GUIDELINES PROCUREMENT UNDER IBRD LOANS AND IDA CREDITS May 2004

Copy of procurement guidelines may-2004

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Copy of procurement guidelines may-2004

GUIDELINESPROCUREMENT

UNDER

IBRD LOANS

AND

IDA CREDITS

May 2004

ProGuideCvr.qxd 5/7/04 3:34 PM Page 1

Page 2: Copy of procurement guidelines may-2004

GUIDELINESPROCUREMENT

UNDER

IBRD LOANS

AND

IDA CREDITS

May 2004

Page 3: Copy of procurement guidelines may-2004

Copyright © 2004The International Bank for Reconstructionand Development / THE WORLD BANK1818 H Street, N.W.Washington D.C. 20433, U.S.A.

First Printing April 2004All rights reservedISBN 0-8213-5829-4

ii

Page 4: Copy of procurement guidelines may-2004

I. Introduction ......................................1

1.1 Purpose ....................................................11.2 General Considerations ..........................21.5 Applicability of Guidelines ....................31.6 Eligibility ..................................................41.9 Advance Contracting and

Retroactive Financing ............................61.10 Joint Ventures ..........................................61.11 Bank Review ............................................61.12 Misprocurement ......................................71.13 References to Bank ..................................71.14 Fraud and Corruption ............................81.16 Procurement Plan ....................................10II. International Competitive Bidding ....11

A. General ....................................................112.1 Introduction ..............................................112.2 Type and Size of Contracts ....................112.6 Two-Stage Bidding ..................................122.7 Notification and Advertising ................132.9 Prequalification of Bidders ....................14B. Bidding Documents ..............................152.11 General ......................................................152.13 Validity of Bids and Bid Security ..........162.15 Language ..................................................172.16 Clarity of Bidding Documents ..............172.19 Standards ..................................................192.20 Use of Brand Names ..............................192.21 Pricing ......................................................202.24 Price Adjustment ....................................212.26 Transportation and Insurance ................222.28 Currency Provisions ................................232.29 Currency of Bid ........................................232.31 Currency Conversion

for Bid Comparison ................................242.32 Currency of Payment ..............................242.34 Terms and Methods of Payment ..........242.37 Alternative Bids ......................................252.38 Conditions of Contract ..........................26

iii

Page 5: Copy of procurement guidelines may-2004

2.39 Performance Security ..............................262.41 Liquidated Damages

and Bonus Clauses ..................................272.42 Force Majeure ..........................................272.43 Applicable Law

and Settlement of Disputes ....................27C. Bid Opening, Evaluation, and Award of

Contract ....................................................282.44 Time for Preparation of Bids ..................282.45 Bid Opening Procedures ........................292.46 Clarifications or Alterations of Bids ....292.47 Confidentiality ........................................292.48 Examination of Bids ................................302.49 Evaluation and Comparison of Bids ....302.55 Domestic Preferences ..............................322.57 Extension of Validity of Bids ................322.58 Postqualification of Bidders ..................332.59 Award of Contract ..................................332.60 Publication of the Award of Contract ..342.61 Rejection of All Bids ................................342.65 Debriefing ................................................35D. Modified ICB ..........................................352.66 Operations Involving a

Program of Imports ................................352.68 Procurement of Commodities ................36III. Other Methods of Procurement ........37

3.1 General ......................................................373.2 Limited International Bidding ..............373.3 National Competitive Bidding ..............373.5 Shopping ..................................................393.6 Direct Contracting ..................................393.8 Force Account ..........................................403.9 Procurement from

United Nations Agencies ........................413.10 Procurement Agents ................................413.11 Inspection Agents ....................................423.12 Procurement in Loans to Financial

Intermediaries ..........................................42

iv

Page 6: Copy of procurement guidelines may-2004

3.13 Procurement under BOO/BOT/BOOT,Concessions and Similar Private SectorArrangements ..........................................43

3.14 Performance-Based Procurement ..........443.16 Procurement under Loans

Guaranteed by the Bank ........................453.17 Community Participation

in Procurement ........................................45Appendix 1: Review by the Bank ofProcurement Decisions ......................46

1. Scheduling of Procurement ....................462. Prior Review ............................................465. Post Review ..............................................50

Appendix 2: Domestic Preferences ....51

1. Preference for Domestically Manufactured Goods ..............................51

2. Preference for Domestic Contractors ....53Appendix 3: Guidance to Bidders ......55

1. Purpose ....................................................552. Responsibility for Procurement ............553. Bank’s Role ..............................................554. Information on Bidding ..........................565. Bidder’s Role ............................................576. Confidentiality ........................................587. Action by the Bank ..................................588. Debriefing ................................................59

v

Page 7: Copy of procurement guidelines may-2004

AcronymsBOO Build, own, operate

BOOT Build, own, operate, transfer

BOT Build, operate, transfer

CIF Cost, Insurance, and Freight

CIP Carriage and Insurance Paid(place of destination)

CPT Carriage Paid To (named placeof destination)

DDP Delivered Duty Paid

EXW Ex works, Ex factory, or Off theShelf

FCA Free Carrier (named place)

GNP Gross National Product

IBRD International Bank forReconstruction andDevelopment (World Bank)

ICB International CompetitiveBidding

IDA International DevelopmentAgency

LIB Limited International Bidding

NCB National Competitive Bidding

NGO Nongovernmental organization

PAD Project Appraisal Document

SA Special Account

SBDs Standard Bidding Documents

UN United Nations

UNDB United Nations DevelopmentBusiness

vi

Page 8: Copy of procurement guidelines may-2004

I. INTRODUCTIONPurpose1.1 The purpose of these Guidelines is toinform those carrying out a project that isfinanced in whole or in part by a loan from theInternational Bank for Reconstruction andDevelopment (IBRD) or a credit or grant fromthe International Development Association(IDA),1 of the policies that govern theprocurement of goods, works, and services(other than consultant services) 2 required forthe project. The Loan Agreement governs thelegal relationships between the Borrower andthe Bank, and the Guidelines are madeapplicable to procurement of goods and worksfor the project, as provided in the agreement.The rights and obligations of the Borrower andthe providers of goods and works for theproject are governed by the bidding3

documents, and by the contracts signed by theBorrower with the providers of goods andworks, and not by these Guidelines or the LoanAgreements. No party other than the parties tothe Loan Agreement shall derive any rightstherefrom or have any claim to loan proceeds.

1

1 Procurement requirements of IBRD and IDA are identical,and references in these Guidelines to the Bank include bothIBRD and IDA, and references to loans include IBRD Loansas well as IDA credits or grants and project preparationadvances (PPAs). References to Loan Agreement includesDevelopment Credit Agreement, Development FinancingAgreement, Development Grant Agreement, and ProjectAgreement. References to “Borrower” include the recipientof an IDA Grant.2 References to “goods” and “works” in these Guidelinesinclude related services such as transportation, insurance,installation, commissioning, training, and initialmaintenance. “Goods” includes commodities, raw material,machinery, equipment, and industrial plant. The provisionsof these Guidelines also apply to services which are bid andcontracted on the basis of performance of a measurablephysical output, such as drilling, mapping, and similaroperations. These Guidelines do not refer to Consultants’services, to which the current Guidelines: Selection andEmployment of Consultants by World Bank Borrowers apply(referred to herein as Consultant Guidelines).3 For the purposes of these Guidelines, the words “bid” and“tender” shall have the same meaning.

Page 9: Copy of procurement guidelines may-2004

General Considerations1.2 The responsibility for theimplementation of the project, and therefore forthe award and administration of contractsunder the project, rests with the Borrower.4 TheBank, for its part, is required by its Articles ofAgreement to “…ensure that the proceeds ofany loan are used only for the purposes forwhich the loan was granted, with due attentionto considerations of economy and efficiencyand without regard to political or other non-economic influences or considerations,”5 and ithas established detailed procedures for thispurpose. While in practice the specificprocurement rules and procedures to befollowed in the implementation of a projectdepend on the circumstances of the particularcase, four considerations generally guide theBank’s requirements:

(a) the need for economy and efficiency inthe implementation of the project,including the procurement of the goodsand works involved;

(b) the Bank’s interest in giving all eligiblebidders from developed anddeveloping countries6 the sameinformation and equal opportunity tocompete in providing goods and worksfinanced by the Bank;

(c) the Bank’s interest in encouraging thedevelopment of domestic contractingand manufacturing industries in theborrowing country; and

(d) the importance of transparency in theprocurement process.

2

4 In some cases, the Borrower acts only as an intermediary,and the project is carried out by another agency or entity.References in these Guidelines to the Borrower include suchagencies and entities, as well as Sub-Borrowers under on-lending arrangements.5 The Bank’s Articles of Agreement; Article III, Section 5(b)and IDA’s Articles of Agreement; Article V, Section 1(g).6 See para. 1.6, 1.7, and 1.8.

Page 10: Copy of procurement guidelines may-2004

1.3 Open competition is the basis forefficient public procurement. Borrowers shallselect the most appropriate method for thespecific procurement. In most cases,International Competitive Bidding (ICB),properly administered, and with the allowancefor preferences for domestically manufacturedgoods and, where appropriate, for domesticcontractors7 for works under prescribedconditions is the most appropriate method. Inmost cases, therefore, the Bank requires itsBorrowers to obtain goods, works and servicesthrough ICB open to eligible suppliers andcontractors.8 Section II of these Guidelinesdescribes the procedures for ICB.

1.4 Where ICB is not the most appropriatemethod of procurement, other methods ofprocurement may be used. Section III describesthese other methods of procurement and thecircumstances under which their applicationwould be more appropriate. The particularmethods that may be followed for procurementunder a given project are provided for in theLoan Agreement. The specific contracts to befinanced under the project, and their method ofprocurement, consistent with the LoanAgreement, are specified in the ProcurementPlan as indicated in paragraph 1.16 of theseGuidelines.

Applicability of Guidelines1.5 The procedures outlined in theseGuidelines apply to all contracts for goods andworks financed in whole or in part from Bankloans.9 For the procurement of those contractsfor goods and works not financed from a Bankloan, the Borrower may adopt otherprocedures. In such cases the Bank shall besatisfied that the procedures to be used willfulfill the Borrower’s obligations to cause theproject to be carried out diligently and

3

7 For purposes of these Guidelines, “Contractor” refers onlyto a firm providing construction services.8 See para. 1.6, 1.7, and 1.8.9 This includes those cases where the Borrower employs aprocurement agent under para. 3.10.

Page 11: Copy of procurement guidelines may-2004

efficiently, and that the goods and works to beprocured:

(a) are of satisfactory quality and arecompatible with the balance of theproject;

(b) will be delivered or completed intimely fashion; and

(c) are priced so as not to affect adverselythe economic and financial viability ofthe project.

Eligibility1.6 To foster competition the Bank permitsfirms and individuals from all countries to offergoods, works, and services for Bank-financedprojects. Any conditions for participation shallbe limited to those that are essential to ensurethe firm’s capability to fulfill the contract inquestion.10

1.7 In connection with any contract to befinanced in whole or in part from a Bank loan,the Bank does not permit a Borrower to denypre- or post-qualification to a firm for reasonsunrelated to its capability and resources tosuccessfully perform the contract; nor does itpermit a Borrower to disqualify any bidder forsuch reasons. Consequently, Borrowers shouldcarry out due diligence on the technical andfinancial qualifications of bidders to be assuredof their capabilities in relation to the specificcontract.

1.8 As exceptions to the foregoing:

(a) Firms of a country or goodsmanufactured in a country may beexcluded if, (i) as a matter of law orofficial regulation, the Borrower’scountry prohibits commercial relationswith that country, provided that the

4

10 The Bank permits firms and individuals from Taiwan,China, to offer goods, works, and services for Bank-financedprojects.

