34
TITLE YENG TONG'S SCOPE OF WORKS YEAR CLIENT MAIN CONTRACTOR PJ099 Reclamation of Jurong Island Phase 4 & Tuas View Extension - Option 1-1 Shore Protection Works at New Yard Phase 2 Sept 2011~ Feb 2012 JTC Corporation Samsung C & T Corporation PJ098 Design and Reclamation at Ayer Merbau - Phase 1 Part 2, Jurong Island - Sub Contract for Removal of Existing Revetment and Construction of New Shore Protection Revetment & Shore Protection Works Jul 2011~ Jun 2012 JTC Corporation Samsung C & T Corporation PJ097 Project D2004-00903-120- Dredging Works at CNB Ship Basin Dredging Works Jul 2011~ Dec 2011 Defence Science and Technologh Agency Yeng Tong Construction Pte Ltd PJ095 Proposed Pier on Lot 07442X PT (New Lot 8609WPT) MK05 To The Existing Workshop At No. 15 Pandan Crescent On Lot 04904K MK 05 (Clementi Planing Area) Dredging, Piling & RC Works Jun 2011~ Feb 2012 Tiong Woon Crane & Transport Pte Ltd Yeng Tong Construction Pte Ltd PJ094 Reclamation of Jurong Island PH4 & Tuas View Extension Sandkey Dredging For New Yard Phase 2 V/O Dredging Works May 2011~ Aug 2011 JTC Corporation Hyundai Engineering & Construction Co. Ltd PJ093 Revelopment of Sungei Buloh Wetland Reserve (Phase 1) Improved the tidal gates D6; Restoration of existing sluice gate A3; Toe-protection and rstoration of the mangrove; Constructon of an offshore breakwater. Apr 2011~ Apr 2012 National Parks Board Surbana International Consultants Pte Ltd PJ092 Reclamation Of Jurong Island Phase 4 and Tuas View Extension Option 1- 1 - Rock Works Below Finger Pier Rocks Works Sep 2010~ Feb 2011 JTC Corporation Hyundai Engineering & Construction Co. Ltd CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD Page 1 of 34

CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

TITLEYENG TONG'S SCOPE OF

WORKSYEAR CLIENT MAIN CONTRACTOR

PJ099Reclamation of Jurong Island Phase 4 & Tuas View Extension - Option 1-1

Shore Protection Works at New Yard Phase 2

Sept 2011~Feb 2012

JTC CorporationSamsung C & T Corporation

PJ098

Design and Reclamation at Ayer

Merbau - Phase 1 Part 2, Jurong Island - Sub Contract for Removal of Existing Revetment and Construction of New Shore Protection

Revetment & Shore Protection Works

Jul 2011~Jun 2012

JTC CorporationSamsung C & T Corporation

PJ097Project D2004-00903-120-Dredging Works at CNB Ship Basin

Dredging WorksJul 2011~ Dec 2011

Defence Science and Technologh Agency

Yeng Tong Construction Pte Ltd

PJ095

Proposed Pier on Lot 07442X PT

(New Lot 8609WPT) MK05 To The Existing Workshop At No. 15 Pandan Crescent On Lot 04904K MK 05 (Clementi Planing Area)

Dredging, Piling & RC WorksJun 2011~ Feb 2012

Tiong Woon Crane & Transport Pte Ltd

Yeng Tong Construction Pte Ltd

PJ094

Reclamation of Jurong Island PH4 & Tuas View Extension Sandkey Dredging For New Yard Phase 2 V/O

Dredging WorksMay 2011~ Aug 2011

JTC CorporationHyundai Engineering & Construction Co. Ltd

PJ093Revelopment of Sungei Buloh Wetland Reserve (Phase 1)

Improved the tidal gates D6;

Restoration of existing sluice gate A3; Toe-protection and rstoration of the mangrove; Constructon of an offshore breakwater.

Apr 2011~ Apr 2012

National Parks BoardSurbana International

Consultants Pte Ltd

PJ092

Reclamation Of Jurong Island Phase 4 and Tuas View Extension Option 1-1 - Rock Works Below Finger Pier

Rocks WorksSep 2010~ Feb 2011

JTC CorporationHyundai Engineering & Construction Co. Ltd

CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD

Page 1 of 34

Page 2: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

TITLEYENG TONG'S SCOPE OF

WORKSYEAR CLIENT MAIN CONTRACTOR

CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD

PJ090Dredging Works at P01 to P09, P21 to P26 and PSA defined area at Pasit Panjang Terminal

Dredging WorksMar 2010 ~ Sept 2010

PSA Corporation Ltd.Yeng Tong Construction Pte Ltd

PJ088

Dredging works for proposed additiona and alterations to an existing jetty at an existing workshop at No. 72, Loyang Way

Dredging WorksFeb 2010 ~ May 2010

Technics Offshore Engineering Pte. Ltd.

Oung Construction Pte. Ltd.

PJ087

Reclamation Of Jurong Island Phase 4 and Tuas View Extension Option 2-1 - Shore Protection At Area 3B5b and Area 4A

Shore Protection WorksDec 2009 ~ Oct 2010

JTC Corporation PKDBH Joint Venture

PJ086Dredging Works At Jetty of Senoko Power Station

Dredging WorksApr 2009 ~ Aug 2009

Senoko PowerFederal Resource Services Pte Ltd

PJ084

Upgrading of Berths K12, K13 & K14 At Keppel Terminal And Dredging Works

Dredging WorksNov 2008 ~ Oct 2009

PSA Corporation Limited

Muhibbah Engineering (S'pore) Pte Ltd

PJ077Additional Reclamation at Pulau

Ayer Merbau

Stone Supply & Shore

Protetion Works

Oct 2008 ~

Feb 2009JTC Corporation

Hyundai Engineering and Construction

Limited

PJ082 Supply & Delivery of Sea Sand Supply & Delivery of Sea Sand Apr 2008 ~ Jan 2010

JTC CorporationYeng Tong Construction Pte Ltd

PJ081

Reclamation for Pasir Panjang Terminal Phases 3 and 4 Contract No. 30/06.C08

Stone Supply Oct 2008 ~ Jun 2012

Maritime and Port Authority of Singapore

Hyundai Engineering and Construction Limited

Page 2 of 34

Page 3: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

TITLEYENG TONG'S SCOPE OF

WORKSYEAR CLIENT MAIN CONTRACTOR

CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD

PJ080Removal of Rock from the Seabed at Selat Sengkir at Sentosa

Dredging WorksJun 2008 ~ Jul 2009

McConnell Dowell South East Asia Pte Ltd

Yeng Tong Construction Pte Ltd

PJ079Proposed Dredging work at Berth 4

& Seawater Intake at PCS

Dredging & Sand Capping

Works

Jul 2008 ~

Aug 2008

HSL Constructor Pte

Ltd

Yeng Tong Construction

Pte Ltd

PJ078Reclamation of Jurong Island PH 4 & Tuas View Extension

Sub-Contract for Shore Protection Works in Area A2-Megayard Phase 1 & Part of 2

Apr 2008 ~ Dec 2008

JTC Corporation

Hyundai Engineering & Construction Co. Ltd - Van Oord ACZ - Ballast Nedam JV

PJ077Reclamation of Pulau Ayer Merbau, Jurong Island Phase 1

Removal of Existing Shore Protection

Jan 2008 ~ Feb 2008

JTC CorporationHyundai Engineering & Construction Co. Ltd

PJ076Supply & Delivery of Sea Sand to

Singapore for JTC Corporation (JTC)Stevedoring

Oct 2007 ~

May 2010JTC Corporation

Various Sea Sand

Suppliers

PJ075

Dredging at Changi Creek Leading to / from Changi Point Ferry Terminal

Dredging WorksSep 2007 ~ Feb 2008

Maritime and Port Authority of Singapore

Yeng Tong Construction Pte Ltd

PJ074

Sub-Contract for Removal of Underground Obstruction at Marina Bay

Wet Excavation WorksAug 2007 ~ Aug 2008

Urban Redevelopment Authority

Gammon Construction Limited Singapore Branch

PJ073

Proposed Addition & Alteration and Repair Works to Existing Jetty on Lot 07309W MK05 at No. 13 Pandan Crescent

