(Under Jurisdiction of Nagpur Court only) वेटन कोलफीस लिटेड e- mail WESTERN COALFIELDS LIMITED (A Miniratna Cat-1 Government of India Undertaking) टाक फोसन TASK FORCE कोल इटेट, लसववल लाईस, ागपुर-440 001 COAL ESTATE, CIVIL LINES, NAGPUR-440 001 CIN : U10100MH1975GO1018626 Website : westerncoal.nic.in Telefax No : 0712-2510869 e-mail : [email protected] Date 29 th Dec 2014 Sub: Issues and Solutions sorted by the WCL HQ team from the Feedback received from the Gen next Compliance thereof: Implementation Instruction -18 Chairman cum MD, WCL is pleased to accept the recommendations of Gen Next with respect to system improvement in the company and has desired that the time bound compliance is ensured by the concerned departments. Issue: Induction of new MTs:. When new Management Trainees join the company, they have to be given a warm welcome and their basic needs have to be taken care of. A committee should be constituted which will address the problems faced by the new trainees. A checklist of things to be done, formalities to be completed, the details of the concerned authorities to be approached, timing and place of the training programme will bring in clarity. This will also serve in reducing the attrition rate of MTs. Implementation Instruction: General Manager HRD, General Manager EE and GM GSD will take urgent and immediate action for necessary arrangements and the check list to be mailed before hand to the newly joined MTs. (the implementation instructions are the action plan for strategic vision of the company. They do not supersede any law/ rule/ manual guidelines/ policy/ administratively approved work procedure as applicable on the date. In case of any conflict, the needful amendments be processed as per extant procedures of the company) General Manager HRD, General Manager EE and General Manager GSD will submit the status of compliance by 31 st Jan 2015. It may kindly be appreciated that taskforce mails are forwarded for info to Board level executives, hence appropriate feedback is solicited. M K Singh Convenor, Taskforce Copies for Kind Info: Chairman cum MD WCL Functional Directors WCL TS to CMD Area GM HoD Taskforce members

Core Group Implementation Instruction 18 to 34

  • Upload
    ashraf

  • View
    217

  • Download
    2

Embed Size (px)

DESCRIPTION

Core Group

Citation preview

  • (Under Jurisdiction of Nagpur Court only)

    e- mail

    WESTERN COALFIELDS LIMITED (A Miniratna Cat-1 Government of India Undertaking)

    TASK FORCE

    , , -440 001 COAL ESTATE, CIVIL LINES, NAGPUR-440 001

    CIN : U10100MH1975GO1018626

    Website : westerncoal.nic.in Telefax No : 0712-2510869

    e-mail : [email protected]

    Date 29th

    Dec 2014

    Sub: Issues and Solutions sorted by the WCL HQ team from the Feedback received from the Gen next

    Compliance thereof: Implementation Instruction -18

    Chairman cum MD, WCL is pleased to accept the recommendations of Gen Next with respect to system

    improvement in the company and has desired that the time bound compliance is ensured by the concerned

    departments.

    Issue:

    Induction of new MTs:. When new Management Trainees join the company, they have to be given a warm welcome and their basic needs have to be taken care of. A committee should be constituted which will

    address the problems faced by the new trainees. A checklist of things to be done, formalities to be

    completed, the details of the concerned authorities to be approached, timing and place of the training

    programme will bring in clarity. This will also serve in reducing the attrition rate of MTs.

    Implementation Instruction: General Manager HRD, General Manager EE and GM GSD will take

    urgent and immediate action for necessary arrangements and the check list to be mailed before hand to the

    newly joined MTs. (the implementation instructions are the action plan for strategic vision of the

    company. They do not supersede any law/ rule/ manual guidelines/ policy/ administratively approved work

    procedure as applicable on the date. In case of any conflict, the needful amendments be processed as per

    extant procedures of the company)

    General Manager HRD, General Manager EE and General Manager GSD will submit the status of

    compliance by 31st Jan 2015.

    It may kindly be appreciated that taskforce mails are forwarded for info to Board level executives, hence

    appropriate feedback is solicited.

    M K Singh

    Convenor, Taskforce

    Copies for Kind Info:

    Chairman cum MD WCL

    Functional Directors WCL

    TS to CMD

    Area GM

    HoD

    Taskforce members

    mailto:[email protected]

  • (Under Jurisdiction of Nagpur Court only)

    e- mail

    WESTERN COALFIELDS LIMITED (A Miniratna Cat-1 Government of India Undertaking)

    TASK FORCE

    , , -440 001 COAL ESTATE, CIVIL LINES, NAGPUR-440 001

    CIN : U10100MH1975GO1018626

    Website : westerncoal.nic.in Telefax No : 0712-2510869

    e-mail : [email protected]

    Date 29th

    Dec 2014

    Sub: Issues and Solutions sorted by the WCL HQ team from the Feedback received from the Gen next

    Compliance thereof: Implementation Instruction -19

    Chairman cum MD, WCL is pleased to accept the recommendations of Gen Next with respect to system

    improvement in the company and has desired that the time bound compliance is ensured by the concerned

    departments.

    Issue: Training and Development/ Executive Establishment

    1. A well planned training programme has to be devised and adequate training regarding the overall functioning of the company has to be given before they are sent to the field.

    2. A forum has to be created where the employees can register their complaints online regarding the problems, harassment and any undesirable remarks made against them. The forum has to maintain

    confidentiality. Immediate and strict action has to be taken against the erring officer. Trust has to be

    built in the minds of the employees regarding the effectiveness of the forum.

    3. Training programmes have to be designed for developing the technical skills of the employees. This will keep the employees updated and enhance their efficiency.

