34
Coromandel International Ltd Visakhapatnam Plant K Sridhar – DGM – Mechanical Sumit Roy – AGM – Power & Electrical Amrendra Kumar – Manager - Operations

Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Coromandel International Ltd

Visakhapatnam Plant

K Sridhar – DGM – Mechanical

Sumit Roy – AGM – Power & Electrical

Amrendra Kumar – Manager - Operations

Page 2: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Commissioned in 1967

Fertiliser Products 1.0 MMTPA

Captive Raw Material Generation - 0.26 Phosphoric

Acid & 0.6 MMTPA Sulfuric Acid

0.025 MMTPA Specialty Nutrients Plants

5MW Captive Turbo Generator from Waste Steam

7.8% Power share of APGPCL gas based power plant

Connected Power Load 19 MVA

22 LIGPD Water from Tatipudi & Meghadrigedda

Reservoirs

DSIR approved R & D facility

Page 3: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Company Profile

ProcessPhosphatic Fertiliser with captive Sulphuric acid &

Phosphoric acid plants

Ownership Public - Private

Year of Establishment 1967

Turnover of the Unit 33863 (FY 2019-20) (INR Million)

Thermal Cost as % of Manufacturing Cost 0.23 %

Electrical Cost as % of Manufacturing Cost 2.03 %

Total Energy Cost as % of Manufacturing Cost 2.26 %

Thermal Energy Cost 9644 (INR / million kcal)

Electrical Energy Cost 5.46 (INR / kWh)

Page 4: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Process Flow Diagram

Sulphuric acid Plant – I - 1400 MTPD

Sulphuric Acid Plant – II – 350 MTPD

Sulphur Water Air

Sulphuric Acid

Phosphoric acid – I - 650 MTPD

Phosphoric acid –II - 350 MTPD

Water

Rock

Phosphate

By Product Gypsum

Evaporation

& Fluorine Recovery

Granulation Plant

1050 MTPD x 2

1800 MTPD X 1

By Product

Hydrofluorosilicic Acid

28-28-0

14-35-14

10-26-26

18-46-0

28% P2O5 Acid

48% P2O5 Acid

20-20-0-13

Products

Steam

Steam

Steam

Ammonia

Urea

Potash

24-24-0-8SBought out Sulf Acid

AFBC Boiler

45 MTPH

Coal

Diesel Generators

2 nos x 4 MW

1 nos X 6 MW

LSHS

Turbo Generator

1 nos X 5 MW

Bought out Phos Acid 20-20-0-13S

Turbo Generator

1 nos X 6.5 MW

Page 5: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Production & Energy Consumption

Parameters Unit of Measurements 2017-2018 2018-2019 2019-2020ProductionComplex Fertiliser MT 1066413 1072791 1079187Phosphoric Acid MT 194567 200025 243488Sulphuric Acid MT 546049 570945 581081EnergyAnnual Electrical Energy Consumption million kWh 105.8 102.1 115.5Annual Cost of Electricity Consumed million INR 434 421 492

Annual Thermal Energy Consumption million kcal 5669 6266 31067Annual Cost of Thermal Energy Consumed million INR 19.95 23.06 55.41

Specific Electrical Energy Consumption kWh/Ton of production 99 95 109Specific Thermal Energy Consumption Kcal/Ton of production 5097 5334 28788

Reason for increase in Specific Energy during 2019-20 :

Phosphoric acid Plant – II commissioning trials – Lower capacity utilisation

Page 6: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Energy Consumption 2019-20

Coal,

30943137349,

83%

LSHS,

5126432500,

14%

Kerosene,

544192715, 2%

LPG, 526062500,

1%

LDO, 75611559,

0%

Thermal Energy Consumption kcal

DG SETS,

63,161 , 0%

TG-II,

34,20,930 , 3%

TG-I,

357,94,600 ,

30%

Purchased,

786,17,600 ,

67%

Electrical Energy Usage kWh

Page 7: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Energy Consumption 2019-20

THERMAL,

3059, 12%

ELECTRICAL,

21600, 88%

OVERALL ENERGY CONSUMPTION,

MTOE

Page 8: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Specific Energy Consumption 2017-20

