44
Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT - Optimize iT Eistein Fosli Founder Speaker

Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Embed Size (px)

Citation preview

Page 1: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Metering IT Assets: Chargeback/Showback 101

Linda Cole Director of Sales, Americas

Speaker

Meter iT - Optimize iT

Eistein FosliFounderSpeaker

Page 2: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Today’s Agenda

• Industry Trends and Economic Backdrop• IT Chargeback Goals• Implementing IT Chargeback

– The process– Customer Cases

• Benefits of IT Chargeback

Page 3: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Software licensing is complicated enough in its own right.

Industry Trends and Economic Backdrop

43%

of organizations increase their risk of falling out of compliance because of not having

sufficient process and automation in place to manage their licenses.

Source: International Data Corporation (IDC)

Page 4: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved. 1

“Internal customers can look at what they pay for: servers, compute time, storage, etc., and compare it to what

Amazon charges. It puts IT in an uncomfortable position.”

Source: Julio Gomez, co-founder of Innovation Counsils LLC.i

“The bill of IT for each entity is valuable.”Source: Debe Gash, CIO of St. Luke’s Health System

Do you have an IT chargeback system in place?

IT Chargeback: Bill internal users, groups, and departments for use of software and other IT resources based on actual usage.

Page 5: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Key Chargeback Functions

• Data collection functions• Account table maintenance• Rate setting• Billing & reporting• Administrative functions such as:

– Budgeting activities– Pricing decisions– Usage variance analysis requests– Business general ledger & accounting– Cost allocation decisions– Capacity & usage trending activities

Page 6: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Avoiding Situations Like This

Page 7: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved. 1

Considered fair by most business users

IT Chargeback Goals

Page 8: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved. 1

Easy for IT to communicate the IT costs with the business

IT Chargeback Goals

Page 9: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved. 1

Easy for IT to manage, control and verify

IT Chargeback Goals

Page 10: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Encourages optimized IT resource usage

IT Chargeback Goals

Page 11: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Corporate Policies and Procedures

IT Chargeback Process

1. Target 2. Define 3. Test 4. Deploy

Implementing IT Chargeback

GOAL: Transition from a cost center to a value centerGOAL: Transition from a cost center to a value center

Page 12: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

The Cost Centers

Cost Generators

Faci

lity

Serv

ers

Net

wor

k

Staff

Soft

war

e

Chargeback process

Cost Centers

Dep

artm

ents

Proj

ects

Com

pani

es/ L

egal

En

t

Page 13: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

CUSTOMER CASESIncrease Assets Efficiency

Page 14: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

REDUCED STORAGE WASTE Customer Sample: Reduce Cost

Page 15: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Exponential Increase in Storage Cost • Although storage units cost less

each year, a customer had an exponential increase in their storage cost. (Year 1, storage cost was 1.14 MUSD, Year 2, it was 1.85 MUSD, and Year 3 it had grown to 3.57 MUSD. I.e. storage cost tripled while storage volume increased more than x 8!)

• Even though storage is cheap, managing the service is not.

• The company needed to change the “laissez faire” attitude towards storing and keeping data, and make sure employees cleaned up data no longer in use.

Year 1 Year2 Year30

0.5

1

1.5

2

2.5

3

3.5

4

Storage cost increase

Storage cost

Customer Case 1

Page 16: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Exponential Increase in Storage Cost • Solution:

By mapping actual usage to projects, it is easy to charge projects for their storage usage. This is a strong incentive for project owners to make sure projects are cleaned up upon completion.

Year 1 Year2 Year30

0.5

1

1.5

2

2.5

3

3.5

4

Storage cost increase

Storage cost

Customer Case 1

Page 17: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

DOCUMENT SOFTWARE NOT IN USESupport Business Process Improvement:

Page 18: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Document Software not in use...