Repairs Jetty & Dredging Works

Aug 2007 ~ Jul 2008

Tiong Woon Crane & Transport Pte Ltd

Yeng Tong Construction Pte Ltd

PJ072Construction of Wharf and Ringer Foundation at PPL Shipyard, 27 Tuas Crescent

Wharf and ringer foundationMay 2007 ~ Sep 2007

PPL Shipyard Pte LtdYeng Tong Construction Pte Ltd

Page 3 of 34

Page 4: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

TITLEYENG TONG'S SCOPE OF

WORKSYEAR CLIENT MAIN CONTRACTOR

CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD

-

Proposed Widening of the Existing Penang Bridge Low Level viaduct from East Abutment to Pier 24E and from Pier 24W to Pier 69W - Optim3B (Marine)

Bored pile and pile cap worksFeb 2007 ~ Mar 2009

Penang Bridge Sdn Bhd

UEM Construction Sdn Bhd & Biaxis Sdn Bhd

-

Shuaibah Phase III IWPP Desalination Plant (Civil Offshore Works)

Shoreline Protection and Offshore Works

Oct 2006 ~ Nov 2007

Shuaibah Water and Electricity Company

Zelan Construction

Arabia Co. Ltd & Pembinaan Yeng Tong Sdn Bhd JV

Reclamation of Sakra Basin, Construction of Roads, Drains, Sewers and ancillary works off Sakra Road, Jurong Island

Shore protection works and Dredging

Aug 2006 ~ Jun 2007

Jurong Town Corporation

Hyundai Engineering and Construction Limited

PJ071

Beach Protection Works at Siloso Beach, Sentosa

Sandy Beach & Headland Construction

Feb 2006 ~ Oct 2006

Sentosa Development Corporation

Yeng Tong Construction Pte Ltd

PJ070

Reclamation at Pulau Ubin and Pulau Tekong (Part I)

Subcontract for Sandy Beach Construction at Area A "D-A / D-B"

Jun 2005 ~ May 2006

Housing Development Board, Singapore

Van Oord Dredging And Marine Contractors B.V.

-

Cadangan Pembinaan Pelabuhan

Tanjung Pelepas Fasa 3 - The

Construction, completion and

Maintenance of Wharves Structures

at Berth 9 & 10

Dredging and Arnour Rock Protection

May 2005 ~ May 2006

Tanjung Pelepas Port Authority, Johor

Zelan Construction Sdn Bhd & Omni-Kwang JV

-

Dredging and Armour Rock Works to C.W Outfall and C.W Intake for Power Plant at Tanjung Bin, Johor

Dredging and Arnour Rock Protection

Mar 2005 ~ Jun 2005

Tanjung Bin Power Plant Sdn Bhd

Zelan Construction Sdn Bhd & Omni-Kwang JV

Page 4 of 34

Page 5: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

TITLEYENG TONG'S SCOPE OF

WORKSYEAR CLIENT MAIN CONTRACTOR

CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD

PJ069

Maintenance Dredging Works at Pasir Panjang Terminal, Area A, B & C

Dredging at -15.0 and -16.0 MCD and Rock Rectification Works

Nov 2004 ~ Jul 2006

PSA Corporation Limited

Yeng Tong Construction Pte Ltd

PJ069

Maintenance Dredging at Pasir

Panjang Terminal Area D

Dredging at -15.0 MCD Nov 2004 ~

Jul 2005

PSA Corporation Ltd Yeng Tong Construction

Pte Ltd

PJ069

Maintenance Dredging at Sembawang Wharves

Dredging at -11.00 MCD Nov 2004 ~ Jan 2005

PSA Corporation Ltd Yeng Tong Construction Pte Ltd

PJ068

Dredging Works at Pasir Panjang Wharves

Dredging Works Nov 2003 ~ Dec 2003

PSA Corporation Ltd Yeng Tong Construction Pte Ltd

Seabed Preparation Pipeline Installation and Rock Armour Protection Works in Indonesian Waters

Reinstating Seabed and Filling Trench over Gas Pipeline

Jun 2003 ~ Aug 2003

PT. Perusahaan Gas Negara

Boskalis-Idors J.O.

PJ066

PGN Offshore Pipeline Project at Kuala Tunkal, Sumatra & Batam Island in Indonesia

Placing Rock on Gas Pipeline in Seabed

Jun 2003 ~ Jul 2003

PT. Perusahaan Gas Negara

Hyundai Heavy Industries Co. Ltd

PJ063

Powergas / PMG Submarine Gas Pipeline Project at Pulau Sakra

Reinstatement of Revetment Apr 2003 ~ Jun 2003

Powergas Ltd JDN - Boskalis JV

Dredging at Tanjong Pagar Terminal to Deepen Berth from -12.0m to -13.6m CD

Dredging Works May 2003 ~ Jul 2003

PSA Corporation Limited

Yeng Tong Construction Pte Ltd

Page 5 of 34

Page 6: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

TITLEYENG TONG'S SCOPE OF

WORKSYEAR CLIENT MAIN CONTRACTOR

CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD

-

Cadangan Pembangunan Pelabuhan Tanjung Pelepas - Phase II

Rock Revetment Work Oct 2003 ~ Jun 2004

Tanjung Pelepas Port Authority, Johor

Inai Kiara Sdn Bhd

PJ057

Reclamation of Jurong Island Phase

4 & Tuas View Extension - Shore Protection Works

Shore Protection Works 2002 ~ 2005 Jurong Town

Corporation

Hyundai Engineering &

Construction Co. Ltd & Van Oord ACZ Ballast Ham Rock Joint Venture

Removal and Reinstallation Of Revetment At Pulau Sakra Landfall East And West Natuna Pipeline

Removal and Reinstallation of Revetment

Jun 2002 ~ Aug 2002

Powergas Ltd Jan De Nul - Boskalis Joint Venture

Removal of 25 Nos. Mooring Piles From Sentosa Cove Marina at Sentosa

Removing Steel Piles from Seabed

Feb 2002 Sentosa Development Corporation

Yeng Tong Construction Pte Ltd

Proposed Redevelopment of Changi Point Ferry Terminal - Dredging Works

Dredging Works and Breaking underwater Rocks

2001 ~ 2002 Urban Redevelopment Authority

Swee Hong Engineering Construction Pte Ltd

Maintenance Dredging At Tanjong Pagar Terminal, Keppel Terminal,

Pasir Panjang Terminal and Pasir Panjang Wharves

Dredging Works Oct 2001 ~ Jan 2002

PSA Corporation Limited

Yeng Tong Construction Pte Ltd

North Eastern Coast Reclamation Phase 4 Area At Punggol And Coney Island

Trimming Seabed to Profiles Aug 2001 Government of Singapore

Jan De Nul (S) Pte Ltd

Page 6 of 34

Page 7: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

TITLEYENG TONG'S SCOPE OF

WORKSYEAR CLIENT MAIN CONTRACTOR

CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD

Reclamation at Changi East - Area 'A' North - Proposed Soil Improvement Works at Asian Aerospace Site - Changi East

Surcharge Removal Works 2001 - 2003 Building Construction Authority of Singapore

Hyundai - Koon - Boskalis Joint Venture

Proposed Additional Changi East Reclamation (Phase 1C) Singapore

Shore Protection Works May - Dec 2001 Government of Singapore

Hyundai - Koon - Boskalis Joint Venture

Reclamation at Pulau Ubin and Pulau Tekong (Part I)

