MAGNETI MARELLI SKH EXHAUST SYSTEMS PVT LTD , PUNE PLANT HOUR PRODUCTION CONTROL SHEET Machine Robo 1.2 Robo 1.4 Part Name EURO V Manifold Assembly Part No S133651 Check cycle 1 hour Takt Time 140 Seconds Hourly target 25 Jobs SHIFT START END PLAN ACTUAL DIFFERECE REASON A 06.30 AM 07.30 AM 25 25 07.30 AM 08.30 AM 25 50 08.30 AM 09.30 AM 25 75 09.30 AM 10.30 AM 25 100 10.30 AM 11.30 AM 25 125 12.00 PM 01.00 PM 25 150 01.00 PM 02.00 PM 25 175 02.00 PM 03.00 PM 25 200 Machine Operator Team Leader Engineer In Charge CUMULATI VE PALN CUMULATI VE ACTUAL CUMULATIVE DIFFERENCE DOWN TIME (MIN)

Copy of Production Control Board

Embed Size (px)

DESCRIPTION

sdf

Citation preview

Page 1: Copy of Production Control Board

MAGNETI MARELLI SKH EXHAUST SYSTEMS PVT LTD , PUNE PLANT

HOUR PRODUCTION CONTROL SHEET

Machine Robo 1.2 Robo 1.4

Part Name EURO V Manifold Assembly Part No S133651

Check cycle 1 hour Takt Time 140 Seconds Hourly target 25 Jobs

SHIFT START END PLAN ACTUAL DIFFERECE REASON

A

06.30 AM 07.30 AM25 25

07.30 AM 08.30 AM25 50

08.30 AM 09.30 AM25 75

09.30 AM 10.30 AM25 100

10.30 AM 11.30 AM25 125

12.00 PM 01.00 PM25 150

01.00 PM 02.00 PM25 175

02.00 PM 03.00 PM25 200

Machine Operator Team Leader Engineer In Charge Manager/Operations

CUMULATIVE PALN

CUMULATIVE

ACTUAL

CUMULATIVE DIFFERENCE

DOWN TIME (MIN)

COUNTER MEASURE

CHECKED (TEAM

LEADER)

Page 2: Copy of Production Control Board

Check cycle 1 hour Takt Time 140 seconds

Hourly target 25

SHIFT START END PLAN ACTUAL DIFFERECE REASON

03.00 PM 04.00 PM

04.00 PM 05.00 PM

05.00 PM 06.00 PM

06.00 PM 07.00 PM

07.00 PM 08.00 PM

09.30 PM 10.30 PM

10.30 PM 11.30 PM

11.30 PM 00.30 AM00.30 AM 01.30 AM01.30 AM 02.30 AM02.30 AM 03.30 AM03.30 AM 04.30 AM04.30 AM 05.30 AM05.30 AM 06.30 AM

CUMULATIVE PALN

CUMULATIVE

ACTUAL

CUMULATIVE DIFFERENCE

DOWN TIME (MIN)

COUNTER MEASURE

CHECKED (TEAM

LEADER)

08.00 PM 09.00 PM

08.30 PM 09.30 PM