9,672) (24,492) (3,317)

Cash costs for ounces sold $000s 59,966 60,085 69,733 76,094 96,736 90,745 33,018

Royalties $000s 6,531 5,431 4,198 5,890 8,613 7,731 2,683

Sustaining capital $000s 7,973 10,801 1,212 9,942 17,112 17,024 7,270

Cash cost per ounce sold $/oz 430 466 1,099 866 843 823 566

Mine-level AISC per ounce sold $/oz 534 592 1,184 1,046 1,067 1,048 737

1) Includes waste capitalized 2) Includes waste capitalized adjustment 3) Ity’s production and AISC is excluded for the pre-November 28, 2015 acquisition period.

Page 75: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Reserve and Resource Table

Resources inclusive of reserves

P&P Reserves M&I Resources Inferred Resources

(Mt) Au g/t (koz) (Mt) Au g/t (koz) (Mt) Au g/t (koz)

Agbaou Mine 13.2 2.42 1,027 14.4 2.54 1,180 1.2 1.71 65

Tabakoto Mine 6.4 3.50 725 18.5 3.09 1,844 9.0 3.55 1,023

Nzema Mine 4.7 2.35 356 34.6 1.34 1,490 5.9 1.28 244

Ity Mine & CIL Project 30.4 1.65 1,613 61.4 1.57 3,106 14.1 1.52 687

Karma Mine 33.2 0.89 949 75.2 1.08 2,621 65.3 1.13 2,362

Houndé Project 30.6 2.11 2,075 37.9 2.09 2,551 3.2 2.62 274

Total 6,744 12,793 4,655

Attributable 5,405 10,238 3,852

Gold Price and Cut-off Grades Resources Gold price Resource lower cut-off grade Reserves Gold Price Reserve lower cut-off grade *

US$/oz g/t Au US$/oz g/t Au

Agbaou Mine 1,500 0.5 1,350 0.6 to 0.8

Tabakoto Mine 1,350 to 1,600* 0.5 to 1.5* 1,250 1.1 to 1.9

Nzema Mine 1,500 0.5 1,250 0.8 to 1.9

Ity Mine & CIL Project 1,500 0 to 0.5* HL: 1,250 CIL: 1,150* 0.6 to 1.5

Karma Mine 1,557 0.2 to 0.5* 1,250 0.2 to 0.3

Houndé Project 1,500 0.5 1,300 0.4 to 0.8

*Varies by distance from deposit to the mill, ore type and mining method (OP/UG)

As at December 31, 2015

Full details and notes of reserves and resources can be found under the ‘Reserves and Resources’ section on the Company’s website at www.endeavourmining.com

74 CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 76: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

1,000

1,100

1,200

1,300

1,400

1,500

Upside on 100% of production

75

Gold Revenue Protection Program Limit Debt Drawdown

Gold Revenue Protection Program : Gold Option Collar Strategy

US$1,300 US$1,100 US$1,000

$70m

$30m

US$1,200

($9m) ($9m)

Gold price in US$/oz

Meaningful replacement of reduced revenue

Collar “bought puts” strike

Collar “written calls” strike

Upside on 50% of production

Protection on 50% of

production

Proceeds from Gold Option Contracts (US$) (net of premium cost)

• Gold Option Contracts aim to increase the certainty of the free cash flow during the construction period

Objective of using free cash flow rather than Revolving Credit Facility

Significantly reduces debt requirements, even if the gold price drops to US$1,000/oz

• Gold Option Contracts applied to 400koz, representing ~50% of Endeavour’s expected production over 15 months, (Apr 2016-Jun 2017)

Protect 50% of production below $1,200/oz

Fully exposed between 1,200 and $1,400/oz

Upside beyond $1,400/oz on 50% of production

• Full exposure to the gold price once project is built

• As at June 30, 2016, 320,000 ounces remain outstanding

CREATING A PREMIER AFRICAN GOLD PRODUCER

Page 77: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

10 10

9 8

7

5

Randgold Acacia IAMGOLD B2Gold Semafo EDVEDV 2015

$31/oz

$16m

Acacia

$31/oz

$24m

Randgold

$72/oz

B2gold

$42m

$42/oz

Iamgold

$70/oz

Semafo

$59/oz

$56m

$32m

$18m

2016 estimated production and 2015/2016 Exploration budget

Average $51/oz produced

Short Mine Lives Due To Lack of Exploration, Not Potential!