Site Clearence and Removal of Rock Headlands

2001Housing Development Board, Singapore

TOA-JDN (PUT) Joint Venture

J130 - Seraya Project 2 (Civil Works For Non-Revamp Area)

Shore Protection Works For Cooling Water Outfall Station

2001 Ellba Eastern (Shell) Gammon Pte Ltd

Reclamation at Changi East Area "A"

(South) - Surcharge Removal Work in M-1 Area (SPEC/QS/431/98)

Surcharge Remvoal Work 2001 Government of

Singapore

Samsung Corporation

(Engineering & Construction Group)

Proposed Additional Reclamation at Southern Sentosa Cove

Reclamation / Dredging Soil Improvement and Revetment Works

2000 ~ 2001 Sentosa Development Corporation

Yeng Tong Construction Pte Ltd

Redevelopment of Colombo Port Dredging Works 1999 ~ 2001 Government of Sri Lanka

Hyundai Engineering and Construction Limited

Dredging Works at Berth K13-K14 Keppel Terminal

Dredging Works 1999 ~ 2000 Port of Singapore Authority

Yeng Tong Construction Pte Ltd

Proposed Changi East Reclamation (Phase 1C), Singapore

Revetment Construction Works

1997 ~ 1999 Government of Singapore

Hyundai - Koon - Boskalis Joint Venture

Proposed Design & Construction of Off-Shore Islets at Siloso Beach, Sentosa, Singapore

Reclamation / Dredging and Beach Fromation Works

1997 ~ 1998 Sentosa Development Corporation

Sing Lian Huat-Yeng Tong Construction Pte Ltd

Page 7 of 34

Page 8: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

TITLEYENG TONG'S SCOPE OF

WORKSYEAR CLIENT MAIN CONTRACTOR

CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD

Construction of Two Breakwaters and Other Facilities at Jerudong Beach, Brunei

Breakwater Construction Works

1997 ~ 1998 Amedeo Development Corporation Sdn Bhd

Hyundai Engineering & Construction Co. Ltd

Construction of Marina Entrance and Revetment Works, Singapore

Construction of Marina / Dredging and Shore Protection Works

1997 ~ 1998 Sentosa Development Corporation

Sing Lian Huat - Yeng Tong Construction Joint Venture

Bridge at Marina Bay Project, Singapore

Revetment Works 1997 Public Works Department

Obayashi Corporation

Construction & Completion of Jetties, Breakwater, Groyne, Dredging, Beach Reclamation and Associated Marine Works at Tanjong Leman & Pulau Sibu Tengah, Mersing, Johor

Construction of Jetties, Breakwater Groyne, Dredging and Reclamation

1996 ~ 1997 Kumpulan Penambang (Johor) Sdn Bhd

Tidalmarine Engineering Sdn Bhd

Proposed Demolition of Existing

Ramp and Construction of Revetment at Tanjong Beach, Sentosa, Singapore

Construction Ramp

Construction and Revetment Works

1995 ~ 1996 Sentosa Development

Corporation

Yeng Tong Construction

Pte Ltd

Modification to Shore Protection Works Adjacent to Ramp at Shell Ferry Terminal, Pasir Panjang, Singapore

Shore ProtectionWorks 1995 Port of Singapore Authority

Uninec Construction Pte Ltd

Construction of Dredging Ditch and

Slope Protection Work at Western Catchment Revervoirs, Singapore

Construction of Concrete

Drains and Slope Protection

1995 ~ 1996 Public Utilities Board Yeng Tong Construction

Pte Ltd

Control of Beach Erosion of Coastline of Berakas Camp Coastline Protection - Brunei Darussalam.

Shore Protection Works 1994 ~ 1995 Government of Singapore

Daito Kogyo Co Ltd

Page 8 of 34

Page 9: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

TITLEYENG TONG'S SCOPE OF

WORKSYEAR CLIENT MAIN CONTRACTOR

CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD

Repairs to Existing Sunken Rockbunds and Revetment at Southern Island, Singapore

Repair and Construct New Revetment

1993 ~ 1994 Sentosa Development Corporation

Yeng Tong Construction Pte Ltd

Repairs of Seawall at 30 Bukit Chermin Road, Singapore

Repair Concrete Seawall 1993 Port of Singapore Authority

Yeng Tong Construction Pte Ltd

Reno Matters for Bedok Fifth Subsidiary Drain, Singapore

Construction of Drain 1993 Ministry of Environment

Swee Hong Engineering Construction Pte Ltd

Proposed Revetment for KYC Machine Industry (S) Pte Ltd, Singapore

Revetment Works 1993 KYC Machine Industry (S) Pte Ltd

Yeng Tong Construction Pte Ltd

Proposed Changi East Reclamation (Phase 1A), Singapore

Shore Protection Works 1992 ~ 1996 Government of Singapore

Obayashi - Toyo Joint Venture

Reconstruction of Granite - Block Stone & Drain, Singapore

Rubble Stone Drains 1992 Bukit Timah Turf Club Uninec Construction Pte Ltd

Proposed North Butterworth Container Terminal, Malaysia

Shore Protection Works 1992 Penang Port Commissioner

IJM Corporation Bhd

- Subcontract for Rubble/Revetment Wall

Construction

Rubble / Revetment Wall 1991 P. W. D. Obayashi - Toyo Joint Venture

- Reconstruction of Tanjong Berlayer Seawall, Singapore

Concrete Seawall 1992 ~ 1993 P. W. D. Obayashi - Toyo Joint Venture

Maintenance of Seawall at Raffles Lighthouse, Singapore

Repair of Revetment 1991 ~ 1992 Port of Singapore Authority

Uninec Construction Pte Ltd

Page 9 of 34

Page 10: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

TITLEYENG TONG'S SCOPE OF

WORKSYEAR CLIENT MAIN CONTRACTOR

CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD

Proposed Dredging Work at Tiong Woon Jetty, Singapore

Dredging Works 1991 Tiong Woon Crane & Transport Pte Ltd

Yeng Tong Construction Pte Ltd

Proposed Dredging at Selat Samulun, Singapore

Dredging Works 1991 M.O.E. N. C. Senan & Sons Pte Ltd

-

Proposed Johor - Singapore Ferry

Terminal, Singapore

Dredging Works 1991 ~ 1992 J. K. R. Syarikat Sri Shah Sdn

Bhd

Proposed Reconstruction of Outlet Drain at Pioneer Sector, Singapore

Concrete Outfall Drain Construction

1991 M.O.E. Yeng Tong Construction Pte Ltd

Proposed Extension of Workshop with Additions and Alternations to Existing Factory and Office on Plot 3181 Gul Avenue, Jurong,

Singapore

Structural Steel Workshop Construction

1990 ~ 1991 Akitek Yeokhoo Degree Engineering Pte Ltd

Proposed Infrastructural Development at Pulau Sudong, Singapore

Infrastructure 1990 ~ 1991 Mindef RSEA International Pte Ltd

Proposed Part 1 / Part 2 Storey Factory With Ancillary Facilities on Plot A10593 MK 11 at Kranji Road, Singapore

Concrete / Steel Frame Building for Factory

1990 Thiong Shen Auto Parts Trading

Degree Engineering Pte Ltd

Proposed Development at Sungei Berih, Singapore

Dredging Works 1990 ~ 1991 Mindef Yeng Tong Construction Pte Ltd

-Shore Protection Works at Pantai Mentiri Gold Course, Brunei

Shore Protection Works 1989 ~ 1990 P. W. D. (Brunei) Ted Sdn Bhd

Upgrading of Western Trainning Wall at Muara, Brunei

Construction of Conrete Seawall

1989 P. W. D. (Brunei) Daito Kogyo Co Ltd

Page 10 of 34

Page 11: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

TITLEYENG TONG'S SCOPE OF

WORKSYEAR CLIENT MAIN CONTRACTOR

CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD

Stone Revetments & Seabed Protection Works for Beach & Lagoon Improvements for Sentosa, Singapore

Dredging and Revetment Works

1988 ~ 1989 Sentosa Development Corporation

Van Oord International / RDC / Antara Koh J.V.

