2 © Copyright NTPC Ltd.

Presented by

SMART Catch: An Early Warning System - Excelled through PI System

Sachin Agarwal & ANS Suryanarayana

Page 3: Copyright NTPC Ltd. - OSIsoft

3 © Copyright NTPC Ltd.

• NTPC-A Snapshot • Organizational Challenges • SMART Catch • Our Enablers • Approach-Fish Bone Diagram • Case Studies • Future Roadmap

Outline

Page 4: Copyright NTPC Ltd. - OSIsoft

4 © Copyright NTPC Ltd.

Outline

• NTPC-A Snapshot • Organizational Challenges • SMART Catch • Our Enablers • Approach-Fish Bone Diagram • Case Studies • Future Roadmap

Page 5: Copyright NTPC Ltd. - OSIsoft

5 © Copyright NTPC Ltd.

15 Coal and 7 Gas station with generating capacity of 33194 MW

Significant presence in the entire value chain of Power Generation Business

One of the largest in the World in Energy Generation

One of the Best in Capacity Utilization in the World

03 Subsidiaries and 20 JVs

Plan of becoming 128 GW Company by 2032

Who We Are…

Page 6: Copyright NTPC Ltd. - OSIsoft

6 © Copyright NTPC Ltd.

NTPC Vision

Page 7: Copyright NTPC Ltd. - OSIsoft

7 © Copyright NTPC Ltd.

NTPC…As on Date NO. OF PLANTS

CAPACITY (MW)

NTPC Owned

Coal 15 25,875

Gas/Liquid

Fuel 7

3,955

Total 22 29,830

Owned By JVs

Coal & Gas 6 3,364

Total 28 33,194

REGION COAL GAS TOTAL

Northern 8,015 2,312 10,327

Western 6,860 1,293 8,153

Southern 3,600 350 3,950

Eastern 7,400 - 7,400

JVs 1,424 1,940 3,364

Total 27,299 5,895 33,194

A 33000+ MW

Company with 126

units and still

growing. • 85 Coal Units

• 28 Gas Turbines

• 13 Steam

Turbines/WHRB A Fleet with

average age of

18+ yrs, having

disparate designs Units operating at

challenging targets

of >92% PLF

Page 8: Copyright NTPC Ltd. - OSIsoft

8 © Copyright NTPC Ltd.

NTPC-Diversified Growth Hydro Power

Renewable Energy

Nuclear Power

Coal Mining

Power Trading

Ash Business

Power Distribution

Equipment Manufacturing

Page 9: Copyright NTPC Ltd. - OSIsoft

9 © Copyright NTPC Ltd.

• NTPC -ALSTOM POWER SERVICES PVT. LTD. (NASL)

• NTPC – SCCL GLOBAL VENTURES PRIVATE LTD

• INTERNATIONAL COAL VENTURES PVT. LIMITED (ICVL)

• NTPC-BHEL POWER PROJECTS PVT.LTD

• NTPC-SAIL POWER COMPANY (PVT) LTD (NSPCL)

THERMAL POWER STATION GAS POWER

STATIONS

SINGRAULI RIHAND

KAHALGAON

TALCHER

KORBA

DADRI

SIMHADRI

TANDA

FARAKKA UNCHAHAR

TALCHER TPS

RAMAGUNDAM

VINDHYACHAL

GANDHAR

KAYAMKULAM

KAWAS

ANTA AURAIYA

NCTPP FARIDABAD

Subsidiaries • NTPC Electric Supply Company Ltd.

(NESCL)

• NTPC Vidyut Vyapar Nigam Ltd. (NVVN)

• NTPC Hydro Ltd. (NHL)

• 15 Coal Stations • 7 Gas Stations

Spread

Joint Ventures

Page 10: Copyright NTPC Ltd. - OSIsoft

10 © Copyright NTPC Ltd.

Growth of NTPC

Page 11: Copyright NTPC Ltd. - OSIsoft

11 © Copyright NTPC Ltd.

Outline

• NTPC-A Snapshot • Organizational Challenges • SMART Catch • Our Enablers • Approach-Fish Bone Diagram • Case Studies • Future Roadmap

Page 12: Copyright NTPC Ltd. - OSIsoft

12 © Copyright NTPC Ltd.

Organizational Challenges Ageing fleet

Reduction in O&M cost

Optimization of plant processes

Limited experts in specific areas

Expected reduction in GHG emissions

De-regulation and Global competition

Rapid growth in capacity, across the country

Page 13: Copyright NTPC Ltd. - OSIsoft

13 © Copyright NTPC Ltd.