Page 12: Copy of procurement guidelines may-2004

Bank is satisfied that such exclusiondoes not preclude effective competitionfor the supply of goods or worksrequired, or (ii) by an act of compliancewith a decision of the United NationsSecurity Council taken under ChapterVII of the Charter of the UnitedNations, the Borrower’s countryprohibits any import of goods from, orpayments to, a particular country,person, or entity. Where the Borrower'scountry prohibits payments to aparticular firm or for particular goodsby such an act of compliance, that firmmay be excluded.

(b) A firm which has been engaged by theBorrower to provide consulting servicesfor the preparation or implementationof a project, and any of its affiliates,shall be disqualified from subsequentlyproviding goods, works, or servicesresulting from or directly related to thefirm’s consulting services for suchpreparation or implementation. Thisprovision does not apply to the variousfirms (consultants, contractors, orsuppliers) which together areperforming the contractor’s obligationsunder a turnkey or design and buildcontract.11

(c) Government-owned enterprises in theBorrower’s country may participateonly if they can establish that they (i)are legally and financially autonomous,(ii) operate under commercial law, and(iii) are not dependent agencies of theBorrower or Sub-Borrower.12

(d) A firm declared ineligible by the Bankin accordance with subparagraph (d) ofparagraph 1.14 of these Guidelinesshall be ineligible to be awarded a

5

11 See para. 2.5.12 Other than Force Account units, as permitted under para.3.8.

Page 13: Copy of procurement guidelines may-2004

Bank-financed contract during theperiod of time determined by the Bank.

Advance Contracting and RetroactiveFinancing1.9 The Borrower may wish to proceedwith the initial steps of procurement beforesigning the related Bank loan. In such cases, theprocurement procedures, including advertising,shall be in accordance with the Guidelines inorder for the eventual contracts to be eligiblefor Bank financing, and the Bank shall reviewthe process used by the Borrower. A Borrowerundertakes such advance contracting at its ownrisk, and any concurrence by the Bank with theprocedures, documentation, or proposal foraward does not commit the Bank to make aloan for the project in question. If the contract issigned, reimbursement by the Bank of anypayments made by the Borrower under thecontract prior to loan signing is referred to asretroactive financing and is only permittedwithin the limits specified in the LoanAgreement.

Joint Ventures1.10 Any firm may bid independently or injoint venture confirming joint and severalliability, either with domestic firms and/or withforeign firms, but the Bank does not acceptconditions of bidding which require mandatoryjoint ventures or other forms of mandatoryassociation between firms.

Bank Review1.11 The Bank reviews the Borrower’sprocurement procedures, documents, bidevaluations, award recommendations, andcontracts to ensure that the procurementprocess is carried out in accordance with theagreed procedures. These review proceduresare described in Appendix 1. The ProcurementPlan approved by the Bank13 shall specify theextent to which these review procedures shall

6

13 See paragraphs 1.16.

Page 14: Copy of procurement guidelines may-2004

apply in respect of the different categories ofgoods and works to be financed, in whole or inpart, from the Bank loan.

Misprocurement1.12 The Bank does not finance expendituresfor goods and works which have not beenprocured in accordance with the agreedprovisions in the Loan Agreement and asfurther elaborated in the Procurement Plan.14 Insuch cases, the Bank will declaremisprocurement, and it is the policy of the Bankto cancel that portion of the loan allocated tothe goods and works that have beenmisprocured. The Bank may, in addition,exercise other remedies provided for under theLoan Agreement. Even once the contract isawarded after obtaining a “no objection” fromthe Bank, the Bank may still declaremisprocurement if it concludes that the “noobjection” was issued on the basis ofincomplete, inaccurate, or misleadinginformation furnished by the Borrower or theterms and conditions of the contract had beenmodified without Bank’s approval.

References to Bank1.13 If the Borrower wishes to refer to theBank in procurement documents, the followinglanguage shall be used:

“(name of Borrower) has received (or inappropriate cases ‘has applied for’) a [loan]from the [International Bank for Reconstructionand Development] (the “Bank”) in an amountequivalent to USD toward the cost of (name ofproject), and intends to apply a portion of theproceeds of this [loan] to eligible paymentsunder this contract. Payment by the Bank willbe made only at the request of (name ofBorrower or designate) and upon approval bythe Bank, and will be subject, in all respects, tothe terms and conditions of the [Loan]Agreement. The [Loan] Agreement prohibits a

7

14 See paragraph 1.16.

Page 15: Copy of procurement guidelines may-2004

withdrawal from the [Loan] Account for thepurpose of any payment to persons or entities,or for any import of goods, if such payment orimport, to the knowledge of the Bank, isprohibited by a decision of the United NationsSecurity Council taken under Chapter VII of theCharter of the United Nations.15 No party otherthan (name of Borrower) shall derive any rightsfrom the Loan Agreement or have any claim tothe proceeds of the [loan].”16

Fraud and Corruption1.14 It is the Bank’s policy to require thatBorrowers (including beneficiaries of Bankloans), as well as bidders, suppliers, andcontractors under Bank-financed contracts,observe the highest standard of ethics duringthe procurement and execution of suchcontracts. In pursuance of this policy, the Bank:

(a) defines, for the purposes of thisprovision, the terms set forth below asfollows:

(i) “corrupt practice” means theoffering, giving, receiving, orsoliciting, directly or indirectly,of any thing of value toinfluence the action of a publicofficial17 in the procurementprocess or in contractexecution;

(ii) “fraudulent practice” means amisrepresentation or omissionof facts in order to influence aprocurement process or theexecution of a contract;

(iii) “collusive practices” means ascheme or arrangement

8

15 IBRD’s General Conditions Applicable to Loans andGuarantee Agreements; Article V; Section 5.01 and IDA’sGeneral Conditions Applicable to Development CreditAgreements; Article V; Section 5.01 16 Substitute “credit,” “International DevelopmentAssociation,” and “Credit Agreement,” as appropriate.17 Includes World Bank staff and employees of otherorganizations taking or reviewing procurement decisions.

Page 16: Copy of procurement guidelines may-2004

between two or more bidders,with or without the knowledgeof the Borrower, designed toestablish bid prices at artificial,non-competitive levels;

(iv) “coercive practices” meansharming or threatening toharm, directly or indirectly,persons, or their property toinfluence their participation ina procurement process, or affectthe execution of a contract.

(b) will reject a proposal for award if itdetermines that the bidderrecommended for award has, directlyor through an agent, engaged incorrupt, fraudulent, collusive, orcoercive practices in competing for thecontract in question;

(c) will cancel the portion of the loanallocated to a contract if it determinesat any time that representatives of theBorrower or of a beneficiary of the loanengaged in corrupt, fraudulent,collusive, or coercive practices duringthe procurement or the execution ofthat contract, without the Borrowerhaving taken timely and appropriateaction satisfactory to the Bank toremedy the situation;

(d) will sanction a firm or individual,including declaring ineligible, eitherindefinitely or for a stated period oftime, to be awarded a Bank-financedcontract if it at any time determinesthat the firm has, directly or through anagent, engaged in corrupt, fraudulent,collusive, or coercive practices incompeting for, or in executing, a Bank-financed contract; and

(e) will have the right to require that aprovision be included in biddingdocuments and in contracts financed bya Bank loan, a provision be included

9

Page 17: Copy of procurement guidelines may-2004

requiring bidders, suppliers andcontractors to permit the Bank toinspect their accounts and records andother documents relating to the bidsubmission and contract performanceand to have them audited by auditorsappointed by the Bank.

1.15 With the specific agreement of theBank, a Borrower may introduce, into bid formsfor large contracts financed by the Bank, anundertaking of the bidder to observe, incompeting for and executing a contract, thecountry’s laws against fraud and corruption(including bribery), as listed in the biddingdocuments.18 The Bank will accept theintroduction of such undertaking at the requestof the Borrowing country, provided thearrangements governing such undertaking aresatisfactory to the Bank.

Procurement Plan1.16 As part of the preparation of the projectthe Borrower shall prepare and, before loannegotiations, furnish to the Bank for itsapproval, a Procurement Plan19 acceptable tothe Bank setting forth: (a) the particularcontracts for the goods, works, and/or servicesrequired to carry out the project during theinitial period of at least 18 months; (b) theproposed methods for procurement of suchcontracts that are permitted under the LoanAgreement, and (c) the related Bank reviewprocedures.20 The Borrower shall update the

10

18 As an example, such an undertaking might read asfollows: “We undertake that, in competing for (and, if theaward is made to us, in executing) the above contract, wewill strictly observe the laws against fraud and corruptionin force in the country of the [Purchaser] [Employer], assuch laws have been listed by the [Purchaser] [Employer] inthe bidding documents for this contract.” 19 If the Project includes the selection of consulting services,the Procurement Plan should also include the methods forselection of consulting services in accordance with theGuidelines: Selection and Employment of Consultants byWorld Bank Borrowers. The Bank will disclose the initialProcurement Plan to the public after the related loan hasbeen approved; additional updates will be disclosed afterthe Bank has approved them.20 See Appendix 1

Page 18: Copy of procurement guidelines may-2004

Procurement Plan annually or as neededthroughout the duration of the project. TheBorrower shall implement the ProcurementPlan in the manner in which it has beenapproved by the Bank.

II. INTERNATIONAL COMPETITIVEBIDDINGA. General

Introduction2.1 The objective of InternationalCompetitive Bidding (ICB), as described inthese Guidelines, is to provide all eligibleprospective bidders21 with timely and adequatenotification of a Borrower’s requirements andan equal opportunity to bid for the requiredgoods and works.

Type and Size of Contracts2.2 The bidding documents shall clearlystate the type of contract to be entered into andcontain the proposed contract provisionsappropriate therefor. The most common typesof contracts provide for payments on the basisof a lump sum, unit prices, reimbursable costplus fees, or combinations thereof.Reimbursable cost contracts are acceptable tothe Bank only in exceptional circumstancessuch as conditions of high risk or where costscannot be determined in advance withsufficient accuracy. Such contracts shall includeappropriate incentives to limit costs.

2.3 The size and scope of individualcontracts will depend on the magnitude,nature, and location of the project. For projectsrequiring a variety of goods and works,separate contracts generally are awarded for thesupply and/or installation of different items ofequipment and plant22 and for the works.

11

21 See para. 1.6, 1.7 and 1.8.22 For purposes of these Guidelines, “plant” refers toinstalled equipment, as in a production facility.

Page 19: Copy of procurement guidelines may-2004

2.4 For a project requiring similar butseparate items of equipment or works, bidsmay be invited under alternative contractoptions that would attract the interest of bothsmall and large firms, which could be allowed,at their option, to bid for individual contracts(slices) or for a group of similar contracts(package). All bids and combinations of bidsshall be received by the same deadline andopened and evaluated simultaneously so as todetermine the bid or combination of bidsoffering the lowest evaluated cost to theBorrower.23

2.5 In certain cases the Bank may accept orrequire a turnkey contract under which thedesign and engineering, the supply andinstallation of equipment, and the constructionof a complete facility or works are providedunder one contract. Alternatively, the Borrowermay remain responsible for the design andengineering, and invite bids for a singleresponsibility contract for the supply andinstallation of all goods and works required forthe project component. Design and build, andmanagement contracting24 contracts are alsoacceptable where appropriate.25

Two-Stage Bidding2.6 In the case of turnkey contracts orcontracts for large complex facilities or works ofa special nature or complex information andcommunication technology, it may beundesirable or impractical to prepare completetechnical specifications in advance. In such acase, a two-stage bidding procedure may beused, under which first unpriced technical

12

23 See paras. 2.49-2.54 for the bid evaluation procedures.24 In construction, a management contractor usually doesnot perform the work directly but contracts out andmanages the work of other contractors, taking on the fullresponsibility and risk for price, quality, and timelyperformance. Conversely, a construction manager is aconsultant for, or agent of, the Borrower, but does not takeon such risks. (If financed by the Bank, the services of theconstruction manager should be procured under theConsultant Guidelines. See footnote 2.)25 Also see paras. 3.14 and 3.15 for performance-basedcontracting.

