Bateman Pulsed Column (BPC) The Bateman Settler TM COPPER INDUSTRY Bateman Solvent Extraction Capabilities Bateman Solvent Extraction (BSX) is part of Bateman Litwin N.V. (BNLN). BNLN is a leading supplier of technical solutions to global energy and resources customers providing technology, engineering, procurement and project management services to the world’s oil and gas, power, renewable energy, minerals and process industries. www.bateman-litwin.com Technology, East Europe & Middle East

Copper Capabilities

Embed Size (px)

Citation preview

Page 1: Copper Capabilities

Bateman Pulsed Column (BPC) The Bateman SettlerTM

COPPER INDUSTRY 

Bateman Solvent Extraction

Capabilities

Bateman Solvent Extraction (BSX) is part of Bateman Litwin N.V. (BNLN).BNLN is a leading supplier of technical solutions to global energy and resources customers providing technology, engineering, procurement and project management services to the world’s oil and gas, power, renewable energy, minerals and process industries.

www.bateman-litwin.com

Technology, East Europe & Middle East

Page 2: Copper Capabilities

BSX COPPER INDUSTRY CAPABILITIES PROFILE

2

Bateman Litwin Group Overview  

Bateman  Litwin N.V. is  a  global  provider  of innovative  turnkey  solutions for  the Minerals  and Metals, Oil and Gas, Power, Renewable Energy and Chemical industries.   The Company  is  recognized  for  its  uniquely  comprehensive EPC  (Engineering,  Procurement  and Construction)  capabilities  and  for  its  advanced  technologies,  covering  a  wide  spectrum  of  services. Backed by an impressive track record of hundreds of projects in more than 40 countries, Bateman Litwin has  established  a  reputation  for  excellence  and  on‐time,  on‐price  project  delivery  which  maximize customer profitability.  Bateman operates worldwide, through its strategic business units, subsidiaries and associated companies, and  offers  a  diverse  range  of  technologies  and  project  services  to  the mining, minerals  processing, metallurgical,  chemical,  petrochemical,  power,  materials  handling,  and  industrial,  agricultural  and environmental protection industries.  The wide range of services that Bateman provide, include the following Project services: 

Studies and planning: basic engineering concept and techno‐economic viability to feasibility studies and definitive cost estimates.  

Engineering and project management systems and procedures: project inception to commissioning and start‐up.  

Maintenance and operation: retrofits, audits and staff training 

Bateman Solvent Extraction (BSX) and  the Solution Purification Group (SPG) 

Bateman  formed  a  solvent  extraction  business unit  (BSX)  which  operates  as  a  combined technology developer and package plant  supplier specializing  in  solvent  extraction  processes.  BSX works  closely  with  other  Bateman  Business divisions  and  shares  resources  and  knowledge with  them  to  provide  Ion  Exchange  (IX),  Solvent Extraction  (SX),  and  Electrowinning  (EW)  plants worldwide under a non‐formal entity named  the Solution Purification Group (SPG). 

 

 

 

Page 3: Copper Capabilities

BSX COPPER INDUSTRY CAPABILITIES PROFILE

3

The  Bateman  SPG  team  has  extensive  experience  and  expertise  in  all  aspects  of  IX,  SX  and  EW.  This includes: 

Development of SX processes utilizing BSX’s R&D centre. 

Detailed  design,  supply  and  construction  of  SX/EW  plants  based  on  the  BATEMAN  SETTLER™ (Bateman’s Reverse Flow Settler) as well as the Bateman Pulsed Column (BPC), and IX plants based on technology supplied to the uranium and base metal industries. 

Excellent business and working relationship with technology providers for EW tank houses. 

BSX specifically focuses on SX and its activities include development of SX processes, design of SX plants, design and supply of SX contactors including mixer‐settlers (the Bateman Reverse Flow Settler) as well as the  Bateman  Pulsed  Column  (BPC)  and  the  latest  development  of  the  Bateman  Pulsed  Column with Intermediate Decanter (BPCID).  