    4. Personality development training, meditation, yoga programmes need to be organised for improving the soft skills of the employees. Leadership skills of the employees have to be nurtured.

    5. Good performers have to be motivated and recognised. Continuous assessment of the employees coupled with 360 degree grading and publication of their achievements will create positive impact

    on their work.

    6. When an employee joins the company, an analysis has to be made regarding his/her skills, prior experience and field of interest. Posting has to be determined based on the same. While on job also,

    the core competencies possessed by the employee has to be analysed and utilised by the company.

    7. There is a need to review the KRAs and KPIs. The inputs from the employees of all the disciplines need to be taken while determining the same. An awareness and training programme has to be

    organised for the employees and controlling authorities for proper filing of online PRIDE.

    Continuous assessment of the employees need to be done.

    8. Proper distribution of work has to be ensured. The HR department proposed above should deal with complaints regarding these issues and take necessary action to solve the same.

    9. Job rotation is very necessary in order to enhance the overall knowledge and skill of the employees. This may be done intra-department. This will equip them to become leaders in the due

    course.

    10. A proper succession planning should be put in place and the junior to whom the responsibility is sought to be shifted in the due course should be trained and equipped to handle the situation

    accordingly.

    mailto:[email protected]

  • 11. An HR audit for effective implementation of HR policies to be done by a third party.

    Implementation Instruction: General Manager HRD and General Manager EE will take urgent and

    immediate action for necessary arrangements. (the implementation instructions are the action plan for

    strategic vision of the company. They do not supersede any law/ rule/ manual guidelines/ policy/

    administratively approved work procedure as applicable on the date. In case of any conflict, the needful

    amendments be processed as per extant procedures of the company)

    General Manager HRD and General Manager EE will submit the status of compliance by 28th Feb 2015.

    It may kindly be appreciated that taskforce mails are forwarded for info to Board level executives, hence

    appropriate feedback is solicited.

    M K Singh

    Convenor, Taskforce

    Copies for Kind Info:

    Chairman cum MD WCL

    Functional Directors WCL

    TS to CMD

    Area GM

    HoD

    Taskforce members

  • (Under Jurisdiction of Nagpur Court only)

    e- mail

    WESTERN COALFIELDS LIMITED (A Miniratna Cat-1 Government of India Undertaking)

    TASK FORCE

    , , -440 001 COAL ESTATE, CIVIL LINES, NAGPUR-440 001

    CIN : U10100MH1975GO1018626

    Website : westerncoal.nic.in Telefax No : 0712-2510869

    e-mail : [email protected]

    Date 29th

    Dec 2014

    Sub: Issues and Solutions sorted by the WCL HQ team from the Feedback received from the Gen next

    Compliance thereof: Implementation Instruction -20

    Chairman cum MD, WCL is pleased to accept the recommendations of Gen Next with respect to system

    improvement in the company and has desired that the time bound compliance is ensured by the concerned

    departments.

    Issue: Internal Customer Charter

    There does not seem to be a time line approach to various inter-departmental services. Though it is not

    possible in all cases it must be adopted in cases like house allotment, bill payments, various grievances

    redressal. Each department could be asked to make such a charter for internal customer (employees) as

    well as external customers.

    Implementation Instruction: General Manager Personnel & IR and General Manager EE will sort the

    issues of Grievance Redressal mechanism and Internal customer charter and will take urgent and

    immediate action for necessary arrangements. (the implementation instructions are the action plan for

    strategic vision of the company. They do not supersede any law/ rule/ manual/ guidelines/ policy/

    administratively approved work procedure as applicable on the date. In case of any conflict, the needful

    amendments be processed as per extant procedures of the company)

    General Manager P&IR and General Manager EE will submit the status of compliance by 31st Jan 2015.

    It may kindly be appreciated that taskforce mails are forwarded for info to Board level executives, hence

    appropriate feedback is solicited.

    M K Singh

    Convenor, Taskforce

    Copies for Kind Info:

    Chairman cum MD WCL

    Functional Directors WCL

    TS to CMD

    Area GM

    HoD

    Taskforce members

    mailto:[email protected]

  • (Under Jurisdiction of Nagpur Court only)

    e- mail

    WESTERN COALFIELDS LIMITED (A Miniratna Cat-1 Government of India Undertaking)

    TASK FORCE

    , , -440 001 COAL ESTATE, CIVIL LINES, NAGPUR-440 001

    CIN : U10100MH1975GO1018626

    Website : westerncoal.nic.in Telefax No : 0712-2510869

    e-mail : [email protected]

    Date 29th

    Dec 2014

    Sub: Issues and Solutions sorted by the WCL HQ team from the Feedback received from the Gen next

    Compliance thereof: Implementation Instruction -21

    Chairman cum MD, WCL is pleased to accept the recommendations of Gen Next with respect to system

    improvement in the company and has desired that the time bound compliance is ensured by the concerned

    departments.

    Issue: Gender sensitive complaints

    Provision has to be made for submitting gender sensitive complaints to the HR department. Such issues

    have to be taken seriously and resolved.

    Implementation Instruction: A committee to deal the complaints of sexual harassment exists at Hq

    under chairmanship of Dr Bela Bhattacharya, Chief of Medical Services, WCL. Similar Committees exist

    in the areas as well. Gen Next may take up the issue if any with Dr Bhattacharya. (the implementation

    instructions are the action plan for strategic vision of the company. They do not supersede any law/ rule/

    manual/ guidelines/ policy/ administratively approved work procedure as applicable on the date. In case of

    any conflict, the needful amendments be processed as per extant procedures of the company)

    Dr Bhattacharya, CMS will submit the status of compliance by 31st Jan 2015.