Page 20: Copy of procurement guidelines may-2004

proposals on the basis of a conceptual design orperformance specifications are invited, subjectto technical as well as commercial clarificationsand adjustments, to be followed by amendedbidding documents26 and the submission offinal technical proposals and priced bids in thesecond stage.

Notification and Advertising2.7 Timely notification of biddingopportunities is essential in competitivebidding. For projects that include ICB theBorrower is required to prepare and submit tothe Bank a draft General Procurement Notice.The Bank will arrange for its publication in UNDevelopment Business online (UNDB online) andin the Development Gateway’s dgMarket).27 TheNotice shall contain information concerning theBorrower (or prospective Borrower), amountand purpose of the loan, scope of procurementunder ICB, and the name, telephone (or fax)number, and address of the Borrower’s agencyresponsible for procurement and the address ofthe Website where specific procurement noticeswill be posted. If known, the scheduled date foravailability of prequalification or biddingdocuments should be indicated. The relatedprequalification or bidding documents, as thecase may be, shall not be released to the publicearlier than the date of publication of theGeneral Procurement Notice.

2.8 Invitations to prequalify or to bid, asthe case may be, shall be advertised as SpecificProcurement Notices in at least one newspaperof national circulation in the Borrower’s

13

26 In revising the bidding documents in the second stage theBorrower should respect the confidentiality of the bidders’technical proposals used in the first stage, consistent withrequirements of transparency and intellectual propertyrights.27 UNDB is a publication of the United Nations.Subscription information is available from: DevelopmentBusiness, United Nations, GCPO Box 5850, New York, NY10163-5850, USA (Website: www.devbusiness.com; e-mail:[email protected]); Development Gateway Market is anelectronic portal of Development Gateway Foundation, 1889F Street, N.W. Washington, DC 20006, USA (Website:www.dgmarket.com).

Page 21: Copy of procurement guidelines may-2004

country (or in the official gazette, or in anelectronic portal with free access). Suchinvitations shall also be published in UNDBonline and in dgMarket. Notification shall begiven in sufficient time to enable prospectivebidders to obtain prequalification or biddingdocuments and prepare and submit theirresponses.28

Prequalification of Bidders2.9 Prequalification is usually necessary forlarge or complex works, or in any othercircumstances in which the high costs ofpreparing detailed bids could discouragecompetition, such as custom-designedequipment, industrial plant, specializedservices, some complex information andtechnology and contracts to be let underturnkey, design and build, or managementcontracting. This also ensures that invitations tobid are extended only to those who haveadequate capabilities and resources.Prequalification shall be based entirely uponthe capability and resources of prospectivebidders to perform the particular contractsatisfactorily, taking into account their (a)experience and past performance on similarcontracts, (b) capabilities with respect topersonnel, equipment, and construction ormanufacturing facilities, and (c) financialposition.29

2.10 The invitation to prequalify for biddingon specific contracts or groups of similarcontracts shall be advertised and notified asdescribed in paragraphs 2.7 and 2.8 above. Thescope of the contract and a clear statement ofthe requirements for qualification shall be sentto those who responded to the invitation. Allsuch applicants that meet the specified criteriashall be allowed to bid. Borrowers shall informall applicants of the results of prequalification.As soon as prequalification is completed, thebidding documents shall be made available to

14

28 See para. 2.44.29 The Bank has prepared a Standard PrequalificationDocument for use by its Borrowers, where appropriate.

Page 22: Copy of procurement guidelines may-2004

the qualified prospective bidders. Forprequalification for groups of contracts to beawarded over a period of time, a limit for thenumber or total value of awards to any onebidder may be made on the basis of thebidder’s resources. The list of prequalified firmsin such instances shall be updated periodically.Verification of the information provided in thesubmission for prequalification shall beconfirmed at the time of award of contract, andaward may be denied to a bidder that is judgedto no longer have the capability or resources tosuccessfully perform the contract.

B. Bidding DocumentsGeneral2.11 The bidding documents shall furnishall information necessary for a prospectivebidder to prepare a bid for the goods andworks to be provided. While the detail andcomplexity of these documents may vary withthe size and nature of the proposed bid packageand contract, they generally include: invitationto bid; instructions to bidders; form of bid; formof contract; conditions of contract, both generaland special; specifications and drawings;relevant technical data (including of geologicaland environmental nature); list of goods or billof quantities; delivery time or schedule ofcompletion; and necessary appendices, such asformats for various securities. The basis for bidevaluation and selection of the lowestevaluated bid shall be clearly outlined in theinstructions to bidders and/or thespecifications. If a fee is charged for the biddingdocuments, it shall be reasonable and reflectonly the cost of their printing and delivery toprospective bidders, and shall not be so high asto discourage qualified bidders. The Borrowermay use an electronic system to distributebidding documents, provided that the Bank issatisfied with the adequacy of such system. Ifbidding documents are distributedelectronically, the electronic system shall besecure to avoid modifications to the biddingdocuments and shall not restrict the access ofBidders to the bidding documents. Guidance on

15

Page 23: Copy of procurement guidelines may-2004

critical components of the bidding documentsare given in the following paragraphs.

2.12 Borrowers shall use the appropriateStandard Bidding Documents (SBDs) issued bythe Bank with minimum changes, acceptable tothe Bank, as necessary to address project-specific conditions. Any such changes shall beintroduced only through bid or contract datasheets, or through special conditions ofcontract, and not by introducing changes in thestandard wording of the Bank’s SBDs. Whereno relevant standard bidding documents havebeen issued, the Borrower shall use otherinternationally recognized standard conditionsof contract and contract forms acceptable to theBank.

Validity of Bids and Bid Security2.13 Bidders shall be required to submit bidsvalid for a period specified in the biddingdocuments which shall be sufficient to enablethe Borrower to complete the comparison andevaluation of bids, review the recommendationof award with the Bank (if required in theProcurement Plan), and obtain all the necessaryapprovals so that the contract can be awardedwithin that period.

2.14 Borrowers have the option of requiringa bid security. When used, the bid security shallbe in the amount and form specified in thebidding documents30 and shall remain valid fora period of four weeks beyond the validityperiod for the bids, in order to providereasonable time for the Borrower to act if thesecurity is to be called. Bid security shall bereleased to unsuccessful bidders once thecontract has been signed with the winningbidder. In place of a bid security, the Borrowermay require bidders to sign a declaration

16

30 The format of the bid security shall be in accordance withthe standard bidding documents and shall be issued by areputable bank or financial institution selected by thebidder. If the institution issuing the security is locatedoutside the country of the Borrower, it shall have acorrespondent financial institution located in the country ofBorrower to make it enforceable.

Page 24: Copy of procurement guidelines may-2004

accepting that if they withdraw or modify theirbids during the period of validity or they areawarded the contract and they fail to sign thecontract or to submit a performance securitybefore the deadline defined in the biddingdocuments, the bidder will be suspended for aperiod of time from being eligible for biddingin any contract with the Borrower.

Language2.15 Prequalification and biddingdocuments and the bids shall be prepared inone of the following languages, selected by theBorrower: English, French, or Spanish. Thecontract signed with the winning bidder shallbe written in the language so selected for thebidding documents, and this language shall bethe one that governs the contractual relationsbetween the Borrower and the winning bidder.In addition to being prepared in English,French, or Spanish, the prequalification andbidding documents may, at the Borrower’soption, also be prepared in the nationallanguage of the Borrower’s country (or thelanguage used nation-wide in the borrower’scountry for commercial transactions).31 If theprequalification and bidding documents areprepared in two languages, bidders shall bepermitted to submit their bids in either of thesetwo languages. In such case, the contract signedwith the winning bidder shall be written in thelanguage in which its bid was submitted, inwhich case this language shall be the one thatgoverns the contractual relations between theBorrower and the winning bidder. If thecontract is signed in a language other thanEnglish, French, or Spanish, and the contract issubject to Bank’s prior review, the Borrowershall provide the Bank with a translation of thecontract in the internationally used language inwhich the bidding documents were prepared.Bidders shall not be required nor permitted tosign contracts in two languages.

1731 The Bank shall be satisfied with the language to be used.

Page 25: Copy of procurement guidelines may-2004

Clarity of Bidding Documents2.16 Bidding documents shall be so wordedas to permit and encourage internationalcompetition and shall set forth clearly andprecisely the work to be carried out, thelocation of the work, the goods to be supplied,the place of delivery or installation, theschedule for delivery or completion, minimumperformance requirements, and the warrantyand maintenance requirements, as well as anyother pertinent terms and conditions. Inaddition, the bidding documents, whereappropriate, shall define the tests, standards,and methods that will be employed to judge theconformity of equipment as delivered, or worksas performed, with the specifications. Drawingsshall be consistent with the text of thespecifications, and an order of precedencebetween the two shall be specified.

2.17 The bidding documents shall specifyany factors, in addition to price, which will betaken into account in evaluating bids, and howsuch factors will be quantified or otherwiseevaluated. If bids based on alternative designs,materials, completion schedules, paymentterms, etc., are permitted, conditions for theiracceptability and the method of their evaluationshall be expressly stated.

2.18 All prospective bidders shall beprovided the same information, and shall beassured of equal opportunities to obtainadditional information on a timely basis.Borrowers shall provide reasonable access toproject sites for visits by prospective bidders.For works or complex supply contracts,particularly for those requiring refurbishingexisting works or equipment, a pre-bidconference may be arranged whereby potentialbidders may meet with the Borrowerrepresentatives to seek clarifications (in personor online). Minutes of the conference shall be

18

Page 26: Copy of procurement guidelines may-2004

provided to all prospective bidders with a copyto the Bank (in hard copy or sent electronically).Any additional information, clarification,correction of errors, or modifications of biddingdocuments shall be sent to each recipient of theoriginal bidding documents in sufficient timebefore the deadline for receipt of bids to enablebidders to take appropriate actions. Ifnecessary, the deadline shall be extended. TheBank shall receive a copy (in hard copy formator sent electronically) and be consulted forissuing a “no objection” when the contract issubject to prior review.

Standards2.19 Standards and technical specificationsquoted in bidding documents shall promote thebroadest possible competition, while assuringthe critical performance or other requirementsfor the goods and/or works underprocurement. As far as possible, the Borrowershall specify internationally accepted standardssuch as those issued by the InternationalStandards Organization with which theequipment or materials or workmanship shallcomply. Where such international standards areunavailable or are inappropriate, nationalstandards may be specified. In all cases, thebidding documents shall state that equipment,material, or workmanship meeting otherstandards, which promise at least substantialequivalence, will also be accepted.

Use of Brand Names2.20 Specifications shall be based onrelevant characteristics and/or performancerequirements. References to brand names,catalog numbers, or similar classifications shallbe avoided. If it is necessary to quote a brandname or catalog number of a particularmanufacturer to clarify an otherwiseincomplete specification, the words “or

19

Page 27: Copy of procurement guidelines may-2004

equivalent” shall be added after such reference.The specification shall permit the acceptance ofoffers for goods which have similarcharacteristics and which provide performanceat least substantially equivalent to thosespecified.

Pricing2.21 Bids for goods shall be invited on thebasis of CIP32 (place of destination) for allgoods manufactured abroad, including thosepreviously imported, and EXW33 (ex works, exfactory, or off-the-shelf) plus cost of inlandtransportation and insurance to the place ofdestination for goods manufactured orassembled in the country of the Borrower.Bidders shall be allowed to arrange for oceanand other transportation and related insurancefrom any eligible source.34 Where installation,commissioning, or other similar services arerequired to be performed by the bidder, as inthe case of “supply and installation” contracts,the bidder shall be required to quote for theseservices, in addition.

