Upload
goyalamar87
View
528
Download
7
Embed Size (px)
Citation preview
CircleProject Name
Project Contract Number
Product Line
Spare Warranty Document
Spare SOW (R&R, etc.)
Penalty Clauses
Customer Spare Stock document
Customer Spare Distribution list (I&C/Customer)
List of pending faulty cards in the Engineering phase (From customer side)
List of pending faulty cards in the Engineering phase (From Huawei side)
Remarks (Any Spare related existing issue)
Project HandOver List of Documents - Core NetworkSr.No Document Type List of Documents Copy State
1 Design
SoftSoftSoftSoftSoft
Data Configuration Scripts ( UMG and MSC and Other NSS Equipments)Important Parameters Table(Soft Parameter&Timer&Global Parameter Etc.)
Soft
2 Contract
Main Sales Contract(Soft Copy) SoftService Contract(O&M/Warranty/AMC Soft Copy:Including Service Level Agreements ) SoftMaintenance Responsibilty Matrix Both Customer and Huawei SoftCards Repair & Return Process Soft
3 Engineering
SoftSoft
Power Supply Details SoftRack layout Soft
4 Material Handling
SoftSoft
BoQ of Engineering Spares including Third Party Parts SoftPacking List of Engineering Spares including Third Party Parts Soft
5
SoftSoftSoftSoft
6
SoftSoft
Stability Test report SoftExternal Alarm testing report ((If any) ) Soft
7 Softwares & CDsSoftSoft
8 Precaution and Rectification Pls See the Rectification_for_NSS 2009 Q3(Pls Contact With TAC For the Documents) Soft
Network Design Document (Including Signaling &Traffic& Billing&Clock&LI Etc.) IP Address Distribution Document(Signaling &Traffic& OM IP Address&Port &VLAN Etc.)E1 Distribution Document(To BSC&To POI Etc.)Data Configuration Rule Document(How to Implement Kinds of Service)Network Protection Design(NE Level&Card Level,Pls See the Attachment)
SoftSoft
Labelling Naming Rule Document SoftRemote Login Setup design(Remote Dial Up or VPN)
NE Distribution Table (See the Attachment)DDF/FDF Details (Port Detailed Information to NE)
Complete Network BoQ including Third Party PartsPaking List (With Sr.No. of boards) including Third Party Parts
Engineering System
PAC Signed And UploadedEPMS Upload & Approval(Hard Ware Quality Report &Soft Ware Quality Report&PAC)CEAS Upload & Approval(Including Third Party and Contract Information Uploaded)Commercial License files(NSS&M2000&HLR Etc.)
ATP Test Results
AT Documents for NE's,NMS & Network(Including Pending List and Solution For Pending Issues)Internal Messages Trace Related With ATP Test Cases
OS software CDs & Database software CDsApplication Software (BAM and LMT Software)
Network Protect i on Desi gn. xl s
I ndi a CN Offi ce I nformati on- . xl s网元分布模板
Network Protect i on Desi gn. xl s
document.xls 文档密级:
04/08/2023 华为机密,未经许可不得扩散 第5页,共42页
CEAS/EPMS Checking list for NSS
What is the Benefit For Us ?
1 Login CEAS System and Check the Project Information
Confirm the Warranty Starting Condition Has Been Filled
2 Login EPMS System and Check the Warranty Information
Confirm the Warranty Starting Condition Has Been Filled
FAQ 1: Why need to Check the CEAS & EPMS System ?A: Verify the Warranty Information Including the Warranty Starting Condition , Warranty Period & PAC Copy
Verify the NE Information Including the NE Version , NE Card BOM Code & Third Party SN FAQ 2:
A: Provide Different Support According to the Contract,Provide Timely Support According to the NE information and Basic Data For Saf
1) Confirm the Engineering Numbers Have Been Uploaded Correctly2) Confirm the Contract Number Has Been Uploaded Correctly3) Confirm the Warranty Period Has Been Filled 4)
1) Confirm the Mapping Between Engineering No. and Contract No. is Correct2) Confirm the Warranty Period Has Been Filled 3)
document.xls 文档密级:
04/08/2023 华为机密,未经许可不得扩散 第6页,共42页
3 Login EPMS System and Confirm the PAC Copy and Packing list HasField Require PAC&FAC Must be Filled
4 Login CEAS System and Confirm NE Information(Including NE/Frame
1)2) According to the PAC, The Starting Date of Warranty Can be Found3) According to the Packing List, the Cards Information Can Be Found
1) All the NE Information Should be Filled, Especially the Host Version and Software Patch Version, It is Very Important For Maintenance
document.xls 文档密级:
04/08/2023 华为机密,未经许可不得扩散 第7页,共42页
2) Provide Different Frame Information
3) Provide Cards Information According to the Frame Number,Either Item Code Or Bar Code is Necessary
document.xls 文档密级:
04/08/2023 华为机密,未经许可不得扩散 第8页,共42页
5
6
Check the Outsourcing HardWare Parts,All the Fields Should be Filled,the "SN" Field is Necessary For Maintenance.