In  addition  BSX  has  a  strong  SX  R&D  team,  located  at  Bateman’s  research  centre  at  Katzrin,  Israel. Through  this R&D centre, BSX has successfully developed and  implemented various SX plants, many of which started with  laboratory test work, bench and mini‐pilot plant testing followed by pilot plants and demonstration plants. These normally progressed to  implementation of full‐scale  industrial plants using both mixer‐settlers and BPC’s. 

Codelco’s Gaby SX Plant, Chile ‐ 150,000 TPA Cu SX plant based on Bateman Settler™, Bateman’s Reverse flow technology

Page 4: Copper Capabilities

BSX COPPER INDUSTRY CAPABILITIES PROFILE

4

Unique qualifications and experience

Bateman’s  copper  SX/EW  team  combines experience  in operating large‐scale copper  leach‐SX‐EW  operations  as  well  as  experience  in designing,  constructing  and  commissioning  new plants all around the world.  Team members have worked  in  operations,  represented  the  client during  new  construction,  and  have  been process/project  engineers  on  the  engineering side of new projects. 

For  copper  SX  plants  BSX  provides  its  Patented Reverse  Flow  Mixer  Settler  –  the  BATEMAN SETTLERTM. 

The BATEMAN SETTLERTM was initially introduced to  the  mineral  industry  in  the  early  90’s  by Bateman which patented  the design  in  the USA, Mexico  and Australia. US. Patent No. 5 558 780 and  Australian  Petty  Patent  No.  678  749  have been  awarded  for  this  reverse‐flow  settler  for solvent extraction. 

The  BATEMAN  SETTLERTM,  with  its  advanced design  and  enhanced  efficiency,  provides many advantages  compared  to  conventional  settlers used in Solvent Extraction circuits. 

High process efficiency with low organic loss 

Compact layout 

Short construction time 

Low capital cost 

Ease of operation and maintenance 

Bateman’s  experience  with  designing,  installing and commissioning SX plants using the BATEMAN SETTLER®, enables it to supply the SX section of a copper SX plant on a LSTK basis and provide  the client  with  full  process  and  mechanical guarantees. 

 

The BATEMAN SETTLERTM

Advantages  of  the  BATEMAN SETTLERTM compared to similar designs: 

Approximately  a  20  %  reduction  in capital cost for the SX plant. 

Increased flux rate capability which can further reduce costs. 

Decreased organic losses 

Operator friendly physical layout. 

Total automatic control capability.

Increased fire prevention and control features

Page 5: Copper Capabilities

BSX COPPER INDUSTRY CAPABILITIES PROFILE

5

 

 

  

Mantos de la Luna plant, Chile ‐ 

25,000 TPA Cu SX plant based on  Bateman Settler™,  Bateman’s Reverse flow technology 

Frontera Mining’s Piedras Verdes plant, Mexico ‐ 

32,000 TPA Cu SX plant based on  Bateman Settler™,  Bateman’s Reverse flow technology 

Layout using the  Bateman SettlerTM 

Layout using conventional settler 

Page 6: Copper Capabilities

BSX COPPER INDUSTRY CAPABILITIES PROFILE

6

Project Implementation

Project/Engineering Stages 

Process Guarantee & Mechanical Warranty

Pre‐feasibility Go/no go decision, evaluating optional 

process schemes & costs

Feasibility Confirms/revises earlier conclusions, enhances accuracy of cost evaluation

Definitive Feasibility Formal documentation reporting 

process details, estimation of capital & operating costs

FinanceFacilitating the optimum, most cost‐effective financing packages.  For 

certain solutions equity  investment may be considered

NeedDefining processing goals, optimization of capital and operating costs, safety 

and environmental issues

Design, Supply & ConstructionProcess and equipment optimization, design,  supply and construct  industrial plant (i.e. EP, EPC, Lump –sum turnkey)

Commissioning & Start‐upComprehensive training provided for the plant operation team as well as technical and operational support 

services. BOO skills available if needed

LabEvaluating samples, determining 

materials for construction, identifying recovery procedures

Mini Pilot (Optional)At our research center/on site: process testing on a small scale mini‐pilot plant, 

also providing samples for further testing and market assessment

Pilot At our research center/client facility: 

integrating the process into a continuous operation, validating the process and obtain scale‐up data

