Upload
lamlien
View
217
Download
0
Embed Size (px)
Citation preview
Coristo Customer Info Day
PSM Product Structure ManagementBeat Meier / Martin Behnke – Roche
Mirko Quintern – Coristo
2
Agenda
Roche basic facts
- History
- Solution Overview
- Strategic roadmap
Project Overview – UniteD
- Unite multiple SAP Systems in one new SAP System
- Configuration Management with SAP PSM (Product Structure management)
Achievements and Outlook
- Comparison Past Today
- Observation with introduction of PSM and Configuration Management
- Q&A
3
Roche basic facts at a glance
• Clear focus on healthcare and unique innovation model
• World’s largest biotech company with truly
differentiated medicines in oncology, virology,
inflammation, metabolism and Central Nervous System
(CNS)
• Leadership in in vitro diagnostics
• Founded 1896 in Basel, Switzerland
• Founding families still hold majority stake
*Dow Jones Sustainability Index (DJSI)
Employing 93,734people
Sales of CHF 53.3 billion
R & D core investments of
CHF 10.4 billion
30 Roche medicines on
the WHO Model List of
Essential Medicines
137 million patients treated
with Roche medicines
19 billion tests conducted with
Roche Diagnostics products
10 years in a row ranked as
sustainability leader by DJSI*
150+ new partnerships in
Diagnostics and
Pharmaceuticals
4
Roche is a global pioneer in personalised
healthcareWe work across diagnostics and pharmaceuticals
Innovation is in our DNA
#1 R&D investor in healthcare
Among top 10 R&D investors across industries
CHF 10,392 million R&D
investment
30 R&D sites worldwide**
CHF 53,299 million Sales
26 Manufacturing sites worldwide
**Pharmaceuticals and Diagnostics* Strategy & Global Innovation 1000, Winter 2017
6
Organisational Structure DiagnosticsBusiness Areas and Units
Centralised & Point of Care
Solutions
Serum work area, Point-of-care testing, Specialty
testing, Lab IT and Workflow Mgmt., Custom
Biotech.
Molecular SolutionsMolecular Diagnostics , Tissue Diagnostics,
Sequencing Solutions
R/T PCR, Virology, Blood screening, Genomics/
Oncology, Microbiology, Biochemical reagents.
Primary & Advanced staining, Workflow Mgmt.
Diabetes Care
Blood glucose monitoring, Insulin delivery,
Diabetes workflow management.
7
TISSUE DIAGNOSTICS MOLECULAR DIAGNOSTICSSEQUENCING
CENTRAL LAB Point of Care
Roche Diagnostics - PortfolioTranslating cutting-edge science & innovation into practice
8
Roche Diagnostics - Strategic roadmap From physical to virtual connectivity
Today
Best in Serum Work Area
We shaped the market by
connecting clinical
chemistry and
immunoassays to create
Serum Work Area
2022 Vision
+ Integrated diagnostic information anywhere, anytime
Making diagnostic information
from core labs, satellite labs, PoC
and patients available where and
when it is needed
Tomorrow
Best in Connected
Core Laboratory
Connecting further
disciplines including
molecular diagnostics,
hematology, coagulation and
third parties
9
Integrated Core LabThe future starts now
Pre-analytical systemsAutomated sample preparation
Post-analytical systemsAutomated sample archiving
AnalyzersAnalyzes sample
Workflow & IT
SolutionsCoordinates the integration
of the lab cobas®
connection
modules transportation
system
Bulk loaderSample loading
Data analyticsInformation displayed on screen
10
Agenda
Roche basic facts
- History
- Solution Overview
- Strategic roadmap
Project Overview – UniteD
- Unite multiple SAP Systems in one new SAP System
- Configuration Management with SAP PSM (Product Structure management)
Achievements and Outlook
- Comparison Past Today
- Observation with introduction of PSM and Configuration Management
