S.No Description Unit Quantity Rate 1 FLOORING 1 Sqft 476 2 Sqft 476 100.00 Total carried over to summary 2 FALSE CEILING 1 sqft 476 60.00 3 sqft 55 Total carried over to summary 3 PARTITIONS/GLAZINGS 1 Sqft 500.00 150.00 ii Nos 5 Total carried over to summary BOQ FOR INTERIORS WORKS (Mr.Yash Jindal-Logix Technova) SCREEDING -Providing 1:4 average 40-50mm thick flooring to form a smooth, level surface. VITRIFIED / PORCELAIN TILES : P/F of Vitrified/ Porcelain tiles ( 600 x 600mm) in Cafe area. Providing & laying 600 x 600. VITRIFIED TILES as per approved SHADE/model over a 1:3 cement sand bedding of approx 50mm thickness as per pattern given by Architect including 6mm spacing between tiles filled with approved Tiles Grout of Approved make. Basic rate - 750/-sq mt. MODULAR GRID CEILING .Providing & Fixing of Mineral Fiber, Suspended Ceiling System make Armstrong. Model: Fine Fishered with Tegular edge. INSTALLATION:To comprise main runner spaced at 1200mm centres securely fixed to the structural soffit by approved hangers at 1200mm maximum centre & not more than 150mm from spliced joints. The last hanger at the end of each main runner should not be greater than 600mm from the adjacent wall. 1200mm long cross tees to be interlocked between main runners at 600mm centre to form 1200 x 600 mm module. Cut cross tees longer than 600mm require independent support. 600 x 600mm module to be formed by fitting 600mm long cross tees centrally between the 1200 mm cross tees. The 1200mm cross tees to have central ”birdsmouth” notches to facilitate fitting of 600mm cross tees. Wall angles in white colour to be secured to walls at TRAP DOORS IN CEILING -Trap door with wooden frame work carried to closest structural members & finished with laminate, provided with hinge shutters with ball catches, Trap door to have chains to support shutter FULL HEIGHT GLASS PARTITION : Glass Partition with Single glass 10mm thick toughened with top rail of 83mm. Aluminium Anodized finish U channel to be used for installing glass. Floor Spring : Providing & Fixing of floor spring for glass door

Copy of B O Q

Embed Size (px)

DESCRIPTION

Bill of Material

Citation preview

Page 1: Copy of B O Q

4.23

S.No Description Unit Quantity Rate Amount 1 FLOORING

1 Sqft 476 -

2 Sqft 476 100.00 47,600.00

Total carried over to summary 47,600.00

2 FALSE CEILING

1 sqft 476 60.00 28,560.00

3 sqft 55 -

Total carried over to summary 28,560.00

3 PARTITIONS/GLAZINGS

1 Sqft 500.00 150.00 75,000.00

ii Nos 5 -

Total carried over to summary 75,000.00

4 FIXED FURNITURE:

BOQ FOR INTERIORS WORKS (Mr.Yash Jindal-Logix Technova)

SCREEDING -Providing 1:4 average 40-50mm thick flooring to form a smooth, level surface.

VITRIFIED / PORCELAIN TILES : P/F of Vitrified/ Porcelain tiles ( 600 x 600mm) in Cafe area. Providing & laying 600 x 600. VITRIFIED TILES as per approved SHADE/model over a 1:3 cement sand bedding of approx 50mm thickness as per pattern given by Architect including 6mm spacing between tiles filled with approved Tiles Grout of Approved make. Basic rate - 750/-sq mt.

MODULAR GRID CEILING.Providing & Fixing of Mineral Fiber, Suspended Ceiling System make Armstrong. Model: Fine Fishered with Tegular edge. INSTALLATION:To comprise main runner spaced at 1200mm centres securely fixed to the structural soffit by approved hangers at 1200mm maximum centre & not more than 150mm from spliced joints. The last hanger at the end of each main runner should not be greater than 600mm from the adjacent wall. 1200mm long cross tees to be interlocked between main runners at 600mm centre to form 1200 x 600 mm module. Cut cross tees longer than 600mm require independent support. 600 x 600mm module to be formed by fitting 600mm long cross tees centrally between the 1200 mm cross tees. The 1200mm cross tees to have central ”birdsmouth” notches to facilitate fitting of 600mm cross tees. Wall angles in white colour to be secured to walls at 450 mm maximum centres.

TRAP DOORS IN CEILING -Trap door with wooden frame work carried to closest structural members & finished with laminate, provided with hinge shutters with ball catches, Trap door to have chains to support shutter

FULL HEIGHT GLASS PARTITION: Glass Partition with Single glass 10mm thick toughened with top rail of 83mm. Aluminium Anodized finish U channel to be used for installing glass.