2.22 In the case of turnkey contracts, thebidder shall be required to quote the price ofthe installed plant at site, including all costs forsupply of equipment, marine and local

20

32 Refer to INCOTERMS 2000 for further definitions.Published by the International Chamber of Commerce, 38Cours Albert 1er, 75008 Paris, France. CIP is carriage andinsurance paid to (named place of destination). This termmay be used irrespective of the mode of transport, includingmultimodal transport. CIP term is for custom duties andother import taxes unpaid, payment for which is theresponsibility of the Borrower, either for goods previouslyimported or that will be imported. For previously importedgoods, the quoted CIP price shall be distinguishable fromthe original import value of these goods declared to customsand shall include any rebate or mark-up of the local agent orrepresentative and all local costs except import duties andtaxes, which will be paid by the purchaser.33 The EXW price shall include all duties, sales, and othertaxes already paid or payable for the components and rawmaterials used in the manufacture or assembly of theequipment, offered in the bid.34 See para. 1.6, 1.7 and 1.8.

Page 28: Copy of procurement guidelines may-2004

transportation and insurance, installation, andcommissioning, as well as associated works andall other services included in the scope ofcontract such as design, maintenance,operation, etc. Unless otherwise specified in thebidding documents, the turnkey price shallinclude all duties, taxes, and other levies.35

2.23 Bidders for works contracts shall berequired to quote unit prices or lump sumprices for the performance of the works, andsuch prices shall include all duties, taxes, andother levies. Bidders shall be allowed to obtainall inputs (except for unskilled labor) from anyeligible source so that they may offer their mostcompetitive bids.

Price Adjustment2.24 Bidding documents shall state eitherthat (a) bid prices will be fixed or (b) that priceadjustments will be made to reflect any changes(upwards or downwards) in major costcomponents of the contract, such as labor,equipment, materials, and fuel. Priceadjustment provisions are usually not necessaryin simple contracts involving delivery of goodsor completion of works within eighteenmonths, but shall be included in contractswhich extend beyond eighteen months.However, it is normal commercial practice toobtain firm prices for some types of equipmentregardless of the delivery time and, in suchcases, price adjustment provisions are notneeded.

2.25 Prices may be adjusted by the use of aprescribed formula (or formulae) which breaksdown the total price into components that areadjusted by price indices specified for eachcomponent or, alternatively, on the basis ofdocumentary evidence (including actualinvoices) provided by the supplier orcontractor. The use of the formula method of

21

35 Goods in bids for turnkey contracts may be invited on thebasis of DDP (named place of destination) and Biddersshould be free to choose the best arrangement betweenimported goods or goods manufactured in the country ofthe Borrower, in the preparation of their bids.

Page 29: Copy of procurement guidelines may-2004

price adjustment is preferable to that ofdocumentary evidence. The method to be used,the formula (if applicable), and the base datefor application shall be clearly defined in thebidding documents. If the payment currency isdifferent from the source of the input andcorresponding index, a correction factor shallbe applied in the formula, to avoid incorrectadjustment.

Transportation and Insurance2.26 Bidding documents shall permitsuppliers and contractors to arrangetransportation and insurance from any eligiblesource. Bidding documents shall state the typesand terms of insurance to be provided by thebidder. The indemnity payable undertransportation insurance shall be at least 110percent of the contract amount in the currencyof the contract or in a freely convertiblecurrency to enable prompt replacement of lostor damaged goods. For works, a contractor’sAll Risk form of policy usually shall bespecified. For large projects with severalcontractors on a site, a “wrap-up” or totalproject insurance arrangement may be obtainedby the Borrower, in which case the Borrowershall seek competition for such insurance.

2.27 As an exception, if a Borrower wishesto reserve transportation and insurance for theimport of goods to national companies or otherdesignated sources, bidders shall be asked toquote FCA (named place) or CPT (named placeof destination)36 prices in addition to the CIP(place of destination) price specified inparagraph 2.21. Selection of the lowestevaluated bid shall be on the basis of the CIP(place of destination) price, but the Borrowermay sign the contract on FCA or CPT terms andmake its own arrangement for transportationand/or insurance. Under such circumstances,the contract shall be limited to the FCA or CPTcost. If the Borrower does not wish to obtain

22

36 INCOTERMS 2000 for free carrier (named place) and forcarriage paid to (named place of destination), respectively.

Page 30: Copy of procurement guidelines may-2004

insurance coverage in the market, evidenceshall be provided to the Bank that resources arereadily available for prompt payment in afreely convertible currency of the indemnitiesrequired to replace lost or damaged goods.

Currency Provisions2.28 Bidding documents shall state thecurrency or currencies in which bidders are tostate their prices, the procedure for conversionof prices expressed in different currencies into asingle currency for the purpose of comparingbids, and the currencies in which the contractprice will be paid. The following provisions(paragraphs 2.29-2.33) are intended to (a)ensure that bidders have the opportunity tominimize any exchange risk with regard to thecurrency of bid and of payment, and hence mayoffer their best prices; (b) give bidders incountries with weak currencies the option touse a stronger currency and thus provide afirmer basis for their bid price; and (c) ensurefairness and transparency in the evaluationprocess.

Currency of Bid2.29 Bidding documents shall state that thebidder may express the bid price in anycurrency. If the bidder wishes to express the bidprice as a sum of amounts in different foreigncurrencies, they may do so, provided the priceincludes no more than three foreign currencies.Furthermore, the Borrower may require biddersto state the portion of the bid price representinglocal costs incurred in the currency37 of thecountry of the Borrower.

2.30 In bidding documents for works, theBorrower may require bidders to state the bidprice entirely in the local currency, along withthe requirements for payments in up to threeforeign currencies of their choice for expectedinputs from outside the Borrower’s country,expressed as a percentage of the bid price,

2337 Referred to hereafter as local currency.

Page 31: Copy of procurement guidelines may-2004

together with the exchange rates used in suchcalculations.

Currency Conversion for Bid Comparison2.31 The bid price is the sum of allpayments in various currencies required by thebidder. For the purpose of comparing prices,bid prices shall be converted to a singlecurrency selected by the Borrower (localcurrency or fully convertible foreign currency)and stated in the bidding documents. TheBorrower shall make this conversion by usingthe selling (exchange) rates for those currenciesquoted by an official source (such as the CentralBank) or by a commercial bank or by aninternationally circulated newspaper for similartransactions on a date selected in advance, suchsource and date to be specified in the biddingdocuments, provided that the date shall not beearlier than four weeks prior to the deadline forthe receipt of bids, nor later than the originaldate for the expiry of the period of bid validity.

Currency of Payment2.32 Payment of the contract price shall bemade in the currency or currencies in which thebid price is expressed in the bid of thesuccessful bidder.

2.33 When the bid price is required to bestated in the local currency but the bidder hasrequested payment in foreign currenciesexpressed as a percentage of the bid price, theexchange rates to be used for purposes ofpayments shall be those specified by the bidderin the bid, so as to ensure that the value of theforeign currency portions of the bid ismaintained without any loss or gain.

Terms and Methods of Payment2.34 Payment terms shall be in accordancewith the international commercial practicesapplicable to the specific goods and works.

(a) Contracts for supply of goods shallprovide for full payment on thedelivery and inspection, if so required,of the contracted goods except for

24

Page 32: Copy of procurement guidelines may-2004

contracts involving installation andcommissioning, in which case a portionof the payment may be made after theSupplier has complied with all itsobligations under the contract. The useof letters of credit is encouraged so asto assure prompt payment to thesupplier. In major contracts forequipment and plant, provision shall bemade for suitable advances and, incontracts of long duration, for progresspayments during the period ofmanufacture or assembly.

(b) Contracts for works shall provide inappropriate cases for mobilizationadvances, advances on contractor’sequipment and materials, regularprogress payments, and reasonableretention amounts to be released uponcompliance with the Contractor’sobligations under contract.

2.35 Any advance payment for mobilizationand similar expenses, made upon signature of acontract for goods or works, shall be related tothe estimated amount of these expenses and bespecified in the bidding documents. Amountsand timing of other advances to be made, suchas for materials delivered to the site forincorporation in the works, shall also bespecified. The bidding documents shall specifythe arrangements for any security required foradvance payments.

2.36 Bidding documents shall specify thepayment method and terms offered, whetheralternative payment methods and terms will beallowed and, if so, how the terms will affect bidevaluation.

Alternative Bids2.37 The bidding documents shall clearlyindicate when bidders are allowed to submitalternative bids, how alternative bids should besubmitted, how bid prices should be offeredand the basis on which alternative bids shall beevaluated.

25

Page 33: Copy of procurement guidelines may-2004

Conditions of Contract2.38 The contract documents shall clearlydefine the scope of work to be performed, thegoods to be supplied, the rights and obligationsof the Borrower and of the supplier orcontractor, and the functions and authority ofthe engineer, architect, or construction manager,if one is employed by the Borrower, in thesupervision and administration of the contract.In addition to the general conditions ofcontract, any special conditions particular to thespecific goods or works to be procured and thelocation of the project shall be included. Theconditions of contract shall provide a balancedallocation of risks and liabilities.

Performance Security2.39 Bidding documents for works shallrequire security in an amount sufficient toprotect the Borrower in case of breach ofcontract by the Contractor. This security shallbe provided in an appropriate form andamount, as specified by the Borrower in thebidding document.38 The amount of thesecurity may vary, depending on the type ofsecurity furnished and on the nature andmagnitude of the works. A portion of thissecurity shall extend sufficiently beyond thedate of completion of the works to cover thedefects liability or maintenance period up tofinal acceptance by the Borrower; alternatively,contracts may provide for a percentage of eachperiodic payment to be held as retention moneyuntil final acceptance. Contractors may beallowed to replace retention money with anequivalent security after provisional acceptance.

2.40 In contracts for the supply of goods, theneed for performance security depends on themarket conditions and commercial practice forthe particular kind of goods. Suppliers or

26

38 The format of the performance security shall be inaccordance with the standard bidding documents and shallbe issued by a reputable bank or financial institutionselected by the bidder. If the institution issuing the securityis located outside the country of the Borrower, it shall havea correspondent financial institution located in the countryof Borrower to make it enforceable.

Page 34: Copy of procurement guidelines may-2004

manufacturers may be required to provide aguarantee to protect against nonperformance ofthe contract. Such security in an appropriateamount may also cover warranty obligations or,alternatively, a percentage of the payments maybe held as retention money to cover warrantyobligations, and any installation orcommissioning requirements. The security orretention money shall be reasonable in amount.

Liquidated Damages and Bonus Clauses2.41 Provisions for liquidated damages orsimilar provisions in an appropriate amountshall be included in the conditions of contractwhen delays in the delivery of goods,completion of works or failure of the goods orworks to meet performance requirementswould result in extra cost, or loss of revenue orloss of other benefits to the Borrower. Provisionmay also be made for a bonus to be paid tosuppliers or contractors for completion ofworks or delivery of goods ahead of the timesspecified in the contract when such earliercompletion or delivery would be of benefit tothe Borrower.

Force Majeure2.42 The conditions of contract shallstipulate that failure on the part of the partiesto perform their obligations under the contractwill not be considered a default if such failureis the result of an event of force majeure asdefined in the conditions of contract.