Stone Revetment Works at Penjuru Lane, Singapore

Revetment Works 1988 Containerisation & Packaging Industries

Pte Ltd

Koh Brothers Building & Civil Engineering

Contractor Pte Ltd

Headlands Construction at Eastern End of Pelompong Spit, Brunei

Granite Headland Construction

1987 ~ 1988 P. W. D. (Brunei) Daito Kogyo Co Ltd

Repairs & Pointing to Revetments at Marina Park, Singapore

Repair & Cement Pointing of Revetment

1987 ~ 1988 P. W. D. Yeng Tong Construction Pte Ltd

Rock Bund Construction for Dredging and Reclamation Works at Muara Harbour, Brunei

Rock Bund Construction 1986 ~ 1987 P. W. D. (Brunei) Daito Kogyo Co Ltd

Rock Bund Construction for Yishun MRT Contract 402, Singapore

Rock Bund Construction 1986 ~ 1987 MRTC GTM-SN Coignet Contractors

Shore Protection Works for Fish Landing Complex at Muara, Brunei

Shore Protection Works 1986 P. W. D. (Brunei) San Hin Welding & Construction

Shore Protection Works for Reclamation of Terumbu Pesek, Brunei

Shore Protection Works 1985 Jurong Town Council Boka-Ballast

Shore Protection Works for Reclamation of Pulau Sakra, Singapore

Shore Protection Works 1984 ~ 1985 Jurong Town Council Boka - Ballast

Shore Protection Works for Reclamation of Pulau Busing, Singapore

Shore Protection Works 1983 ~ 1984 Jurong Town Corporation

Boka - Ballast

Headland Construction at Pelompong Spit, Brunei

Headland Construction1982 P.W. D. (Brunei) Daito Kogyo Co Ltd

Page 11 of 34

Page 12: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

* All Amounts are in SGD unless otherwise stated.

TITLEYENG TONG'S SCOPE OF

WORKSCONTRACT VALUE YEAR CLIENT MAIN CONTRACTOR

Proposed Construction and Completion of

Coastal Protection Works at Teluk Lipat,

Dungun, Terengganu Darul Iman

Shore Protection Works RM37,919,100.00July 2012 ~ Jan

2015

East Coast Economic

Region Development

Council (ECERDC)

Pembinaan Yeng Tong Sdn

Bhd

Proposed Construction and Completion of

Coastal Protection Works at Tanjung

Batu, Pekan, Pahang Darul Makmur

Shore Protection Works RM1,832,800.00Aug 2012 ~ Nov

2012

East Coast Economic

Region Development

Council (ECERDC)

Pembinaan Yeng Tong Sdn

Bhd

PJ104Shore Protection Work for Reclaimation

Work At RRM V/OReclamation works $1,936,651.00 Aug 2012~

Hyundai Engineering &

Construction Co. LtdJTC Corporation

PJ103 Reclamation of T-Bund at Jurong Island Reclamation works $10,820,626.00 May 2012 ~ Penta Ocean Construction

Pte Ltd

Koon Construction &

Transport Co. Pte Ltd.

PJ102Shore Protection Work for Reclaimation

Work At A2 - A3a Corner V/O

Reclaimation of Jurong

Island Phrase 4 % Tuas View

Extension Option 1-1

$2,534,575.00 Apr 2012 ~Hyundai Engineering &

Construction Co. LtdJTC Corporation

PJ101 Proposed Dredging of Benoi Basin Dredging Works $1,438,430.00Feb 2012~

Jun 2012JTC Corporation

Yeng Tong Construction

Pte Ltd

PJ100

Reclamation of Jurong Island PH4 & Tuas

View Extension Shore Protection Works

For New Yard Phase 2 V.O.

Shore Protection Works $8,935,140.00Sep 2011~

Mar 2012JTC Corporation

Hyundai Engineering &

Construction Co. Ltd

PJ099Reclamation of Jurong Island Phase 4 &

Tuas View Extension - Option 1-1

Shore Protection Works at

New Yard Phase 2$3,312,550.00

Sept 2011~

Feb 2012JTC Corporation

Hyundai Engineering &

Construction Co. Ltd

PJ098

Design and Reclamation at Ayer Merbau -

Phase 1 Part 2, Jurong Island - Sub

Contract for Removal of Existing

Revetment and Construction of New

Shore Protection

Revetment & Shore

Protection Works$11,000,000.00

Jul 2011~

Jun 2012JTC Corporation

Samsung C & T

Corporation

CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION PTE LTD

Page 13: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

PJ097Project D2004-00903-120-Dredging

Works at CNB Ship BasinDredging Works $1,169,000.00

Jul 2011~

Dec 2011

Defence Science and

Technologh Agency

Yeng Tong Construction

Pte Ltd

PJ095

Proposed Pier on Lot 07442X PT (New Lot

8609WPT) MK05 To The Existing

Workshop At No. 15 Pandan Crescent On

Lot 04904K MK 05 (Clementi Planing

Area)

Dredging, Piling & RC

Works$2,967,835.00

Jun 2011~

Feb 2012

Tiong Woon Crane &

Transport Pte Ltd

Yeng Tong Construction

Pte Ltd

PJ094

Reclamation of Jurong Island PH4 & Tuas

View Extension Sandkey Dredging For

New Yard Phase 2 V/O

Dredging Works $4,232,300.00May 2011~

Aug 2011JTC Corporation

Hyundai Engineering &

Construction Co. Ltd

PJ093Revelopment of Sungei Buloh Wetland

Reserve (Phase 1)

Improved the tidal gates D6;

Restoration of existing sluice

gate A3; Toe-protection and

rstoration of the mangrove;

Constructon of an offshore

breakwater.

$5,765,055.75Apr 2011~

Apr 2012National Parks Board

Yeng Tong Construction

Pte Ltd

PJ092

Reclamation Of Jurong Island Phase 4 and

Tuas View Extension Option 1-1

- Rock Works Below Finger Pier

Rocks Works $3,139,695.96Sep 2010~

Feb 2011JTC Corporation

Hyundai Engineering &

Construction Co. Ltd

PJ091

Marine structures, current Training

Wall and other Acillary Works for

International Cruise Terminal at

Marina South

Supply & Place Stone

Revetment Incl Sand

Trimming & Geofabric

Works

$8,800,000.00 mar2010 ~ feb

2011

Ee Fong Construction

Pte Ltd

Penta-Ocean

Construction Co. Ltd

PJ090

Dredging Works at P01 to P09, P21 to

P26 and PSA defined area at Pasit Panjang

Terminal

Dredging Works $3,370,000.00Mar 2010 ~ Sept

2010PSA Corporation Ltd.

Yeng Tong Construction

Pte Ltd

PJ088

Dredging works for proposed additiona

and alterations to an existing jetty at an

existing workshop at No. 72, Loyang Way

Dredging Works $1,300,000.00Feb 2010 ~

May 2010

Technics Offshore

Engineering Pte. Ltd.

Oung Construction Pte.

Ltd.

