30
30 Cooperative Service Specifications

Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

  • Upload
    halien

  • View
    217

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

30

Cooperative Service

Specifications

Page 2: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

31

Page 3: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

32

Page 4: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

33

Page 5: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

34

Page 6: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

35

Page 7: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

36

Page 8: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

37

Page 9: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

1 Contractors shall call the district office of the Cooperative a minimum of 24 hours before trench is started to make arrangements for on-site inspection.

2 Underground (buried) conduit shall be Schedule 40 PVC or other corrosion resist-ant duct suitable for the intended environ-ment as approved by the Cooperative. All 90 degree bends shall be electricalgrade, schedule 40 PVC or Rigidgalvanized steel sweeps with minimumbending radius of 36 inches.

3 Minimum size for buried conduit shall be 3 inches for all conductor smaller than 500 MCM, and 4 inches for primary orconductor 500 MCM or larger.

4 Conduit minimum depth 36 inches. Any conduit crossing under a road shall be Schedule 80. Conduits installed less than 36 inches in depth require Cooperative engineering approval andshall be encased in concrete to Cooperative specs. Depths specified are to finished grade.

5 Trenches to be in as straight and direct a line as possible. Routes through unstable soil such as mud, shifting soils, or other hazards should be avoided.

6 Longitudinal runs of conduit should not belocated directly over or under other under-ground facilities such as gas, water sewer lines and septic systems. Whenever possible the horizontal distance between these facilities should be a minimum of 6 feet to permit access and maintenance of either facility without damage to the other. Under special circumstances, controlled horizontal separation of down to 12 inches will be allowed providing all parties are in agreement as to the method.

7 Underground conduit systems shall not beinstalled within 5 feet of any building foundation, swimming pool, etc., exceptfor where service conduit merges to intercept the service equipment.

8 Caution Ribbon shall be installed above the conduit, a foot below finished grade. In

trenches for primary cable, a continuous No. 6 AWG copper grounding conductor shall be directly buried in the bottom of the trench, prior to installation of any conduit, with adequate length at each end for connections by the Cooperative.

9 When electric facilities are installed in thesame trench as communication facilities, aNo. 6 AWG copper bonding conductor, readily accessible at both ends shall be installed at each vault, pad mounted equipment location between electric and communication facilities.

10 A pulling rope, 1/4 inch diameter polypropylene, shall be installed in each conduit.

11 The ends of the conduit shall be plugged during construction to prevent the entrance of foreign matter. The conduit shall be terminated as follows:

a Conduit shall terminate not more than 3 inches inside a vault.Whenever possible the conduit should run straight into the vault without sweeps or bends. Where the conduit enters the vault, it shall be grouted to prevent water, soil and rock intrusion.

b At meter locations, the conduit shall terminate as per appropriate meter installation specs. If the meter socket is at a lower grade than the pad mounted equipment location or part of the under-ground conduit system, provisions shall be made as necessary so that the conduit will not fill with water and run into the meter socket.

12 All ends, joints and internal finish of the conduit shall be free of sharp edges or burrs which could damage the cable.

13 All buried joints shall be glued with cement as recommended by the conduit manufacturer.

14 Any change in direction between lengths of straight rigid conduit greater than 5 degrees shall be made in electrical sweeps,or with a very gradual sweeping change of

Installation Requirements for Underground Conduit Systems

38

Page 10: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

39

direction. Any single run of conduit will contain no more than two 90 degreesweeps. If the secondary runs of conduitare less than 150 feet in length thenschedule 40, PVC sweeps are acceptable.For runs of conductor sized 500MCM andlarger that exceed 150 feet in length, all sweeps shall be steel. For runs of conductor smaller than 500MCM size and that exceed 200 feet in length, all 90º sweeps shall be steel.

15 The consumer shall be responsible for having the conduit/vault system ready, prior to NHEC personnel installing the cable. Any changes, repairs or other work required to the underground conduit/vault system in order for NHEC personnelto pull the cable into the conduit shall bethe responsibility of the consumer.

16 A drainage system must be installed in all vaults and structures. In areas of high water table, vaults and conduit may need to be elevated to promote effective drainage.

17 If a reduction in the service conduit is required, it will occur at the top of the slip joint/expansion fitting utilizing a reducing bushing. The slip joint/expan-sions fitting will remain the same size as the conduit installed in the trench with the transition occurring above ground. (Refer to IU Service Reduction drawing onpage 53.)

18 Member shall be responsible to encloseand cover any open holes and secure anyhazardous conditions until such timeNHEC completes their work.

Installation Requirements for Underground Conduit Systems

Page 11: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

Conduit and Trench Inspection Notice

All contractors and developers requestingunderground electrical service shall call theMember Solutions Department of NewHampshire Electric Cooperative a minimum of 24hours before trench is started to makearrangements for on-site inspection by NHECConstruction personnel. NHEC will contuct an on-site inspection within 2 working days of theinspection request.

All trenches will be left open so that the conduitsystem can be certified as meeting the“Installation Requirements for UndergroundConduit Systems” listed on page 38 of the“Handbook for Electric Service” provided byNHEC.

Once certification has been completed, anNHEC “approval” sitcker will be placed at theappropriate location on the meter socket to notifyall parties that the underground electrical systemcan be installed.

