Corey F Jordan2000 Pine Tree Rd, Longview, TX 75604 903-235-3311 [email protected]

May 13, 2015 Human Resource Manager Dear Human Resource Manager: Your posting for an Industrial Electrician indicated requirements that closely match my background and expertise. I have enclosed my resume to provide a summary of my qualifications and background for your review. The following are highlights of my qualifications and accomplishments: Industrial Electrician

15 years of experience in Industrial construction projects

Installation of conduit, cable tray etc.

Cable pulls and terminations

Supervision of construction crews

Knowledge of production equipment

With excellent organizational skills, an outstanding work ethic and the ability to work well in both team- oriented and self-directed environments. I am positioned to exceed your expectations. I would welcome an opportunity to meet with you to discuss my qualifications and candidacy in further detail. Thank you for your consideration.

Corey Jordan Enclosure Corey F Jordan 2000 Pine Tree Rd, Longview, TX 75604 903-235-3311 [email protected] Experience Premier Industrial Resources Longview, TX Journeyman Electrician 11/15/12- current Operate Electrical service truck Fabricate and install cable tray and conduit

Build and install PLC control panels

Calibrate control valves and transmitters

Loop check

Electric Heat tracing

Perform duties as Industrial electrician in the petrochemical and refining industry. Conduct JSA/STA daily meetings with crew. Perform facility maintenance as well as new construction projects (Delek Refining) (Enbridge Energy) and (Markwest Energy). Insco Instrument and Electric White Oak, TX Journeyman Electrician 10/10/2010- 11/14/2012 Operate Electrical Service Truck

Build and install PLC

Compressor control panel wiring

Cable tray and rigid conduit

Facility maintenance

PCE Constructors Baton Rouge, LA Journeyman Electrician 06/01/09- 09/30/09 ADM Ethanol Refinery Install conduit

Pull Cable

Install switch gear and motor control centers

Temporary Power for office complex

Terminations of Motors, Transformers and controls

Fluor Services Tatum, TX Journeyman Electrician 10/01/09-02/01/09 TXU Power Station Install cable tray

Pull cable

Temporary Power

Facility Maintenance

Test Automation and Controls, Tengiz, Kazakhstan

I&E Supervisor 05/01/07- 06/30/08

Tengiz Chevron Oil and Gas Refinery

Supervise Multinational CrewsTrain Local Workforce in Installation of Process ControlsCoordinate with Management and other ContractorsQA/QC and CommissioningSystem walk downs, status tracking and reporting

Gregg Industrial Insulators, Longview, TX

Electrical Construction Foreman 02/01/06 04/18/07

Texas Eastman Chemical

Responsible for Organizing Tasks for CrewConduct morning Safety MeetingOrder necessary materialsSupervise the Installation of Electric Heat TracingFacility Maintenance