Business Drivers for using PI System • Earlier, data input was manual and that too in non-

standardized form • PI System came along with ERP system to automate

the MIS • Real time data retrieval through PI System brought it

on uniform platform • Added no extra cost to present system • Provide “Fleet wide” Plant Monitoring Capabilities

Page 14: Copyright NTPC Ltd. - OSIsoft

14 © Copyright NTPC Ltd.

Fleet-Wide Monitoring (FWM) • A Centralized Resource to manage Generating Assets

• Implementation of applications for monitoring, maintaining and optimizing business assets from a centralized location

• Primary focus is to develop an integrated approach based on all available information and advanced monitoring capabilities:

– Equipment, plant, and fleet health status

– Maintenance schedules and outage planning

– Thermal Performance

– Vibration Monitoring

Page 15: Copyright NTPC Ltd. - OSIsoft

15 © Copyright NTPC Ltd.

FWM-Drivers Improved

Operations Improved Maintenance

Planning / Strategy

Improved Thermal Performance

Improved Asset Management Tools

New Technologies

Page 16: Copyright NTPC Ltd. - OSIsoft

16 © Copyright NTPC Ltd.

Outline

• NTPC-A Snapshot • Organizational Challenges • SMART Catch • Our Enablers • Approach-Fish Bone Diagram • Case Studies • Future Roadmap

Page 17: Copyright NTPC Ltd. - OSIsoft

17 © Copyright NTPC Ltd.

SMART Catch (Strategic Monitoring & Assistance Remote Terminus)

• An additional watchful eye • Automation of thought process • In-depth analysis of real time data • Early detection of impending problems • Innovative approach for providing solutions • Pool of experts operating from a centralized location • Making knowledge available where it matters, reducing

knowledge gap

Page 18: Copyright NTPC Ltd. - OSIsoft

18 © Copyright NTPC Ltd.

Objectives • To bring the real time data to

Regional set up & Corporate Centre

• 24x7 Access to Specialized Domain Knowledge

• Deployment of State-of-the-art Software & Diagnostic Tools

• Advisories to Plant personnel • Creation of “Knowledge

Repositories.” • Move Data, Not People

Page 19: Copyright NTPC Ltd. - OSIsoft

19 © Copyright NTPC Ltd.

Evolution

Capturing the Experience

Providing Real time measures

Identifying key elements for current and

historical analysis

Providing alerts and

advisories to plants

Establishing Knowledge Repository

Automating the Thought Process

Page 20: Copyright NTPC Ltd. - OSIsoft

20 © Copyright NTPC Ltd.

Outline

• NTPC-A Snapshot • Organizational Challenges • SMART Catch • Our Enablers • Approach-Fish Bone Diagram • Case Studies • Future Roadmap

Page 21: Copyright NTPC Ltd. - OSIsoft

21 © Copyright NTPC Ltd.

Our Enablers

PI System at most of the plants

•Along with a Corporate PI Server

Vibrations analysis system

for Turbine

SMART Catch Software

• In-house development

•Using PI SDK, PI ProcessBook, PI DataLink

Page 22: Copyright NTPC Ltd. - OSIsoft

22 © Copyright NTPC Ltd.

Deliverables using Existing Enablers

Tracking of Unit Startup and Shutdowns

Performance & Loss Monitoring

Monitoring of Turbine Vibration (With the addition of client Software)

Keeping track of critical parameters (Available in PI Servers from DCS)

Page 23: Copyright NTPC Ltd. - OSIsoft

23 © Copyright NTPC Ltd.

Deliverables using Existing Enablers

Tracking of Unit Startup and Shutdowns

Performance & Loss Monitoring

Monitoring of Turbine Vibration (With the addition of client Software)

Keeping track of critical parameters (Available in PI Servers from DCS)

Page 24: Copyright NTPC Ltd. - OSIsoft

24 © Copyright NTPC Ltd.

Non-routine Operations : Start-Up

Page 25: Copyright NTPC Ltd. - OSIsoft

25 © Copyright NTPC Ltd.

Non-routine Operations : Shut-Down

Page 26: Copyright NTPC Ltd. - OSIsoft

26 © Copyright NTPC Ltd.

Deliverables using Existing Enablers

Tracking of Unit Startup and Shutdowns

Performance & Loss Monitoring

Monitoring of Turbine Vibration (With the addition of client Software)

Keeping track of critical parameters (Available in PI Servers from DCS)

Page 27: Copyright NTPC Ltd. - OSIsoft

27 © Copyright NTPC Ltd.