Applicable Law and Settlement ofDisputes2.43 The conditions of contract shall includeprovisions dealing with the applicable law andthe forum for the settlement of disputes.International commercial arbitration haspractical advantages over other methods for thesettlement of disputes. Therefore, the Bank

27

Page 35: Copy of procurement guidelines may-2004

recommends that Borrowers use this type ofarbitration in contracts for the procurement ofgoods and works. The Bank shall not be namedarbitrator or be asked to name an arbitrator.39

In case of works contracts, supply andinstallation contracts, and turnkey contracts, thedispute settlement provision shall also includemechanisms such as dispute review boards oradjudicators, which are designed to permit aspeedier dispute settlement.

C. Bid Opening, Evaluation, andAward of Contract

Time for Preparation of Bids2.44 The time allowed for the preparationand submission of bids shall be determinedwith due consideration of the particularcircumstances of the project and the magnitudeand complexity of the contract. Generally, notless than six weeks from the date of theinvitation to bid or the date of availability ofbidding documents, whichever is later, shall beallowed for ICB. Where large works or complexitems of equipment are involved, this periodshall generally be not less than twelve weeks toenable prospective bidders to conductinvestigations before submitting their bids. Insuch cases, the Borrower is encouraged toconvene pre-bid conferences and arrange sitevisits. Bidders shall be permitted to submit bidsby mail or by hand. Borrowers may also useelectronic systems permitting bidders to submitbids by electronic means, provided the Bank issatisfied with the adequacy of the system,including, inter alia, that the system is secure,maintains the confidentiality and authenticityof bids submitted, uses an electronic signaturesystem or equivalent to keep bidders bound totheir bids, and only allows bids to be openedwith due simultaneous electronic authorizationof the bidder and the Borrower. In this case,

28

39 It is understood, however, that officials of theInternational Centre for Settlement of Investment Disputes(ICSID) shall remain free to name arbitrators in theircapacity as ICSID officials.

Page 36: Copy of procurement guidelines may-2004

bidders shall continue to have the option tosubmit their bids in hard copy. The deadlineand place for receipt of bids shall be specifiedin the invitation to bid.

Bid Opening Procedures2.45 The time for the bid opening shall bethe same as for the deadline for receipt of bidsor promptly40 thereafter, and shall beannounced, together with the place for bidopening, in the invitation to bid. The Borrowershall open all bids at the stipulated time andplace. Bids shall be opened in public; bidders ortheir representatives shall be allowed to bepresent (in person or online, when electronicbidding is used). The name of the bidder andtotal amount of each bid, and of any alternativebids if they have been requested or permitted,shall be read aloud (and posted online whenelectronic bidding is used) and recorded whenopened and a copy of this record shall bepromptly sent to the Bank and to all bidderswho submitted bids in time. Bids received afterthe time stipulated, as well as those not openedand read out at bid opening, shall not beconsidered.

Clarifications or Alterations of Bids2.46 Except as otherwise provided inparagraphs 2.63 and 2.64 of these Guidelines,bidders shall not be requested or permitted toalter their bids after the deadline for receipt ofbids. The Borrower shall ask bidders forclarification needed to evaluate their bids butshall not ask or permit bidders to change thesubstance or price of their bids after the bidopening. Requests for clarification and thebidders’ responses shall be made in writing, inhard copy or by an electronic systemsatisfactory to the Bank.41

Confidentiality2.47 After the public opening of bids,information relating to the examination,

29

40 To allow sufficient time to take the bids to the placeannounced for public bid opening.41 See paragraph 2.44

Page 37: Copy of procurement guidelines may-2004

clarification, and evaluation of bids andrecommendations concerning awards shall notbe disclosed to bidders or other persons notofficially concerned with this process until thepublication of contract award.

Examination of Bids2.48 The Borrower shall ascertain whetherthe bids (a) meet the eligibility requirementsspecified in paragraph 1.6, 1.7 and 1.8 of theseGuidelines, (b) have been properly signed, (c)are accompanied by the required securities orrequired declaration signed as specified inparagraph 2.14 of the Guidelines, (d) aresubstantially responsive to the biddingdocuments, and (v) are otherwise generally inorder. If a bid is not substantially responsive,that is, it contains material deviations from orreservations to the terms, conditions, andspecifications in the bidding documents, it shallnot be considered further. The bidder shall notbe permitted to correct or withdraw materialdeviations or reservations once bids have beenopened.42

Evaluation and Comparison of Bids2.49 The purpose of bid evaluation is todetermine the cost to the Borrower of each bidin a manner that permits a comparison on thebasis of their evaluated cost. Subject toparagraph 2.58, the bid with the lowestevaluated cost,43 but not necessarily the lowestsubmitted price, shall be selected for award.

2.50 The bid price read out at the bidopening shall be adjusted to correct anyarithmetical errors. Also, for the purpose ofevaluation, adjustments shall be made for anyquantifiable nonmaterial deviations orreservations. Price adjustment provisionsapplying to the period of implementation of thecontract shall not be taken into account in theevaluation.

2.51 The evaluation and comparison of bidsshall be on CIP (place of destination) prices for

30

42 See para. 2.50 regarding corrections.43 See para. 2.52.

Page 38: Copy of procurement guidelines may-2004

the supply of imported goods44 and EXWprices, plus cost of inland transportation andinsurance to the place of destination, for goodsmanufactured within the Borrower’s country,together with prices for any requiredinstallation, training, commissioning, and othersimilar services.45

2.52 Bidding documents shall also specifythe relevant factors in addition to price to beconsidered in bid evaluation and the manner inwhich they will be applied for the purpose ofdetermining the lowest evaluated bid. Forgoods and equipment, other factors may betaken into consideration including, amongothers, payment schedule, delivery time,operating costs, efficiency and compatibility ofthe equipment, availability of service and spareparts, and related training, safety, andenvironmental benefits. The factors other thanprice to be used for determining the lowestevaluated bid shall, to the extent practicable, beexpressed in monetary terms, or given arelative weight in the evaluation provisions inthe bidding documents.

2.53 Under works and turnkey contracts,contractors are responsible for all duties, taxes,and other levies,46 and bidders shall take thesefactors into account in preparing their bids. Theevaluation and comparison of bids shall be onthis basis. Bid evaluation for works shall bestrictly in monetary terms. Any procedureunder which bids above or below apredetermined assessment of bid values are

31

44 Borrowers may ask for prices on a CIF basis (and bidscompared on that same basis) only when the goods arecarried by sea and the goods are not containerized. CIF shallnot be used for anything other than sea transport. In thecase of manufactured goods, it is unlikely that the choice ofCIF will be appropriate, because these goods are usuallycontainerized. CIP can be used for any mode of transport,including sea and multimodal transport.45 The evaluation of bids shall not take into account: (a)customs duties and other taxes levied on imported goodsquoted CIP (which are excluded of custom duties); (b) salesand similar taxes levied in connection with the sale ordelivery of the goods46 Unless bidding documents specify otherwise for someturnkey contracts (see para. 2.22 ).

Page 39: Copy of procurement guidelines may-2004

automatically disqualified is not acceptable. Iftime is a critical factor, the value of earlycompletion to the Borrower may be taken intoaccount according to criteria presented in thebidding documents, only if the conditions ofcontract provide for commensurate penaltiesfor noncompliance.

2.54 The Borrower shall prepare a detailedreport on the evaluation and comparison ofbids setting forth the specific reasons on whichthe recommendation is based for the award ofthe contract.

Domestic Preferences2.55 At the request of the Borrower, andunder conditions to be agreed under the LoanAgreement and set forth in the biddingdocuments, a margin of preference may beprovided in the evaluation of bids for:

(a) goods manufactured in the country ofthe Borrower when comparing bidsoffering such goods with those offeringgoods manufactured abroad; and

(b) works in member countries below aspecified threshold of GNP47 per capita,when comparing bids from eligibledomestic Contractors with those fromforeign firms.

2.56 Where preference for domesticallymanufactured goods or for domesticContractors is allowed, the methods and stagesset forth in Appendix 2 to these Guidelinesshall be followed in the evaluation andcomparison of bids.

Extension of Validity of Bids2.57 Borrowers shall complete evaluation ofbids and award of contract within the initialperiod of bid validity so that extensions are notnecessary. An extension of bid validity, ifjustified by exceptional circumstances, shall berequested in writing from all bidders before theexpiration date. The extension shall be for the

32

47 Gross national product as defined annually by the Bank.

Page 40: Copy of procurement guidelines may-2004

minimum period required to complete theevaluation, obtain the necessary approvals, andaward the contract. In the case of fixed pricecontracts, requests for second and subsequentextensions will be permissible only if therequest for extension provides for anappropriate adjustment mechanism of thequoted price to reflect changes in the cost ofinputs for the contract over the period ofextension. Whenever an extension of bidvalidity period is requested, bidders shall notbe requested or be permitted to change thequoted (base) price or other conditions of theirbid. Bidders shall have the right to refuse togrant such an extension. If the biddingdocuments require a bid security, bidders mayexercise their right to refuse to grant such anextension without forfeiting their bid security,but those who are willing to extend the validityof their bid shall be required to provide asuitable extension of bid security.

Postqualification of Bidders2.58 If bidders have not been prequalified,the Borrower shall determine whether thebidder whose bid has been determined to offerthe lowest evaluated cost has the capability andresources to effectively carry out the contract asoffered in the bid. The criteria to be met shall beset out in the bidding documents, and if thebidder does not meet them, the bid shall berejected. In such an event, the Borrower shallmake a similar determination for the next-lowest evaluated bidder.

Award of Contract2.59 The Borrower shall award the contract,within the period of the validity of bids, to thebidder who meets the appropriate standards ofcapability and resources and whose bid hasbeen determined (i) to be substantiallyresponsive to the bidding documents and (ii) tooffer the lowest evaluated cost.48 A bidder shallnot be required, as a condition of award, toundertake responsibilities for work not

33

48 Referred to as “lowest evaluated bidder” and “lowestevaluated bid,” respectively.

Page 41: Copy of procurement guidelines may-2004

stipulated in the bidding documents orotherwise to modify the bid as originallysubmitted.

Publication of the Award of Contract2.60 Within two weeks of receiving theBank’s “no objection” to the recommendation ofcontract award, the Borrower shall publish inUNDB online and in dgMarket the resultsidentifying the bid and lot numbers and thefollowing information: (a) name of each bidderwho submitted a bid; (b) bid prices as read outat bid opening; (c) name and evaluated pricesof each bid that was evaluated; (d) name ofbidders whose bids were rejected and thereasons for their rejection; and (e) name of thewinning bidder, and the price it offered, as wellas the duration and summary scope of thecontract awarded.

Rejection of All Bids2.61 Bidding documents usually providethat Borrowers may reject all bids. Rejection ofall bids is justified when there is lack ofeffective competition, or bids are notsubstantially responsive or when bid prices aresubstantially higher than existing budget. Lackof competition shall not be determined solelyon the basis of the number of bidders. Evenwhen only one bid is submitted, the biddingprocess may be considered valid, if the bid wassatisfactorily advertised and prices arereasonable in comparison to market values.Borrowers may, after the Bank’s prior approval,reject all bids. If all bids are rejected, theBorrower shall review the causes justifying therejection and consider making revisions to theconditions of contract, design andspecifications, scope of the contract, or acombination of these, before inviting new bids.

2.62 If the rejection of all bids is due to lackof competition, wider advertising shall beconsidered. If the rejection is due to most or allof the bids being nonresponsive, new bids maybe invited from the initially prequalified firms,or with the agreement of the Bank from onlythose that submitted bids in the first instance.

34

Page 42: Copy of procurement guidelines may-2004

2.63 All bids shall not be rejected and newbids invited on the same bidding and contractdocuments solely for the purpose of obtaininglower prices. If the lowest evaluated responsivebid exceeds the Borrower’s pre-bid costestimates by a substantial margin, the Borrowershall investigate causes for the excessive costand consider requesting new bids as describedin the previous paragraphs. Alternatively, theBorrower may negotiate with the lowestevaluated bidder to try to obtain a satisfactorycontract through a reduction in the scopeand/or a reallocation of risk and responsibilitywhich can be reflected in a reduction of thecontract price. However, substantial reductionin the scope or modification to the contractdocuments may require rebidding.