Attachment (the Project Hand Over Reference For NSS Parts)
Attachment2-Board Layout. xl s
Proj ect Hand over Documents_NSS. rar
document.xls 文档密级:
04/08/2023 华为机密,未经许可不得扩散 第9页,共42页
CEAS/EPMS Checking list for NSS
Confirm the Warranty Starting Condition Has Been Filled
Confirm the Warranty Starting Condition Has Been Filled
erify the Warranty Information Including the Warranty Starting Condition , Warranty Period & PAC Copyerify the NE Information Including the NE Version , NE Card BOM Code & Third Party SN
Provide Different Support According to the Contract,Improve the Customer's Satisfactory,Increase the Service Revenue Of HuaweiProvide Timely Support According to the NE information and Basic Data For Safety Stock and OutSourcing HardWares
onfirm the Engineering Numbers Have Been Uploaded CorrectlyRemak: Pls Verify the Warranry Information According to the Frame Contract Kept By Secretary, and Get Contract Copy From ACM&SPM;
Contract Number Has Been Uploaded Correctly
Remak: Pls Verify the Warranry Information According to the Frame Contract Kept By Secretary, and Get Contract Copy From ACM&SPM;
onfirm the Mapping Between Engineering No. and Contract No. is Correct
document.xls 文档密级:
04/08/2023 华为机密,未经许可不得扩散 第10页,共42页
Remak: If Field Information is Not Complete or the PAC Copy is Not Uploaded, Project Hand Over Should Not Be Allowedccording to the PAC, The Starting Date of Warranty Can be Found
ccording to the Packing List, the Cards Information Can Be Found
the NE Information Should be Filled, Especially the Host Version and Software Patch Version, It is Very Important For MaintenanceRemak: Without Frame and Boards Information, the
CEAS System Should Not be Accepted, So the Project Hand Over Should be Rejected.
document.xls 文档密级:
04/08/2023 华为机密,未经许可不得扩散 第11页,共42页
rovide Cards Information According to the Frame Number,Either Item Code Or Bar Code is Necessary
Remak: Cards Information should be According to the Board Layout Information From Project Team,
document.xls 文档密级:
04/08/2023 华为机密,未经许可不得扩散 第12页,共42页
heck the Outsourcing HardWare Parts,All the Fields Should be Filled,the "SN" Field is Necessary For Maintenance.
ttachment (the Project Hand Over Reference For NSS Parts)
document.xls 文档密级:
04/08/2023 华为机密,未经许可不得扩散 第13页,共42页
Improve the Customer's Satisfactory,Increase the Service Revenue Of Huawei
document.xls 文档密级:
04/08/2023 华为机密,未经许可不得扩散 第14页,共42页
the NE Information Should be Filled, Especially the Host Version and Software Patch Version, It is Very Important For Maintenance
Without Frame and Boards Information, the CEAS System Should Not be Accepted, So the Project Hand Over Should be Rejected.