    It may kindly be appreciated that taskforce mails are forwarded for info to Board level executives, hence

    appropriate feedback is solicited.

    M K Singh

    Convenor, Taskforce

    Copies for Kind Info:

    Chairman cum MD WCL

    Functional DirectorsWCL

    TS to CMD

    Area GM

    HoD

    Taskforce members

    mailto:[email protected]

  • (Under Jurisdiction of Nagpur Court only)

    e- mail

    WESTERN COALFIELDS LIMITED (A Miniratna Cat-1 Government of India Undertaking)

    TASK FORCE

    , , -440 001 COAL ESTATE, CIVIL LINES, NAGPUR-440 001

    CIN : U10100MH1975GO1018626

    Website : westerncoal.nic.in Telefax No : 0712-2510869

    e-mail : [email protected]

    Date 29th

    Dec 2014

    Sub: Issues and Solutions sorted by the WCL HQ team from the Feedback received from the Gen next

    Compliance thereof: Implementation Instruction -22

    Chairman cum MD, WCL is pleased to accept the recommendations of Gen Next with respect to system

    improvement in the company and has desired that the time bound compliance is ensured by the concerned

    departments.

    Issue: Information centre

    1. Need has been felt for an information centre for clarifying doubts regarding various provisions,

    rules, etc. that are applicable to a particular situation. The information centre to be constituted with

    experts from various disciplines. This will cut down a lot of unnecessary processes.

    2. An online portal for sharing information and experiences. An online portal to be created which is

    accessible to all the officers wherein information that are crucial, experiences regarding

    interpretation or application of a particular provision of rules, manual, etc. will improve the

    functional knowledge. This will also pave way for uniform interpretation of the provisions

    throughout the company..

    Implementation Instruction: Gen Next will take the lead in setting an online portal for info sharing. This

    portal will be instrumental in online discussions and resolution of the doubts. A better informed executive

    is the order of the day. Gen Next will take the lead. The Gen Next Executives of Systems department will

    also be involved in design of system architecture. (the implementation instructions are the action plan for

    strategic vision of the company. They do not supersede any law/ rule/ manual/ guidelines/ policy/

    administratively approved work procedure as applicable on the date. In case of any conflict, the needful

    amendments be processed as per extant procedures of the company)

    HQ- Gen Next team will submit the status of compliance by 31st Jan 2015.

    It may kindly be appreciated that taskforce mails are forwarded for info to Board level executives, hence

    appropriate feedback is solicited.

    M K Singh

    Convenor, Taskforce

    Copies for Kind Info:

    Chairman cum MD WCL

    Functional Directors WCL

    TS to CMD

    Area GM

    HoD

    Taskforce members

    mailto:[email protected]

  • (Under Jurisdiction of Nagpur Court only)

    e- mail

    WESTERN COALFIELDS LIMITED (A Miniratna Cat-1 Government of India Undertaking)

    TASK FORCE

    , , -440 001 COAL ESTATE, CIVIL LINES, NAGPUR-440 001

    CIN : U10100MH1975GO1018626

    Website : westerncoal.nic.in Telefax No : 0712-2510869

    e-mail : [email protected]

    Date 29th

    Dec 2014

    Sub: Issues and Solutions sorted by the WCL HQ team from the Feedback received from the Gen next

    Compliance thereof: Implementation Instruction -23

    Chairman cum MD, WCL is pleased to accept the recommendations of Gen Next with respect to system

    improvement in the company and has desired that the time bound compliance is ensured by the concerned

    departments.

    Issue: Colony Roads

    It is learnt from several feedbacks that the roads constructed or available at area HQ level, colliery level

    are not of concrete due to which problem of water logging and deterioration is observed frequently.

    Implementation Instruction: General Manager Civil and General Manager Welfare will study the

    problem during the study tour of Sub Committee on Welfare. Recommendation for needful policy decision

    has to be made by GM Civil (the implementation instructions are the action plan for strategic vision of

    the company. They do not supersede any law/ rule/ manual/ guidelines/ policy/ administratively approved

    work procedure as applicable on the date. In case of any conflict, the needful amendments be processed as

    per extant procedures of the company)

    GM Civil will submit the status of compliance by 31st March 2015.

    It may kindly be appreciated that taskforce mails are forwarded for info to Board level executives, hence

    appropriate feedback is solicited.

    M K Singh

    Convenor, Taskforce

    Copies for Kind Info:

    Chairman cum MD WCL

    Functional Directors WCL

    TS to CMD

    Area GM

    HoD

    Taskforce members

    mailto:[email protected]

  • (Under Jurisdiction of Nagpur Court only)

    e- mail

    WESTERN COALFIELDS LIMITED (A Miniratna Cat-1 Government of India Undertaking)

    TASK FORCE

    , , -440 001 COAL ESTATE, CIVIL LINES, NAGPUR-440 001

    CIN : U10100MH1975GO1018626

    Website : westerncoal.nic.in Telefax No : 0712-2510869

    e-mail : [email protected]

    Date 29th

    Dec 2014

    Sub: Issues and Solutions sorted by the WCL HQ team from the Feedback received from the Gen next

    Compliance thereof: Implementation Instruction -24

    Chairman cum MD, WCL is pleased to accept the recommendations of Gen Next with respect to system

    improvement in the company and has desired that the time bound compliance is ensured by the concerned

    departments.

    Issue: Non availability/arrangement of vehicles/transportation for staff/executives visiting

    fields/railway siding/areas

    Fleet of vehicles/transportation should be arranged at HQ, area HQ and colliery level to avoid

    inconvenience caused and wastage of time for timely field visit/inspections etc. Groups of staff/executives

    can be made and common transport arrangement should be made to avoid excessive expenses on

    travelling.