Decision Tree

Page 28: Copyright NTPC Ltd. - OSIsoft

28 © Copyright NTPC Ltd.

Deliverables using Existing Enablers

Tracking of Unit Startup and Shutdowns

Performance & Loss Monitoring

Monitoring of Turbine Vibration (With the addition of client Software)

Keeping track of critical parameters (Available in PI Servers from DCS)

Page 29: Copyright NTPC Ltd. - OSIsoft

29 © Copyright NTPC Ltd.

Vibration Monitoring

HPT F –X Vibration hunting from about 60 – 150 and its base value increasing

slowly

Page 30: Copyright NTPC Ltd. - OSIsoft

30 © Copyright NTPC Ltd.

Deliverables using Existing Enablers

Tracking of Unit Startup and Shutdowns

Performance & Loss Monitoring

Monitoring of Turbine Vibration (With the addition of client Software)

Keeping track of critical parameters (Available in PI Servers from DCS)

Page 31: Copyright NTPC Ltd. - OSIsoft

31 © Copyright NTPC Ltd.

Monitoring of Critical Parameters

Page 32: Copyright NTPC Ltd. - OSIsoft

32 © Copyright NTPC Ltd.

Page 33: Copyright NTPC Ltd. - OSIsoft

33 © Copyright NTPC Ltd.

Page 34: Copyright NTPC Ltd. - OSIsoft

34 © Copyright NTPC Ltd.

Page 35: Copyright NTPC Ltd. - OSIsoft

35 © Copyright NTPC Ltd.

Outline

• NTPC-A Snapshot • Organizational Challenges • SMART Catch • Our Enablers • Approach-Fish Bone Diagram • Case Studies • Future Roadmap

Page 36: Copyright NTPC Ltd. - OSIsoft

36 © Copyright NTPC Ltd.

Fishbone Approach

– The fishbone diagram identifies many possible causes for an effect or problem

– It can be used to structure a brainstorming session

– It immediately sorts ideas into useful categories

– The same approach has been used for SMART Catch system

Page 37: Copyright NTPC Ltd. - OSIsoft

37 © Copyright NTPC Ltd.

Outline

• NTPC-A Snapshot • Organizational Challenges • SMART Catch • Our Enablers • Approach-Fish Bone Diagram • Case Studies • Future Roadmap

Page 38: Copyright NTPC Ltd. - OSIsoft

38 © Copyright NTPC Ltd.

Case Studies • Condenser Tube Leakage by monitoring chemical

parameters through SMART Catch • Reduction of HP Heater Drain Temperature • Condenser Vacuum improvement by arresting air ingress • Instrumentation Failure Catch • High Turbine Bearing vibrations after Overhaul • High Cooling Water system Differential Pressure (DP) due to

Debris Filter damage

Page 39: Copyright NTPC Ltd. - OSIsoft

39 © Copyright NTPC Ltd.

Case Studies • Condenser Tube Leakage by monitoring chemical

parameters through SMART Catch • Reduction of HP Heater Drain Temperature • Condenser Vacuum improvement by arresting air ingress • Instrumentation Failure Catch • High Turbine Bearing vibrations after Overhaul • High Cooling Water system Differential Pressure (DP) due to

Debris Filter damage

Page 40: Copyright NTPC Ltd. - OSIsoft

40 © Copyright NTPC Ltd.

Deviations observed in Condensate

Sodium & Condensate After

Cation Conductivity Parameters kept

under control using both Condensate Polishing Units

(CPU)

Condenser tubes were plugged after

planned backing down

Fishbones triggered: • Poor Condenser

Vacuum • Boiler Tube Leakage

Page 41: Copyright NTPC Ltd. - OSIsoft

41 © Copyright NTPC Ltd.

Case Studies • Condenser Tube Leakage by monitoring chemical

parameters through SMART Catch • Reduction of HP (High Pressure) Heater Drain Temperature • Condenser Vacuum improvement by arresting air ingress • Instrumentation Failure Catch • High Turbine Bearing vibrations after Overhaul • High Cooling Water system Differential Pressure (DP) due to

Debris Filter damage

Page 42: Copyright NTPC Ltd. - OSIsoft

42 © Copyright NTPC Ltd.

High HP Heater drain

temperature was detected

Site was suggested to increase HP Heater drip

level…

… this resulted in 200C

reduction in drain temperature , thus

improving the efficiency

Fishbones triggered: • HP Heater

Performance Poor

Page 43: Copyright NTPC Ltd. - OSIsoft

43 © Copyright NTPC Ltd.