0.000

0.002

0.004

0.006

0.008

0.010

2017-18 2018-19 2019-20

Electrical 0.006 0.005 0.006

Thermal 0.001 0.001 0.001

▲2.6%

Intermediate Product Sulfuric Acid, MTOE/MT

Reason for Improved Specific Energy – Higher capacity utilisation (Achieved second highest ever Sulphuric acid production)

Page 9: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Specific Energy Consumption 2017-20

0.000

0.010

0.020

0.030

0.040

0.050

0.060

0.070

2017-18 2018-19 2019-20

Electrical 0.054 0.049 0.050

Thermal 0.003 0.003 0.013

11.9%

Intermediate Product Phosphoric Acid, MTOE/MT

Reason for higher Specific Energy consumption –

Phosphoric acid Plant – II commissioning trials – Lower capacity utilisation

Page 10: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Specific Energy Consumption 2017-20

0.000

0.010

0.020

0.030

2017-18 2018-19 2019-20

Electrical 0.0195 0.0185 0.0200

Thermal 0.0005 0.0006 0.0028

13.9%

Complex Fertiliser Plant, MTOE/MT

Consolidated

Reason for higher Specific Energy consumption –

Phosphoric acid Plant – II commissioning trials –

Lower capacity utilisation

0.000

0.003

0.006

0.009

0.012

0.015

2017-18 2018-19 2019-20

Electrical 0.010 0.009 0.009

Thermal 0.000 0.000 0.000

3%

Complex Fertiliser Plant, MTOE/MT

Stand alone

Reason for Lower Specific Energy consumption –

Higher capacity Utilisation

Page 11: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Benchmarking

Comments

Derived benchmark being sum total energy of Sulphuric

acid, Phosphoric acid & NPK complex plant

Source of InformationElectrical Thermal Total

Unit of measurement kWh/MT Kcal / MT MTOE/MT

Coromandel Specific Energy 109 28788 0.0228

Global Benchmark 88 870740 0.1124

Location of Unit Europe Europe Europe

Difference with Global Benchmark -21 865406 0.0896

Internal Target Specific Energy 109 6235 0.0219

1Page 58 Table A2, Best Available Techniques for Production of Sulphuric Acid, Booklet No 3 of 8, Year 2000

2EU IPPC - Reference Document on Best Available Techniques in Large Volume Inorganic Chemicals –Ammonia, Acids and Fertilizers Industries. December 2006

3Roger Heath, John Mulckhuyse and Subrahmanyan Venkataraman, Page 16, The Potential for Energy Efficiency in the Fertilizer Industry. World Bank Technical paper No 35, 11985

Page 12: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Benchmarking

Action Plans to Achieve Benchmark

Annual Specific energy consumption targets

Annual Energy efficiency improvement projects

with specific targets and allocated budget

Maximise Rail transport

Institutionalization of energy efficiency &

conservation awareness programs.

Institutionalization of internal incentive system to

promote & reward energy efficiency behaviors

Support technical training

2020-21

0.00219

MTOE/MT

2021-22

0.00217

MTOE/MT

2022-23

0.00215

MTOE/MT

Activities:

Installation of capacitor banks at motor control centers

SCADA & IIOT for real time monitoring

Installation of LED lights for general illumination

Installation of Variable Frequency drives

Installation of Roof top solar plant

Modernisation of age-old electrical drives & switchgear

Maximise day light savings using translucent roof

sheets and optimization of auto light sensors

Optimisation of process plant loads

Maximise Planned shutdown

Maximise utilisation of waste heat

Avoid Diesel Power & Coal Fired Boiler Generation,

Maximize internal storage & avoid multiple material

handling

Deploy best available technologies in manufacturing

Page 13: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Planned ENCON 2020-21

Title of Project

Annual Electrical

Saving

Annual

Thermal Saving Investment

(Million kWh) (Million Kcal) Rs Million

Optimisation of Plant Layout - 35000

MT internal raw material storage 0 2405 96

Modernisation of age old Motor control

switchgear 0.05 10

Covid – 19

Several Project Plans deferred complying to state restrictions. Site activities being restored