    Implementation Instruction: Area General Managers will take needful action. A trade off between high

    TA expenses vs provision of vehicles has to be studied at respective areas. (the implementation

    instructions are the action plan for strategic vision of the company. They do not supersede any law/ rule/

    manual/ guidelines/ policy/ administratively approved work procedure as applicable on the date. In case of

    any conflict, the needful amendments be processed as per extant procedures of the company)

    Area GMs will submit the status of compliance by 31st Jan 2015.

    It may kindly be appreciated that taskforce mails are forwarded for info to Board level executives, hence

    appropriate feedback is solicited.

    M K Singh

    Convenor, Taskforce

    Copies for Kind Info:

    Chairman cum MD WCL

    Functional Directors WCL

    TS to CMD

    Area GM

    HoD

    Taskforce members

    mailto:[email protected]

  • (Under Jurisdiction of Nagpur Court only)

    e- mail

    WESTERN COALFIELDS LIMITED (A Miniratna Cat-1 Government of India Undertaking)

    TASK FORCE

    , , -440 001 COAL ESTATE, CIVIL LINES, NAGPUR-440 001

    CIN : U10100MH1975GO1018626

    Website : westerncoal.nic.in Telefax No : 0712-2510869

    e-mail : [email protected]

    Date 29th

    Dec 2014

    Sub: Issues and Solutions sorted by the WCL HQ team from the Feedback received from the Gen next

    Compliance thereof: Implementation Instruction -25

    Chairman cum MD, WCL is pleased to accept the recommendations of Gen Next with respect to system

    improvement in the company and has desired that the time bound compliance is ensured by the concerned

    departments.

    Issue: Poor condition of roads between Pitheads/collieries to stock-CHP/bunkers/loading points-

    weighbridges

    Poor condition of roads is severely affecting the pace of coal despatches. At many places there are no

    proper roads from pit heads to CHP/bunkers/loading points to weighbridges. This increases rush of

    tippers/trucks deployed due to which transportation cycle from colliery to railway siding increases. The

    same may be observed in road sales transport arrangement. Proper route should be made ensuring

    minimum distance from pithead to despatch point. These roads should be mainly of concrete or any other

    such material which necessarily be durable and does not weather in adverse climatic condition and heavy

    transportation.

    Implementation Instruction: General Manager Civil will take needful action. (the implementation

    instructions are the action plan for strategic vision of the company. They do not supersede any law/ rule/

    manual/ guidelines/ policy/ administratively approved work procedure as applicable on the date. In case of

    any conflict, the needful amendments be processed as per extant procedures of the company)

    General Manager Civil will submit the status of compliance by 31st March 2015.

    It may kindly be appreciated that taskforce mails are forwarded for info to Board level executives, hence

    appropriate feedback is solicited.

    M K Singh

    Convenor, Taskforce

    Copies for Kind Info:

    Chairman cum MD WCL

    Functional Directors WCL

    TS to CMD

    Area GM

    HoD

    Taskforce members

    mailto:[email protected]

  • (Under Jurisdiction of Nagpur Court only)

    e- mail

    WESTERN COALFIELDS LIMITED (A Miniratna Cat-1 Government of India Undertaking)

    TASK FORCE

    , , -440 001 COAL ESTATE, CIVIL LINES, NAGPUR-440 001

    CIN : U10100MH1975GO1018626

    Website : westerncoal.nic.in Telefax No : 0712-2510869

    e-mail : [email protected]

    Date 29th

    Dec 2014

    Sub: Issues and Solutions sorted by the WCL HQ team from the Feedback received from the Gen next

    Compliance thereof: Implementation Instruction -26

    Chairman cum MD, WCL is pleased to accept the recommendations of Gen Next with respect to system

    improvement in the company and has desired that the time bound compliance is ensured by the concerned

    departments.

    Issue: Formation of R&D Team

    An exclusive team should be formed to carry out R & D for the Company. This team should visit other

    industries across the country & world to learn about new technologies and implementation of the same in

    the respective subsidiary. Also the members of the team should not be permanent and be replaced as and

    when needed.

    Implementation Instruction: General Manager New Technology will take needful action. (the

    implementation instructions are the action plan for strategic vision of the company. They do not supersede

    any law/ rule/ manual/ guidelines/ policy/ administratively approved work procedure as applicable on the

    date. In case of any conflict, the needful amendments be processed as per extant procedures of the

    company)

    General Manager NT will submit the status of compliance by 31st Jan 2015.

    It may kindly be appreciated that taskforce mails are forwarded for info to Board level executives, hence

    appropriate feedback is solicited.

    M K Singh

    Convenor, Taskforce

    Copies for Kind Info:

    Chairman cum MD WCL

    Functional Directors WCL

    TS to CMD

    Area GM

    HoD

    Taskforce members

    mailto:[email protected]

  • (Under Jurisdiction of Nagpur Court only)

    e- mail

    WESTERN COALFIELDS LIMITED (A Miniratna Cat-1 Government of India Undertaking)

    TASK FORCE

    , , -440 001 COAL ESTATE, CIVIL LINES, NAGPUR-440 001

    CIN : U10100MH1975GO1018626

    Website : westerncoal.nic.in Telefax No : 0712-2510869

    e-mail : [email protected]

    Date 29th

    Dec 2014

    Sub: Issues and Solutions sorted by the WCL HQ team from the Feedback received from the Gen next

    Compliance thereof: Implementation Instruction -27

    Chairman cum MD, WCL is pleased to accept the recommendations of Gen Next with respect to system

    improvement in the company and has desired that the time bound compliance is ensured by the concerned

    departments.