Floor Spring : Providing & Fixing of floor spring for glass door

Page 2: Copy of B O Q

1 Nos 1 -

2 Nos 1 -

3 No. 1 15,000.00 15,000.00

4 No. 3

4.1 Nos 3

Total carried over to summary 15,000.00

5 PAINTING

1 Sqft 1100 15.00 16,500.00

2 Sqft 1100 -

Total carried over to summary 16,500.00

6

1 Seats 1 5,000.00 5,000.00

2 Chairsa) Workstation Chair Nos 3 - b) Executive Chair (for Director Cabin) Nos 10 4,000.00 40,000.00 c) Visitor Chair (for Director Cabin) Nos 3 -

Nos 0 -

Total Chairs Nos 16

Total carried over to summary 45,000.00

RECEPTION TABLE -P/F and placing in position Reception table with side ledge consisting of 25mm thick MDF/ comm. board. As per detailed shop drawing. (1200 mm X 600 mm)

Round MEETING/ Discussion TABLE WITH GLASS TOP( 4 Pax.) - P/F and placing in position round meeting room table 8MM Glass Top & Wooden/SS base with approved shade & custom made wire management system complete as per detailed drawings. (size: Dia 800mm). ( For 4 Pax)

Director & CEO Cabin Table: P/F Cabin Table in Laminated finish with side credenza and Back Storage only. Complete as per design. (Table Size - 1500 mm X 750 mm, Side Credenza - 900 x 450mm.(In-house production)

Modular Linear Desk - : P/F and placing in position modular linear Desk of size 1200 mm X 600mm. Indian Make. Keyboard tray included. (Indian/ Imported Make)

Mobile Three Drawer Pedestal : 2 Drawer + 1 Filing box, Pre laminated Pedestal Unit , telescopic slides, Flush handles, central locking mechanism & levellers.

EMULSION PAINT- Providing and applying 2 or more coats of plastic emulson paint (roller coat) of approved manufacturer and shade to walls, partitions and ceiling, including cleaning, preparing the surface, puttying including scaffolding, etc., complete all levels.

POP PUNNING-Providing & applying average 6- 8mm thick plaster of paris punning to the walls & in plumb and level & line including hacking the surface of wall complete as required.

SOFT SEATINGS, TABLES & OTHER LOOSE FURNITURE (Basic rate of Fabric/Leatherite @ Rs.350/- per Rmt.)

Soft sitting with FABRIC/ LEATHERITE OPTIONS- Basic rate of fabric/leatherite @ 350 Per Meter.(Location - Reception)

d) Workstation Chair (for Reception,Meeting Room & Conference Room)

Page 3: Copy of B O Q

7 ELECTRICAL WORKS Unit Quantity Rate Amount

I. LIGHT AND SOCKET OUTLETS POINT WIRING 50,000.00II.

III. INSTALLATION OF PANELSIV.

V. FIXING OF LIGHTING FIXTURESVI

Total carried over to summary 50,000.00

8 Office Accessories Unit Quantity Rate Amount

I Sqft 98 5,000.00

Total carried over to summary 5,000.00

9 Miscellaneous Items (Hardware) Unit Quantity Rate Amount Door Locks (Godrej/Doorset/Ipsa make) Nos 0Door Closer (Ipsa/Doorking) Nos 0Door Stopper (S.S) Nos 0Sliding Door Channel of Hettich make Nos 0Sliding Door Locks Nos 0Sliding Door Handle Nos 0Projector Screen Nos 1 - Total carried over to summary -

10 HVAC WORKS Unit Quantity Rate Amount

A Centralized Air conditioner1 sqft 125,000

11 FIRE FIGHTING SERVICES Unit Quantity Rate Amount

2 sqft 15,000.00

1.00 Flooring - 47,600.00

2.00 False Ceiling - 28,560.00

3.00 Partition / Glazing - 75,000.00

4.00 Fixed furniture - 15,000.00

5.00 Painting 16,500.00

6.00 Sofa Seating, Tables & Other Loose furniture - 45,000.00

7.00 Office Accessories - 5,000.00

8.00 Electrical Works - 50,000.00

9.00 Miscellaneous Items - -

11.00 HVAC Works - 125,000.00

12.00 Fire Fighting - 15,000.00

Total Cost Of Interiors Package - 422,660.00

* Installation for Modular Furniture INCLUSIVE

Cartages INCLUSIVE

G.TOTAL 422,660.00

Terms & Conditions : -

VOICE AND DATA NETWORK : MS PAINTED CHANNELS , CONDUITS

SUPPLY AND INSTALLATION OF DB, CABLES, CABLE TRAY AND EARTHING

SUPPLY OF LIGHTING FIXTURES : Equivalent to WIPRO CAT. NO.

Roller Blinds : Supply & Installation Roller Blinds of MAC make.

HAVAC Providing and installation of ducting 20 gage sheet with rubber insulation for air conditioning and heat control with difusers complete will all aspects

Fire Fighting fire fighting sprinklers with fitting / piping for water and drainage system/ detectors down side of false ceiling with testing/commissioning and installation

Page 4: Copy of B O Q

1) 50% Advance Required with Firm Order2) Running Payment is required as per progress of work (2-Running Bills & 1 Final Bill)3) All payment as per actual measurement on site4) The above estimate is based on the proposed layout submitted to you, and the quantities/ cost may vary between 5 to 7.5 percent, corresponding to any changes/ amendments made in the layout as per the client's requirements oras per the detail working drawing proposed by the Architect/ Design Consultant.6) Any additional item or change in specifications apart/deviated from the detail BOQ shall be charged Extra.

clearences and advance. Material mobilization required is 4days

8) V.A.T @ 14% Extra ( All above items are excluding of V.A.T)