Failure to comply with this rquirement will resultin the system being re-exposed so that the properinstallation can be performed. No electrical

service will be installed until the inspection stickeris in place.

Please be prepared to give all informationregarding your project to our Member Solutionsrepresentative, including your Service Order#_________________.

Contact number: 1-800-698-2007

40

Page 12: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

41

Page 13: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

42

Page 14: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

43

Page 15: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

44

Page 16: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

45

Page 17: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

46

Page 18: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

47

Page 19: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

48

Page 20: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

49

Page 21: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

50

Page 22: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

51

Page 23: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

52

NOTE:1.) CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH OF 5000

P.S.I. AFTER 28 DAYS WHEN TESTED IN ACCORDANCE WITHASTM C 39-72 (LATEST EDITION)

2.) APPROXIMATE WEIGHT: 1515 LBS.

3-1/2"

6"3" 6"

CARRY SLOT DETAIL

SIDE END

1/2" REINFORCING ROD

45° CHAMFER

6"

5'-0"

4'-4"

LC

LC

6" REINFORCING MESH (#6)

PROVIDE 2CARRY SLOTS

(SEE DETAIL)

ISSUE DATE: 01/06

U7-5BCONSTRUCTION STANDARDS

U7-5B

VAULT COVERFOR

U5-5 & U5-4

Page 24: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

53

Page 25: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

54

Page 26: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

55

CABLE TV

PRIMARY(ELECTRIC)

PRIMARY

WITH TELEPHONE AND/OR CABLE TVONE OR MORE PRIMARY CIRCUITS

(ELECTRIC)

TELEPHONE

36" min.

6"

6" 6" 6"

GROUND CONDUCTORNO. 6 AWG COPPER

UNDISTURBED EARTHDIAMETERNO ROCKS LARGER THAN 1"SAND OR FINE BACKFILL,

DIAMETERNO ROCKS LARGER THAN 6"WHEEL COMPACTED BACKFILL,

WARNING TAPE

24" min.

6"

6" TO 12"

CONDUIT (TYP.)

SECONDARY(ELECTRIC)

6"

NOTE:1. TRENCH WIDTH AS REQUIRED TO MAINTAIN 6" MINIMUM SPACING BETWEEN ALL CONDUITS AND

TRENCH SIDEWALLS.2. TRENCH TO BE INSPECTED BY A REPRESENTATIVE OF NHEC PRIOR TO BACKFILLING.

ISSUE DATE: 06/05

IU Primary Trench

CONSTRUCTION STANDARDS

IU Primary Trench

TRENCH FOR JOINT ELECTRICAND COMMUNICATION FACILITIES

Page 27: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

DIAMETERNO ROCKS LARGER THAN 1"SAND OR FINE BACKFILL,

(ELECTRIC)

CONDUIT (TYP.)4"

4" 6"

WARNING TAPE

6" TO 12"

6"

PRIMARY

GROUND CONDUCTORNO. 6 AWG COPPER

6" 4"

24"

4"

4"

WHEEL COMPACTED BACKFILL,NO ROCKS LARGER THAN 4"DIAMETER

UNDISTURBED EARTH

5000 PSI CONCRETE ENCASEMENT

SCHEDULE 40

NOTE:1. TRENCH WIDTH AS REQUIRED TO MAINTAIN 6" MINIMUM SPACING BETWEEN ALL CONDUITS

AND 4" TO TRENCH SIDEWALLS.2. CONCRETE TO BE 5000 PSI3. TRENCH TO BE INSPECTED BY A REPRESENTATIVE OF NHEC PRIOR TO BACKFILLING.

CONCRETE CAPPED TRENCH

CONCRETE

ISSUE DATE: 06/05

CONSTRUCTION STANDARDS

CONCRETE CAPPED TRENCHFOR ELECTRICAL FACILITIES

IU Concrete Trench

IU Concrete Trench

56

Page 28: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

57

4"

6"

2'-6"

2'-0"

4"

4"

6'-0"

(SEE DETAIL)PROVIDE 2 CARRY SLOTS

1/2" REINFORCING ROD

ENDSIDE

CARRY SLOT DETAIL

6"3"

6"

2-1/2"

ACCORDANCE WITH ASTM C 39-72 (LATEST EDITION).1.) CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH OF 5000 P.S.I. AFTER 28 DAYS WHEN TESTED IN

NOTE:

6" REINFORCING MESH (#6)

CROSSING UTILITY CONDUITCULVERT OR OTHER PIPING

UTILITY CONDUIT SYSTEM

SIDE VIEW CABLE COVER SIDE VIEW CABLE COVER

6" MIN. OF GROUND COVER

ISSUE DATE: 05/06

U7-6B.1CONSTRUCTION STANDARDS

U7-6B.1

UNDERWATER CABLE COVER

Page 29: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

58

N o t e s

Page 30: Cooperative Service Specifications - NHEC · 16 A drainage system must be installed in ... all parties that the underground electrical system ... 5000 PSI CONCRETE ENCASEMENT SCHEDULE

59

N o t e s

1-800-698-2007 • Fax: 603-536-8687 579 Tenney Mountain Hwy, Plymouth, NH 03264-3154

www.nhec.coop