18
THE ETHIOPIAN RAILWAYS PROJECT (The Sub Sahara Transit Gateway ) Adil Abdalla June 2011 Controlled Copy

Controlled Copy. Disclaimer This presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and is (and is intended to remain)

Embed Size (px)

Citation preview

Page 1: Controlled Copy. Disclaimer This presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and is (and is intended to remain)

THE ETHIOPIAN RAILWAYS PROJECT

(The Sub Sahara Transit Gateway)

Adil AbdallaJune 2011

Controlled Copy

Page 2: Controlled Copy. Disclaimer This presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and is (and is intended to remain)

DisclaimerThis presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and

is (and is intended to remain) confidential, being provided for the exclusive use of the intended addressee and may be legally privileged. If you have reason to believe you are not the intended

addressee(s); disclosing, copying, disseminating or otherwise taking any action in connection with this document or the information in; it is prohibited and may be unlawful. If you have reason to

believe you have accessed this document in error, please notify the ETHRAA FZ LLC®, comply with the foregoing warning and delete this document from your system. This document shall not

constitute binding legal obligation with the company..

2

Page 3: Controlled Copy. Disclaimer This presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and is (and is intended to remain)

3

Africans on the Move

Page 4: Controlled Copy. Disclaimer This presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and is (and is intended to remain)

Starting Point: The MDGs; Global Partnership

Target 8.A:Develop further an open, rule-based, predictable, non-discriminatory trading and financial system

Target 8.B: Address the special needs of least developed countries

Target 8.C: Address the special needs of landlocked developing countries and small island developing States

Target 8.D:Deal comprehensively with the debt problems of developing countries

Target 8.E:In cooperation with pharmaceutical companies, provide access to affordable essential drugs in developing countries

Target 8.F: In cooperation with the private sector, make available benefits of new technologies, especially information and communications

“MDGs : UN’s Millennium Development Goals”

4

Page 5: Controlled Copy. Disclaimer This presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and is (and is intended to remain)

The Development Axis

Beijing

Accra

4,000 miles

• Medium & Lower HD Rates• Fast Growing Population• Conventional Economics• Immature Governance• Fast Growing GDP

5

Page 6: Controlled Copy. Disclaimer This presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and is (and is intended to remain)

The PPP Modeling

Invested Capital

Risk Sharing with Gov.

Profit Sharing with Gov.

Regulatory Supervision

Ops Sharing with Gov.

BOO BOT

Gov. Share is non monetary

Risk Liability & Management

Enabler for Ops Support

Alignment to Public Interests

Sustaining Ops. know-how

Build, Operate & TransferBuild, Own & Operate

It is about the legal provisions to sale all or part of the shares

6

Page 7: Controlled Copy. Disclaimer This presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and is (and is intended to remain)

Trans-Africa Railway: Alignment

Since 1912

Corridor will include Road & Rail

7

Page 8: Controlled Copy. Disclaimer This presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and is (and is intended to remain)

Trans-Africa Railway: Countries

http://www.nationmaster.com/index.phphttp://www.foreignpolicy.com/articles/2010/06/21/2010_failed_states_index_interactive_map_and_rankingshttp://www.creditwritedowns.com/2010/04/all-sp-sovereign-credit-ratings-in-order-from-aaa-to-junk.htmlhttp://www.indexmundi.com/g/r.aspx?c=sg&v=113

8

Senegal Mali Niger Nigeria Chad Sudan Ethiopia Djibouti

GDP 2009 bln $ 18.2 12.3 16.5 155.6 20.2 69.4 56.9 1.5

Aid % in GDP 9.7 15.7 11.6 0.4 9.3 2.0 10.8 12.9

GDP Growth % 5.1 6.1 4.5 6.9 5.5 8.0 8.7 3.2

Population mln 12.6 14.2 16.5 155.2 10.7 45.1 90.9 0.8

Rail Length km 906 593 3,505 3,505 0 5,987 681 100

Railway Rank 95 114 49 50 (NA) 30 108 128

Passengersmln km pe 12.1 14.9 0 1.3 0 1.1 2.9 103.4

Surface Cargomln ton km 32.6 14.4 0 0.6 0 21.1 0.9 122.3

Sovereign Credit Rating B+ (NA) (NA) B+ (NA) (NA) (NA) (NA)

