1 2 3 4 5 6 7
Move/ Rig
UpDrill Reaming Coring Circ. Trip Rig Serv.
january, 1 24.00 24.00
january, 2 24.00 24.00
january, 3 24.00 17.50 1.00 5.50
january, 4 24.00 10.50
january, 5 24.00 18.00
january, 6 24.00 24.00
january, 7 24.00 24.00
january, 8 24.00 10.00 3.00 11.00
january, 9 24.00 4.50 4.00 7.50
january, 10 24.00 24.00
january, 11 24.00 24.00
january, 12 24.00 19.50 0.50 4.00
january, 13 24.00 0.50 13.00
january, 14 24.00 21.00 3.00
january, 15 24.00 22.50 1.50
january, 16 24.00 18.00 1.50 4.50
january, 17 24.00 21.50
january, 18 24.00 14.00 8.00
january, 19 24.00
january, 20 24.00 0.50 10.50
january, 21 24.00 2.50 20.00
january, 22 0.00
january, 23 0.00
january, 24 0.00
january, 25 0.00
january, 26 0.00
january, 27 0.00
january, 28 0.00
january, 29 0.00
january, 30 0.00
0.00 257.00 0.00 0.00 27.50 138.50 0.00
0.00% 35.69% 0.00% 0.00% 3.82% 19.24% 0.00%
Total ( Hrs )
Percentage
Monthly Operations Time AnalysisRig # SK501 - Well # SHABEEL # 01 - CANMEX
Date
Operations Time Distribution (Hrs)
8 9 10 11 12 13 14 15 16
Repair RigSlip and
CutDev. Surv.
Wireline
logsCSG&CMT WOC N/U BOP Test BOP DST
3.00 7.00
2.00
0.50
1.50
1.00
14.00 8.00
8.25 0.50
1.50
3.50 5.00 0.00 0.00 22.25 0.00 0.00 16.50 0.00
0.49% 0.69% 0.00% 0.00% 3.09% 0.00% 0.00% 2.29% 0.00%
Monthly Operations Time AnalysisRig # SK501 - Well # SHABEEL # 01 - CANMEX
Operations Time Distribution (Hrs)
17 18 19 20 21 A B C D
Plug BackSqueeze
CMTFishing Dir. Work Others Perforating
Tubing
TripsTreating Swabbing
3.50
4.00
7.50
9.00
2.50
1.00
2.00
4.25
4.25 0.00 0.00 14.50 15.00 0.00 0.00 0.00 0.00
0.59% 0.00% 0.00% 2.01% 2.08% 0.00% 0.00% 0.00% 0.00%
Monthly Operations Time AnalysisRig # SK501 - Well # SHABEEL # 01 - CANMEX
Completion Time Distribution (Hrs)Operations Time Distribution (Hrs)
E
Testing
0.00
0.00%
Monthly Operations Time AnalysisRig # SK501 - Well # SHABEEL # 01 - CANMEX
Completion Time Distribution (Hrs)
Drill, 257.00
Circ., 27.50
Trip, 138.50
Repair Rig, 3.50
Slip and Cut, 5.00
CSG&CMT, 22.25
Test BOP, 16.50
Others, 15.00
Chart Title
Operations Time Distribution (Hrs)
Drill 53%
Circ. 6%
Trip 28%
Repair Rig 1%
Slip and Cut 1%
CSG&CMT 5%
Test BOP 3%
Others 3%
Operations Time Distribution (%)
Draw
Work Sys.
Crown
Block
Travelling
BlockHook
Swivel & Wash
PipeTop Drive
Pipe
Spinner
Pipe Handling
Sys.BOP Sys.
BOP Control
Sys.
Mud
Pumps
Mechanical
Sys.