It is estimated that EDV should have spent at least $10m/year more in exploration in the previous years to support resource replacement and to be in line with peers

Exploration spend, $m/year Exploration spend, $/oz produced Average Mine Life of operating assets

Endeavour spent less than peers on exploration… … As a result it suffers from shorter mine lives

*Excluding purchases of Ity and Karma, exludes Hounde project

*

76 CREATING A LOW COST AFRICAN GOLD PRODUCER

Page 78: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

77

Previous Exploration Strategy Was Based

On Converting Inferred Resources

CREATING A PREMIER AFRICAN GOLD PRODUCER

133

1,603

165

1,693

273

1,582

154

311 274

1,023

65

244

Houndé Agbaou Nzema Tabakoto

2014 2015 2013 ‒ Previous 3 years focused on replacing depletion/production by drilling in-mine or near-mine already existing inferred resources for conversion to indicated and subsequent reserves

‒ Insufficient exploration investment previous 3 years to support inferred resources renewal

‒ Re-launching near-mine and brownfield exploration to define new inferred resources and bring them to Indicated/reserve status

Inferred Resources Evolution (excluding acquisitions)

Page 79: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

Exploration Became a Core Focus in 2016

with New Structure in Place

SVP West Africa Exploration

Resource Manager

HR Manager

New Ventures Manager

Expert Geologist

Finance Manager

NI 43-101 Compliance

Greater Ity Explo Manager

Regional CI Explo Manager

Agbaou Explo Manager

Hounde Explo Manager

Karma Explo Manager

Regional BF Explo Manager

Tabakoto/Kofi Explo Manager

Abidjan based

78 CREATING A LOW COST AFRICAN GOLD PRODUCER

Sr Geos Jr Geos DB Techs Account Support

Sr Geos Jr Geos DB Techs Account Support

Sr Geos Jr Geos DB Techs Account Support

Sr Geos Jr Geos DB Techs Support

Sr Geos Jr Geos DB Techs Account Support

Sr Geos Jr Geos Techs Account Support

Sr Geos Jr Geos Techs Support

Highly experienced team – Strong knowledge of West African

Birimian belts

– Senior staff from BRGM, Randgold, Iamgold, Areva, La Mancha, etc

– 20 Seniors Geologists

– 7 Exploration Managers

– 40 Juniors Geologists

– 130 Technicians and Support Staff

CEO

COO EVP

Projects EVP

Exploration & Growth

CI Government Relations Advisor

Legal Advisor

Page 80: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

79

Exhaustive screening of all >200 potential

targets

130+ target screened through multi-criteria

data analysis

First filtering

Quantifying min/max and mean size and grade

(Length x width x 100m depth x density x average grade issued from existing drilling or nearby analogs)

Top selection of 40 most significant

targets

Risked mean Indicated Resource

per Target

Risked-probability weighted potential

per target High/Medium/Low

Exploration budget required per target to

reach Indicated resource level status

Strategic Prioritization

Screening and Ranking Methodology

Conservative Approach

79 CREATING A LOW COST AFRICAN GOLD PRODUCER

Page 81: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

80 CREATING A PREMIER AFRICAN GOLD PRODUCER

Methodic and Exhaustive Review to Quantify and Rank Potential

• Visit to all sites with Exploration Managers/Chef-Senior Geologists, EDV experts

• 6 months detailed review of all past exploration, synthesis of all available and validated data in database

• All Geochem (Stream and Soil), all geophysics (air and ground)

• All Geological and Structural data (Outcrops, cores, Maps, regolith, structures, artisanal mining)

• All Drilling (Auger, RC, DD, Geotech) , logs and analytic results

• 130+ Targets screened through multi-criteria analysis of all data to identify and support exploration targets for evaluation

• All targets referenced and classified according to :

– Current state of project knowledge (from grassroot to development)

– Quality of supporting data (drilling, available nearby analogs, structural trends, favorable geology, etc.)

– Distance to producing facilities:

• Mine Exploration then Near Mine exploration within a 5 km radius from facilities

• Brownfield Exploration between 5 and 15 km from facilities

• Greenfield Exploration for over 15/20 km from facilities (tentative stand alone future projects, or feeding the facilities if high grade)

– Geological framework, mineralization type, mineability, exploration game changer

• All targets characterized by a minimum-maximum and mean size of tentative deposit (length, width, depth), including estimated average grade when calibration is available

• Selection of the 30% (40) most significant targets over the full portfolio in term of localization, mean size, and nearby upside (possible clusters), all gathered per relevant PE (Exploration Permit)or PEX (Exploitation permit)

Page 82: Corporate Presentation - Endeavour Mining...2016/12/12  · Endeavour Mining Overview 2 Immediate Cashflow from 5 producing mines at low AISC – 2015 production: 517 koz – 2016E

81

Further Selection, Ranking and Risk Evaluation

• Each selected target (~40) was risked and characterized by a Probability of Occurrence (POO), based on geological confidence/structural understanding/ type of expected mineralization/existing positive intercepts/trend extension, strong and coherent gold in soil and Auger anomalies

– POO 0.8 to 1: Very high confidence (some Mine and Near Mine Exploration or already Identified /tested targets)

– POO 0.6 : Probable deposit, with a size and grade distribution according to prognosis (Oz and average grade)

– POO 0.4: Less than average Probability of Occurrence, kept in the planning due to its possible size (High Risk- High Reward type) or due to its short distance to mine

• All selected exploration targets were set within a 5 year window, according to mine priorities, permit duration, requested exploration efforts, and budget

• All selected targets characterized with:

– The required drilling amount/yearly budgets and the related timing of Indicated resource definition

– Proposed yearly budgets include estimated manpower, drilling, analysis, support, geophysics, geochem, etc

– A 2017-2021 required risked exploration spending necessary to discover the targeted risked mean indicated Oz per target

CREATING A PREMIER AFRICAN GOLD PRODUCER