- Q&A
11
Penzberg
Mannheim
RotkreuzPleasanton
TucsonIndianapolis
Branchburg
Madison
Replacement of current IT systems for Enterprise Resource Planning (ERP)
with a single modern platform (SAP ECC 6.0) in Dia R&D and manufacturing
sites
Involved FunctionsAffected Business Areas /
UnitsSAP Systems
Waiblingen (PVT)
Kapa Biosystems Massachussets
Ariosa San Jose
Project UniteD - big pictureProduct - Target IT Landscape Perspectives
Global Operations
Global Supply Chain
Global Direct Procurement
Operations Finance
Global Quality & Regulatory
Core Finance
Global Indirect Functions
Site Services
Informatics
Dia Research & Development
Molecular Diagnostics
Professional Diagnostics
Tissue Diagnostics
P86 (Wave 1)
US1 (Wave 1)
P70 (Wave 2)
None SAP
Systems
PVT (Wave 3)
Ariosa / KAPA
(Wave 4)
13
UniteD ProjectAfter an exciting, challenging and successful journey, UniteD is
2018 live in 10 sites around the globe
14
Agenda
Roche basic facts
- History
- Solution Overview
- Strategic roadmap
Project Overview – UniteD
- Unite multiple SAP Systems in one new SAP System
- Configuration Management with SAP PSM (Product Structure management)
Achievements and Outlook
- Comparison Past Today
- Observation with introduction of PSM and Configuration Management
- Q&A
15
15
DHF DHF DMR DHR
CENIT / expi
CATIA V5SolidWorks
Configuration Management UniteDProduct - Target IT Landscape Perspectives – Big picture
16
Configuration Management UniteDExcel was starting point for configuration documentation
16
Hardware
Software
Reagents
Entire system
Consumables
Parameter Sets
CI-FM 0.2 CI-FM 1.0 CI-FM 1.0 CI-FM 1.0 CI-FM 1.0
AC2.2 AC3.3 AC3.4.1 AC3.4.1 AC Rev D
Scope
Sprint Sprint SW FM 6.2 SW FM 6.2 SW FM 6.3 SW FM 6.4
SW FM 6.4 + Patch
- definition file update for
testspecific cassettes (RL9)
Iteration
Parameter Files
Lysis Kit RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
Wash reagent-Kit RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
MGP-Kit RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
Spec-Dil Kit RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
HEV 96 Kit
HEV 480 Kit
HEV RMC Kit
HEV RMC Kit NPsep
HBV 96 Kit RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
HBV 480 Kit
HCV Kit 96 RL7, RL8 RL 9
HCV Kit 480
HIV 96 Kit RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
HIV 480 Kit
HxV RMC Kit
HxV RMC Kit NPsep
MPX Kit 96 RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
MPX Kit 480
MPX RMC Kit
MPX RMC Kit NPsep
WNV Kit 96 RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
WNV Kit 480
WNV RMC Kit
WNV RMC Kit NPsep
CMV Kit 96 RL7, RL8 RL 9
CMV Kit 480
CMV RMC Kit
CMV RMC Kit NPsep
DPX Kit 96 RL7, RL8 RL 9
DPX Kit 480
DPX RMC Kit
DPX RMC Kit NPsep
MGP-Cassette V02 MGP-Cassette V02.X MGP-Cassette V03.X MGP-Cassette Rev G
Reagent Cassette low volume
V01
Reagent Cassette low volume
V03.X
Reagent Cassette low volume
V03.XReagent Cassette 96 Rev B
RMC Cassette V01.X RMC Cassette V01.X RMC Cassette Rev F
Specimen Diluent Reagent
Bottle
Specimen Diluent Reagent
Bottle
Specimen Diluent Reagent
Bottle Rev B
Lysis Reagent Bottle Lysis Reagent Bottle Lysis Reagent Bottle Rev B
Wash Buffer Bottle Wash Buffer Bottle Wash Buffer Bottle Rev B
V03, encrypted content with
API
P-plate 48 V03.1
- optimized footprint
(new molding process
parameters)
P-plate 48 V04.0
- optimized footprint
(new mold cooling)
P-plate 48 V04.X
- manufacturing with injection
molding machine Netstal Elion
- packaged with secondary
flat box, content 32 pieces
(only for development)
P-plate 48 V05.X
- longer barcode label with