    Issue: Sanction of Leave

    There is a huge chain (minimum 4 reporting officers) of approval required to sanction leaves, it takes

    many days to forward leave application and get it granted and many times it so happens that the HODs of

    unit level & G.M. office reject the leave applications for unknown reasons which is harassment to the

    executive. Immediate action required as it is an undesirable situation. Implementation Instruction: Area General Managers of respective areas will take needful action to

    replace this draconian system, by fixing the responsibility of grant of leave to Gen Next by the reporting

    officer only. (the implementation instructions are the action plan for strategic vision of the company. They

    do not supersede any law/ rule/ manual/ guidelines/ policy/ administratively approved work procedure as

    applicable on the date. In case of any conflict, the needful amendments be processed as per extant

    procedures of the company)

    Area General Managers of respective areas will submit the status of compliance by 31st Jan 2015.

    It may kindly be appreciated that taskforce mails are forwarded for info to Board level executives, hence

    appropriate feedback is solicited.

    M K Singh

    Convenor, Taskforce

    Copies for Kind Info:

    Chairman cum MD WCL

    Functional Directors WCL

    TS to CMD

    Area GM

    HoD

    Taskforce members

    mailto:[email protected]

  • (Under Jurisdiction of Nagpur Court only)

    e- mail

    WESTERN COALFIELDS LIMITED (A Miniratna Cat-1 Government of India Undertaking)

    TASK FORCE

    , , -440 001 COAL ESTATE, CIVIL LINES, NAGPUR-440 001

    CIN : U10100MH1975GO1018626

    Website : westerncoal.nic.in Telefax No : 0712-2510869

    e-mail : [email protected]

    Date 29th

    Dec 2014

    Sub: Issues and Solutions sorted by the WCL HQ team from the Feedback received from the Gen next

    Compliance thereof: Implementation Instruction -28

    Chairman cum MD, WCL is pleased to accept the recommendations of Gen Next with respect to system

    improvement in the company and has desired that the time bound compliance is ensured by the concerned

    departments.

    Issue: Finance- Reimbursement of dues/ Salary

    1. Traditional system of Cash Payment of Medical Bill, TA/DA & other Payment related to

    Workers in Areas & Sub-Areas- Such a system should be abolished immediately. Most of the

    field workers and field executives are engaged in finance office for taking cash. The payment of

    this kind of expenses should be either with salary or from bank. It will save office time of the

    workers and executives who engage in production activity. It will save time and cost of the

    company.

    2. Uncertainty about salary payments (time frame) for new executives/ recruits It is a practice in

    WCL that salary account of new recruits is opened only after their posting is confirmed at

    respective Areas. This delayed salary payment ultimately leads to executive harassment. After

    completion of formalities at IICM the details new recruits who are to join WCL may be obtained in

    advance and a list of documents to be produced at the WCL HQ for account opening as well as

    completing the joining formalities may be done. This ensures that as and when new recruits join

    WCL their salary processing starts.

    Implementation Instruction: General Manager Finance will take needful action. (the implementation

    instructions are the action plan for strategic vision of the company. They do not supersede any law/ rule/

    manual/ guidelines/ policy/ administratively approved work procedure as applicable on the date. In case of

    any conflict, the needful amendments be processed as per extant procedures of the company)

    General Manager Finance will submit the status of compliance by 31st Jan 2015.

    It may kindly be appreciated that taskforce mails are forwarded for info to Board level executives, hence

    appropriate feedback is solicited.

    M K Singh

    Convenor, Taskforce

    Copies for Kind Info:

    Chairman cum MD WCL

    Functional Directors WCL

    TS to CMD

    Area GM

    HoD

    Taskforce members

    mailto:[email protected]

  • (Under Jurisdiction of Nagpur Court only)

    e- mail

    WESTERN COALFIELDS LIMITED (A Miniratna Cat-1 Government of India Undertaking)

    TASK FORCE

    , , -440 001 COAL ESTATE, CIVIL LINES, NAGPUR-440 001

    CIN : U10100MH1975GO1018626

    Website : westerncoal.nic.in Telefax No : 0712-2510869

    e-mail : [email protected]

    Date 29th

    Dec 2014

    Sub: Issues and Solutions sorted by the WCL HQ team from the Feedback received from the Gen next

    Compliance thereof: Implementation Instruction -29

    Chairman cum MD, WCL is pleased to accept the recommendations of Gen Next with respect to system

    improvement in the company and has desired that the time bound compliance is ensured by the concerned

    departments.

    Issue: Security & Surveillance

    1. CCTV Cameras to be placed at important locations for Security at filter plants and at

    Manager and Sub Area Managers rooms to protect employees from anti-social elements.-

    Provision of CCTVs would increase the alertness and help in providing clear evidence when any

    un ethical practices or such sort of wilful damages caused to the property of management by the

    miscreants.

    2. Posting of Security Guards on the basis of their fitness at sensitive places like scrap yard,

    stores, and workshop This would help in avoiding the thefts to high level as physical fitness of

    security guard is highly recommended.

    3. Placement of security guard in all 3 shifts in officers colony. To avoid the theft of vehicles and

    create awareness that the colony is under high supervision ensuring the safety of the employees and

    their belonging/property.

    Implementation Instruction: Chief of Security and Area General Managers of respective areas will take

    needful action. (the implementation instructions are the action plan for strategic vision of the company.

    They do not supersede any law/ rule/ manual/ guidelines/ policy/ administratively approved work

    procedure as applicable on the date. In case of any conflict, the needful amendments be processed as per

    extant procedures of the company)

    Area General Managers will submit the status of compliance by 31st Jan 2015.

    It may kindly be appreciated that taskforce mails are forwarded for info to Board level executives, hence

    appropriate feedback is solicited.