Page 14: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

PJ087

Reclamation Of Jurong Island Phase 4 and

Tuas View Extension Option 2-1

- Shore Protection At Area 3B5b and Area

4A

Shore Protection Works $4,204,260.00Dec 2009 ~

Oct 2010JTC Corporation PKDBH Joint Venture

PJ086Dredging Works At Jetty of Senoko Power

StationDredging Works $444,480.00

Apr 2009 ~

Aug 2009Senoko Power

Federal Resource Services

Pte Ltd

PJ084Upgrading of Berths K12, K13 & K14 At

Keppel Terminal And Dredging WorksDredging Works $2,921,414.74

Nov 2008 ~

Oct 2009PSA Corporation Limited

Muhibbah Engineering

(S'pore) Pte Ltd

PJ077Additional Reclamation at Pulau Ayer

Merbau

Stone Supply & Shore

Protetion Works$3,503,400.00

Oct 2008 ~

Feb 2009JTC Corporation

Hyundai Engineering and

Construction Limited

PJ082 Supply & Delivery of Sea Sand Supply & Delivery of Sea

Sand $250,250,000.00

Apr 2008 ~

Jan 2010JTC Corporation

Yeng Tong Construction

Pte Ltd

PJ081

Reclamation for Pasir Panjang Terminal

Phases 3 and 4

Contract No. 30/06.C08

Stone Supply $30,934,210.00Oct 2008 ~

Jun 2012

Maritime and Port

Authority of Singapore

Hyundai Engineering and

Construction Limited

PJ080Removal of Rock from the Seabed at Selat

Sengkir at SentosaDredging Works $356,000.00

Jun 2008 ~

Jul 2009

McConnell Dowell South

East Asia Pte Ltd

Yeng Tong Construction

Pte Ltd

PJ079Proposed Dredging work at Berth 4 &

Seawater Intake at PCS

Dredging & Sand Capping

Works$429,123.00

Jul 2008 ~

Aug 2008HSL Constructor Pte Ltd

Yeng Tong Construction

Pte Ltd

PJ078Reclamation of Jurong Island PH 4 & Tuas

View Extension

Sub-Contract for Shore

Protection Works in Area A2-

Megayard Phase 1 & Part of

2

$2,307,000.00Apr 2008 ~

Dec 2008JTC Corporation

Hyundai Engineering &

Construction Co. Ltd - Van

Oord ACZ - Ballast Nedam

JV

PJ077Reclamation of Pulau Ayer Merbau,

Jurong Island Phase 1

Removal of Existing Shore

Protection$136,750.00

Jan 2008 ~

Feb 2008JTC Corporation

Hyundai Engineering &

Construction Co. Ltd

PJ076Supply & Delivery of Sea Sand to

Singapore for JTC Corporation (JTC)Stevedoring S$1.30 per M3

Oct 2007 ~

May 2010JTC Corporation

Various Sea Sand

Suppliers

Page 15: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

PJ075Dredging at Changi Creek Leading to /

from Changi Point Ferry TerminalDredging Works $456,877.00

Sep 2007 ~

Feb 2008

Maritime and Port

Authority of Singapore

Yeng Tong Construction

Pte Ltd

PJ074Sub-Contract for Removal of

Underground Obstruction at Marina BayWet Excavation Works $2,123,490.00

Aug 2007 ~

Aug 2008

Urban Redevelopment

Authority

Gammon Construction

Limited Singapore Branch

PJ073

Proposed Addition & Alteration and

Repair Works to Existing Jetty on Lot

07309W MK05 at No. 13 Pandan

Crescent

Repairs Jetty & Dredging

Works$2,210,525.00

Aug 2007 ~

Jul 2008

Tiong Woon Crane &

Transport Pte Ltd

Yeng Tong Construction

Pte Ltd

PJ072

Construction of Wharf and Ringer

Foundation at PPL Shipyard, 27 Tuas

Crescent

Wharf and ringer

foundation$2,100,825.00

May 2007 ~

Sep 2007PPL Shipyard Pte Ltd

Yeng Tong Construction

Pte Ltd

-

Proposed Widening of the Existing

Penang Bridge Low Level viaduct from

East Abutment to Pier 24E and from Pier

24W to Pier 69W - Optim3B (Marine)

Bored pile and pile cap

worksRM90,235,982.00

Feb 2007 ~

Mar 2009Penang Bridge Sdn Bhd

UEM Construction Sdn

Bhd & Biaxis Sdn Bhd

-Shuaibah Phase III IWPP Desalination

Plant (Civil Offshore Works)

Shoreline Protection and

Offshore WorksRM25,700,420.00

Oct 2006 ~

Nov 2007

Shuaibah Water and

Electricity Company

Zelan Construction Arabia

Co. Ltd & Pembinaan Yeng

Tong Sdn Bhd JV

Reclamation of Sakra Basin, Construction

of Roads, Drains, Sewers and ancillary

works off Sakra Road, Jurong Island

Shore protection works and

Dredging$1,893,000.00

Aug 2006 ~

Jun 2007Jurong Town Corporation

Hyundai Engineering and

Construction Limited

PJ071Beach Protection Works at Siloso Beach,

Sentosa

Sandy Beach & Headland

Construction$3,886,224.00

Feb 2006 ~

Oct 2006

Sentosa Development

Corporation

Yeng Tong Construction

Pte Ltd

PJ070Reclamation at Pulau Ubin and Pulau

Tekong (Part I)

Subcontract for Sandy Beach

Construction at Area A "D-A

/ D-B"

$2,193,984.00Jun 2005 ~

May 2006

Housing Development

Board, Singapore

Van Oord Dredging And

Marine Contractors B.V.

-

Cadangan Pembinaan Pelabuhan Tanjung

Pelepas Fasa 3 - The Construction,

completion and Maintenance of Wharves

Structures at Berth 9 & 10

Dredging and Arnour Rock

ProtectionRM9,386,500.00

May 2005 ~

May 2006

Tanjung Pelepas Port

Authority, Johor

Zelan Construction Sdn

Bhd & Omni-Kwang JV

Page 16: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

-

Dredging and Armour Rock Works to

C.W Outfall and C.W Intake for Power

Plant at Tanjung Bin, Johor

Dredging and Arnour Rock

ProtectionRM9,095,030.00

Mar 2005 ~

Jun 2005

Tanjung Bin Power Plant

Sdn Bhd

Zelan Construction Sdn

Bhd & Omni-Kwang JV

PJ069Maintenance Dredging Works at Pasir

Panjang Terminal, Area A, B & C

Dredging at -15.0 and -

16.0 MCD and Rock

Rectification Works

$2,088,411.00Nov 2004 ~

Jul 2006PSA Corporation Limited

Yeng Tong Construction

Pte Ltd

PJ069Maintenance Dredging at Pasir Panjang

Terminal Area DDredging at -15.0 MCD $505,667.00

Nov 2004 ~

Jul 2005PSA Corporation Ltd

Yeng Tong Construction

Pte Ltd

PJ069Maintenance Dredging at Sembawang

WharvesDredging at -11.00 MCD $490,000.00

Nov 2004 ~

Jan 2005PSA Corporation Ltd

Yeng Tong Construction

Pte Ltd

PJ068Dredging Works at Pasir Panjang

WharvesDredging Works $350,000.00

Nov 2003 ~

Dec 2003PSA Corporation Ltd

Yeng Tong Construction

Pte Ltd

Seabed Preparation Pipeline Installation

and Rock Armour Protection Works in

Indonesian Waters

Reinstating Seabed and

Filling Trench over Gas

Pipeline

$220,000.00Jun 2003 ~

Aug 2003

PT. Perusahaan Gas

NegaraBoskalis-Idors J.O.