additional content of expiry date
and version ID
- packaged with secondary
"cube" box, content 32 pieces
(similar to serial packaging)
P-plate 48 Rev C
- longer barcode label with
additional content of expiry date
and version ID
- packaged with secondary
"cube" box, content 32 pieces
(similar to serial packaging)
Combo-tip Rack 48 V04.0
- 3-piece rack
- with 48 P-tips 1ml and 48 E-
Tips
0.3ml from Hamilton
- System Development
assembles
the racks with the Hamilton
Tips
Combo-tip Rack 48 V06.0
- 1-piece rack
- with 48 P-tips 1ml and 48 E-
Tips
0.3ml from Hamilton
- System Development
assembles
the racks with the Hamilton
Tips
Combo-tip Rack 48 V07.X
- optimized footprint of
Combo-Rack
Combo-tip Rack 48 V08.X
- longer barcode label with
additional content of expiry date
and version ID
- included Process-waste Insert
- packaged with secondary
"cube" box, content 16 pieces
(similar to serial packaging)
Combo-tip Rack 48 Rev C
- longer barcode label with
additional content of expiry date
and version ID
- included Process-waste Insert
- packaged with secondary
"cube" box, content 16 pieces
(similar to serial packaging)
AD-plate 96 V07.0
- without Cassette
- 5 AD-plate initial in banderole
- without barcode label
AD-plate 96 V09.1
- with 1.7mm deeper wells
- with barcode label and
orientation check label on
AD-frame, with barcode
label on AD-plate blank 1C
AD-plate 96 V09.X
- with barcode label and
orientation check label on
AD-frame, without barcode
label on AD-plate blank 1C
AD-plate 96 V09.X
- with barcode label and
orientation check label on
AD-frame, without barcode
label on AD-plate blank 1C
AD-plate 96 Rev C
- longer barcode label with
additional content of expiry date
and version ID
- 4 AD-plates initial into a
cassette
- packaged with secondary
"cube" box, content 32 pieces
(similar to serial packaging)
RFID
C-FM 1
Hardware
C-FM 2 C-FM 4C-FM 3 C-FM 5
Estimated Timeline
Configuration Baseline
De
sig
n A
sp
ec
t
Pooler Instrument
Single use Consumables
WDO 10461573 V00
Analytics Instrument
Main Configuration
Items
Software
Generic Reagents
Assay specific reagents
Reagent Packaging Consumables
WDO 10457774 V00
17
CI-FM 0.2 CI-FM 1.0 CI-FM 1.0 CI-FM 1.0 CI-FM 1.0
AC2.2 AC3.3 AC3.4.1 AC3.4.1 AC Rev D
Scope
Sprint Sprint SW FM 6.2 SW FM 6.2 SW FM 6.3 SW FM 6.4
SW FM 6.4 + Patch
- definition file update for
testspecific cassettes (RL9)
Iteration
Parameter Files
Lysis Kit RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
Wash reagent-Kit RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
MGP-Kit RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
Spec-Dil Kit RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
HEV 96 Kit
HEV 480 Kit
HEV RMC Kit
HEV RMC Kit NPsep
HBV 96 Kit RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
HBV 480 Kit
HCV Kit 96 RL7, RL8 RL 9
HCV Kit 480
HIV 96 Kit RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
HIV 480 Kit
HxV RMC Kit
HxV RMC Kit NPsep
MPX Kit 96 RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
MPX Kit 480
MPX RMC Kit
MPX RMC Kit NPsep
WNV Kit 96 RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
WNV Kit 480
WNV RMC Kit
WNV RMC Kit NPsep
CMV Kit 96 RL7, RL8 RL 9
CMV Kit 480
CMV RMC Kit
CMV RMC Kit NPsep
DPX Kit 96 RL7, RL8 RL 9
DPX Kit 480
DPX RMC Kit
DPX RMC Kit NPsep
MGP-Cassette V02 MGP-Cassette V02.X MGP-Cassette V03.X MGP-Cassette Rev G
Reagent Cassette low volume
V01
Reagent Cassette low volume
V03.X
Reagent Cassette low volume
V03.XReagent Cassette 96 Rev B
RMC Cassette V01.X RMC Cassette V01.X RMC Cassette Rev F
Specimen Diluent Reagent
Bottle