• Usage reporting to support a remix of licenses or to reveal training needs

Site Bergen Caracas Copenhagen Harstad London Stavanger

Applications Active time Distinct Active

time Distinct Active time Distinct Active

time Distinct Active time Distinct Active

time Distinct

CNTRASSIST 0.00 0.00 0.00 0.00 0.00 0.00 76.92 6.00 0.00 0.00 0.12 3.00

DATALOAD 516.17 14.00 11.17 3.00 44.57 4.00 749.25 18.00 431.93 5.00 10929.83 96.00

DSPACE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 63.21 5.00

DSS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 606.71 36.00

DT3DV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.71 3.00

DTEXPLORER 0.00 0.00 0.00 0.00 2.75 1.00 562.75 2.00 3.93 2.00 2196.58 17.00

DTEXPRESS 0.42 1.00 2.42 1.00 0.00 0.00 555.50 3.00 58.25 4.00 551.62 14.00

DTGUI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.71 3.00

DTINTERPRETER 0.00 0.00 0.00 0.00 0.00 0.00 24.92 2.00 0.00 0.00 12.08 3.00

EARTHCUBE 0.00 0.00 0.00 0.00 0.00 0.00 490.42 17.00 278.82 8.00 3245.92 34.00

FMP 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1094.62 6.00

FSTTRK 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.24 1.00 0.00 0.00

FZAP 0.04 1.00 0.00 0.00 0.00 0.00 7.92 2.00 0.00 0.00 0.04 1.00

LGCIO 0.00 0.00 0.00 0.00 2.08 1.00 204.00 3.00 0.00 0.00 95.71 12.00

18

Statoil

Page 19: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Action Item:More Training or Cut in Maintenance?

• Why is the product ”DSPACE” only being used in Stavanger?Site Bergen Caracas Copenhagen Harstad London Stavanger

Feature Active time Distinct Active time Distinct Active

time Distinct Active time Distinct Active

time Distinct Active time Distinct

CNTRASSIST 0.00 0.00 0.00 0.00 0.00 0.00 76.92 6.00 0.00 0.00 0.12 3.00

DATALOAD 516.17 14.00 11.17 3.00 44.57 4.00 749.25 18.00 431.93 5.00 10929.83 96.00

DSPACE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 63.21 5.00

DSS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 606.71 36.00

DT3DV 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.71 3.00

DTEXPLORER 0.00 0.00 0.00 0.00 2.75 1.00 562.75 2.00 3.93 2.00 2196.58 17.00

DTEXPRESS 0.42 1.00 2.42 1.00 0.00 0.00 555.50 3.00 58.25 4.00 551.62 14.00

DTGUI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.71 3.00

DTINTERPRETER 0.00 0.00 0.00 0.00 0.00 0.00 24.92 2.00 0.00 0.00 12.08 3.00

EARTHCUBE 0.00 0.00 0.00 0.00 0.00 0.00 490.42 17.00 278.82 8.00 3245.92 34.00

FMP 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1094.62 6.00

FSTTRK 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.24 1.00 0.00 0.00

FZAP 0.04 1.00 0.00 0.00 0.00 0.00 7.92 2.00 0.00 0.00 0.04 1.00

LGCIO 0.00 0.00 0.00 0.00 2.08 1.00 204.00 3.00 0.00 0.00 95.71 12.00

19

Statoil

Page 20: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

NEGOTIATE A DIFFERENT SOFTWARE AGREEMENT

Reduce Risk:

Page 21: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved. Open iT, Inc. All rights reserved. 21

Once upon a time…Maximum Concurrent Users Agreements

• Took advantage of different license agreements by selecting agreements that best fit usage patterns:

– Changing from max number of concurrent licenses to enterprise agreement based on average maximum concurrent users

Statoil/Halliburton

1 7 13 19 25 31 37 43 49 55 61 67 73 79 85 91 970

306090

120150180210240

Usage Distribution

OW

Used Licenses/ Feature

Duration (h)

Page 22: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved. Open iT, Inc. All rights reserved. 22

Once upon a time…Maximum Concurrent Users Agreements

• Took advantage of different license agreements by selecting agreements that best fit usage patterns:

– Changing from max number of concurrent licenses to enterprise agreement based on average maximum concurrent users

Statoil/Halliburton

81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 1000

50

100

150

200

250

300

Usage Distribution

OW

Used Licenses/ Feature

Duration (min)

Page 23: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Open iT, Inc. All rights reserved.