PJ066

PGN Offshore Pipeline Project at Kuala

Tunkal, Sumatra & Batam Island in

Indonesia

Placing Rock on Gas Pipeline

in Seabed$1,423,015.00

Jun 2003 ~

Jul 2003

PT. Perusahaan Gas

Negara

Hyundai Heavy Industries

Co. Ltd

PJ063Powergas / PMG Submarine Gas Pipeline

Project at Pulau SakraReinstatement of Revetment $321,000.00

Apr 2003 ~

Jun 2003Powergas Ltd JDN - Boskalis JV

Dredging at Tanjong Pagar Terminal to

Deepen Berth from -12.0m to -13.6m CDDredging Works $500,000.00

May 2003 ~

Jul 2003PSA Corporation Limited

Yeng Tong Construction

Pte Ltd

-Cadangan Pembangunan Pelabuhan

Tanjung Pelepas - Phase IIRock Revetment Work RM34,000,000.00

Oct 2003 ~

Jun 2004

Tanjung Pelepas Port

Authority, JohorInai Kiara Sdn Bhd

Page 17: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

PJ057

Reclamation of Jurong Island Phase 4 &

Tuas View Extension - Shore Protection

Works

Shore Protection Works $15,500,581.00 2002 ~ 2005 Jurong Town Corporation

Hyundai Engineering &

Construction Co. Ltd &

Van Oord ACZ Ballast

Ham Rock Joint Venture

Removal and Reinstallation Of Revetment

At Pulau Sakra Landfall East And West

Natuna Pipeline

Removal and Reinstallation

of Revetment$332,839.00

Jun 2002 ~

Aug 2002Powergas Ltd

Jan De Nul - Boskalis Joint

Venture

Removal of 25 Nos. Mooring Piles From

Sentosa Cove Marina at Sentosa

Removing Steel Piles from

Seabed$39,583.33 Feb 2002

Sentosa Development

Corporation

Yeng Tong Construction

Pte Ltd

Proposed Redevelopment of Changi Point

Ferry Terminal - Dredging Works

Dredging Works and

Breaking underwater Rocks$1,000,000.00 2001 ~ 2002

Urban Redevelopment

Authority

Swee Hong Engineering

Construction Pte Ltd

Maintenance Dredging At Tanjong Pagar

Terminal, Keppel Terminal, Pasir Panjang

Terminal and Pasir Panjang Wharves

Dredging Works $700,000.00Oct 2001 ~

Jan 2002PSA Corporation Limited

Yeng Tong Construction

Pte Ltd

North Eastern Coast Reclamation Phase 4

Area At Punggol And Coney IslandTrimming Seabed to Profiles $125,000.00 Aug 2001 Government of Singapore Jan De Nul (S) Pte Ltd

Reclamation at Changi East - Area 'A'

North - Proposed Soil Improvement

Works at Asian Aerospace Site - Changi

East

Surcharge Removal Works $4,828,570.00 2001 - 2003Building Construction

Authority of Singapore

Hyundai - Koon - Boskalis

Joint Venture

Proposed Additional Changi East

Reclamation (Phase 1C) SingaporeShore Protection Works $750,000.00 May - Dec 2001 Government of Singapore

Hyundai - Koon - Boskalis

Joint Venture

Reclamation at Pulau Ubin and Pulau

Tekong (Part I)

Site Clearence and Removal

of Rock Headlands$1,630,000.00 2001

Housing Development

Board, Singapore

TOA-JDN (PUT) Joint

Venture

J130 - Seraya Project 2 (Civil Works For

Non-Revamp Area)

Shore Protection Works For

Cooling Water Outfall

Station

$420,000.00 2001 Ellba Eastern (Shell) Gammon Pte Ltd

Page 18: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

Reclamation at Changi East Area "A"

(South) - Surcharge Removal Work in M-

1 Area (SPEC/QS/431/98)

Surcharge Remvoal Work $3,690,000.00 2001 Government of Singapore

Samsung Corporation

(Engineering &

Construction Group)

Proposed Additional Reclamation at

Southern Sentosa Cove

Reclamation / Dredging Soil

Improvement and

Revetment Works

$10,333,000.00 2000 ~ 2001Sentosa Development

Corporation

Yeng Tong Construction

Pte Ltd

Redevelopment of Colombo Port Dredging Works $2,200,000.00 1999 ~ 2001 Government of Sri LankaHyundai Engineering and

Construction Limited

Dredging Works at Berth K13-K14

Keppel TerminalDredging Works $68,000.00 1999 ~ 2000

Port of Singapore

Authority

Yeng Tong Construction

Pte Ltd

Proposed Changi East Reclamation (Phase

1C), Singapore

Revetment Construction

Works$26,228,327.00 1997 ~ 1999 Government of Singapore

Hyundai - Koon - Boskalis

Joint Venture

Proposed Design & Construction of Off-

Shore Islets at Siloso Beach, Sentosa,

Singapore

Reclamation / Dredging and

Beach Fromation Works$6,800,000.00 1997 ~ 1998

Sentosa Development

Corporation

Sing Lian Huat-Yeng Tong

Construction Pte Ltd

Construction of Two Breakwaters and

Other Facilities at Jerudong Beach, Brunei

Breakwater Construction

WorksB$ 62545657 1997 ~ 1998

Amedeo Development

Corporation Sdn Bhd

Hyundai Engineering &

Construction Co. Ltd

Construction of Marina Entrance and

Revetment Works, Singapore

Construction of Marina /

Dredging and Shore

Protection Works

$14,870,000.00 1997 ~ 1998Sentosa Development

Corporation

Sing Lian Huat - Yeng

Tong Construction Joint

Venture

Bridge at Marina Bay Project, Singapore Revetment Works $190,055.00 1997 Public Works Department Obayashi Corporation

Construction & Completion of Jetties,

Breakwater, Groyne, Dredging, Beach

Reclamation and Associated Marine

Works at Tanjong Leman & Pulau Sibu

Tengah, Mersing, Johor

Construction of Jetties,

Breakwater Groyne,

Dredging and Reclamation

RM8,800,000.00 1996 ~ 1997Kumpulan Penambang

(Johor) Sdn Bhd

Tidalmarine Engineering

Sdn Bhd

Proposed Demolition of Existing Ramp

and Construction of Revetment at Tanjong

Beach, Sentosa, Singapore

Construction Ramp

Construction and Revetment

Works

$121,234.00 1995 ~ 1996Sentosa Development

Corporation

Yeng Tong Construction

Pte Ltd

Page 19: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

Modification to Shore Protection Works

Adjacent to Ramp at Shell Ferry Terminal,

Pasir Panjang, Singapore

Shore ProtectionWorks $60,000.00 1995Port of Singapore

Authority

Uninec Construction Pte

Ltd

Construction of Dredging Ditch and Slope

Protection Work at Western Catchment

Revervoirs, Singapore

Construction of Concrete

Drains and Slope Protection$350,000.00 1995 ~ 1996 Public Utilities Board

Yeng Tong Construction

Pte Ltd

Control of Beach Erosion of Coastline of

Berakas Camp Coastline Protection -

Brunei Darussalam.

Shore Protection Works B$ 6,500,000.00 1994 ~ 1995 Government of Singapore Daito Kogyo Co Ltd

Repairs to Existing Sunken Rockbunds

and Revetment at Southern Island,

Singapore

Repair and Construct New

Revetment$1,538,501.00 1993 ~ 1994

Sentosa Development

Corporation

Yeng Tong Construction

Pte Ltd

Repairs of Seawall at 30 Bukit Chermin

Road, SingaporeRepair Concrete Seawall $19,000.00 1993

Port of Singapore

Authority

Yeng Tong Construction

Pte Ltd

Reno Matters for Bedok Fifth Subsidiary

Drain, SingaporeConstruction of Drain $40,000.00 1993 Ministry of Environment

Swee Hong Engineering

Construction Pte Ltd

Proposed Revetment for KYC Machine

Industry (S) Pte Ltd, SingaporeRevetment Works $35,000.00 1993

KYC Machine Industry (S)

Pte Ltd

Yeng Tong Construction

Pte Ltd

Proposed Changi East Reclamation (Phase

1A), SingaporeShore Protection Works $37,525,624.60 1992 ~ 1996 Government of Singapore

Obayashi - Toyo Joint

Venture

Reconstruction of Granite - Block Stone &

Drain, SingaporeRubble Stone Drains $25,000.00 1992 Bukit Timah Turf Club

Uninec Construction Pte

Ltd

Proposed North Butterworth Container

Terminal, MalaysiaShore Protection Works RM10,502,175.00 1992

Penang Port

CommissionerIJM Corporation Bhd

- Subcontract for Rubble/Revetment

Wall ConstructionRubble / Revetment Wall $288,000.00 1991 P. W. D.