Specimen Diluent Reagent
Bottle
Specimen Diluent Reagent
Bottle Rev B
Lysis Reagent Bottle Lysis Reagent Bottle Lysis Reagent Bottle Rev B
Wash Buffer Bottle Wash Buffer Bottle Wash Buffer Bottle Rev B
V03, encrypted content with
API
P-plate 48 V03.1
- optimized footprint
(new molding process
parameters)
P-plate 48 V04.0
- optimized footprint
(new mold cooling)
P-plate 48 V04.X
- manufacturing with injection
molding machine Netstal Elion
- packaged with secondary
flat box, content 32 pieces
(only for development)
P-plate 48 V05.X
- longer barcode label with
additional content of expiry date
and version ID
- packaged with secondary
"cube" box, content 32 pieces
(similar to serial packaging)
P-plate 48 Rev C
- longer barcode label with
additional content of expiry date
and version ID
- packaged with secondary
"cube" box, content 32 pieces
(similar to serial packaging)
Combo-tip Rack 48 V04.0
- 3-piece rack
- with 48 P-tips 1ml and 48 E-
Tips
0.3ml from Hamilton
- System Development
assembles
the racks with the Hamilton
Tips
Combo-tip Rack 48 V06.0
- 1-piece rack
- with 48 P-tips 1ml and 48 E-
Tips
0.3ml from Hamilton
- System Development
assembles
the racks with the Hamilton
Tips
Combo-tip Rack 48 V07.X
- optimized footprint of
Combo-Rack
Combo-tip Rack 48 V08.X
- longer barcode label with
additional content of expiry date
and version ID
- included Process-waste Insert
- packaged with secondary
"cube" box, content 16 pieces
(similar to serial packaging)
Combo-tip Rack 48 Rev C
- longer barcode label with
additional content of expiry date
and version ID
- included Process-waste Insert
- packaged with secondary
"cube" box, content 16 pieces
(similar to serial packaging)
AD-plate 96 V07.0
- without Cassette
- 5 AD-plate initial in banderole
- without barcode label
AD-plate 96 V09.1
- with 1.7mm deeper wells
- with barcode label and
orientation check label on
AD-frame, with barcode
label on AD-plate blank 1C
AD-plate 96 V09.X
- with barcode label and
orientation check label on
AD-frame, without barcode
label on AD-plate blank 1C
AD-plate 96 V09.X
- with barcode label and
orientation check label on
AD-frame, without barcode
label on AD-plate blank 1C
AD-plate 96 Rev C
- longer barcode label with
additional content of expiry date
and version ID
- 4 AD-plates initial into a
cassette
- packaged with secondary
"cube" box, content 32 pieces
(similar to serial packaging)
RFID
C-FM 1
Hardware
C-FM 2 C-FM 4C-FM 3 C-FM 5
Estimated Timeline
Configuration Baseline
Desig
n A
sp
ect
Pooler Instrument
Single use Consumables
WDO 10461573 V00
Analytics Instrument
Main Configuration
Items
Software
Generic Reagents
Assay specific reagents
Reagent Packaging Consumables
WDO 10457774 V00
Configuration Management UniteDEvery Excel for each project was different
18
Configuration Management UniteDSystem Decomposition Guidance for GPS
QAP System
Architecture
SOP System
Comp. Standard
System Decomposition
20
UniteD: Config ManagementSystem Decomposition with PSM
Two separate “Layers” in PSM with project & product documentation
The Product Structure consists of Material Masters (Config. Items)
21
UniteD: Config ManagementExample: Cobas P612 in PSM
Simple & incomplete example of the HW decomposition
Decomposition contains system component “Instrument” & Units
22
Configuration Management UniteDFrom Excel to SAP Product Structure Management
Hardware
Software
Reagents
Entire system
Consumables
Parameter Sets
23
UniteD: Config ManagementProduct Structure with PLM Configuration Items
Each Component has a Config
Item (Material Master) assigned
Each Material Master has a