    M K Singh

    Convenor, Taskforce

    Copies for Kind Info:

    Chairman cum MD WCL

    Functional Directors WCL

    TS to CMD

    Area GM , HoDs, Task Force Members

    mailto:[email protected]

  • (Under Jurisdiction of Nagpur Court only)

    e- mail

    WESTERN COALFIELDS LIMITED (A Miniratna Cat-1 Government of India Undertaking)

    TASK FORCE

    , , -440 001 COAL ESTATE, CIVIL LINES, NAGPUR-440 001

    CIN : U10100MH1975GO1018626

    Website : westerncoal.nic.in Telefax No : 0712-2510869

    e-mail : [email protected]

    Date 29th

    Dec 2014

    Sub: Issues and Solutions sorted by the WCL HQ team from the Feedback received from the Gen next

    Compliance thereof: Implementation Instruction -30

    Chairman cum MD, WCL is pleased to accept the recommendations of Gen Next with respect to system

    improvement in the company and has desired that the time bound compliance is ensured by the concerned

    departments.

    Issue: Technology Issues

    Issue Details Implementing authority

    Codes for material

    For material procurement 11

    digit codes are required. But

    sometime the code is not

    available. In that case we

    have to generate code from

    M M department which

    delays the procurement

    process by many days and

    even weeks. So, the code

    may be generated at the time

    of procurement of equipment

    for its every spare so that in

    case of emergency the

    material may be procured

    without delay.

    General Manager MM will

    take needful action

    Sleeveless jackets instead of

    cross belt jacket

    Fluorescent safety jackets are

    issued at the project, which

    are cross belt type. Cross belt

    type are loose and can get

    stuck while working on

    machine. So cross belt

    should be replaced with

    sleeveless jackets which are

    safer.

    Area General Managers of

    respective areas and General

    Manager MM will take

    needful action.

    No uniformity in NIT.

    Different areas have different

    style of NIT which may

    cause problems.

    Unique code to every

    Contractors for tendering

    process and other work

    Uniformity in rules &

    procedure in various process

    of every departments

    One common NIT template

    may be prepared at WCL HQ

    and circulated to all Areas

    General Manager CMC will

    study the issue and suggest

    the ways and means of

    rectification,

    mailto:[email protected]

  • Central Stores is not located

    central to all areas of WCL.

    Trucks from MP areas have

    to travel about 300 km to

    collect material from Central

    Stores, Tadali which is huge

    cost to company

    One regional store in MP

    areas may be treated as

    central Stores for MP areas

    and it can be made consignee

    for material of MP areas.

    General Manager MM will

    study the issue and

    recommend policy decision.

    A lot of time is wasted for

    waiting for release orders

    from WCL HQ when

    collecting material from

    central stores, Tadali.

    Release orders of materials

    from CST should be through

    email.

    General Manager MM will

    implement.

    Once the store/office is

    closed we cannot see the

    current stock position.

    WCL MMS NET should be

    available through internet so

    that Depot Officer and SO

    (MM) can check the status of

    stock at any time of day and

    from anywhere. For this

    WAN may be needed which

    may take time.

    General Manager MM and

    General Manger System will

    take needful action

    AMC for the server systems

    installed in all the stores is

    finished. Since the machines

    are very old they are giving

    frequent troubles and their

    repair from outside is not

    economical.

    Since the server system is

    very old, there is no need to

    renew the AMC. New Server

    systems need to be installed

    for smooth functioning of the

    Stores

    General Manager System to

    take needful action.

    Non availability of real time

    inventory management.

    Centralized real-time

    Inventory management

    System should made. This

    system will show real time

    stocks of material available

    in a particular

    colliery/subarea/area etc. It

    will help us to reduce

    unwanted inventory and will

    generate very useful data like

    trend of a particular material

    often used or required. It will

    increase better coordination

    between areas for equipment

    sharing system.

    General Manager MM will

    take needful action.

    Scrap Management System

    Stocking of scraps is a

    measure problem. It has been

    observed that there are

    chances of theft/pilferage of

    scraps generated due to day

    to day maintenance of

    machineries/ equipments etc.

    Scrap Management should be

    made where the scrap will be

    segregated, stored in proper

    manner and finally

    sold/disposed off in proper

    General Manager MM will

    take needful action.

  • way which will generate

    considerable revenue.

    Huge Delay in finalizing

    /scrutiny of Technical tenders

    It has been observed that

    during technical scrutiny of

    tenders the members have to

    scrutinize huge amount of

    data in paper forms. Also

    these papers need to be made

    in several sets which

    increases use of paper.

    Introduction of digital

    signature can help in

    minimizing paperworks and

    unnecessary delay.

    General Manager MM will

    study the issue and

    recommend the policy

    decision.

    Long travelling time to reach

    the destined seam in UG

    mines

    It has been observed

    that it takes long time

    to reach the actual

    seam in UG mines

    results in less per

    man productivity.

    Man Riding System

    should be

    implemented on

    technical viability to

    increase productivity

    per man.

    General Manager NT may

    take needful action.

    Non availability of

    loading/unloading

    manpower/equipments. Long

    Cycle time.

    It has been observed that

    majority of stores does not

    have either manpower or

    equipment to load unload the

    materials required to be

    issued from time to time

    which increase cycle time.

    Adequate manpower should

    be made available or

    forklifts should be used to for

    loading/unloading of

    materials.

    Area General Manager of

    respective areas will take

    needful action.

