Copy of Ars Fp Thanraj Correct 4side Different

Embed Size (px)

Citation preview

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    1/25

    50000.00

    1) Name of the Revenue Village :-PUNGAMPAALI

    2) Location (S.F.No.& Location):- The site is located at a distance of 16KM

    From Sathyamangalam and 10 km from Pulliyampatti.

    3) Particulars of land use :-

    Village Name of the S.F.No. Total Extent Extent Remarks

    land owner Sub Divisio Ha. Proposed Ha.

    Kalliyappan

    Periyakallipatti S/o Karuppa Gr 195 2.95.0 0.15.0

    Pungampalli

    4) RAIN FALL

    Average annual rain fall :-775.46mm

    5) SOIL CONDITION

    Depth of soil :- 0 to 0.45 m

    Depth of sub soil :- 0.45 to 1.45

    Texture :- Earth mixed with small sized boulders & hard

    gravelly soil

    Infiltration capacity :- Fair / Moderate

    6) Crops

    Main crops :- Ground nut

    Rotation of crops :- Ragi, Cholam

    Pattern of cultivation :-Sown in July,Aug & Harvested

    in October, November

    Whether composed manure used :- Yes

    7) Erosion

    Hazards of Erosion :- Severe

    Type of Erosion :- Gully Erosion

    Assistant Executive Engineer Junior Engineer

    Agricultural Engineering Department Agricultural Engineering Department

    Gobichettipalayam Gobichettipalayam

    Estimate Amount Rs:-

    for the year 2008-09

    Report to accompany the Estimate for the Construction of Farm Pond

    in Pungampalli Village of Bhavani Sagar Block ,Sathyamangalam Taluk

    in Erode Disrtict under Rain Water Harvesting Scheme

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    2/25

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    3/25

    DEPTH

    in metre

    29.00 + 25.40 27.00 + 23.40 20.00 + 16.40 25.00 + 21.40

    2 2 2 2

    x 35.32 x 10-6

    = mcft

    Asst.Executive Engineer Junior Engineer,

    Agrl Engineering Dept Agrl Engineering D

    Gobichettipalayam Gobichettipalayam

    NAME OF WORK : FARM POND under RAIN WATER HARVESTING SCHEME

    CAPACITY OF THE POND

    LENGTH in metreNO

    )+( )}/2{({( )+(

    DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR

    VILLAGE: PUNGAMPALLI ; SF.NO: 195

    FORM POND1.80

    BREADTH in metre

    )}/21 x 1

    976.212

    0.034

    Capacity of the pond =

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    4/25

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    5/25

    QUANTIT

    Y in cum

    ept

    976.21

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    6/25

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    7/25

    NAME OF WORK : FARM POND under RAIN WATER HARVESTING SCHEME

    VILLAGE: PUNGAMPALLI ; SF.NO: 195

    1 Rough stone for revetm 1 Cu.M Nalroad 11 60.65 200.00 260.65

    2. The rates adopted are as per the current P.W.D. Schedule of rates for the year 2008-09

    Counter signed

    Assistant Exeutive Engineer, Junior Engineer,Agricultural Engg, Department, Agricultural Engg, Department,

    Gobichettipalayam. Gobichettipalayam.

    1. The distance furnished are correct and minimum to the best of my Knowledge.

    Destinatio Lead charges

    Ordinary Hill

    Cost of

    Materials

    Total

    Cost

    Rs.

    Worksite

    LEAD STATEMENT

    Sl.No.Description of

    MaterialsQuantity

    Source of

    supply

    Lead Distance

    in K.m.

    Ordinary Hill

    DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    8/25

    DATA SHEET

    Rate AmountRs Ps Rs. Ps

    1 2 3 4 5 6

    1 M2

    Clearing light jungle as per SI.No:2 1.65 M2

    1.65

    2 M3

    H.G.S.SS.20.B.Earthwork excovating and depositing

    on bank within initial lead of 10 M.& initial lift of 2M.

    In hard stiff clay,stiff black cotton, hard red earth, shales,

    murram, gravel, stoneyearth, and earth mixed with

    small size boulders as per S.S.20.B.and S.I.62. 28.75 M3

    28.75

    3 M3

    H.G.S. S.S.20.A. Earth work excovating and depositing

    on bank within initial lead of 10 M.& initial lift of 2M.