defined Maturity Level
To each material revision a set of
valid documents exists for this
date
Documents are grouped via Data
Packages
27
Agenda
Roche basic facts
- History
- Solution Overview
- Strategic roadmap
Project Overview – UniteD
- Unite multiple SAP Systems in one new SAP System
- Configuration Management with SAP PSM (Product Structure management)
Achievements and Outlook
- Comparison Past Today
- Observation with introduction of PSM and Configuration Management
- Q&A
28
CI-FM 0.2 CI-FM 1.0 CI-FM 1.0 CI-FM 1.0 CI-FM 1.0
AC2.2 AC3.3 AC3.4.1 AC3.4.1 AC Rev D
Scope
Sprint Sprint SW FM 6.2 SW FM 6.2 SW FM 6.3 SW FM 6.4
SW FM 6.4 + Patch
- definition file update for
testspecific cassettes (RL9)
Iteration
Parameter Files
Lysis Kit RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
Wash reagent-Kit RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
MGP-Kit RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
Spec-Dil Kit RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
HEV 96 Kit
HEV 480 Kit
HEV RMC Kit
HEV RMC Kit NPsep
HBV 96 Kit RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
HBV 480 Kit
HCV Kit 96 RL7, RL8 RL 9
HCV Kit 480
HIV 96 Kit RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
HIV 480 Kit
HxV RMC Kit
HxV RMC Kit NPsep
MPX Kit 96 RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
MPX Kit 480
MPX RMC Kit
MPX RMC Kit NPsep
WNV Kit 96 RL 4 RL5, RL6 RL6, RL7 RL7, RL8 RL 9
WNV Kit 480
WNV RMC Kit
WNV RMC Kit NPsep
CMV Kit 96 RL7, RL8 RL 9
CMV Kit 480
CMV RMC Kit
CMV RMC Kit NPsep
DPX Kit 96 RL7, RL8 RL 9
DPX Kit 480
DPX RMC Kit
DPX RMC Kit NPsep
MGP-Cassette V02 MGP-Cassette V02.X MGP-Cassette V03.X MGP-Cassette Rev G
Reagent Cassette low volume
V01
Reagent Cassette low volume
V03.X
Reagent Cassette low volume
V03.XReagent Cassette 96 Rev B
RMC Cassette V01.X RMC Cassette V01.X RMC Cassette Rev F
Specimen Diluent Reagent
Bottle
Specimen Diluent Reagent
Bottle
Specimen Diluent Reagent
Bottle Rev B
Lysis Reagent Bottle Lysis Reagent Bottle Lysis Reagent Bottle Rev B
Wash Buffer Bottle Wash Buffer Bottle Wash Buffer Bottle Rev B
V03, encrypted content with
API
P-plate 48 V03.1
- optimized footprint
(new molding process
parameters)
P-plate 48 V04.0
- optimized footprint
(new mold cooling)
P-plate 48 V04.X
- manufacturing with injection
molding machine Netstal Elion
- packaged with secondary
flat box, content 32 pieces
(only for development)
P-plate 48 V05.X
- longer barcode label with
additional content of expiry date
and version ID
- packaged with secondary
"cube" box, content 32 pieces
(similar to serial packaging)
P-plate 48 Rev C
- longer barcode label with
additional content of expiry date
and version ID
- packaged with secondary
"cube" box, content 32 pieces
(similar to serial packaging)
Combo-tip Rack 48 V04.0
- 3-piece rack
- with 48 P-tips 1ml and 48 E-
Tips
0.3ml from Hamilton
- System Development
assembles
the racks with the Hamilton
Tips
Combo-tip Rack 48 V06.0
- 1-piece rack
- with 48 P-tips 1ml and 48 E-
Tips
0.3ml from Hamilton
- System Development
assembles
the racks with the Hamilton
Tips
Combo-tip Rack 48 V07.X
- optimized footprint of
Combo-Rack
Combo-tip Rack 48 V08.X
- longer barcode label with
additional content of expiry date
and version ID
- included Process-waste Insert
- packaged with secondary
"cube" box, content 16 pieces
(similar to serial packaging)
Combo-tip Rack 48 Rev C
- longer barcode label with
additional content of expiry date
and version ID
- included Process-waste Insert
- packaged with secondary
"cube" box, content 16 pieces
(similar to serial packaging)
