    Client Audi

    SOW Test Driving:Comparative Experience

    Cities Gurgaon

    Venue Audi Showroom

    Event Date 22th August 2013

    S No Particulars

    A Production SpecificationsBar-fabrication

    Panel 1-(9.5*12)-Duco finish(Matt-White)

    Panel 2-(9.*12)-Duco finish(Gloss-Red)

    Panel 3-(8*12)-Duco finish(Matt-White)-Moulded curve

    Embedded lighting and eletricals for each partition(Backdrop)

    Moulded shelves on 3rd Panel-Moulded

    Vinyl print for backdrop(Panel 3)

    Platform /carpetwith 4 '' riaser for complete structure

    Facade (12*4*2.5)-Moulded-Acralic Counter(Milky White)

    5 crstal LED panles(Acrylic Sandwich) on facade-(images of 5 fetaured

    models)@Rs,5000 eachTotal cost (a-1)

    Buffet Table, Valet Podium &Registration

    MDF -Moulded/Laminate (8*4)-Buffet table

    MDF -Moulded /Laminate Podium with Print

    MDF -Moulded/Laminate (8*4)-Registration table-with print

    Laser cut-out of car (Registration facade)

    Registration backdrop framing with print

    Standees on Digital media (6*3)-5 nos

    Total cost (a-2)TOTAL COST -A

    B Manpower,Transportation & Misc

    Give-aways-(Chivas miniatures)300 NosUshers 2 nosTransportation ,Labour

    MiscTOTAL COST -B

    Sub Total-A+BAgency Commission @ 12%

    Total

    Service Tax @ 12.36%

    GRAND TOTAL

    Please NoteAugust PSR will not be liable for cancellation of the event due to any natural calamity or political cau

    All actuals will be billed to you separately

    We will require 50% advance of the above amount as your confirmation along with a work order bef

    Any extra apart from the above will be billed to separately.

    ESTIMATE

    Our Pan No

    Service Tax Reg. NO.

    Services : Event Management Service

  • 8/13/2019 Copy of Audi-Experience

    2/6

    Authorised Signatory.

    Service Code :

    For August PRS

  • 8/13/2019 Copy of Audi-Experience

    3/6

    18th December 2013

    Amount

    28,000.00

    30,000.00

    203,000.00

    18,000.00

    10,000.00

    18,000.00

    4,000.00

    7,000.00

    12,000.00

    69,000.00

    272,000.00

    on actuals5,000.005,000.00

    8,000.00

    18,000.00

    290,000.0034,800.00

    324,800.00

    40,145.28

    364,945.28

    es

    ore the event, the balance

    145,000.00

  • 8/13/2019 Copy of Audi-Experience

    4/6

  • 8/13/2019 Copy of Audi-Experience

    5/6

    S. No Particular Sizes Unit RP

    A Fabrication

    1 Bar table facia-Modular-Aclric highlights-Platform 6x4 2 50000

    2 Bar backdrop-3 layerd moulded within-panel lighting 12x9 1 1500

    3 Valet-Podium-Modular-With print 2.5x4 1 7000

    4 Registration Back drop 12 x8 1 30005 Registration Table Facia (with lamination) 12x4 1 20000

    6 Podium Printing 3x4 1 1500

    7 Standees 3x6 5 2400

    8 Buffet tabel-Modular-Laminate 8x4x3 1 7000

    9 Car cut outs (laser cut in front of registration table) 2x5 1 5000

    10 car cut outs(lasser cut in front of bar tabel ) 1.5x1 5 4000

    11 Box for chivas bottel minature 7"x7"x7" 300 100

    B Miscellaneous

    1 Ushers(good english speaking) 2 2500

    2 Props(gody bag with chivas bottel miniature) 300 50

    3 Traveling expences 2 10000

    F & B

    food for crew 2 5000

    TOTAL

    TOTAL

    Govt Service Tax @ 10.3%

    Grand Total

  • 8/13/2019 Copy of Audi-Experience

    6/6

    CP Total CP vendor

    60,000.00 50,000.00

    3,500.00 3,500.00

    3,500.00 3,500.00

    3,500.00 3,500.0025,000.00 25,000.00

    2,500.00 2,500.00

    2,000.00 10,000.00

    10,000.00 10,000.00

    6,500.00 6,500.00

    5,000.00 25,000.00

    300.00 90,000.00

    3,000.00 6,000.00

    100.00 30,000.00

    15,000.00 15,000.00

    5,000.00 5,000.00

    285,500.00

    30,060.00

    315,560.00

    35,598.86

    351,158.86