    In hard stiff clay,stiff black cotton, hard red earth, shales,

    murram, gravel, stoneyearth, and earth mixed with small

    size boulders as per S.S.20.A.and S.I.61. 30.60 M3

    30.60

    4 M3

    SDR (Not requiring blasting).Earthwork excovating and

    depositing on bank within initial lead of 10 M.& initial lift of 2M. 42.90 M3

    42.90

    soft disintegrated rock,laterite,softrock or kunkar

    not requirig blasting as per SI67 For Pond

    5 M3

    Add to relevent T.N.D.S.S No. 20.A rates for new tank

    bunds and closing breaches for extra watering and

    consolidation. (A) By hand rollars as per Sl.No.79.A. 6.05 M3

    6.05

    6 M3

    Extra for every additional 10M. Lead or part thereof

    over the initial lead as per Sl.No 76

    I Lead 3.65 M3

    3.65

    II Lead 2x3.65 M3

    7.30

    III Lead 3x3.65 M3

    10.95

    IV Lead 4x3.65 M3

    14.60

    V Lead 5x3.65 M3

    18.25

    7 M3

    Extra for every additional 1Meter. Lift or part thereof

    over the initial lift as per Sl.No 77

    I Lift 2.95 M3

    2.95

    II Lift 2 x 2.95 M3

    5.90Certified that the above rates are adopted as per the current P.W.D standard shedule ofrates for the year 2008-09

    Assistant executive engineer,Agricultural engineering department, Agricultural Engg department,

    Gobichettipalayam Gobichettipalayam

    NAME OF WORK : FARM POND under RAIN WATER HARVESTING SCHEME

    VILLAGE: PUNGAMPALLI ; SF.NO: 195

    DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR

    Junior Engineer,

    Sl.No. Quantity Description of item Unit

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    9/25

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    10/25

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    11/25

    NAME OF WORK : FARM POND under RAIN WATER HARVESTING SCHEME

    DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR

    VILLAGE: PUNGAMPALLI ; SF.NO: 195

    Depth

    M

    1 5 6

    1 H.G.S.SS.20.B.Earthwork excovating and depositing on bank within initial lead of 10 M.& initial lift of 2M.

    In hard stiff clay,stiff black cotton, hard red earth, shales, murram, gravel, stoneyearth, and earth mixed with

    small size boulders as per S.S.20.B.and S.I.62. For DEEPENING OF POND

    1 x 1 29.00 + 28.10 27.00 + 26.10 20.00 + 19.10 25.00 + 24.10

    2 2 2 2

    2 SDR (Not requiring blasting).Earthwork excovating and depositing on bank within initial lead of 10 M.and

    initial lift of 2M.soft disintegrated rock,laterite,softrock or kunkar not requirig blasting as per SI67 For Pond

    1 x 1 28.10 + 25.40 26.10 + 23.40 19.10 + 16.40 24.10 + 21.40

    2 2 2 2

    3 H.G.S.SS.20.A.Earthwork excovating and depositing on bank within initial lead of 10 M.& initial lift of 2M.

    In hard stiff clay,stiff black cotton, hard red earth, shales, murram, gravel, stoneyearth, and earth mixed with

    small size boulders as per S.S.20.A.and S.I.61. For Bund

    1 x 1 3.00 + 1.00 1.00

    2

    1 x 3 3.00 + 1.00 1.00

    2

    4 Extra for every additional 10M. Lead or part thereof

    1 x 1

    1 x 1

    1 x 1

    1 x 1

    5 Add to relevent T.N.D.S.S No. 20.A rates for new tank

    bunds and closing breaches for extra watering and

    consolidation. (A) By hand rollars as per Sl.No.79.A.

