52
BTS SITE INSTALLATION Prepared By : Parakramsinh Mahida Date : 27/07/2012

Copy of Complete BTS Site Installation

Embed Size (px)

DESCRIPTION

bts site

Citation preview

Page 1: Copy of Complete BTS Site Installation

BTS SITE INSTALLATION

Prepared By: Parakramsinh MahidaDate : 27/07/2012

Page 2: Copy of Complete BTS Site Installation

CONTENTS

1. Antenna Installation2. Antenna line installation3. Earthing on Feeder cable4. Installation of Roxtec5. Installation of Surge Arrestors6. Grouting of BTS and TRSM rack7. Installation of Battery Bank8. Installation of Power plant9. Installation of Air conditioner10.Grounding connection inside the shelter11. Power connection 12.Alarm connection13.Labeling pattern of cables

Page 3: Copy of Complete BTS Site Installation

Antenna Installation

1. Assembling2. Installation

1. Assembling

1. Unpack the antenna from the cartoon using knife carefully.

2. Verify it according the RF plan.3. Using D-type 12-13 no spanner assemble it.

2. Installation

1. Connect O/D jumper to the antenna port using 30-32 D-type spanner.

2. Do the weather proofing on Jumper-Antenna connection (only PVC tape).

I

Antenna –jumper connection WP

Page 4: Copy of Complete BTS Site Installation

Connect the antenna 2 clamps on the back side of antenna using 12-13 no D-type spanner.

Then use nylon rope for pulling up the antenna over the tower.Tie the rope with antenna.

Page 5: Copy of Complete BTS Site Installation

Then pull the antenna on the tower by pulling rope through the 6” double bearing pulley.

Page 6: Copy of Complete BTS Site Installation

Now connect the antenna on this pole mount (installed as per RF plan) by the use of 12-13 no D-type spanner.

SATETY BELTS

SHOULD BE USED AT HEIGHTS

Page 7: Copy of Complete BTS Site Installation

Antenna is now installed on the tower along with O/D jumper cable

Page 8: Copy of Complete BTS Site Installation

Antenna Line Installation

1. Routing of O/D jumper

Jumper cable (½” , 50Ω)

II

Page 9: Copy of Complete BTS Site Installation

U-shape loop Circular loop

Route the jumper cable along with tower body Provide cable ties at sufficient distance Provide loop on the jumper cable (U-shape/Circular)

Page 10: Copy of Complete BTS Site Installation

All cable ties are tied in same direction and should have smooth edges

At each loop provide the cable ties.

Page 11: Copy of Complete BTS Site Installation

2. Assembling and installation of RF clamps

6 WAY ,7/8” RF CLAMPWITH FULL THREADED NUTS-BOLTS.

Assembled 6 way clamp

Assemble it by using 12-13 D-type spanner.

Page 12: Copy of Complete BTS Site Installation

3-way RF clamp

6-way RF clams Install RF clamps on HCT and VCT (on the rectangular strips) using 12-13 D-type spanner.

RF clampsOn VCT

NOTE : Distance between 2 clamps should be symmetric.i.e On HCT < 1mtr & on VCT =1 to 1.5mtr

Page 13: Copy of Complete BTS Site Installation

2. Routing of RF cable

Cut the RF cable from the roll/drum as per the desired length using RF cable cutter

Made 6 parts of feeder, 2 for each sector.

RF cable cutterRF cable Drum

Page 14: Copy of Complete BTS Site Installation

Connectrorization procedure at one end of feeder cable:

Using knife remove outer insulation from feeder and then using two 30-32 no D-type spanner and made the connectors on each feeder cable at one end.

Page 15: Copy of Complete BTS Site Installation

Then provide temporary seal on each connector.Using rope and pulley pull up the cables on the tower (Connector ends)Made RF-Jumper connection using D-type 30-32 no. spanners.

J CRF CONCTR

D-type spanner (30-32 no)

RF connector N-M

Page 16: Copy of Complete BTS Site Installation

Provide the weather proofing on the each connection.

PVC TapeRubber TapeButyle Tape

Weather proofing set contains:

4 layers of tapes are provided on each connection. First PVC, Butyle, Rubber and then PVC again.