Failed States 102 83 20 14 2 3 17 74

Human Develop. 144 160 167 142 163 154 157 147

Page 10: Controlled Copy. Disclaimer This presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and is (and is intended to remain)

Trans-Africa Railway: Anchor Ports: Djibouti

NetworkAirport/Road

Capacity3,030 Dwt

OperatorDP World

Investment Plan$ 50 mln

Containers Storage1,600 TEU

Area20 hectares

Traffic3.5 millions MT

Cranes4

http://djiboutiembassyke.org/index.php?option=com_content&view=article&id=59:djibouti-port&catid=31:djibouti&Itemid=1

10

Page 11: Controlled Copy. Disclaimer This presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and is (and is intended to remain)

Target Case Study: Ethiopia Railways

The Track

The Stations

No info

5,000 kmLaunched Jan 2011

165 in 3 grades

Standard solutions

Loan of $320 mln from China

Contract Awarded China Railways Co

Serve 49 Cities Only 6 qualify for Transit Hubs

The System 50 x 1000 seats

11

Page 12: Controlled Copy. Disclaimer This presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and is (and is intended to remain)

Target Case Study: Target Locations

12

EXAMPLE

Phase One: 6 Main Cities

Phase Two: 7 Main Cities

Page 13: Controlled Copy. Disclaimer This presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and is (and is intended to remain)

Target Case Study: Integrated Development

Railway Alignment

The New Transit Hub

The Existing

City

EXAMPLE

The Urban Orientation

The Future

City

13

Page 14: Controlled Copy. Disclaimer This presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and is (and is intended to remain)

Target Case Study: Proposed Transit Township

Railway Alignment

The New Transit

Hub

The Existing

City

EXAMPLEPlot 2,000,000 ft2GFA 2,000,000 ft2The City HallTransit HubShopping MallOffice BldgsHotelResidential BldgsCineplexRecreational ParkGardensNursery & SchoolCommunity ClinicSurface Car ParkOthers…Invest $ 300mln

Spearheading the Urban DevelopmentCatalyst for Social Economic Upgrading

Focus point for FDIs in the Metropolitans

14

Page 15: Controlled Copy. Disclaimer This presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and is (and is intended to remain)

15

The Transit Hub

Page 16: Controlled Copy. Disclaimer This presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and is (and is intended to remain)

Case Study: Summary

•Phase One - Principle Cities: 6 nos. Transit HubsEach 2,000,000 ft2 Plot

• Phase Two – Main Cities: 7 nos.Grand StationsEach 500,000 ft2 Plot

• Phase Three – Grade One Stations: 50 nos.Standard Stations

• Phase Four – Grade Two Stations: 50 nos.Basic Stations

•Phase Five – Grade Three Stations: 58 nos.Platform Plus

16

Investment Targets

Page 17: Controlled Copy. Disclaimer This presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and is (and is intended to remain)

Target Case Study: Proposed Concession Structure

Award Mgmt

(Negotiate)ETNH ?? Years BOO

(Award)BOO Concession

(Product)Multipurpose Train

Central Stations

Concession Design Mgmt

(Enabling Environment)Ethiopian Investment

Corporation

(PPP Initiative)Ethiopian Government

(Regulatory)Ethiopian Municipal

Councils

(Target)New Urban Catalyst

Townships

Ethraa FZ LLC(Investment Development Manager)

Other Investors(To Be Named Later)

Ethiopian Railways Corporation

(Government Partner)

ZZZZZ Plc(Local Ethiopian Investor)

XXXXX LLC(Strategic Investor)

Operations

ETNHEthiopia New Horizons LLC

(Concession Company)

YYYYYY(Int’l Master Concessionaire)

Example; Subject to the Final Consortium Formation

17

Page 18: Controlled Copy. Disclaimer This presentation document contains information which is proprietary to the ETHRAA FZ LLC®, and is (and is intended to remain)

Case Study: Launch Actions

• Launch the Investment Development Management: Sign off HOA with the Sovereign Client(Ethiopian Railways Corporation)

• Recognize the Enabling Environment:Workshops with Concerned Authorities

• Develop the Product Identification:Report on Findings and Compliances

• Consortiums Formation:Legal Negotiations and Foundation

18