    6 Provision for TNCLW Fund 0.3%

    7 Provision for photography charges

    8 Provisoion for Unforseen items

    Asst.Executive Engineer Junior Engineer

    Agrl Engineering Dept Agrl Engineering Dept

    Gobichettipalayam Gobichettipalayam

    IV Lead

    For Bund qty

    Deduct inlet&outlet vent

    I Lead

    over the initial lead as per Sl.No 76

    II Lead

    III Lead

    or DEEPENING OF POND

    or DEEPENING OF POND

    Total

    6

    )}/2

    DETAILED ESTIMATE FOR FARM POND

    Sl

    no Description of work

    No

    MBreadthLength

    2

    )+(

    {( )+(

    )}/2)+(

    Total

    )}/2 1.35

    43

    {( 0.45

    121.00

    Total

    {( )+( )}/2

    {(

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    12/25

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    13/25

    Quantity

    M3

    7

    M3

    273.36 M3

    M3

    703.94 M3

    242.00

    36.00 M3

    206.00 M3

    291.00 M3

    97.00 M3

    97.00 M3

    485.00 M3

    206.00 M3

    LS

    LS

    LS

    273.36

    703.94

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    14/25

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    15/25

    NAME OF WORK : FARM POND under RAIN WATER HARVESTING SCHEME

    DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR

    VILLAGE: PUNGAMPALLI ; SF.NO: 195

    Rate

    Rs Ps

    1 H.G.S.SS.20B.Earthwork excovating and depositingon bank within initial lead of 10 M.& initial lift of 2M.

    In hard stiff clay,stiff black cotton, hard red earth, shales,

    murram, gravel, stoneyearth, and earth mixed with

    small size boulders as per S.S.20.B.and S.I.62.

    67.36 M3

    28.75 M3

    2 SDR (Not requiring blasting).Earthwork excovating and

    depositing on bank within initial lead of 10 M.& initial

    lift of 2M.soft disintegrated rock,laterite,softrock or kunkar

    not requirig blasting as per SI67 For Pond

    703.94 M3

    42.90 M3

    3 H.G.S.SS.20.A.Earthwork excovating and depositing

    on bank within initial lead of 10 M.& initial lift of 2M.

    In hard stiff clay,stiff black cotton, hard red earth, shales,

    murram, gravel, stoneyearth, and earth mixed with

    small size boulders as per S.S.20.A.and S.I.61.

    206.00 M3

    30.60 M3

    4 Extra for every additional 10M. Lead or part thereof

    over the initial lead as per Sl.No 76

    291.00 M3

    I Lead 3.65 M3

    97.00 M3

    II Lead 7.30 M3

    97.00 M

    3

    III Lead 10.95 M

    3

    485.00 M3

    IV Lead 14.60 M3

    5 206.00 M3

    Add to relevent T.N.D.S.S No. 20.A rates for new tank

    bunds and closing breaches for extra watering and

    consolidation. (A) By hand rollars as per Sl.No.79.A. 6.05 M3

    6 Provision for TNCLW Fund 0.3%

    7 LS Provision for photography charges LS

    8 LS Provisoion for Unforseen items LS

    (Rupees Fifty thousand only) weir

    Assistant Executive Engineer,

    Agricultural Engineering Department, Agricultural Engineering Departm

    Gobichettipalayam

    ABSTRACT ESTIMATE FOR FARM POND

    Sl

    noDescription of work

    Gobichettipalayam

    For BUND Qty

    Qty Unit

    Total

    Junior Engineer,

    For Deepening of Farm Pond

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    16/25

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    17/25

    Amount

    Rs Ps

    1937.00

    30199.00

    6304.00

    1062.15

    708.10

    1062.157081.00

    1246.00

    150.00

    150.00

    100.60

    50000.00#REF!

    ent,

    #REF!

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    18/25

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    19/25

    NAME OF WORK : FARM POND under RAIN WATER HARVESTING SCHEME

    VILLAGE: PUNGAMPALLI ; SF.NO: 195

    DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR

    Quantity

    Cu.M

    1 3 7

    1 H.G.S.SS.20.B.Earthwork excovating and depositing

    on bank within initial lead of 10 M.& initial lift of 2M.

    In hard stiff clay,stiff black cotton, hard red earth, shales,

    murram, gravel, stoneyearth, and earth mixed with

    small size boulders as per S.S.20.B.and S.I.62.

    For foundation of weir.

    Bell mouth toe 1x1 1.11

    Cutt off wall - I 1x1 1.42

    Cutt off wall - II 1x1 1.52

    Side wall 1x1 0.51

    Apron 1x1 7.00 + 7.50 2.25

    2

    Total 6.81

    2 Rough stone dry Packing for Bell

    Mouth

    BGL Bell mouth toe 1x1 1.11

    Cutt off wall - I 1x1 1.42

    Cutt off wall - II 1x1 1.52

    Side wall 1x1 0.51

    Apron 1x1 7.00 + 7.50 2.25

    2

    AGL Slopping portion 1x1 5.50 + 2.50 0.92

    2 7.73

    Counter signed.

    Asst. Exe. Engineer. Junior Engineer.