2.64 The Bank’s prior approval shall beobtained before rejecting all bids, soliciting newbids, or entering into negotiations with thelowest evaluated bidder.

Debriefing2.65 In the publication of Contract Awardreferred to in paragraph 2.60 the Borrower shallspecify that any bidder who wishes to ascertainthe grounds on which its bid was not selected,should request an explanation from theBorrower. The Borrower shall promptly providean explanation of why such bid was notselected, either in writing and/or in adebriefing meeting, at the option of theBorrower. The requesting bidder shall bear allthe costs of attending such a debriefing.

D. Modified ICBOperations Involving a Program ofImports49

2.66 Where the loan provides financing for aprogram of imports, ICB with simplifiedadvertising and currency provisions may be

35

49 Also see para. 3.11.

Page 43: Copy of procurement guidelines may-2004

used for large-value contracts, as defined in theLoan Agreement.50

2.67 The simplified provisions fornotification of ICB procurement do not requirea General Procurement Notice. SpecificProcurement Notices shall be inserted in at leastone newspaper of national circulation in theBorrower’s country (or in the official gazette, ifany, or in an electronic portal with free access)in addition to UNDB online and dgMarket. Theperiod allowed for submission of bids may bereduced to four weeks. Bidding and paymentmay be limited to one currency widely used ininternational trade.

Procurement of Commodities2.68 Market prices of commodities, such asgrain, animal feed, cooking oil, fuel, fertilizer,and metals, fluctuate, depending upon thedemand and supply at any particular time.Many are quoted in established commoditymarkets. Procurement often involves multipleawards for partial quantities to assure securityof supply and multiple purchases over a periodof time to take advantage of favorable marketconditions and to keep inventories low. A list ofprequalified bidders may be drawn up towhom periodic invitations are issued. Biddersmay be invited to quote prices linked to themarket price at the time of or prior to theshipments. Bid validities shall be as short aspossible. A single currency in which thecommodity is usually priced in the market, maybe used for bidding and payment. The currencyshall be specified in the bidding document.Bidding documents may permit telexed orfaxed bids or bids submitted by electronicmeans, and in such cases either no bid securityis required, or standing bid securities valid overa specified period of time have been submittedby prequalified bidders. Standard contractconditions and forms consistent with marketpractices shall be used.

36

50 Procurement of smaller contracts is normally carried outin accordance with procedures followed by the private orpublic entity handling the imports, or other establishedcommercial practices acceptable to the Bank, as described inpara. 3.12.

Page 44: Copy of procurement guidelines may-2004

III. OTHER METHODS OFPROCUREMENT

General3.1 This Section describes the methods ofprocurement that can be used where ICB wouldnot be the most economic and efficient methodof procurement, and where other methods aredeemed more appropriate.51 The Bank’spolicies with respect to margins of preferencefor domestically manufactured goods andworks contracts do not apply to methods ofprocurement other than ICB. Paragraphs 3.2 to3.7 describe the generally used methods indescending order of preference and theremaining paragraphs the methods used inspecific circumstances.

Limited International Bidding3.2 Limited International Bidding (LIB) isessentially ICB by direct invitation withoutopen advertisement. It may be an appropriatemethod of procurement where (a) there is onlya limited number of suppliers, or (b) otherexceptional reasons may justify departure fromfull ICB procedures. Under LIB, Borrowers shallseek bids from a list of potential suppliersbroad enough to assure competitive prices,such list to include all suppliers when there areonly a limited number. Domestic preferencesare not applicable in the evaluation of bidsunder LIB. In all respects other thanadvertisement and preferences, ICB proceduresshall apply, including the publication of theAward of Contract as indicated in paragraph2.60.

National Competitive Bidding3.3 National Competitive Bidding (NCB) isthe competitive bidding procedure normallyused for public procurement in the country of

37

51 Contracts shall not be divided into smaller units in orderto make them less attractive for ICB procedures; anyproposal to divide a contract into smaller packages shallrequire the prior approval of the Bank.

Page 45: Copy of procurement guidelines may-2004

the Borrower, and may be the most appropriateway of procuring goods or works which, bytheir nature or scope, are unlikely to attractforeign competition. To be acceptable for use inBank-financed procurement, these proceduresshall be reviewed and modified52 as necessaryto assure economy, efficiency, transparency, andbroad consistency with the provisions includedin Section I of these Guidelines. NCB may bethe most appropriate method of procurementwhere foreign bidders are not expected to beinterested because (a) the contract values aresmall, (b) works are scattered geographically orspread over time, (c) works are labor intensive,or (d) the goods or works are available locallyat prices below the international market. NCBprocedures may also be used where theadvantages of ICB are clearly outweighed bythe administrative or financial burden involved.

3.4 Advertising may be limited to thenational press or official gazette, or a free andopen access website. Bidding documents maybe only in a national language of theborrower’s country (or the language usednation-wide in the borrower’s country forcommercial transactions), and the currency ofthe country of the Borrower is generally usedfor the purposes of bidding and payment. Inaddition, the bidding documents shall provideclear instructions on how bids should besubmitted, how prices should be offered, andthe place and time for submission of bids.Adequate response time for preparation andsubmission of bids shall be provided. Theprocedures shall provide for adequatecompetition in order to ensure reasonableprices, and methods used in the evaluation ofbids and the award of contracts shall beobjective and made known to all bidders in thebidding documents and not be appliedarbitrarily. The procedures shall also includepublic opening of bids, publication of results ofevaluation and of the award of contract and

38

52 Any such modification shall be reflected in the LoanAgreement.

Page 46: Copy of procurement guidelines may-2004

provisions for bidders to protest. If foreignfirms wish to participate under thesecircumstances, they shall be allowed to do so.

Shopping 3.5 Shopping is a procurement methodbased on comparing price quotations obtainedfrom several suppliers (in the case of goods) orfrom several contractors (in the case of civilworks), with a minimum of three, to assurecompetitive prices, and is an appropriatemethod for procuring readily available off-the-shelf goods or standard specificationcommodities of small value, or simple civilworks of small value. Requests for quotationsshall indicate the description and quantity ofthe goods or specifications of works, as well asdesired delivery (or completion) time andplace. Quotations may be submitted by letter,facsimile or by electronic means. The evaluationof quotations shall follow the same principlesas of open bidding. The terms of the acceptedoffer shall be incorporated in a purchase orderor brief contract.

Direct Contracting3.6 Direct contracting is contractingwithout competition (single source) and may bean appropriate method under the followingcircumstances:

(a) An existing contract for goods orworks, awarded in accordance withprocedures acceptable to the Bank, maybe extended for additional goods orworks of a similar nature. The Bankshall be satisfied in such cases that noadvantage could be obtained by furthercompetition and that the prices on theextended contract are reasonable.Provisions for such an extension, ifconsidered likely in advance, shall beincluded in the original contract.

(b) Standardization of equipment or spareparts, to be compatible with existingequipment, may justify additionalpurchases from the original Supplier.

39

Page 47: Copy of procurement guidelines may-2004

For such purchases to be justified, theoriginal equipment shall be suitable,the number of new items shallgenerally be less than the existingnumber, the price shall be reasonable,and the advantages of another make orsource of equipment shall have beenconsidered and rejected on groundsacceptable to the Bank.

(c) The required equipment is proprietaryand obtainable only from one source.

(d) The Contractor responsible for aprocess design requires the purchase ofcritical items from a particular Supplieras a condition of a performanceguarantee.

(e) In exceptional cases, such as inresponse to natural disasters.

3.7 After the contract signature, theBorrower shall publish in UNDB online and indgMarket the name of the contractor, price,duration, and summary scope of the contract.This publication may be done quarterly and inthe format of a summarized table covering theprevious period.

Force Account3.8 Force account, that is, construction bythe use of the Borrower’s own personnel andequipment,53 may be the only practical methodfor constructing some kinds of works. The useof force account may be justified where:

(a) quantities of work involved cannot bedefined in advance;

(b) works are small and scattered or inremote locations for which qualifiedconstruction firms are unlikely to bid atreasonable prices;

40

53 A government-owned construction unit that is notmanagerially and financially autonomous shall beconsidered a force account unit. “Force account” isotherwise known as “direct labor,” “departmental forces,”or “direct work.”

Page 48: Copy of procurement guidelines may-2004

(c) work is required to be carried outwithout disrupting ongoing operations;

(d) risks of unavoidable work interruptionare better borne by the Borrower thanby a Contractor; and

(e) there are emergencies needing promptattention.

Procurement from United NationsAgencies3.9 There may be situations in whichprocurement directly from specialized agenciesof the United Nations (UN), acting as suppliers,pursuant to their own procedures, may be themost appropriate way of procuring: (a) smallquantities of off-the-shelf goods, primarily inthe fields of education and health; and (b)specialized products where the number ofsuppliers is limited such as for vaccines ordrugs.

Procurement Agents3.10 Where Borrowers lack the necessaryorganization, resources, and experience,Borrowers may wish (or be required by theBank) to employ, as their agent, a firmspecializing in handling procurement. Theagent shall follow all the procurementprocedures provided for in the Loan Agreementand as further elaborated in the ProcurementPlan approved by the Bank on behalf of theBorrower, including use of Bank SBDs, reviewprocedures, and documentation. This alsoapplies in cases where UN agencies act asprocurement agents.54 ManagementContractors may be employed in a similarmanner for a fee to contract for miscellaneousworks involving reconstruction, repairs,rehabilitation, and new construction in

41

54 The Consultant Guidelines shall apply for the selection ofprocurement and inspection agents. The cost or fee of theprocurement or inspection agent is eligible for financingfrom the Bank loan, if so provided in the Loan Agreementand in the Procurement Plan , and provided the terms andconditions of selection and employment are acceptable tothe Bank.

Page 49: Copy of procurement guidelines may-2004

emergency situations, or where large numbersof small contracts are involved.

Inspection Agents3.11 Preshipment inspection andcertification of imports is one of the safeguardsfor the Borrower, particularly where thecountry has a large import program. Theinspection and certification usually coversquality, quantity, and reasonableness of price.Imports procured through ICB procedures shallnot be subject to price verification, but onlyverification for quality and quantity. However,imports not procured through ICB mayadditionally be subjected to price verification.The inspection agents are ordinarily paid for ona fee basis levied on the value of the goods.Costs for certification of imports shall not beconsidered in the evaluation of bids under ICB.

Procurement in Loans to FinancialIntermediaries3.12 Where the loan provides funds to anintermediary institution such as an agriculturalcredit institution or a development financecompany, to be re-lent to beneficiaries such asindividuals, private sector enterprises, smalland medium enterprises, or autonomouscommercial enterprises in the public sector forthe partial financing of subprojects, theprocurement is usually undertaken by therespective beneficiaries in accordance withestablished private sector or commercialpractices, which are acceptable to the Bank.However, even in these situations, ICB may bethe most appropriate procurement method forthe purchase of large single items or in caseswhere large quantities of like goods can begrouped together for bulk purchasing.