Page 14: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

ENCON 2017-18

Sl No Project Details Investment Savings Payback

Rs million Rs million Months

1 Scrapped Energy Intensive 6 MW Diesel Generator set III 0 0 0

2Phase I - Installation of 25000 MT Sulf Acid Storage Tanks at

Wharf & Laying of 5 Kilometer Long Pipeline36 0

0

3 Solar energy power tie up with Visakhapatnam Port Trust 0 0.89 1

4Deployment of higher capacity trucks 25 MT trucks replacing

19 MT trucks0 5.2

1

5 Install Variable Frequency Drive 0.4 0.9 6

6Plant Layout Improvement - Install internal storage – 30000 MT

Rock godown86 6.6

156

7 Installed Sieve Tray Condenser in Fluorine Recovery Unit 3.1 2.83 13

8 Energy Efficient Lighting - Phase II 0.84 0.59 17

Page 15: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

ENCON 2018-19

Sl No Project Details Investment Savings Payback

Rs million Rs million Months

1Turbo Generator Surface Condenser Online Tube Cleaning

System 3.6 8.88 5

2Plant Layout Improvement - Installed internal Sulphuric acid

storage & Piping system 288.5 4.67 742

3Installation of Online Silica Analyser in Demineralised Water

Plant 1.38 1.44 11

4 Replacement of old rewound Motors 2.1 0.63 40

5 Modernisation of High Tension switchgear 2.5 0.26 113

6 Lower Temperature suction to Air compressor 0.1 0.05 24

7 Energy Efficient Lighting, Phase III 2.1 1.19 1

Page 16: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

ENCON 2019-20

Sl No Project Details Investment Savings Payback

Rs million Rs million Months

1 Installation of Combined Heat & Power Plant 500 100.3 60

2 Demineralisation Plant upgradation with Mixed bed & Ultra filtration Units 47 12.2 46

3 Waste Utilisation – Installed 4no’s evaporators 183 74.2 30

4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92

5 Modernisation of Low Tension switchgear 10 1.1 113

6 Energy Efficient Lighting 7 6.8 12

7 Modernisation of Air Conditioning Units 2 0.167 144

8 Belt Conveyor travel length Optimisation 0.000 0.039 0

Year No of Proposals Investment Savings

Summary Rs Million Rs Million

2017-18 8 126 17.01

2018-19 7 300 17.11

2019-20 8 762 197

Page 17: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Innovative Projects 2019-20

1 Installation of 45 MTPH AFBC Boiler & 6.5MWH Combined Heat & Power Plant

2 Installed 6.5 MW non condensing steam turbine. Exhaust steam utilised for process heating.

3 Replication Higher thermal efficiency over Turbo Generator I which is a condensing turbine. Also, the cost of installation is lower than condensing turbine! Hence finds wide replicability

Impact Higher thermal efficiency due to Utilisation of exhaust steam for process heating4

Page 18: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Innovative Projects 2019-20

1Installation of Mixed Bed Ion exchange systems along with Ultra Filtration Units for meetings stringent silica & TDS norms for high pressure boiler

2

To bring down Total dissolved solids of Boiler Feed Water from 0.5 ppm to 0.02 ppm & employ 0.02 microns ultra-filtration to remove 98% of colloidal silica with molecular weight cut off of 10000 daltons. This results in lower steam turbine specific steam consumption

3 Replication DM Plant with mixed bed and ultra-filtration units is a viable option for meeting quality parameters of high-pressure boilers

Impact 1) Lower scaling & higher thermal efficiency of turbines 2) Lower boiler blowdown heat loss

4

Page 19: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Innovative Projects 2019-20

1 Installed Additional 4 no’s Evaporators for waste steam utilisation

2 Low Pressure waste steam is better utilized for concentrating Phosphoric acid otherwise being lost in turbine condenser

3Replication Best Practice where waste Low Pressure steam is available for concentrating Phosphoric acid

Impact

Waste Energy Low Pressure steam Utilisation

Byproduct Fluorine recovery

Concentrated Phosphoric acid production

4

Page 20: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Utilisation of renewable energy sources