    Agri.Engg.Department, Agrl.Engg.Department,

    Gobichettipalayam Gobichettipalayam

    0.45

    7.00 0.45 0.45

    0.45

    1.35

    7.50 0.45 0.45

    5.50 0.45

    2.50 0.45

    7.00

    7.50

    2.50

    0.45

    0.45

    5 6

    0.45 0.45

    0.45

    0.23

    Total

    1.00

    0.23

    0.45

    0.45

    0.23

    0.45

    1.35

    DETAILED ESTIMATE

    Sl.no. Description of work Nos.Length Breadth Depth

    M. M. M.

    2

    5.50

    4

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    20/25

    ABSTRACT ESTIMATE

    NAME OF WORK : FARM POND under RAIN WATER HARVESTING SCHEME

    VILLAGE: PUNGAMPALLI ; SF.NO: 195

    DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR

    Rate Amount

    Rs Ps Rs. Ps

    1 6.81 H.G.S.SS.20.B.Earthwork excovating and depositing

    Cu.M. on bank within initial lead of 10 M.& initial lift of 2M.

    In hard stiff clay,stiff black cotton, hard red earth, shales,

    murram, gravel, stoneyearth, and earth mixed with

    small size boulders as per S.S.20.B.and S.I.62. 28.75 Cu.M. 195.80

    2 7.73 Rough stone dry packing for bund bell mouth

    Cu.M.

    #REF! Cu.M. #REF!

    TOTAL #REF!

    Counter signed.

    Asst. Exe. Engineer.

    Agri.Engg.Department,

    Gobichettipalayam

    Junior Engineer,

    Gobichettipalayam

    l.No uantit Description of item Unit

    Agrl.Engg.Department,

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    21/25

    3.00 1.00 1.80 1.80 1.00 3.00

    1.00 1.00

    GL 1.00 GL

    3.00 0.45 3.00

    1.80 GL

    1.0

    0

    1.0

    0

    3.0

    0

    1.0

    0

    1.0

    0

    CS 1

    .80

    16.40

    LS LS1.0

    0

    0.4

    5

    1.3

    5

    25.40 23.40

    21.40

    CS 1

    .80

    25.00 1.0

    0

    1.0

    0

    1.0

    0

    1.0

    0

    GL

    3.0

    0

    27.00 23.40

    1.8

    0

    27.00

    0 0 0

    1.35

    16.40

    20.00

    SCALE:N

    PLAN SHOWING THE PROPOSED FARM POND

    NAME OF WORK : FARM POND under RAIN WATER HARVESTING SCHEME

    DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR

    PLAN

    LONGITUDINAL SECTION

    VILLAGE: PUNGAMPALLI ; SF.NO: 195

    20.00

    29.00

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    22/25

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    23/25

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    24/25

    : ERODE N

    : SATHYAMANGALAM

    : BHAVANISAGAR

    : PUNGAMPALLI

    SATHYAMANGALAM

    GOBI

    PUNGAMPALLI

    ERODE

    SANAPIRATAI

    Checked by me:- Prepared by me:-

    CEMENT

    SAND(SANAPIRATAI)

    Asst. Executive Engineer, Junior Engineer,

    Agricultural Engineeing Dept. Agricultural Engineeing Dept. PROPOSED SITE

    Gobichettipalayam. Gobichettipalayam.

    KARUR

    REFERENCE

    AYYAMPALAYAM PULIYAMPATTI

    TO METTUPALAYAM

    TO KOVAI

    STONE(BHAVANISAGAR

    NALLROAD)

    SCALE:NOT

    TO SCALETHALAVADI &

    MYSORE

    ANTHIYUR & BHAVANI

    KAVANDAPADI

    BHAVANISAGAR NALL ROAD

    PERIYAKALLIPATTI PIRIUV PANAYAMPALLI

    LEAD CUM LOCATION MAP

    DISTRICT

    TALUK

    BLOCK

    VILLAGE

    SF NO: : 197/1

  • 7/29/2019 Copy of Ars Fp Thanraj Correct 4side Different

    25/25

    : un er

    : ; . :

    ####

    Sl.No DescriptionAmount

    Rs. Ps

    1 Cost of Formation of Bund 50000.00

    2 Cost of Construction of Surplus Arrengement #REF!

    3 Provision for Photographic Charges 250.00

    4 Provisoion for Unforseen items 531.30

    Total #REF!

    ( Rupees One Lakh nine thousand only )

    Counder singined

    Asst.Executive Engineer Junior Engineer,

    Agrl Engineering Dept Agrl. Engineering Dept.

    Gobichettipalayam Gobichettipalayam.

    GENERAL ABSTRACT