42

Page 50: Copy of procurement guidelines may-2004

Procurement under BOO/BOT/BOOT,Concessions and Similar Private SectorArrangements3.13 Where the Bank is participating infinancing the cost of a project procured under aBOO/BOT/ BOOT,55 concessions or similartype of private sector arrangement, either of thefollowing procurement procedures shall beused, as provided for in the Loan Agreementand further elaborated in the Procurement Planapproved by the Bank:

(a) The concessionaire or entrepreneurunder the BOO/BOT/ BOOT or similartype of contract56 shall be selectedunder ICB procedures acceptable to theBank, which may include several stagesin order to arrive at the optimalcombination of evaluation criteria, suchas the cost and magnitude of thefinancing offered, the performancespecifications of the facilities offered,the cost charged to the user orpurchaser, other income generated forthe Borrower or purchaser by thefacility, and the period of the facility’sdepreciation. The said entrepreneurselected in this manner shall then befree to procure the goods, works, andservices required for the facility fromeligible sources, using its ownprocedures. In this case, the ProjectAppraisal Document, and the LoanAgreement shall specify the type ofexpenditures incurred by the saidentrepreneur towards which Bankfinancing will apply.

Or,

(b) If the said concessionaire orentrepreneur has not been selected inthe manner set forth in subparagraph

43

55 BOO: Build, Own, Operate; BOT: Build, Operate, Transfer;BOOT: Build, Own, Operate, Transfer.56 For projects such as toll roads, tunnels, harbors, bridges,power stations, waste disposal plants, and waterdistribution systems.

Page 51: Copy of procurement guidelines may-2004

(a) above, the goods, works, or servicesrequired for the facility and to befinanced by the Bank shall be procuredin accordance with ICB proceduresdefined in Section II.

Performance-Based Procurement3.14 Performance Based Procurement,57 alsocalled Output-Based Procurement, refers tocompetitive procurement processes (ICB orNCB) resulting in a contractual relationshipwhere payments are made for measuredoutputs instead of the traditional way whereinputs are measured. The technicalspecifications define the desired result andwhich outputs will be measured including howthey will be measured. Those outputs aim atsatisfying a functional need both in terms ofquality, quantity and reliability. Payment ismade in accordance with the quantity ofoutputs delivered, subject to their delivery atthe level of quality required. Reductions frompayments (or retentions) may be made forlower-quality level of outputs and, in certaincases, premiums may be paid for higher qualitylevel of outputs. The bidding documents do notnormally prescribe the inputs, nor a workmethod for the contractor. The contractor is freeto propose the most appropriate solution, basedon mature and well proven experience andshall demonstrate that the level of qualityspecified in the bidding documents will beachieved.

3.15 Performance Based Procurement (orOutput Based Procurement) can involve: (a) theprovision of services to be paid on the basis ofoutputs; (b) design, supply, construction (orrehabilitation) and commissioning of a facilityto be operated by the borrower; or (c) design,supply, construction (or rehabilitation) of a

44

57 The use of Performance Based Procurement in Bankfinanced projects should be the result of the satisfactorytechnical analysis of the different options available andshould be either included in the PAD or subject to priorapproval by the Bank for incorporation into theprocurement plan.

Page 52: Copy of procurement guidelines may-2004

facility and provision of services for itsoperation and maintenance for a defined periodof years after its commissioning.58 For the caseswhere design, supply and/or construction arerequired, prequalification is normally requiredand the use of Two-Stage Bidding as indicatedin paragraph 2.6 shall apply.

Procurement under Loans Guaranteed bythe Bank3.16 If the Bank guarantees the repaymentof a loan made by another lender, the goodsand works financed by the said loan shall beprocured with due attention to economy andefficiency and in accordance with procedureswhich meet the requirements of paragraph 1.5.

Community Participation in Procurement3.17 Where, in the interest of projectsustainability, or to achieve certain specificsocial objectives of the project, it is desirable inselected project components to (a) call for theparticipation of local communities and/ornongovernmental organizations (NGOs) in thedelivery of services, or (b) increase theutilization of local know-how and materials, or(c) employ labor-intensive and otherappropriate technologies, the procurementprocedures, specifications, and contractpackaging shall be suitably adapted to reflectthese considerations, provided these are efficientand are acceptable to the Bank. The proceduresproposed and the project components to becarried out by community participation shall beoutlined in Loan Agreement and furtherelaborated in the Procurement Plan or therelevant project implementation documentapproved by the Bank.

45

58 Examples of such type of procurement are: (i) for the caseof procurement of services: provision of medical services,i.e. payments for specific services, like office visits, ordefined laboratory tests, etc. ; (ii) for the case ofprocurement of a facility: Design, Procurement,Construction, and Commissioning of a thermal power plantto be operated by the borrower; (iii) for the case ofprocurement of a facility and services: Design, Procurement,Construction (or Rehabilitation) of a road and operation andmaintenance of the road for 5 years after construction.

Page 53: Copy of procurement guidelines may-2004

APPENDIX 1: REVIEW BY THE BANKOF PROCUREMENT DECISIONS

Scheduling of Procurement1. The Bank shall review the procurementarrangements proposed by the Borrower in theProcurement Plan for its conformity with theLoan Agreement and these Guidelines. TheProcurement Plan shall cover an initial periodof at least 18 months. The Borrower shallupdate the Procurement Plan on an annualbasis or as needed always covering the next 18months period of project implementation. Anyrevisions proposed to the Procurement Planshall be furnished to the Bank for its priorapproval.

Prior Review2. With respect to all contracts59 which aresubject to the Bank’s prior review:

(a) In cases where prequalification is used,the Borrower shall, beforeprequalification submissions areinvited, furnish the Bank with the draftdocuments to be used, including thetext of the invitation to prequalify, theprequalification questionnaire, and theevaluation methodology, together witha description of the advertisingprocedures to be followed, and shallintroduce such modifications in saidprocedure and documents, as the Bankshall reasonably request. The reportevaluating the applications received bythe Borrower, the list of proposedprequalified bidders, together with astatement of their qualifications and ofthe reasons for the exclusion of anyapplicant for prequalification, shall be

46

59 For contracts procured on the basis of direct contractingunder paras. 3.6 and 3.7, the Borrower shall furnish to theBank for its approval, prior to contract execution, a copy ofthe specifications and the draft contract. The contract shallbe executed only after the Bank has given its approval, andthe provisions in (h) of this paragraph shall apply withrespect to the executed contract.

Page 54: Copy of procurement guidelines may-2004

furnished by the Borrower to the Bankfor its comments before the applicantsare notified of the Borrower’s decision,and the Borrower shall make suchadditions to, deletions from, ormodifications in the said list as theBank shall reasonably request.

(b) Before bids are invited, the Borrowershall furnish to the Bank for itscomments, draft bidding documents,including the invitation to bid;instructions to bidders, including thebasis of bid evaluation and contractaward; and the conditions of contractand specifications for the civil works,supply of goods, or installation ofequipment, etc., as the case may be,together with a description of theadvertising procedures to be followedfor the bidding (if prequalification hasnot been used), and shall make suchmodifications in the said documents asthe Bank shall reasonably request. Anyfurther modification shall require theBank’s approval before it is issued tothe prospective bidders.

(c) After bids have been received andevaluated, the Borrower shall, before afinal decision on the award is made,furnish to the Bank, in sufficient timefor its review, a detailed report(prepared, if the Bank shall so request,by experts acceptable to the Bank), onthe evaluation and comparison of thebids received, together with therecommendations for award and suchother information as the Bank shallreasonably request. The Bank shall, if itdetermines that the intended awardwould be inconsistent with the LoanAgreement and/or the ProcurementPlan, promptly inform the Borrowerand state the reasons for suchdetermination. Otherwise, the Bankshall provide its no objection to therecommendation for contract award.

47

Page 55: Copy of procurement guidelines may-2004

The Borrower shall award the contractonly after receiving the “no objection”from the Bank.

(d) If the Borrower requires an extension ofbid validity to complete the process ofevaluation, obtain necessary approvalsand clearances, and to make the award,it should seek the Bank’s priorapproval for the first request forextension, if it is longer than fourweeks, and for all subsequent requestsfor extension, irrespective of the period.

(e) If after publication of the results ofevaluation, the Borrower receivesprotests or complaints from bidders, acopy of the complaint and a copy of theBorrower’s response shall be sent to theBank for information.

(f) If as result of analysis of a protest theborrower changes its contract awardrecommendation, the reasons for suchdecision and a revised evaluationreport shall be submitted to the Bankfor no objection. The Borrower shallprovide a republication of the contractaward in the format of paragraph 2.60of these Guidelines.

(g) The terms and conditions of a contractshall not, without the Bank’s priorapproval, materially differ from thoseon which bids were asked orprequalification of Contractors, if any,was invited.

(h) One conformed copy of the contractshall be furnished to the Bank promptlyafter its execution and prior to deliveryto the Bank of the first application forwithdrawal of funds from the LoanAccount in respect of such contract.Where payments for the contract are tobe made out of a Special Account (SA),a copy of the contract shall befurnished to the Bank prior to the

48

Page 56: Copy of procurement guidelines may-2004

making of the first payment out of theSA in respect of such contract.

(i) All evaluation reports shall beaccompanied by a summary of theprocurement on a form provided by theBank. The description and amount ofthe contract, together with the nameand address of the successful bidder,shall be subject to release by the Bankupon receipt of the signed copy of thecontract.

3. Modifications. In the case of contractssubject to prior review, before granting amaterial extension of the stipulated time forperformance of a contract, agreeing to anymodification or waiver of the conditions ofsuch contract, including issuing any changeorder or orders under such contract (except incases of extreme urgency) which would inaggregate increase the original amount of thecontract by more than 15 percent of the originalprice, the Borrower shall seek the Bank’s noobjection to the proposed extension,modification, or change order. If the Bankdetermines that the proposal would beinconsistent with the provisions of the LoanAgreement and/or Procurement Plan, it shallpromptly inform the Borrower and state thereasons for its determination. A copy of allamendments to the contract shall be furnishedto the Bank for its record.

4. Translations. If a contract awardedunder ICB procedures is subject to prior-reviewand is written in the national language,60 (orthe language used nation-wide in theborrower’s country for commercialtransactions) a certified translation of thecontract in the internationally used languagespecified in the bidding documents (English,French, or Spanish) shall be furnished to theBank together with the conformed copy of thecontract. Such certified translations shall also befurnished to the Bank, for any subsequentmodifications of such contracts.

49

60 Refer to para. 2.15.

Page 57: Copy of procurement guidelines may-2004

Post Review5. The Borrower shall retain alldocumentation with respect to each contractnot governed by paragraph two during Projectimplementation and up to two years after theclosing date of the Loan Agreement. Thisdocumentation would include, but not belimited to, the signed original of the contract,the analysis of the respective proposals, andrecommendations for award, for examinationby the Bank or by its consultants. The Borrowershall also furnish such documentation to theBank upon request. If the Bank determines thatthe goods, works or services were not procuredin accordance with the agreed procedures, asreflected in the Loan Agreement and furtherdetailed in the Procurement Plan approved bythe Bank or that the contract itself is notconsistent with such procedures, it may declaremisprocurement as established in paragraph1.12 of the Guidelines. The Bank shall promptlyinform the Borrower the reasons for suchdetermination.

50

Page 58: Copy of procurement guidelines may-2004

APPENDIX 2: DOMESTICPREFERENCES

Preference for Domestically ManufacturedGoods1. The Borrower may, with the agreementof the Bank, grant a margin of preference in theevaluation of bids under ICB procedures to bidsoffering certain goods manufactured in thecountry of the Borrower, when compared tobids offering such goods manufacturedelsewhere. In such cases, bidding documentsshall clearly indicate any preference to begranted to domestic manufactured goods andthe information required to establish theeligibility of a bid for such preference. Thenationality of the manufacturer or Supplier isnot a condition for such eligibility. The methodsand stages set forth hereunder shall be followedin the evaluation and comparison of bids.

2. For comparison, responsive bids shallbe classified in one of the following threegroups:

(a) Group A: bids exclusively offeringgoods manufactured in the country ofthe Borrower if the bidder establishesto the satisfaction of the Borrower andthe Bank that (i) labor, raw material,and components from within thecountry of the Borrower will accountfor 30 percent or more of the EXW priceof the product offered, and (ii) theproduction facility in which thosegoods will be manufactured orassembled has been engaged inmanufacturing/assembling such goodsat least since the time of bidsubmission.