Demonstration (Optional)Produce marketable samples in a small 

industrial simulation plant, which provides conclusive evidence of process and project viability

Development Stages 

Page 7: Copper Capabilities

BSX COPPER INDUSTRY CAPABILITIES PROFILE

7

BSX Experience in the Copper Industry – Solvent Extraction and Electrowinning Projects Over the years, BATEMAN has executed copper SX‐EW projects worldwide  for major producers. The projects are detailed below.

 

Year of Award 

Execution  Details 

Kounrad – Sary Kazna, Kazakhstan  

2008  Basic Engineering Leach‐SX‐EW Copper plant based on BATEMAN SETTLERS (BATEMAN’s RFMS technology). The plant will produce 10,000 TPA Copper Cathodes 

Tres Valles – Vale, Chile  

2008  EPC SX‐EW Copper plant based on BATEMAN SETTLERS (BATEMAN’s RFMS technology). The plant will produce 22,000 TPA Copper Cathodes 

Boleo – Baja Mining, Mexico  

2008  Design & Supply SX‐EW Copper plant based on BATEMAN SETTLERS (BATEMAN’s RFMS technology). The plant will produce 60,000 TPA Copper Cathodes 

KOL Phase 5 – Katanga Mining, DRC  

2007  EPCM SX‐EW Copper plant based on BATEMAN SETTLERS (BATEMAN’s RFMS technology) and Xstrata EW technology. The plant should produce 250,000 TPA Copper Cathodes. Project deferred. 

CVRD – Project 118, Brazil   2006  Design  Design of Cu SX MS based on RFMS. 

Codelco – Gaby Project, Chile   2006  EPC  Design, supply construction of 150,000 TPA Cu SX plant. Polymet – Polymet Mining Corp, USA   2006  Study  DFS for a 33,000 TPA Cu SX/EW plant.Las Cruces – Cobre Las Cruces, Spain   2006  Study  LSTK estimate for a 70,000 TPA copper SX plant. Timna – AHMSA Steel, Israel   2005  Study  PFS for a 20,000‐40,000 TPA HL‐SX‐EW plant. Timna – AHMSA Steel, Israel  

2005  Design & Supply Design of HL‐SX‐EW demonstration plant (SX based on pre‐owned equipment). 

Piedras Verdes ‐ M3/ Frontera, Mexico   2005  Design  Design of Cu SX based on RFMS.Chambishi‐ Chambishi Metals, Zambia  

2004  Study DFS for a 40,000 TPA Cu/Co SX plant and an expansion of existing EW facility. 

Mantos de la Luna – MDLL Mining Company, Chile  2004  Design  Design of the SX plant based on BATEMAN’s RFMS technology Tenke Fungurume – Phelps Dodge, DRC   2003  Study  PFS for Copper SXKolwezi tailings – Anglo America/ AMFI, DRC   2002  Study  PFS for Copper SXPenoles – Mexico   

2001  Study & EPCM Design and install a copper concentrate bio‐leach demonstration plant in cooperation with BacTech, Mintek, and Penoles 

Gibraltar – Taseko/CESL, Canada   2001  Study  Study for copper SX

Page 8: Copper Capabilities

BSX COPPER INDUSTRY CAPABILITIES PROFILE

8

 

Year of Award 

Execution  Details 

Sepon – Oxiana, Laos   2001  Study  Study for copper SXLumwana – Equinox, Zambia   2000  Study  Copper SX expansionNifty Copper – Straits Resources, Australia   2000  EPCM  Copper SX expansionAvmin – N'komati, South Africa   2000  Study  FS for Copper SXGunpowder Copper ‐ Australia  

1997‐1998  Study & EPCM Expansion of existing facility to 45,000 mtpy. Autoclave, ferric sulfate leach, solvent extraction and electrowinning. 