    Absence of Vendor

    Management System

    It has been observed that

    there is no Vendor

    Management System

    available. There is no tie ups

    with OEMs or suppliers

    which leads to local purchase

    which not only increases cost

    but also leads to purchase of

    inferior quality of products

    from local market resulting

    frequent machinery

    breakdowns thus ultimately

    lowers productivity. A robust

    Vendor Management System

    should be implemented

    which will be connected to

    OEMs, Vendors so that right

    product is purchased from

    General Manager MM will

    take needful action.

  • right supplier increasing in

    less breakdown thus

    increasing profitability.

    Tedious process to avail

    service tax credit/cenvat

    credit due to manual

    processing of data.

    Use of financial software for

    financial management.

    General Manager Finance

    and GM System will take

    needful action.

    Maintenance Management

    Procurement of power tools

    and machine tools. Effective

    training about new

    technology and machines to

    concerned engineers and

    maintenance crews.

    3 Advanced fault diagnosis

    tools like infrared camera,

    Caterpillar Electronic

    technician, etc

    General Manager X will

    study the problem.

    Maintenance Management

    Physio chemical and wear

    debris analysis of oil (CBM)

    is being carried

    out. Even if the analysis

    report for the

    oil says it can be further used

    ,being changed. So CBM can

    be used as an effective tool

    to decide the oil changing

    duration. This will cut off

    the POL usage drastically.

    General Manager X will

    study and make needful

    guidelines

    PoL Dispensation Pump

    There should be proper

    security at each Diesel Pump

    i.e. CC TV Camera and

    security Guards. There

    should be proper record

    keeping system for

    diesel consumption. Live

    updation of consumption is

    needed. For that Computer

    has to be provided at

    every pump with LAN/WAN

    for live updation.

    Maintenance of various

    Machinery is also an issue

    General Manager System,

    Chief of security will study

    and suggest the applicability.

    Underground Production

    Production per cycle of

    operation should be higher.

    For example:-

    A. Quadbolter at tandsi unit

    is acting as twin bolter.

    B. At development stage

    after 3m cut we have to

    support the roof. So, most of

    the time is consumed in

    tramming.

    C/M is showing much more

    potential in other projects

    except tandsi.

    There is a need for

    supervisory staff to check

    Chief General Manager

    Operation to study the issue.

  • intrusion of

    stones/boulders/other

    extraneous matter along with

    coal.

    Underground Coal

    Production

    Access to the working face

    should be made as quick as

    possible. So that available

    time at face can increase.

    Say, if it increases from 4

    hour to 5 hour, it will

    increase about 20% of our

    production rate. It should be

    taken into consideration from

    the making of project report.

    It may be implemented in

    present mines also which are

    productive for at least

    coming five years. It looks

    difficult but it is possible.

    Chief General Manager

    Operation will study the

    problem

    Implementation Instruction: Concerned authorities will take needful action. (the implementation

    instructions are the action plan for strategic vision of the company. They do not supersede any law/ rule/

    manual/ guidelines/ policy/ administratively approved work procedure as applicable on the date. In case of

    any conflict, the needful amendments be processed as per extant procedures of the company)

    Status of compliance will submitted by 31st March 2015.

    It may kindly be appreciated that taskforce mails are forwarded for info to Board level executives, hence

    appropriate feedback is solicited.

    M K Singh

    Convenor, Taskforce

    Copies for Kind Info:

    Chairman cum MD WCL

    Functional Directors WCL

    TS to CMD

    Area GM

    HoD

    Taskforce members

  • (Under Jurisdiction of Nagpur Court only)

    e- mail

    WESTERN COALFIELDS LIMITED (A Miniratna Cat-1 Government of India Undertaking)

    TASK FORCE

    , , -440 001 COAL ESTATE, CIVIL LINES, NAGPUR-440 001

    CIN : U10100MH1975GO1018626

    Website : westerncoal.nic.in Telefax No : 0712-2510869

    e-mail : [email protected]

    Date 29th

    Dec 2014

    Sub: Issues and Solutions sorted by the WCL HQ team from the Feedback received from the Gen next

    Compliance thereof: Implementation Instruction -31

    Chairman cum MD, WCL is pleased to accept the recommendations of Gen Next with respect to system

    improvement in the company and has desired that the time bound compliance is ensured by the concerned

    departments.

    Issue: Welfare Issues

    1. Periodical Get Together of employees.- Get together at regular interval will increase the bonding between the employees and will give a sense of belongingness. It will also give platform for

    sharing ideas and showcasing talent. Activities like workshops, picnics can be taken up to add

    more constructive and positive thought process in the employees.

    2. Welfare officer to monitor welfare fund- Welfare officer of the mine monitors the welfare activities. He should monitor the fund as well.

    3. Implementation/amendment of Work order for sanitation works - In case of the sanitation works the work order should mention that the contractors should report to Welfare Officer who will

    certify the attendance/ work done. This kind of work order might ensure improvement in the

    sanitation works.

    4. Requirement of Counseling cell at Area and Sub-Area levels -There should be some counselling cells at Area level whose job is to motivate the grass root workers. Guiding them in the career

    growth of their children education and making them aware of the new government policies etc. Implementation Instruction: Area General Managers of respective areas will take needful action. (the

    implementation instructions are the action plan for strategic vision of the company. They do not supersede

    any law/ rule/ manual/ guidelines/ policy/ administratively approved work procedure as applicable on the

    date. In case of any conflict, the needful amendments be processed as per extant procedures of the

    company)

    Area General Managers will submit compliance by 31st Jan 2015.

    It may kindly be appreciated that taskforce mails are forwarded for info to Board level executives, hence

    appropriate feedback is solicited.