Replacement of Electrical

Energy with Renewable

Energy

Installed

Capacity

(MW)

Annual

Energy

Generated

in 2017-18

%

Share

Annual

Energy

Generated

in 2018-19 % Share

Annual

Energy

Generated

in 2019-20 % Share

(Million

kWh)

(Million

kWh)

(Million

kWh)

Solar (PV) - Offsite Gen. 0 0.989 0.93 0.682 0.67 0.945 0.81

Others – Offsite Gen. 0 1.479 1.4 1.363 1.33 1.512 1.29

Page 21: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Waste Utilisation

2017-2018 2018-2019 2019-2020

Generation, MT

Waste Steam from Sulphuric acid Plant, MT 655479 691210 696965

Heat Value (GCV 634 kcals/kg) mkcal 415574 438227 441876

Disposal, MT

Utilised for Process Heating 449191 488433 488095

Balance for Power Generation 206289 202777 208870

Commissioned 4 nos evaporators in Phosphoric acid Plant for utilisation of waste

steam (Alternative fuel usage) during 2019-20 at an investment of Rs 183 million

Page 22: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

GHG Inventorisation

Absolute Emissions 2017-18 2018-19 2019-20

Thermal (Scope 1 - Direct) 2090 2336 2355 Ton CO2

Power (Scope 2 - bought out power) 60282 57508 64466 Ton CO2

Scope III - Employee commuting 3177 3177 3177 Ton CO2

Total 65548 63021 69998 Ton CO2

Emission Intensity 2017-18 2018-19 2019-20

Production 1066413 1072791 1079187 MT

Carbon Intensity 0.0615 0.0587 0.0649 Ton CO2 / MT

Disclosure of Emission data Publicly – Yes Partial disclosure

Page 23: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

GHG Inventorisation

Minimising Power consumption

Maximise turbo power generation from waste

Steam

Install energy efficient lighting using LED bulb

Install Rooftop solar power plant of 95 kWp

capacity

Modernisation of age-old low-tension

switchgear

Power factor improvement by installing

capacitor banks

Minimising Thermal energy consumption

Replacement of defective insulation

Improve condensate recovery

Action PlanEmission Ton CO2/MT

Target Short Term 0.064

Target Long Term 0.058

Achieved 2019-20 0.0649

1

2

3

4

5

6

7

8

9

Page 24: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Green Supply Chain Management

Green purchase policy ( if, any) : Yes

In all purchases, preference to local suppliers

All packaging materials used to be made of recyclable materials

Transport charges determined considering fuel efficiency

1

2

3

Projects Implemented

Investment Made (Rs In

Million) Description

Captive Generated Raw

Material Phosphoric

acid supply to sister

concerns

1

As part of Make in India initiative, Captive Generated Raw

material phosphoric acid plant capacity augmented, resulting

in self-sufficiency. Excess raw material produced is supplied to

sister concerns through truck transport, limiting import &

saving in transport fuel costs

Captive Raw Material Generation &

supply to sister concerns

Page 25: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Monitoring

Daily Monitoring – Daily Target Vs Actual Specific Energy Consumption compared & corrective actions undertaken

Review Meeting Chaired By - Unit Head

Typical Report

Page 26: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Encon budget & Training

126

300

762

106

0

100

200

300

400

500

600

700

800

900

2017-18 2018-19 2019-20 2020-21

Encon Investment, Rs million

All proposals are evaluated for performance and

economic viability and then implemented.

Proposals with quick payback are prioritised.

There is no limit of funds for taking up energy

conservation activities

Training

Plant personnel regularly participate in CII

Webinars, Encon training programs conducted by

CII and Other Institutions & Internal training

programs

Walkathon conducted on the beach on world

environment day, world earth day, world water

day etc. to raise public awareness on

conservation of resources

Plant Underwent CII Energy Audit of Visak Unit in

2014

Baseline verification audit was carried on 8th

August 2016 as per guidelines issued by Bureau of

Energy Efficiency, Ministry of Power, Govt of

India.