Electrical
Sys.Engines Others Total
january, 1 0.50 0.50
january, 2 0.50 0.50
january, 3 0.50 0.50
january, 4 0.00
january, 5 0.00
january, 6 0.00
january, 7 0.00
january, 8 0.00
january, 9 0.00
january, 10 0.00
january, 11 0.00
january, 12 0.00
january, 13 0.00
january, 14 0.00
january, 15 0.00
january, 16 0.00
january, 17 0.00
january, 18 0.00
january, 19 0.00
january, 20 0.00
january, 21 0.00
january, 22 0.00
january, 23 0.00
january, 24 0.00
january, 25 0.00
january, 26 0.00
january, 27 0.00
january, 28 0.00
january, 29 0.00
january, 30 0.00
0.00 0.00 0.00 0.00 0.00 1.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.50Total
Date
Monthly Repair Time AnalysisRig # SK501 - Well # SHABEEL # 01 - CANMEX
Monthly Repair Time Analysis (Hrs)
0.00 0.00 0.00 0.00 0.00
1.50
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.50
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
Hrs Repair Time Analysis (Hrs)
From To From To From To
1 3827 0 16.00 7.97
2 0 3866 18.00 7.16
3 4071 0 11.00 12.34
4 0 4060 7.00 19.33
5 2490 0 9.00 9.22
6 0 4290 11.50 12.43
7 4457 0 11.75 12.64
8 0 3240 10.50 10.29
9 3240 0 8.50 12.71
10 0 3279 4.00
11 3279 0 4.00
12 0 4457 9.00 16.51
13 3300 0 9.75 11.28
14 0 3602 6.00 20.01
15 3602 0 8.50 14.13
Average RIH 12.3
Average POOH 11.0
Average ( CSG 7'' )
As per CANMEX plan, We did CMT plugs without
running 7'' liner
Monthly Tripping&Casing PerformanceRig # SK501 - Well # SHABEEL # 01 - CANMEX
Tripping Performance Running Caing Performance
CaseSection: 8 1/2'' Hole Casing 7''
RIH (m) POOH (m) Duration
(Hrs)
Stand per
hour
RIH (m)
0.00Average ( CSG 7'' )
As per CANMEX plan, We did CMT plugs without
running 7'' liner
Monthly Tripping&Casing PerformanceRig # SK501 - Well # SHABEEL # 01 - CANMEX
Running Caing Performance
Casing 7''
Duration
(Hrs)
Joint per
hour
7.16
19.33
12.43
10.29
16.51
20.01
12.3
0.00
5.00
10.00
15.00
20.00
25.00
2 4 6 8 10 12 14 Average RIH
Stand/Hr Section 8 1/2'' ( RIH Performance )
7.97
12.34
9.22
12.64 12.71
11.28
14.13
11.0
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
1 3 5 7 9 11 13 15 Average POOH
Series1
Stand/Hr Section 8 1/2'' ( POOH Performance )
Depth (m) Time (Days) Depth (m)
0 0
227 1.17
670 2.17
1015 3.17
1233 4.17
1233 5.17
1233 5.17
1233 6.17
1233 7.17
1233 8.17
1373 9.17
1807 10.17
2002 11.17
2048 12.17
2298 13.17
2501 14.17
2763 15.17
2833 16.17
2833 17.17
2833 18.17
2833 19.17
2833 20.17
2883 21.17
3000 22.17
3084 23.17
3171 24.17
3246 25.17
3342 26.17
3418 27.17
3468 28.17
3468 29.17
3468 30.17 Drilling 12 1/4'' Hole
3542 31.17
3625 32.17
3704 33.17
3778 34.17
3827 35.17
3827 36.17
3866 37.17
3983 38.17
4048 39.17
4071 40.17
Openning 12 1/4'' Hole To
17 1/2'' Hole
Running 13 3/8'' CSG & CMT
Job & N/U 13 5/8'' BOP &
Pressure Test
Section 12 1/4'' & 9 5/8''
CSG
Drilling 12 1/4'' Pilot Hole
Section 17 1/2'' & 13 3/8''
CSG
Rig # SK501 - Well # SHABEEL # 01 - CANMEXWell Progress Actual Vs. Planned
ActualActual Operations
Planned
Drillinh 17.5'' Hole
Section 26'' & 20'' CSG
Running 13 3/8'' CSG &
CMT Job '' Diverter System
4096 41.17
4185 42.17
4248 43.17
4290 44.17
4290 45.17
4381 46.17
4439 47.17
4457 48.17
4457 49.17
4457 50.17
4457 51.17
4457 52.17
4457 53.17
4457 54.17
4457 55.17
4457 56.17
4457 57.17
4457 58.17
4457 59.17
4457 60.17
4457 61.17
4457 62.17
4457 63.17 rig release
Section 8 1/2'' & 7'' CSG
Section 12 1/4'' & 9 5/8''
CSG
Section 8 1/2'' & 7'' CSG
Time (Days)
Rig # SK501 - Well # SHABEEL # 01 - CANMEXWell Progress Actual Vs. Planned
PlannedPlanned Operations
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
0 10 20 30 40 50 60 70
Time (Days)
Depth
Well Progress Actual Vs. Planned
17 1/2'' Section
12 1/4'' Section
8 1/2'' Section
completion
- palned time 84 dayes including 15 days rig move - actual drillign dayes (63 +4hrs ) days and 13 day rig move - we finneshed earlier with 7.3 dayes
RIG ACCEPTANCE 29-11-2013 @ 08:00 PM.
rig released RIG RELEASED ON 01-Feb-2014