(b) Group B: all other bids offering goodsmanufactured in the country of theBorrower.

(c) Group C: bids offering goodsmanufactured abroad that have been

51

Page 59: Copy of procurement guidelines may-2004

already imported or that will bedirectly imported.

3. The price quoted for goods in bids ofGroups A and B shall include all duties andtaxes paid or payable on the basic materials orcomponents purchased in the domestic marketor imported, but shall exclude the sales andsimilar taxes on the finished product. The pricequoted for goods in bids of Group C shall be onCIP (place of destination), which is exclusive ofcustoms duties and other import taxes alreadypaid or to be paid.

4. In the first step, all evaluated bids ineach group shall be compared to determine thelowest bid in each group. Such lowestevaluated bids shall be compared with eachother and if, as a result of this comparison, abid from Group A or Group B is the lowest, itshall be selected for the award.

5. If as a result of the comparison underparagraph four above, the lowest evaluated bidis a bid from Group C, the lowest evaluated bidfrom Group C shall be further compared withthe lowest evaluated bid from Group A afteradding to the evaluated price of goods offeredin the bid from Group C, for the purpose of thisfurther comparison only, an amount equal to 15percent of the CIP bid price. The lowestevaluated bid determined from this lastcomparison shall be selected.

6. In the case of single responsibility orturnkey contracts for the supply of a number ofdiscrete items of equipment as well as majorinstallation and/or construction services nomargin of preference shall apply.61 However,with Bank’s “no objection”, bids for such

52

61 This does not refer to the supply of goods withsupervision of installation in the same contract which isconsidered a contract for the supply of goods, and thereforeeligible for the application of domestic preference in thegoods component.

Page 60: Copy of procurement guidelines may-2004

contracts may be invited and evaluated on thebasis of DDP62 (named place of destination)prices for goods manufactured abroad.

Preference for Domestic Contractors7. For contracts for works to be awardedon the basis of ICB, eligible Borrowers may,with the agreement of the Bank, grant a marginof preference of 7.5 percent to domesticcontractors,63 in accordance with, and subjectto, the following provisions:

(a) Contractors applying for suchpreference shall be asked to provide, aspart of the data for qualification,64 suchinformation, including details ofownership, as shall be required todetermine whether, according to theclassification established by theBorrower and accepted by the Bank, aparticular contractor or group ofcontractors qualifies for a domesticpreference. The bidding documentsshall clearly indicate the preference andthe method that will be followed in theevaluation and comparison of bids togive effect to such preference.

53

62 DDP is the INCOTERM which stands for “Delivered DutyPaid” where the seller delivers the goods to the buyer,cleared for import, and not unloaded from any arrivingmeans of transport at the named place of destination. Theseller has to bear all the costs and risks involved in bringingthe goods thereto including, where applicable, any duty forimport in the country of destination, and unloading at finaldestination as part of the turn-key contract. In countries thatexempt bidders on imports under contracts financed by theBank, comparison shall be made on the basis of non-exemption of duties and taxes on importation of goodsmanufactured abroad and the bidding documents mayindicate that, before contract signature, the purchaser andthe winning bidder will identify the amount of taxespayable for importation of the goods offered resulting fromthat exemption. However, the contract amount to be signedwill not include the identified total amount of exemptedduties and taxes63 Preference for domestic Contractors is applicable only incountries which qualify. 64 At the prequalification and/or at the bidding stage.

Page 61: Copy of procurement guidelines may-2004

(b) After bids have been received andreviewed by the Borrower, responsivebids shall be classified into thefollowing groups:

(i) Group A: bids offered bydomestic contractors eligiblefor the preference.

(ii) Group B: bids offered by othercontractors.

For the purpose of evaluation and comparisonof bids, an amount equal to 7.5 percent of thebid amount shall be added to bids receivedfrom Contractors in Group B.

54

Page 62: Copy of procurement guidelines may-2004

APPENDIX 3: GUIDANCE TOBIDDERS

Purpose1. This Appendix provides guidance topotential bidders wishing to participate inBank-financed procurement.

Responsibility for Procurement2. The responsibility for theimplementation of the project, and therefore forthe payment of goods, works, and servicesunder the project, rests solely with theBorrower. The Bank, for its part, is required byits Articles of Agreement to ensure that fundsare paid from a Bank loan only as expendituresare incurred. Disbursements of the proceeds ofa loan are made only at the Borrower’s request.Supporting evidence that the funds are used inaccordance with the Loan Agreement and/orthe Procurement Plan shall be submitted withthe Borrower’s withdrawal application.Payment may be made (a) to reimburse theBorrower for payment(s) already made from itsown resources, (b) directly to a third party(usually to a supplier or contractor), or (c) to acommercial bank for expenditures against aWorld Bank Special Commitment covering acommercial bank’s letter of credit.65 Asemphasized in paragraph 1.2 of the Guidelines,the Borrower is legally responsible for theprocurement. It invites, receives, and evaluatesbids, and awards the contract. The contract isbetween the Borrower and the supplier orcontractor. The Bank is not a party to thecontract.

Bank’s Role3. As stated in paragraph 1.11 of theGuidelines, the Bank reviews the procurementprocedures, documents, bid evaluations, awardrecommendations, and the contract to ensure

55

65 A complete description of the Bank’s disbursementprocedures is provided in the Disbursement Handbook(available on the Bank’s website athttp://www.worldbank.org/projects.

Page 63: Copy of procurement guidelines may-2004

that the process is carried out in accordancewith agreed procedures, as required in the LoanAgreement. In the case of major contracts, thedocuments are reviewed by the Bank prior totheir issue, as described in Appendix 1. Also, if,at any time in the procurement process (evenafter the award of contract), the Bank concludesthat the agreed procedures were not followedin any material respect, the Bank may declaremisprocurement, as described in paragraph1.12. However, if a Borrower has awarded acontract after obtaining the Bank’s “noobjection,” the Bank will declaremisprocurement only if the “no objection” wasissued on the basis of incomplete, inaccurate, ormisleading information furnished by theBorrower. Furthermore, if the Bank determinesthat corrupt or fraudulent practices wereengaged in by representatives of the Borroweror of the bidder, the Bank may impose theapplicable sanctions set forth in paragraph 1.14of the Guidelines.

4. The Bank has published StandardBidding Documents (SBDs) for various types ofprocurement. As stated in paragraph 2.12 of theGuidelines, it is mandatory for the Borrower touse these documents, with minimum changesto address country- and project-specific issues.The prequalification and bidding documentsare finalized and issued by the Borrower.

Information on Bidding5. Information on bidding opportunitiesunder ICB may be obtained from the GeneralProcurement Notice and the SpecificProcurement Notices as described inparagraphs 2.7 and 2.8 of the Guidelines.General guidance on participation, as well asadvance information on business opportunitiesin upcoming projects, may be obtained from theWorld Bank website66 as well as from theInfoshop.67 Project Appraisal Documents (PAD)

56

66 http://www.worldbank.org.67 The Infoshop address is the World Bank address at 1818H Street, N.W., Washington, D.C., 20433, U.S.A. The ProjectDatabase is available at:http://www.worldbank.org/projects/.

Page 64: Copy of procurement guidelines may-2004

are also available from the Infoshop and on theBank’s website upon approval of the loan.

Bidder’s Role6. Once a bidder receives theprequalification or bidding document, thebidder should study the documents carefully todecide if it can meet the technical, commercial,and contractual conditions, and if so, proceedto prepare its bid. The bidder should thencritically review the documents to see if there isany ambiguity, omission, or internalcontradiction, or any feature of specifications orother conditions which are unclear or appeardiscriminatory or restrictive; if so, it shouldseek clarification from the Borrower, in writing,within the time period specified in the biddingdocuments for seeking clarifications.

7. The criteria and methodology forselection of the successful bidder are outlinedin the bidding documents, generally underInstructions to Bidders and Specifications. Ifthese are not clear, clarification should besimilarly sought from the Borrower.

8. In this connection it should beemphasized that the specific biddingdocuments issued by the Borrower govern eachprocurement, as stated in paragraph 1.1 of theGuidelines. If a bidder feels that any of theprovisions in the documents are inconsistentwith the Guidelines, it should also raise thiswith the Borrower.

9. It is the responsibility of the bidder toraise any issue of ambiguity, contradiction,omission, etc., prior to the submission of its bid,to assure submission of a fully responsive andcompliant bid, including all the supportingdocuments requested in the biddingdocuments. Noncompliance with critical(technical and commercial) requirements willresult in rejection of the bid. If a bidder wishesto propose deviations to a noncriticalrequirement, or propose an alternative solution,the bidder should quote the price for the fullycompliant bid and then separately indicate the

57

Page 65: Copy of procurement guidelines may-2004

adjustment in price that can be offered if thedeviation is accepted. Alternative solutionsshould be offered only when authorized in thebidding documents. Once bids are received andpublicly opened, bidders will not be required orpermitted to change the price or substance of abid.

Confidentiality10. As stated in paragraph 2.47 of theGuidelines, the process of bid evaluation shallbe confidential until the publication of contractaward . This is essential to enable the Borrowerand Bank reviewers to avoid either the realityor perception of improper interference. If at thisstage a bidder wishes to bring additionalinformation to the notice of the Borrower, theBank, or both, it should do so in writing.

Action by the Bank11. Bidders are free to send copies of theircommunications on issues and questions withthe Borrower to the Bank or to write to theBank directly, when Borrowers do not respondpromptly, or the communication is a complaintagainst the Borrower. All such communicationsshould be addressed to the Task Team Leaderfor the project, with a copy to the CountryDirector for the borrowing country and to theRegional Procurement Adviser. Names of TaskTeam Leaders are available in the PAD.

12. References received by the Bank frompotential bidders, prior to the closing date forsubmission of the bids, will, if appropriate, bereferred to the Borrower with the Bank’scomments and advice, for action or response.

13. Communication received from biddersafter the opening of the bids, will be handled asfollows. In the case of contracts not subject toprior review by the Bank, the communicationwill be sent to the Borrower for dueconsideration and appropriate action, if any,and these will be reviewed during subsequentsupervision of the project by Bank staff. In thecases of contracts subject to the prior reviewprocess, the communication will be examined

58

Page 66: Copy of procurement guidelines may-2004

by the Bank, in consultation with the Borrower.If additional data is required to complete thisprocess, these will be obtained from theBorrower. If additional information orclarification is required from the bidder, theBank will ask the Borrower to obtain it andcomment or incorporate it, as appropriate, inthe evaluation report. The Bank’s review willnot be completed until the communication isfully examined and considered.

14. Except for acknowledgment, the Bankwill not enter into discussion or correspondencewith any bidder during the evaluation andreview process of the procurement, until awardof the contract is published.

Debriefing15. As stated in paragraph 2.65, if, afternotification of award, a bidder wishes toascertain the grounds on which its bid was notselected, it should address its request to theBorrower. If the bidder is not satisfied with theexplanation given and wishes to seek a meetingwith the Bank, it may do so by addressing theRegional Procurement Adviser for theborrowing country, who will arrange a meetingat the appropriate level and with the relevantstaff. In this discussion, only the bidder’s bidcan be discussed and not the bids ofcompetitors.

59

Page 67: Copy of procurement guidelines may-2004

60

Page 68: Copy of procurement guidelines may-2004

61

Page 69: Copy of procurement guidelines may-2004

62

Page 70: Copy of procurement guidelines may-2004

63

Page 71: Copy of procurement guidelines may-2004

64

Page 72: Copy of procurement guidelines may-2004

65

Page 73: Copy of procurement guidelines may-2004

66