document.xls 文档密级:
04/08/2023 华为机密,未经许可不得扩散 第15页,共42页
Cards Information should be According to the Board Layout Information From Project
Network Handover Check List Fixed NetworkS.No. Description Documentation
1 Network Diagram23 Equipment Details4 Service Configurations5 Spare stock if any (I&C/Customer)6 Copy of HIR/EIR7 Copy of PAC/FAC8 Copy of signed AT documents9 CEAS (Customer Equipment Arcive System)
10 Main Contract +Service contract details11 Packing list12 BOQ13 Site address and contact details14 NMS details including License file15 Username and Password for NMS and routers16 Customer spares test report17 Software/ hardware quality check reports18 Optimized Network Documents(LLD/HLD)19 Third Party Details if any20 Service Design Explanation21 HQ Handover Documents
IP Plan of equipments and server
NOTE: Pls provide all documents
Network Handover Check List Fixed NetworkStatus
List of Documents (Optical)Sr.No Document Type List of Documents Copy
1 Design
Network Design SoftBayface Design SoftProtection Network Design SoftDCN Design SoftClock Design SoftRemote Login setup design Soft
2 Contract
Main contract HardResponsibilty Matrix HardScope of work HardService level agreements HardRepair & Return process Hard
3 Engineering
NE ID's, EoW,IP's SoftSignal Flow Diagram SoftSite and Rack layout SoftTraffic Details Soft
4 Material Handling
Complete Network BoQ including spares SoftPaking List (With Sr.No. of boards) SoftSitewise Open Box Inspection Report signed by Customer HardHardware & Software version report for all boards SoftBoQ of Engineering Spares SoftPacking List of Engineering Spares Soft
Soft
5 Implementation
Power Supply Details SoftDDF/FDF Details SoftLabelling Details SoftFiber/Link Loss report SoftHardware Installation Report signed by customer HardOptical Power values SoftMVOA Values SoftFixed Attenuators Report SoftComprison Table between Design & Field values SoftNMS License files SoftEquipment Installation Report HardCEAS Opload & Approval SoftPAC Soft
6 Test Results
AT Documents for NE's,NMS & network HardOSNR Printout HardStability Test report HardExternal Alarm(If any) testing report HardRemote login test details HardSpares test report Hard
7 QualityHW quality check Sheets SoftSW quality Check Sheets(By Optix Inspector/NMS) Soft
List of Engineering spares handed over to CSSD including version information.
List of Documents (Optical)Status
Network Handover Check List
Category
1
Project Overview
23456789
1011
Cable Connections1213141516
System Configuration1718
19Softwares CDs & documentation
202122
Software Versions & Existing Risks23242527
Spares28
Sr. No.
Network Handover Check List
Check Item Name
Huawei's Engineering contract number with NE count (as per EPMS)Project BOQs for different configurations used in networkNetwork Diagram (MSC/MGW/SGSN/GGSN/PDSN interconnection)System configurationBoard Position Diagram of BSCClock Connection & distributionInter Subrack connectivity Details(Main subrack to slave subrack)Intra Subrack connectivity detailsPending technical issues listCEAS loaded with correct informationPDF Connection DiagramA Interface port Allocation TableInter BSC link detailsPacket data services link details (PDSN/SGSN Link configuration)Abis Interface link Allocation TableIP address Allocation (OM/Signalling link)System health check report should not have any pending critical alarms M2000 should have schedule task added for BSC CFG backup (GSM only)
Product Documentation (Soft & Hard copy) handover acceptance documentWhether the software versions are the updated as per HQ suggestionRedundancy should be in working condition for all applicable cards NE should have permanent license Is there any risk exists due to network design (eg:No redundancy etc)All NE's boards list with BOM codes & quantity in attached formatList & quantity of spare cards provided along with engineering contract
Status (OK/NOK)
Mainex-Gather
tool output
OS software CDs, license certificate & SW serial number handover acceptance documentDatabase software CDs & license certificate & SW serial number handover acceptance document
BOM code list Template
SN Check point1
Network Topology
2
3
4
5PM data availability in client
6PM data availability in TTI NMS
7FM data availability
8Main topology
9Mediation software
10M2000 health check tool Results
11 License Check
Description StatusNetwork Topology detailsIP inter connection details along with details IP network diagram
All the fault alarm should be available for all the NE connected with M2000
Health check tool's report should not have any major faults
NE should have permanent License loaded
M2000 OS,Database SW & its licenses handover details. (Along with customer acceptance certificate's scanned copy)M2000 documentation CD & hardcopies handover details (along with customer acceptance certificate's scanned copy)
All customer required MUIDs should be available in M2000 client for all the connected NE
All customer required MUID should be available in NMS (any 3rd party NMS) for all the connected NE