Case Studies • Condenser Tube Leakage by monitoring chemical

parameters through SMART Catch • Reduction of HP Heater Drain Temperature • Condenser Vacuum improvement by arresting air ingress • Instrumentation Failure Catch • High Turbine Bearing vibrations after Overhaul • High Cooling Water system Differential Pressure (DP) due to

Debris Filter damage

Page 44: Copyright NTPC Ltd. - OSIsoft

44 © Copyright NTPC Ltd.

Simultaneous increase in Condensate Dissolved

Oxygen & Condenser back pressure

Similar patterns indicating towards

air ingress

Fishbones triggered: • Poor Condenser

Vacuum • Boiler Tube Leakage

Site checked and one of TDBFP explosion

vent diaphragm found ruptured

Page 45: Copyright NTPC Ltd. - OSIsoft

45 © Copyright NTPC Ltd.

Case Studies • Condenser Tube Leakage by monitoring chemical

parameters through SMART Catch • Reduction of HP Heater Drain Temperature • Condenser Vacuum improvement by arresting air ingress • Instrumentation Failure Catch • High Turbine Bearing vibrations after Overhaul • High Cooling Water system Differential Pressure (DP) due to

Debris Filter damage

Page 46: Copyright NTPC Ltd. - OSIsoft

46 © Copyright NTPC Ltd.

Fishbones triggered: • Air Pre Heater (APH)

Trouble • Dry Flue Gas Loss

Sudden Primary Air Pre Heater (PAPH) outlet Air

Temperature drop indicated towards instrument failure

On checking by site, thermocouple

found faulty

Page 47: Copyright NTPC Ltd. - OSIsoft

47 © Copyright NTPC Ltd.

Case Studies • Condenser Tube Leakage by monitoring chemical

parameters through SMART Catch • Reduction of HP Heater Drain Temperature • Condenser Vacuum improvement by arresting air ingress • Instrumentation Failure Catch • High Turbine Bearing vibrations after Overhaul • High Cooling Water system Differential Pressure (DP) due to

Debris Filter damage

Page 48: Copyright NTPC Ltd. - OSIsoft

48 © Copyright NTPC Ltd.

O/H

Pre Overhaul Behavior

Increased bearing

vibrations after overhaul

Low Pressure Turbine (LPT)

Trim balancing exercises

Site in dilemma to go ahead for

Turbine rolling or not

Page 49: Copyright NTPC Ltd. - OSIsoft

49 © Copyright NTPC Ltd.

Interactive Problem Solving

Decreasing trend in bearing

vibrations

Page 50: Copyright NTPC Ltd. - OSIsoft

50 © Copyright NTPC Ltd.

Case Studies • Condenser Tube Leakage by monitoring chemical

parameters through SMART Catch • Reduction of HP Heater Drain Temperature • Condenser Vacuum improvement by arresting air ingress • Instrumentation Failure Catch • High Turbine Bearing vibrations after Overhaul • High Cooling Water system Differential Pressure (DP) due to

Debris Filter damage

Page 51: Copyright NTPC Ltd. - OSIsoft

51 © Copyright NTPC Ltd.

Tangible Benefits • Proactive notification • Reduces unexpected downtime • Return on Investment by catching failures before they happen • Avoid costs –labour, parts, replacing things that don’t need to be • Performance & Reliability Improvements • One unit trip avoided is less than remote monitoring service cost

annually • Economic benefit calculated considering the penalty for

unplanned loss of generation and one day outage comes to around 16 million ($ 340,000).

Page 52: Copyright NTPC Ltd. - OSIsoft

52 © Copyright NTPC Ltd.

Intangible Benefits • Sense of control • Reliable information • Prevent unnecessary labour & maintenance • Awareness of asset health versus time-based

maintenance • Impact on performance improvement means additional

revenues • No additional investment is required

Page 53: Copyright NTPC Ltd. - OSIsoft

53 © Copyright NTPC Ltd.

Outline

• NTPC-A Snapshot • Organizational Challenges • SMART Catch • Our Enablers • Approach-Fish Bone Diagram • Case Studies • Future Roadmap

Page 54: Copyright NTPC Ltd. - OSIsoft

54 © Copyright NTPC Ltd.

Future Roadmap • Coverage of Total NTPC fleet • Enhancement of Knowledge Repository • Data validation and reconciliation through PI System

– Sigmafine

• Integrate critical business applications and data to new shared environment

• Looking to leverage some of the web-based technologies at offer – PI WebParts – PI ActiveView

• Further automation, other engineering tools utilizing PI System – PI Notifications

• Integration of advanced technology tools