Kansanshi – Cypress Amax, Zambia   1998  Study  FS for Copper SXKakanda – IPRC, DRC   1997  Study  FS for Copper SXRuashi Etoile – AMFI, DRC   1997  Study  FS for Copper SXTyrone ‐ Phelps Dodge, USA   1996‐1997  EPC  Expansion to solvent extraction plantYuma – Yuma Copper Corporation, Chile   1996‐1997  Study & Design  Solvent Extraction, Electrowinning plant to process oxide copper ore.Kounrad Copper Mine – Resource Development Kazakh LTD., Kazakhstan  

1996  Design New Solvent Extraction, Electrowinning plant to process waste ore dumps. 

Bwana Mkubwa – First Quantum, Zambia   1996  Study  First QuantumMariquita ‐ Minera Maria Cananea, Mexico  

1995‐1997  Study & EPCM Process design, preliminary and detail engineering of  new  60 tpd of cathode copper, 21,900 mtpy, leaching, solvent extraction,  electrowinning plant. Includes ore crushing. 

Olympic Dam ‐ Western Mining Corporation, Australia  

1995  Study Feasibility study to expand copper tankhouse from 35000 to 300 000 tpy of cathode. Electrowinning, Electrorefining 

Kounrad Copper Mine ‐ Resource Development Kazakh LTD, Kazakhstan  

1995  Study New Solvent Extraction, Electrowinning plant and new acid plant to process copper oxide ore.

Lumwana ‐ Phelps Dodge, Zambia 

  1995  Study Grassroots copper mine including heap leach, solvent extraction, and infrastructure. 

Sanyati Copper Mine ‐ Munyati Mining Company LTD, Zimbabwe 

  1994  Study & EPCM New Solvent Extraction, Electrowinning plant installation to process oxide copper ore.

Miami ‐ Cyprus Copper, USA Arizona   1994  EPC Solvent Extraction,  Electrowinning plant expansion to 80,000 tpyRay Complex ‐ Asarco INC, USA, Arizona   1994  Design Basic engineering for solvent extraction expansion El Arco ‐ Grupo Mexico, Mexico   1994  Study & EPCM SX/EW portable pilot plant

Page 9: Copper Capabilities

BSX COPPER INDUSTRY CAPABILITIES PROFILE

9

 

Year of Award 

Execution  Details 

Balkhash ‐ Resource Development LTD, Kazakhstan  

1993  Study Bankable feasibility study for leach, solvent extraction, electrowinning facility 

Torreon ‐ Met‐Mex Penoles, Mexico  

1993  Study & Design Leach Solvent extraction – Electrowinning comparative study with  smelting / refining

La Caridad Mine Sonora ‐ Mexicana DE Cobre, Mexico   1992  Study Leach / Solvent Extraction – Electrowinning plant project. Rio Tinto Zimbabwe ‐ South Africa   1992  Study  Upgrade nickel / copper leach and Electrowinning plant. Cuajone ‐ Southern Peru Copper, Peru   1991  Study 15 tpd leach – Solvent Extraction – Electrowinning project. Sonora ‐ Chutine Resources LTD., Mexico  

1991  Study 22 mtpd cathode copper leach – Solvent Extraction – Electrowinning plant.

Southern Peru Copper Company ‐ Peru  

1990  Study Solvent Extraction, Electrowinning plant with varying capacities from 44 to 84 mtpd of cathode copper production.

Magma Copper Company ‐ USA, Arizona  

1990  EPC Further expansion of Refinery with addition of new commercial cells, busbar, piping, etc.  Capacity increased by 50,000 tpa

Casa Grande ‐ Cyprus Metals Company, USA, Arizona  1989  Study  Cost estimate to rehabilitate roast / leach / electrowinning plant.Magma Copper Company ‐ USA, Arizona  

1988  Construction Expansion of Existing Refinery with added starter sheet cells, larger rectifiers and new busbar.  Capacity increased by 100,000 tpa 

Compania Minera de Cananea ‐ Mexico   1986‐1989  EPC  60 tpd copper SX‐EW plant (ESDE II)