All the NEs are connected succesfully without showing any disconnection sign in M2000 client's main topology
Mediation software versions are exactly matched versions with NEs connected with M2000
Remark
Name of the server ( e.g. RCOM CDMA Bhopal M2000 )
Equipment Serial Number ( e.g. 0652AM0977 )
Including disk arrayEquipment Model Number
(e.g. SUN V890 )
Server description (e.g
602-3225-02)
Hardware Configuration
(Number of CPUs,RAM,Disk
size etc)
Server Installation Address (Location of the server)
Contact detail of the owner of the server
Few suggestions for MS Pls include if applicable
S.N Activity Details
1
2 No Alarm Pending in these Nodes3 Login of All Nodes through LMT
4 Verfication of all Performance Reports5 Integration of EMS with OSS / BOCO etc6 Access Policy
7 Network Diagram Network Diagram for Core, Wireless , Datacom8
Critical Board Switch Over ( MSS,MGW,BSC)9
10 Design Document Design Document for Core , Wireless , Datacom
11 Software Version
12 IP Details Node IP Details14
15 TAC Information
16 AT Status FM will provide the AT Status17 Admin Password Admin password has to be given to Back office18 Other AT signoff sheet19 MAINEX health check20 Sync Diagram for the BSC and BTS21 Detail Network Digram of the BSC and BTS connectivity
22 Login Details and Admin password23 Spares availability and inventory details24
25
26 License should be commercial
Visibility of all NE s in NOC
Node List to be sent to FO and FO will confirm back whether all Nodes Visible or Not
List of active Login of Nodes through LMT Performance
Individual User creation in both M2000 and all Core / Wireless Nodes
Redundancy Checks
Redundancy checks between MSS-MGW-BSC , BSC - SGSN for Gb
Back up and Check Back Up and Restoration for MSS,MGW and
Software Version Check - Agreed vs Actual for Core , Wireless , Datacom
3rd Party Node Details
3rd Party Node details alongwith contact person e.g IN , VASPrior Information to TAC for tentative launch dates alongwith Network Size
A/Ater signaling link are distributed in different Ater CPI as per Redundant Media and redundant cardsUnconnected OFC/Electrical E1s on the redundant interfcace are not looped
Few suggestions for MS Pls include if applicable
Remarks
Pending FO
Pending FO Pending BO
Pending OPSPending OPSPending BO
OK BOPending BO
Pending BOPending BONot OK BO
Not OK BO
OK BON/A BO If required
N/A BO If required
Pending FMOK BOOKN/A
PendingPending
OKPending
OK
Pending
Status ( OK / NOT OK)-to be filled by Project
Verification to be Done By
Site folder required
CircleProject Name
Project Contract Number
Product Line
Equipment Serial number
Equipment Model
Include Sonu Kumar while sending this Third party equipment details after filling all the required information, Be noted Column Highlighted in yellow are mandatory.
Vendor Role Address CriticalityDescription/Cofiguration
Equipment type
Current Status( Used or Not Used)
Include Sonu Kumar while sending this Third party equipment details after filling all the required information, Be noted Column Highlighted in yellow are mandatory. [email protected]
Equipment Warranty Start Date
Equipment Warranty End Date
Warranty Documents
On site contact information
Site Equipments Database Collection
Project Information Site Base Information
S.N. CircleHuawei Site IDProject Site ID Site Name Site AddressProject Name
Project Contract
No.
Site Equipments Database Collection
Site Base Information Tower
On-Air Date TSPRFI Date
SITESPAC
DATE
Site Type
(GBT/RTT/RTP
)
Vender/ Supplier
NameTower
Ht. in MWarranty_Start_D
ate
Site Equipments Database Collection
Tower Shelter
Shelter Size(L*B*H)Warranty_End_Dat
eAttach
warranty document
Shelter Make/Ser
ial no.Warranty_St
art_DateWarranty_En
d_Date
Site Equipments Database Collection
Shelter D.G.
Attach warranty document
DG set supplier Name
DG set Serial No
Engine Make/ Model
No/ Serial No.
Alt.Make/Model/Serial
No/Capacity
Warranty_Start_D
ate
Warranty_End_Dat
e
Site Equipments Database Collection
D.G. AC
Attach warranty document
AC Make/ Capacity
AC controller
makeAC Serial
No.Warranty_Start_D
ate
Warranty_End_Dat
eAttach
warranty document
Site Equipments Database Collection
Power Plant
P.Plant Make /
CapacityP.Plant
Model no.P.Plant Serial
no.
R.F. Moudul Capacit
y
Number of R.F Moudul
Warranty_Start_D
ate
Warranty_End_Dat
eAttach
warranty document
Site Equipments Database Collection
Battery Bank PIU
B.Bank Make/Capacity
No.of B.Bank
Installed
B.Bank1 Serial
no.
B.Bank 2 Serial
no.
Warranty_Start_D
ate
Warranty_End_Dat
eAttach
warranty document
PIU Make/ Capacity
Site Equipments Database Collection
PIU ACDB
Serial NoPIU
Serial no.
Warranty_Start_D
ate
Warranty_End_Dat
eAttach
warranty document
Make/ Capacity
Warranty_Start_Dat
e
Site Equipments Database Collection
ACDB LT Panel On site Contact
Warranty_End_Date
Attach warranty document
Make/ Serial No/
Capacity
Warranty_Start_D
ate
Warranty_End_Dat
eAttach
warranty document
On site contact information
Site Equipments Database Collection
Remarks