Weather proofing set 4

3 2

1

1= PVC 3= Rubber2= Butyle 4= PVC

Page 17: Copy of Complete BTS Site Installation

Route the cable straightly through the clamps on the VCT

Give proper bend at HCT-VCT connection ( bending radius ≥ 300mm)

Provide a dummy clamp at the bend

On HCT also routing should be straight and tight enough

Weather proofing

HCT

VCTBend with Dummy clamp

Page 18: Copy of Complete BTS Site Installation

Provide S-bend on feeder routing before it enters through roxtec

Shelter

S-bend

Page 19: Copy of Complete BTS Site Installation

Insert all cables through the roxtec inside the roxtecMark on the cable at the same position for all cable by keeping 0.5 mtr extraRemove them all, cut from the mark Make connectorization outside the shelter insert again all the cables inside the shelter

Page 20: Copy of Complete BTS Site Installation

Earthing on FeederIII

Earthing kit

Earthing kit with weather proofing kit

•Strip out the outer insulation by knife

•Wrap the kit using combinational plier

•Using 12-13no spanner connect kit with C-clamp for termination on tower body

•Before termination of c-clamp paint from tower body is removed by flat file.

Page 21: Copy of Complete BTS Site Installation

Earthing on feeder

Near Roxtec

Near RF-Jumper connection

Page 22: Copy of Complete BTS Site Installation

Installation of RoxtecIV

Roxtec plate with Rubber boots

7/8” Rubber

boot

Accessories for installing roxtec

½” rubber boot

Page 23: Copy of Complete BTS Site Installation

Seal the iron plate of roxtec using silicon gelAfter proper insertion of rubber boots by combinational plier tight the metallic clamp using flat head small duty screw driver

Metallic clamp

Roxtec plate

Rubber boots

Page 24: Copy of Complete BTS Site Installation

Surge Arrestor

Connect the 6 Surge Arrestors to the each connector of feeder cable by using 30-32 no D-type spanner.

Surge Arrestor with Grounding

cable

At the other end connect the six indoor jumper with that six surge arrestors using 30-32 no D-type spanner.

And third terminal of S.A are terminated by the grounding cable 16/25 sq.mm green/black cable It is connected by 16-17 no spanner

Installation of Surge ArrestorsV

Page 25: Copy of Complete BTS Site Installation

Surge Arrestor SA – RF connection

SA – jumper connection

Page 26: Copy of Complete BTS Site Installation

Outdoor installation is done

Page 27: Copy of Complete BTS Site Installation

Installation of Indoor Equipment

Page 28: Copy of Complete BTS Site Installation

4000

2000

5000TOWER

50

50

100

100

10 010 0

100

010

00

100

100

100

600

600

600

25030 0

250

30 0

60 0

100

0

1000

600

80 0

100

0

100

010

00

300

0

125

60 0

150

10 010 0

B.B / P.PPIU

A/C

TRSM EXPANSION BTS

BTS

DDF

DOOR

W.F.T

450

1000

ANNEXTURE II FLOOR PLAN

Site Details Drawing Details

Site Name : Nizampura Scale : 650mm = 1"

Site ID : A39P7Z Ht of Tower : 60 mtr

Address : RNC cmpx Ht of S1 : 40 mtr

Location : Vadodara Ht of S2 : 42 mtr

Customer : Vodafone Ht of S3 : 38 mtr

Submitted By :Parakramsinh Mahida On 13/07/2012

Page 29: Copy of Complete BTS Site Installation

Grouting of BTS and Transmission RackVI

ANCHOR FASTNERS –M10,75L FOR BTS & TRSM GROUTING

Page 30: Copy of Complete BTS Site Installation

Mark for the drilling on shelter floor by referring floor planUsing drill machine make 4 holes for BTS and 4 for TRSMFix the BTS cabinet with floor using anchor fasteners using 16-17 no Spanner (D-type) and use nylon washor.Also fix the TRSM rack Use the sprit level during the installation to maintain the horizontal level

Cabinet of BTSTRSM rack

Page 31: Copy of Complete BTS Site Installation

1. Attach the Cabinet to the Base.2. Adjust the Cabinet feet firmly to the floor.3. Check that the cabinet is leveled, if required then adjust the anchor bolt & feet.