Obayashi - Toyo Joint

Venture

Page 20: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

- Reconstruction of Tanjong Berlayer

Seawall, SingaporeConcrete Seawall $130,108.00 1992 ~ 1993 P. W. D.

Obayashi - Toyo Joint

Venture

Maintenance of Seawall at Raffles

Lighthouse, SingaporeRepair of Revetment $240,000.00 1991 ~ 1992

Port of Singapore

Authority

Uninec Construction Pte

Ltd

Proposed Dredging Work at Tiong Woon

Jetty, SingaporeDredging Works $50,000.00 1991

Tiong Woon Crane &

Transport Pte Ltd

Yeng Tong Construction

Pte Ltd

Proposed Dredging at Selat Samulun,

SingaporeDredging Works $300,000.00 1991 M.O.E. N. C. Senan & Sons Pte Ltd

-Proposed Johor - Singapore Ferry

Terminal, SingaporeDredging Works $500,000.00 1991 ~ 1992 J. K. R. Syarikat Sri Shah Sdn Bhd

Proposed Reconstruction of Outlet Drain

at Pioneer Sector, Singapore

Concrete Outfall Drain

Construction$178,000.00 1991 M.O.E.

Yeng Tong Construction

Pte Ltd

Proposed Extension of Workshop with

Additions and Alternations to Existing

Factory and Office on Plot 3181 Gul

Avenue, Jurong, Singapore

Structural Steel Workshop

Construction$1,250,600.00 1990 ~ 1991 Akitek Yeokhoo Degree Engineering Pte Ltd

Proposed Infrastructural Development at

Pulau Sudong, SingaporeInfrastructure $1,393,000.00 1990 ~ 1991 Mindef RSEA International Pte Ltd

Proposed Part 1 / Part 2 Storey Factory

With Ancillary Facilities on Plot A10593

MK 11 at Kranji Road, Singapore

Concrete / Steel Frame

Building for Factory$600,000.00 1990

Thiong Shen Auto Parts

TradingDegree Engineering Pte Ltd

Proposed Development at Sungei Berih,

SingaporeDredging Works $650,000.00 1990 ~ 1991 Mindef

Yeng Tong Construction

Pte Ltd

-Shore Protection Works at Pantai Mentiri

Gold Course, BruneiShore Protection Works B$ 2,700,000.00 1989 ~ 1990 P. W. D. (Brunei) Ted Sdn Bhd

Upgrading of Western Trainning Wall at

Muara, Brunei

Construction of Conrete

SeawallB$ 176,000.00 1989 P. W. D. (Brunei) Daito Kogyo Co Ltd

Page 21: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

Stone Revetments & Seabed Protection

Works for Beach & Lagoon Improvements

for Sentosa, Singapore

Dredging and Revetment

Works$1,109,000.00 1988 ~ 1989

Sentosa Development

Corporation

Van Oord International /

RDC / Antara Koh J.V.

Stone Revetment Works at Penjuru Lane,

SingaporeRevetment Works $45,000.00 1988

Containerisation &

Packaging Industries Pte

Ltd

Koh Brothers Building &

Civil Engineering

Contractor Pte Ltd

Headlands Construction at Eastern End of

Pelompong Spit, Brunei

Granite Headland

ConstructionB$ 2,100,000.00 1987 ~ 1988 P. W. D. (Brunei) Daito Kogyo Co Ltd

Repairs & Pointing to Revetments at

Marina Park, Singapore

Repair & Cement Pointing of

Revetment$288,000.00 1987 ~ 1988 P. W. D.

Yeng Tong Construction

Pte Ltd

Rock Bund Construction for Dredging

and Reclamation Works at Muara

Harbour, Brunei

Rock Bund Construction B$ 500,000.00 1986 ~ 1987 P. W. D. (Brunei) Daito Kogyo Co Ltd

Rock Bund Construction for Yishun MRT

Contract 402, SingaporeRock Bund Construction $740,000.00 1986 ~ 1987 MRTC

GTM-SN Coignet

Contractors

Shore Protection Works for Fish Landing

Complex at Muara, BruneiShore Protection Works B$ 70,000.00 1986 P. W. D. (Brunei)

San Hin Welding &

Construction

Shore Protection Works for Reclamation

of Terumbu Pesek, BruneiShore Protection Works B$ 500,000.00 1985 Jurong Town Council Boka-Ballast

Shore Protection Works for Reclamation

of Pulau Sakra, SingaporeShore Protection Works B$ 2,200,000.00 1984 ~ 1985 Jurong Town Council Boka - Ballast

Shore Protection Works for Reclamation

of Pulau Busing, SingaporeShore Protection Works B$ 1,800,000.00 1983 ~ 1984 Jurong Town Corporation Boka - Ballast

Headland Construction at Pelompong

Spit, BruneiHeadland Construction B$ 1,500,000.00 1982 P.W. D. (Brunei) Daito Kogyo Co Ltd

Page 22: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

* All Amounts are in SGD unless otherwise stated.

TITLEYENG TONG'S SCOPE OF

WORKSCONTRACT VALUE YEAR CLIENT MAIN CONTRACTOR

PJ105Maintenance dredging at tanjong pagar,

keppel and brani terminal defined areasDredging Works S$4865425.00

26/11/2012~

25/08/2013

PSA CORPORATION

LIMITED

Yeng Tong Construction

Pte Ltd

PJ104Shore Protection Work for Reclaimation

Work At RRM V/OReclamation works $1,936,651.00 Aug 2012~

Hyundai Engineering &

Construction Co. LtdJTC Corporation

PJ103 Reclamation of T-Bund at Jurong Island Reclamation works $10,820,626.00 May 2012 ~ Penta Ocean Construction

Pte Ltd

Koon Construction &

Transport Co. Pte Ltd.

PJ102Shore Protection Work for Reclaimation

Work At A2 - A3a Corner V/O

Reclaimation of Jurong

Island Phrase 4 % Tuas View

Extension Option 1-1

$2,534,575.00 Apr 2012 ~Hyundai Engineering &

Construction Co. LtdJTC Corporation

PJ101 Proposed Dredging of Benoi Basin Dredging Works $1,438,430.00Feb 2012~

Jun 2012JTC Corporation

Yeng Tong Construction

Pte Ltd

PJ100

Reclamation of Jurong Island PH4 & Tuas

View Extension Shore Protection Works

For New Yard Phase 2 V.O.