    M K Singh

    Convenor, Taskforce

    Copies for Kind Info:

    Chairman cum MD WCL

    Functional Directors WCL

    mailto:[email protected]

  • TS to CMD

    Area GM

    HoD

    Taskforce members

  • (Under Jurisdiction of Nagpur Court only)

    e- mail

    WESTERN COALFIELDS LIMITED (A Miniratna Cat-1 Government of India Undertaking)

    TASK FORCE

    , , -440 001 COAL ESTATE, CIVIL LINES, NAGPUR-440 001

    CIN : U10100MH1975GO1018626

    Website : westerncoal.nic.in Telefax No : 0712-2510869

    e-mail : [email protected]

    Date 29th

    Dec 2014

    Sub: Issues and Solutions sorted by the WCL HQ team from the Feedback received from the Gen next

    Compliance thereof: Implementation Instruction -32

    Chairman cum MD, WCL is pleased to accept the recommendations of Gen Next with respect to system

    improvement in the company and has desired that the time bound compliance is ensured by the concerned

    departments.

    Issue: Welfare Issues

    Open defecation On both sides of the road to GM office, Chandrapur Area.- Our company may build

    public toilets at suitable places and gauge the hygiene and health impact in the locality. Further the use of

    bio-digesters in these toilets will generate the fuel in the form of gas which again can be used for public

    purpose which is a measure in the nature of CSR activity

    1. Implementation Instruction: Area General Manager Chandrapur Area will take needful action. (the

    implementation instructions are the action plan for strategic vision of the company. They do not supersede

    any law/ rule/ manual/ guidelines/ policy/ administratively approved work procedure as applicable on the

    date. In case of any conflict, the needful amendments be processed as per extant procedures of the

    company)

    Area General Manager Chandrapur will submit compliance of the activity undertaken in the welfare

    activity of next financial year 2015-16, by 31st Jan 2015.

    It may kindly be appreciated that taskforce mails are forwarded for info to Board level executives, hence

    appropriate feedback is solicited.

    M K Singh

    Convenor, Taskforce

    Copies for Kind Info:

    Chairman cum MD WCL

    Functional Directors WCL

    TS to CMD

    Area GM

    HoD

    Taskforce members

    mailto:[email protected]

  • (Under Jurisdiction of Nagpur Court only)

    e- mail

    WESTERN COALFIELDS LIMITED (A Miniratna Cat-1 Government of India Undertaking)

    TASK FORCE

    , , -440 001 COAL ESTATE, CIVIL LINES, NAGPUR-440 001

    CIN : U10100MH1975GO1018626

    Website : westerncoal.nic.in Telefax No : 0712-2510869

    e-mail : [email protected]

    Date 29th

    Dec 2014

    Sub: Issues and Solutions sorted by the WCL HQ team from the Feedback received from the Gen next

    Compliance thereof: Implementation Instruction -33

    Chairman cum MD, WCL is pleased to accept the recommendations of Gen Next with respect to system

    improvement in the company and has desired that the time bound compliance is ensured by the concerned

    departments.

    Issue: Wani North Area- vacant quarters

    Executives of Wani North Area hesitate to shift into some colonies where the company quarters are

    available and still left vacant due to lack of facilities near those colonies..- By providing facilities like medical shops, schools, mobile communication, internet, ATM, daily needs shops etc the problem can be

    rectified.

    1. Implementation Instruction: Area General Manager Wani North Area will take needful action. (the

    implementation instructions are the action plan for strategic vision of the company. They do not supersede

    any law/ rule/ manual/ guidelines/ policy/ administratively approved work procedure as applicable on the

    date. In case of any conflict, the needful amendments be processed as per extant procedures of the

    company)

    Area General Manager Wani North will submit compliance of the activity undertaken in the next financial

    year 2015-16, by 31st Jan 2015.

    It may kindly be appreciated that taskforce mails are forwarded for info to Board level executives, hence

    appropriate feedback is solicited.

    M K Singh

    Convenor, Taskforce

    Copies for Kind Info:

    Chairman cum MD WCL

    Functional Directors WCL

    TS to CMD

    Area GM

    HoD

    Taskforce members

    mailto:[email protected]

  • (Under Jurisdiction of Nagpur Court only)

    e- mail

    WESTERN COALFIELDS LIMITED (A Miniratna Cat-1 Government of India Undertaking)

    TASK FORCE

    , , -440 001 COAL ESTATE, CIVIL LINES, NAGPUR-440 001

    CIN : U10100MH1975GO1018626

    Website : westerncoal.nic.in Telefax No : 0712-2510869

    e-mail : [email protected]

    Date 29th

    Dec 2014

    Sub: Issues and Solutions sorted by the WCL HQ team from the Feedback received from the Gen next

    Compliance thereof: Implementation Instruction -33

    Chairman cum MD, WCL is pleased to accept the recommendations of Gen Next with respect to system

    improvement in the company and has desired that the time bound compliance is ensured by the concerned

    departments.

    Issue: Koyala Vihar- WCL HQ

    Proper lightning may be arranged in Koyala Vihar WCL HQ Park...- The childrens park in koyala

    vihar campus, WCL HQ has no proper lights and is always dark because of which outsiders come into the

    park at late nights and consume alcohol/smoke cigarettes which are highly unsafe for the women/kids.

    Implementation Instruction: General Manager GSD will take needful action. (the implementation

    instructions are the action plan for strategic vision of the company. They do not supersede any law/ rule/

    manual/ guidelines/ policy/ administratively approved work procedure as applicable on the date. In case of

    any conflict, the needful amendments be processed as per extant procedures of the company)

    General Manager GSD will submit compliance of the activity undertaken by 31st Jan 2015.

    It may kindly be appreciated that taskforce mails are forwarded for info to Board level executives, hence

    appropriate feedback is solicited.

    M K Singh

    Convenor, Taskforce