NYLON WASHERS FOR ISOLATION

Cabinet floor

Shelter / room floor

Page 32: Copy of Complete BTS Site Installation

Cross sectional view of grouting

Page 33: Copy of Complete BTS Site Installation

Installation of Battery Bank and Power plantVII

Iron Garter

Stack of BB filled with cells

Horizontal strips

Vertical strips

Page 34: Copy of Complete BTS Site Installation

Install the BB on Iron garterAssemble the battery bank stacks by using sixteen 16 no steel nut bolts and also use 2 washor (normal & pressure)at each side of nut-bolts and tight them 16-17 no d-type spannerInsert the cells (2V) in the stackConnect all cells using horizontal, vertical / cross strips (made up of lead alloy)Use 10no. Bolt to connect the strips (lead alloy) by using 10-11no spannerDuring installation use sprit level for the proper leveling of the BB.

Remove the paints on frame & Connect the frame To the main grounding bus bars of the equipment room by proper cables using flat file.

Page 35: Copy of Complete BTS Site Installation

Install the base plate over the B.B by eight 16no nut bolts and install the Power plant over the B.B by using 16-17 no d-type spanner

Base plate

Power plant

Page 36: Copy of Complete BTS Site Installation

BACK MOUNT FRAME

DISCONNECTIONMODULES

DDF BOX WITHBACKMOUNT FRAME

DISCONNECTIONEARTH MODULE

Installation of DDFVIII

Page 37: Copy of Complete BTS Site Installation

Using poker and hammer(ball peen) make proper holes on shelter wall (use sprit level for horizontal installation)Install the DDF frame on wall using full threaded screw along with washor using flat head small duty S.DJack in the DDF block (punching type) inside the frame using FH small duty SD

Page 38: Copy of Complete BTS Site Installation

Installation of Air conditionerIX

Capacity of AC 2.5 ton.Two Acs are installed on shelter wallTemperature detector/ Thermister is also installed along with AC.

Thermister

Page 39: Copy of Complete BTS Site Installation

DDF

IGB

Indoor Cable Tray

Label

25 sq.mm Green cable25 sq.mm lugUsing knife strip out the outer insulation of cableCrimp the lug using crimping toolProvide the green PVC tape over the connectionAlso provide the labeling on both ends of cableRoute the cable straightly over the cable tray

Grounding connection of BTS and DDF

Grounding connection inside the shelterX

Page 40: Copy of Complete BTS Site Installation

Grounding connection of Surge arrestors

Using 12-13no D-type spanner connect the grounding cable at surge arrestor and at IGB use 10-11 no D-type spanner and 10no nut bolts

25 sq.mm

Surge arrestors

Page 41: Copy of Complete BTS Site Installation

Routing of grounding cable on cable tray

Routing of cables on CT is straight and tight enoughProvide the cable ties at each strips in cross patternDo not cross the cables in routingDo not provide any loop in routing Make the Edge of the cable ties smooth

Page 42: Copy of Complete BTS Site Installation

Grounding connection at IGB

Terminate the all grounding cable coming from indoor equipments to IGB10no nut-bolts and 10-11 o d-type spanner for connectionProvide green PVC tape at the connectionGive the label near the IGB that contain from where the cable is coming

Page 43: Copy of Complete BTS Site Installation

Power connectionXI

Earthing cable- Grounding bar Neutral cable- Contactor Phase cable- 32A MCB

3C 6.5 sq.mm Cu cable

E N P

Power connection from PIU to Power plant

PIUPower plant

Page 44: Copy of Complete BTS Site Installation

Power connection from Battery Bank to Power plant

Positive terminal of Battery – Bus bar Of P.P Negative Terminal – Fuse of P.P

Termination of Cables

Page 45: Copy of Complete BTS Site Installation

Label

Power connection from Power plant to BTS

35 sq.mm blue

35 sq.mm black

Termination of Cables

Blue cable- Bus bar of PPBlack cable- 63A MCB

Power plant

BTS

Page 46: Copy of Complete BTS Site Installation

Power connection from Power plant to DCDB2C 4 sq.mm Cu cable

Termination of cable at both cable

32A MCB of P.P – MCB (6A)channel of DCDBBus bar of P.P – Bus bar of DCDB

Power plant

TRSM Rack

DCDB

Page 47: Copy of Complete BTS Site Installation

Alarm cable connectionXII

Alarm cable connection from BTS to DDF

37 pinD-type connector

Alarm cable

Alarm DDF

Page 48: Copy of Complete BTS Site Installation

DDF

FROM SENSORS/ FAP/ DG-AMF FROM BTS FLEXI BTS alarm cable type is D37 .

