12
© Copyright 2013, First Solar, Inc. © Copyright 2013, First Solar, Inc.

© Copyright 2013, First Solar, Inc./media/Files/MSB/Centers/EMIC... · 2 . Barilla Solar Project Phase I •First merchant solar plant in the U.S. •Phase I interconnection (22

Embed Size (px)

Citation preview

Page 1: © Copyright 2013, First Solar, Inc./media/Files/MSB/Centers/EMIC... · 2 . Barilla Solar Project Phase I •First merchant solar plant in the U.S. •Phase I interconnection (22

© Copyright 2013, First Solar, Inc. © Copyright 2013, First Solar, Inc.

Page 2: © Copyright 2013, First Solar, Inc./media/Files/MSB/Centers/EMIC... · 2 . Barilla Solar Project Phase I •First merchant solar plant in the U.S. •Phase I interconnection (22

2

© C

op

yri

gh

t 2

01

3, F

irst

So

lar,

In

c.

Barilla Solar Project Phase I

• First merchant solar plant in the U.S.

• Phase I interconnection (22 MW) will be completed by the end of this month

• No water used to generate electricity

• Takes advantage of existing transmission infrastructure

Page 3: © Copyright 2013, First Solar, Inc./media/Files/MSB/Centers/EMIC... · 2 . Barilla Solar Project Phase I •First merchant solar plant in the U.S. •Phase I interconnection (22

3

© C

op

yri

gh

t 2

01

3, F

irst

So

lar,

In

c.

What Makes a PV Plant “Grid Friendly”?

Page 4: © Copyright 2013, First Solar, Inc./media/Files/MSB/Centers/EMIC... · 2 . Barilla Solar Project Phase I •First merchant solar plant in the U.S. •Phase I interconnection (22

4

© C

op

yri

gh

t 2

01

3, F

irst

So

lar,

In

c.

Page 5: © Copyright 2013, First Solar, Inc./media/Files/MSB/Centers/EMIC... · 2 . Barilla Solar Project Phase I •First merchant solar plant in the U.S. •Phase I interconnection (22

5

© C

op

yri

gh

t 2

01

3, F

irst

So

lar,

In

c.

Page 6: © Copyright 2013, First Solar, Inc./media/Files/MSB/Centers/EMIC... · 2 . Barilla Solar Project Phase I •First merchant solar plant in the U.S. •Phase I interconnection (22

6

© C

op

yri

gh

t 2

01

3, F

irst

So

lar,

In

c.

Page 7: © Copyright 2013, First Solar, Inc./media/Files/MSB/Centers/EMIC... · 2 . Barilla Solar Project Phase I •First merchant solar plant in the U.S. •Phase I interconnection (22

7

© C

op

yri

gh

t 2

01

3, F

irst

So

lar,

In

c.

Cost Competitive with Conventional Energy Sources Today

Source: Texas Solar Power Association

Page 8: © Copyright 2013, First Solar, Inc./media/Files/MSB/Centers/EMIC... · 2 . Barilla Solar Project Phase I •First merchant solar plant in the U.S. •Phase I interconnection (22

8

© C

op

yri

gh

t 2

01

3, F

irst

So

lar,

In

c.

ERCOT Projects Strong Solar Market

-

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

18,000

MW

of

Sola

r A

dd

ed

Page 9: © Copyright 2013, First Solar, Inc./media/Files/MSB/Centers/EMIC... · 2 . Barilla Solar Project Phase I •First merchant solar plant in the U.S. •Phase I interconnection (22

9

© C

op

yri

gh

t 2

01

3, F

irst

So

lar,

In

c.

EPA’s RE Growth Assumptions are Conservative

Page 10: © Copyright 2013, First Solar, Inc./media/Files/MSB/Centers/EMIC... · 2 . Barilla Solar Project Phase I •First merchant solar plant in the U.S. •Phase I interconnection (22

10

© C

op

yri

gh

t 2

01

3, F

irst

So

lar,

In

c.

Getting Credit for What’s Already Happening

• Texas is already on a path to add substantial solar and wind resources through 2029

— “Current Trends” Scenario from ERCOT LTSA shows approximately 10 GW of new solar will come online by 2029

— In ERCOT’s April 2015 Generation Interconnection Status Report over 10,000 MW of additional wind energy is expected to come online by 2017

• To ensure that it receives full credit for what it is already doing, Texas needs to have a credible plan that

— Supports a continuation of Texas’ historical growth in renewable energy

— Reduces the risk of renewable energy curtailment

• The competitive wholesale market is the ideal mechanism to achieve these goals at the least cost possible providing Texas a further advantage beyond its ample solar and wind resources

• “Outside the fence” solutions like increased use of existing natural gas generation, solar, wind, and energy efficiency are critical to keeping costs low and reducing dependence on other states for fuel

Page 11: © Copyright 2013, First Solar, Inc./media/Files/MSB/Centers/EMIC... · 2 . Barilla Solar Project Phase I •First merchant solar plant in the U.S. •Phase I interconnection (22

11

© C

op

yri

gh

t 2

01

3, F

irst

So

lar,

In

c.

Key Issues for the EPA to Address

• “Glide path” to 2030 instead of a cliff in 2020

• Credit for early action once compliance plan is in place

• Allowing for flexible, creative solutions

Page 12: © Copyright 2013, First Solar, Inc./media/Files/MSB/Centers/EMIC... · 2 . Barilla Solar Project Phase I •First merchant solar plant in the U.S. •Phase I interconnection (22

© Copyright 2013, First Solar, Inc.

TAKING ENERGY FORWARD partnering with you to uncover solutions to your energy needs.