23

New Enterprise Agreement based on daily maximums at each site

Statoil/Halliburton

1-May

2-May

3-May

4-May

5-May

6-May

7-May

8-May

9-May

10-May

11-May

12-May

13-May

14-May

15-May

16-May

17-May

18-May

19-May

0

10

20

30

40

50

60

70

Daily Max Licenses Usage of OW

Site9Site 8Site 7Site 6Site 5Site 4Site 3Site 1

Max Used Li-censes

Page 24: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

CHARGING MORE AT PEAK HOURSIncrease Assets Efficiency

Page 25: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

License Efficiency Chart

8

Version 6.2.1

Page 26: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

8

License Efficiency Chart

Page 27: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Use Heat Map to Determine Prime Time

Page 28: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

GET RID OF DORMANT USERSCut Cost

Page 29: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Following Up Named-User Agreements

29

Page 30: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Following up Named-User Agreements

30

Page 31: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Sad Stories

Page 32: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Sad Story

“A user of the software using it for 8 hours on Sunday afternoon pays the same as a user utilizing 8 licenses for one hour during peak time.”

32

Which units/measurements are needed?

Page 33: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Sad Story

“During one month, there is only one user of an application. This user has used the application for 20 minutes only, but will have to carry all costs related to that application for the full month.”

33

Page 34: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Optimize Resource Usage

• Determine the best allocation model to avoid counter-productive behavior. Example from “Customer A”. “Customer A” has a prior chargeback system in place, based on elapsed time only, which means leaving software on can be expensive for an end-user. This may encourage some counter-productive behaviors, as seen in the following examples:

• Starting up the application OpenWorks and loading in a dataset typically takes 30 minutes. The customer’s agreement with the software provider is based on the number of desktop counts, so customer A won’t save money if the user logs out every night and starts up the project again every morning. Charging by elapsed time (without any filtering) may lead to counter-productive behavior from the end-user, by losing 30 minutes of productive work every day.

• A better approach is in this case to charge for distinct users.

34

Page 35: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

The Cost Centers

Cost Generators

Faci

lity

Serv

ers

Net

wor

k

Staff

Soft

war

e

Chargeback process

Cost Centers

Dep

artm

ents

Proj

ects

Com

pani

es/ L

egal

En

t

• Raw data

Threshold unique

ad-hoc filter

• Filtered raw data

concurrency and grouping • PPU

values

cost calculations

• Cost values

creating invoices • Invoices

distribute

Page 36: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

User/Cost Center Hierarchy • We need to understand the current structure :

– Mapping from Users to Cost Center using Active Directory?

– Or what about SAP HR?– Do the costs centers belong to a division or Legal

entity, or are they across all? (1:M, or M:M)– Are Project ID’s used?

Cost Center Division/Legal Ent

P1-D-12341234 Production

D5-C-12341234 Design

Division/Legal Entity

Cost Center

User

Page 37: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Open iT, Inc. All rights reserved.

Chargeback

• Types of agreements:

– Base only, fixed payment for access/service

– No base; only pay for usage– Base payment includes “free”

usage up to a limit; only pay for extra usage

• Usage is metered as a function of:– Elapsed time– # of distinct users or

devices– # of concurrent

users or devices– Combinations

Page 38: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved. 1

Update the Cost Catalog

Page 39: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved. 1

Update the Cost Catalog

Page 40: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Sample Invoice

A sample of an auto generated invoice

Invoices emailed at regular interval, typically once a month. We advise excel or .pdf attachments or a link to SAP (BAPI)

Page 41: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Sample Invoice

Page 42: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved. 1

Benefits of IT Chargeback

• Cost awareness• Recognition of the value• Resource flexibility• Understanding the complications and charges for

requesting an IT service• Accountability

Page 43: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Better financial control

Stay Compliant

Increased ResourceFlexibility

Optimization and negotiation power

Better employee productivity

IT Chargeback Takes You to a Higher Level

43

Page 44: Copyright © 2015 Open iT, Inc. All rights reserved. Metering IT Assets: Chargeback/Showback 101 Linda Cole Director of Sales, Americas Speaker Meter iT

Copyright © 2015 Open iT, Inc. All rights reserved.

Eistein FosliFounder

[email protected]

Linda ColeDirector of Sales, Americas

[email protected]

For more information visit our website: www.openit.com Q & A

44