Prefabricated cable should be used. Connector have to be correct type. All cables have to be labeled on both

end of the cable. Proper tools have to be used during

alarm cable installation. Cabling from the BTS have to be

connected on upper side of disconnection module.

Cabling from the sensors have to be connected on bottom side of disconnection module.

Proper tools have to be used during alarm cable installation.

All cables have to be fixed properly.

Page 49: Copy of Complete BTS Site Installation

AlarmsNumb

er Alarm DetailAlarm

DefinationPolari

tyColour Code of BTS Alarm

Cable

Alarm17401 Mains Failure

Minor NO Green & Green/White

Alarm2 7402 Rectifier Module Failure-RFA Major NO Blue & Blue/White

Alarm3 7403 Battery at 47v Critical NO Violate & White/Violate

Alarm4 7404 Load on Battery Major NO Grey & White/Grey

Alarm5 7405 Load on DG Minor NO Pink & Black/Red

Alarm6 7406 DG LLOP Major NO Light Green & Black/Green

Alarm7 7407 Low Fuel Critical NO Light Blue & Black/BlueAlarm8 7408 DG Fail to Start Critical NO White & Black/White

Alarm9 7409 AC Fail(AC-1/AC-2) Major NO Light Grey & Light Grey/Black

Alarm10 7410 Door Open Minor NC Red/Black & Red/Blue

Alarm10 7411 High Temperature Critical NO Orange/Red & Orange/Light Grey

Alarm12 7412 Fire/Smoke Critical NO Orange/Black & Orange/Green

List of External alarms for Flexi BTS

Page 50: Copy of Complete BTS Site Installation

Labeling of cablesXII

1. LABELING OF CABLES,FUSES SHOULD BE MADE ON BOTH END OF CABLE.

2. LABELS SHOULD BE VISIBLE .3. LABELS SHOULD BE TIED WITH

CABLE TIES.

Labeling stickers

Page 51: Copy of Complete BTS Site Installation

Sr No Equipment Label No From To1 BTS Gnd 1010 IGB BTS2 Site Main Gnd 1000 IGB GI strip3 DDF Gnd 1006 IGB DDF4 Internal Ladder Gnd 1009 IGB Int Ladder5 Bat Body Gnd 1005 IGB Battery6 PP Body 1004 IGB PP7 positive bus bar gnd 1008 IGB PP8 Site Main Gnd 1001 EGB Strip9 EMP Busbar 1002 EMP Busbar EGB

10BTS Power

(positive) 3110 BTS PP

11BTS Power

(Negative) 3111 BTS PP12 Bat-1 Positive 3000 PP Bat-113 Bat-1 Negative 3001 PP Bat-114 Bat-2 Positive 3002 PP Bat-216 AC Power Cable 2000 PP PIU/ACDB

Labeling codes for FLEXI BTS Nokia

Page 52: Copy of Complete BTS Site Installation

Sr No Equipment Label No From To17 IF Cable MW-1 4010 BTS/FIU MW-118 IF Cable MW-2 4011 BTS/FIU MW-219 IF Cable MW-3 4012 BTS/FIU MW-320 IF Cable MW-4 4013 BTS/FIU MW-421 E1 Cable/PCM 5110 BTS DDF22 BTS Alarm Cable 6001 BTS DDF23 PIU Alarm 6110 PIU DDF24 Rect Alarm 6120 PP DDF25 Feeder-TX/RX,Sec-1 4110 BTS Ant-126 Feeder-RX,Sec-1 4111 BTS Ant-127 Feeder Sec-1 RxD 4112 BTS Ant-128 Feeder-TX/RX,Sec-2 4120 BTS Ant-229 Feeder-RX,Sec-2 4121 BTS Ant-230 Feeder Sec-2 RxD 4122 BTS Ant-231 Feeder-TX/RX,Sec-3 4130 BTS Ant-333 Feeder Sec-3 RxD 4132 BTS Ant-3

Labeling codes for FLEXI BTS Nokia