1

2

3

4

Page 27: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Encon Kaizens & Team work

Modernisation of Air conditioning system Right sizing belt conveyor

Projects taken up by workers & supervisors

Page 28: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Implementation of ISO 50001 / Green Co / IGBC rating

28

Ours integrated management system encompasses standards of Quality - ISO 9001:2015, Environment

- ISO 14001 : 2015 & Occupational Health & Safety - ISO 45001:2018.

The level of integration with energy management is

ISO14001:

Cost savings through improved efficiency and productivity.

Minimize waste and improve energy efficiency in order to reduce operating costs.

Continual improvement based on Plan – Do –Check-Act

Our Annual Energy Consumption is average 24659 MTOE , also as we are not a designated consumer

as our energy consumption is less than 30000 MTOE for fertiliser sector.

Hence we have not opted for ISO50001 additional certification

Page 29: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Encon Investment on Turnover

29

2017-18 2018-19 2019-20

Investment in Encon 126 300 762 Rs millionTurnover 25770 31387 33863 Rs million% Investment for Encon on Turnover 0.49% 0.96% 2.25% %

Page 30: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Other Innovative technologies implemented

30

a. Roadmap for digital enablement Developed b. Automation projects

1) Level transmitters installation on Major acid tanks 2) Manless Gypsum weigh bridge 3) Online moisture analyser Gypsum 4) Stack Opacity Monitor5) Real time monitoring

6) CEQMS & CAAQMS-Online Connectivity to CPCB/APPCB

Real time Monitoring DCS Training CentreManless Gypsum

weighbridgeStack Opacity Monitor CEQMS & CAAQMS -

Automation projects – Benefits achieved

1. Real time process monitoring

2. Ambient air & Emission monitoring

3. Manless operation

4. Product quality monitoring

1

2

3

4

Page 31: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Long term vision on Energy Efficiency

31

Long Term target of Energy Efficiency

1. 6% Renewable energy utilisation

2. 90% Capacity utilisation

3. 1% increase in Planned shutdown every year from current 35% to 40% by 2025

Support required

1. Suppler engagement –

a. Wagons availability during peak season

b. Priority berthing for Fertiliser materials

2. Financial support

a. External - Regular Subsidy payment by Government

b. Internal - Funds for implementing latest technology

3. Technical support

a. Latest technology IOT, Robotics, AI, Analytics implementation

b. Training

Page 32: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Energy Management Awards

32

2014 2015 2016 2017

2018 2019

Page 33: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Accolades

33

Award Awarded By Year

SAFETY & ENVIRONMENT

“One of the Top 10 Greenest Companies in India” TERI & Business Today 2001

Safety, Health & Environment Performance Award CII - SR 2003, 2004

Environment Protection Award FAI 1996, 2009, 2017

5 Star Rating British Safety Council 1999, 2011

Safety Award National Safety Council 1998

WATER & ENERGY CONSERVATION

Excellence in Energy Conservation & Management CII 2000,2001,2002,2014,2015,2016,2017,2018, 2019

Certificate of Merit Energy Conservation BEE 2002-03, 2003-04, 2005-06 & 2006-07, 2011-12

Excellence in Energy Conservation NREDCAP –Govt of AP 2009-10,2011-12,2012-13

Excellence in Energy Conservation AP Productivity council 2006-07

Excellence in Water Management CII 2009-10, 2010-11, 2011-12

PRODUCTION

Best overall performance of Fertiliser Plant FAI 1994-95

Best Operating Phosphoric Acid Plant FAI 1994-95,1995-96,1996-97,97-98,2000-01,2001-02, 2003-04,2004-05,2005-06,2006-07,2009-10, 2011-12,2013-14,2014-15,2015-16,2016-17, 2017-18

INDUSTRIAL RELATIONS

Best Management Award Labour Dept – AP Govt 2000, 2005, 2013, 2015,2016,2017

Page 34: Coromandel International Ltd · 4 Variable Frequency Drive Phos Acid plant - II & AFBC boiler 14 1.8 92 5 Modernisation of Low Tension switchgear 10 1.1 113 6 Energy Efficient Lighting

Energy Management

For further information please contact

[email protected]

Vice president - Manufacturing

Thank you