AD-plate 96 V07.0
- without Cassette
- 5 AD-plate initial in banderole
- without barcode label
AD-plate 96 V09.1
- with 1.7mm deeper wells
- with barcode label and
orientation check label on
AD-frame, with barcode
label on AD-plate blank 1C
AD-plate 96 V09.X
- with barcode label and
orientation check label on
AD-frame, without barcode
label on AD-plate blank 1C
AD-plate 96 V09.X
- with barcode label and
orientation check label on
AD-frame, without barcode
label on AD-plate blank 1C
AD-plate 96 Rev C
- longer barcode label with
additional content of expiry date
and version ID
- 4 AD-plates initial into a
cassette
- packaged with secondary
"cube" box, content 32 pieces
(similar to serial packaging)
RFID
C-FM 1
Hardware
C-FM 2 C-FM 4C-FM 3 C-FM 5
Estimated Timeline
Configuration Baseline
De
sig
n A
sp
ec
t
Pooler Instrument
Single use Consumables
WDO 10461573 V00
Analytics Instrument
Main Configuration
Items
Software
Generic Reagents
Assay specific reagents
Reagent Packaging Consumables
WDO 10457774 V00
Comparison Past vs. TodayProduct Configuration
Past
• Project-scope configuration only
• In Excel /Word documented
• Configuration not complete
• Each project used own template for decomposition
Today
• Complete product and project configuration
• Related documentation in SAP Document Management (LOD List of deliverables)
• Same template for all
29
Comparison Past vs. TodayStatus Reporting
Past
• Excel based
• Disconnected from project maturityand product
• Many different files
• Manual effort
Today
• Full visibility on project, product andrelated documentation status and maturity
• Complete report for LOD, DHF, DMR
• Complete overview about all implemented and planned changes on all product items
• …all by standard report … generated in seconds
30
Comparison Past vs. TodayBaselines
Past
• Excel based
• Disconnected from the product BOM
• Many different files
• Manual effort
• Changes implemented in operations continuously
Today
• In SAP available
• Manageable based on changes and effectivity
• Packaging of changes possible
• Configuration baselines as designed and production lots manageable
31
Configuration ManagementNeed for improvement
• Customer satisfaction (CM, R&D, Ops)
• commitment of Project Teams for CM
• CM Process and Tool perceived as complicated
• Trust in CM
• Action List of 22 open topics by R&D
Need for Improvement started Q1 2018 Improvement Initiatives Q2/Q3 2018
Kick-off Workshop
Cluster Workshops
Final Workshop
CM BPM Meeting
32
1. Evaluation
a. Are all stakeholders known and represented?
b. Is relevant business process mature enough?
c. Is real way of working known?
2. Investigation
a. Is the need of critical users known?
(stakeholder)?
b. Is impact to processes / tools known?
c. Is new tool / process and way of working
matching?
3. Consolidation
a. Are critical users committed?
b. Is management committed?
4. Verification
a. Is accountability for implementation clear?
b. Key user not trained before go-live
Configuration ManagementRoot causes for findings
Phases of root causes in PLM CM project Key root causes
Validation
Verification
Customer need Customer satisfaction
1
2
3
4
Go-live Oct. 20162015
2016
33
Configuration ManagementAchievements
Improvement Initiatives Q2/Q3 2018 Achievement Q3 2018
• Needs for improvement identified with R&D and
Ops
• CM process improved and synchronized in close
collaboration with R&D and Ops stakeholders
• CM BPM meeting and continual improvement
established
• SAP CMT Meeting and continual improvement
established
• CM commitment improved
• Operational CM role in development projects