Shore Protection Works $8,935,140.00Sep 2011~

Mar 2012JTC Corporation

Hyundai Engineering &

Construction Co. Ltd

PJ099Reclamation of Jurong Island Phase 4 &

Tuas View Extension - Option 1-1

Shore Protection Works at

New Yard Phase 2$3,312,550.00

Sept 2011~

Feb 2012JTC Corporation

Hyundai Engineering &

Construction Co. Ltd

PJ098

Design and Reclamation at Ayer Merbau -

Phase 1 Part 2, Jurong Island - Sub

Contract for Removal of Existing

Revetment and Construction of New

Shore Protection

Revetment & Shore

Protection Works$11,000,000.00

Jul 2011~

Jun 2012JTC Corporation

Samsung C & T

Corporation

CONTRACTS EXECUTED BY YTC IN SINGAPORE

Page 23: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

PJ097Project D2004-00903-120-Dredging

Works at CNB Ship BasinDredging Works $1,169,000.00

Jul 2011~

Dec 2011

Defence Science and

Technologh Agency

Yeng Tong Construction

Pte Ltd

PJ095

Proposed Pier on Lot 07442X PT (New Lot

8609WPT) MK05 To The Existing

Workshop At No. 15 Pandan Crescent On

Lot 04904K MK 05 (Clementi Planing

Area)

Dredging, Piling & RC

Works$2,967,835.00

Jun 2011~

Feb 2012

Tiong Woon Crane &

Transport Pte Ltd

Yeng Tong Construction

Pte Ltd

PJ094

Reclamation of Jurong Island PH4 & Tuas

View Extension Sandkey Dredging For

New Yard Phase 2 V/O

Dredging Works $4,232,300.00May 2011~

Aug 2011JTC Corporation

Hyundai Engineering &

Construction Co. Ltd

PJ093Revelopment of Sungei Buloh Wetland

Reserve (Phase 1)

Improved the tidal gates D6;

Restoration of existing sluice

gate A3; Toe-protection and

rstoration of the mangrove;

Constructon of an offshore

breakwater.

$5,765,055.75Apr 2011~

Apr 2012National Parks Board

Yeng Tong Construction

Pte Ltd

PJ092

Reclamation Of Jurong Island Phase 4 and

Tuas View Extension Option 1-1

- Rock Works Below Finger Pier

Rocks Works $3,139,695.96Sep 2010~

Feb 2011JTC Corporation

Hyundai Engineering &

Construction Co. Ltd

PJ091

Marine structures, current Training

Wall and other Acillary Works for

International Cruise Terminal at

Marina South

Supply & Place Stone

Revetment Incl Sand

Trimming & Geofabric

Works

$8,800,000.00 mar2010 ~ feb

2011

Ee Fong Construction

Pte Ltd

Penta-Ocean

Construction Co. Ltd

PJ090

Dredging Works at P01 to P09, P21 to

P26 and PSA defined area at Pasit Panjang

Terminal

Dredging Works $3,370,000.00Mar 2010 ~ Sept

2010PSA Corporation Ltd.

Yeng Tong Construction

Pte Ltd

PJ088

Dredging works for proposed additiona

and alterations to an existing jetty at an

existing workshop at No. 72, Loyang Way

Dredging Works $1,300,000.00Feb 2010 ~

May 2010

Technics Offshore

Engineering Pte. Ltd.

Oung Construction Pte.

Ltd.

Page 24: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

PJ087

Reclamation Of Jurong Island Phase 4 and

Tuas View Extension Option 2-1

- Shore Protection At Area 3B5b and Area

4A

Shore Protection Works $4,204,260.00Dec 2009 ~

Oct 2010JTC Corporation PKDBH Joint Venture

PJ086Dredging Works At Jetty of Senoko Power

StationDredging Works $444,480.00

Apr 2009 ~

Aug 2009Senoko Power

Federal Resource Services

Pte Ltd

Proposed Nusajaya waterfront precinct on

Part of Lot PTD 141089 And Part of Lot

PTD141090, Mukim Pulai, Bandar

Nusajaya

Earthworks, Dredging

works , Relcamation RM$72,320,772.50

Mar 2009 ~ Jan

2010 UEM LAND

Yeng Tong Construction

Pte Ltd

PJ084Upgrading of Berths K12, K13 & K14 At

Keppel Terminal And Dredging WorksDredging Works $2,921,414.74

Nov 2008 ~

Oct 2009PSA Corporation Limited

Muhibbah Engineering

(S'pore) Pte Ltd

PJ077Additional Reclamation at Pulau Ayer

Merbau

Stone Supply & Shore

Protetion Works$3,503,400.00

Oct 2008 ~

Feb 2009JTC Corporation

Hyundai Engineering and

Construction Limited

PJ082 Supply & Delivery of Sea Sand Supply & Delivery of Sea

Sand $250,250,000.00

Apr 2008 ~

Jan 2010JTC Corporation

Yeng Tong Construction

Pte Ltd

PJ081

Reclamation for Pasir Panjang Terminal

Phases 3 and 4

Contract No. 30/06.C08

Stone Supply $30,934,210.00Oct 2008 ~

Jun 2012

Maritime and Port

Authority of Singapore

Hyundai Engineering and

Construction Limited

PJ080Removal of Rock from the Seabed at Selat

Sengkir at SentosaDredging Works $356,000.00

Jun 2008 ~

Jul 2009

McConnell Dowell South

East Asia Pte Ltd

Yeng Tong Construction

Pte Ltd

PJ079Proposed Dredging work at Berth 4 &

Seawater Intake at PCS

Dredging & Sand Capping

Works$429,123.00

Jul 2008 ~

Aug 2008HSL Constructor Pte Ltd

Yeng Tong Construction

Pte Ltd

PJ078Reclamation of Jurong Island PH 4 & Tuas

View Extension

Sub-Contract for Shore

Protection Works in Area A2-

Megayard Phase 1 & Part of

2

$2,307,000.00Apr 2008 ~

Dec 2008JTC Corporation

Hyundai Engineering &

Construction Co. Ltd - Van

Oord ACZ - Ballast Nedam

JV

PJ077Reclamation of Pulau Ayer Merbau,

Jurong Island Phase 1

Removal of Existing Shore

Protection$136,750.00

Jan 2008 ~

Feb 2008JTC Corporation

Hyundai Engineering &

Construction Co. Ltd

Page 25: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

PJ076Supply & Delivery of Sea Sand to

Singapore for JTC Corporation (JTC)Stevedoring S$1.30 per M3

Oct 2007 ~

May 2010JTC Corporation

Various Sea Sand

Suppliers

PJ075Dredging at Changi Creek Leading to /

from Changi Point Ferry TerminalDredging Works $456,877.00

Sep 2007 ~

Feb 2008

Maritime and Port

Authority of Singapore

Yeng Tong Construction

Pte Ltd

PJ074Sub-Contract for Removal of

Underground Obstruction at Marina BayWet Excavation Works $2,123,490.00

Aug 2007 ~

Aug 2008

Urban Redevelopment

Authority

Gammon Construction

Limited Singapore Branch

PJ073

Proposed Addition & Alteration and

Repair Works to Existing Jetty on Lot

07309W MK05 at No. 13 Pandan

Crescent

Repairs Jetty & Dredging

Works$2,210,525.00

Aug 2007 ~

Jul 2008

Tiong Woon Crane &

Transport Pte Ltd

Yeng Tong Construction

Pte Ltd

PJ072

Construction of Wharf and Ringer

Foundation at PPL Shipyard, 27 Tuas

Crescent

Wharf and ringer

foundation$2,100,825.00

May 2007 ~

Sep 2007PPL Shipyard Pte Ltd

Yeng Tong Construction

Pte Ltd

Reclamation of Sakra Basin, Construction

of Roads, Drains, Sewers and ancillary

works off Sakra Road, Jurong Island

Shore protection works and

Dredging$1,893,000.00

Aug 2006 ~

Jun 2007Jurong Town Corporation

Hyundai Engineering and

Construction Limited

PJ071Beach Protection Works at Siloso Beach,

Sentosa

Sandy Beach & Headland

Construction$3,886,224.00

Feb 2006 ~

Oct 2006

Sentosa Development

Corporation

Yeng Tong Construction

Pte Ltd

PJ070Reclamation at Pulau Ubin and Pulau

Tekong (Part I)

Subcontract for Sandy Beach

Construction at Area A "D-A

/ D-B"

$2,193,984.00Jun 2005 ~

May 2006

Housing Development

Board, Singapore

Van Oord Dredging And

Marine Contractors B.V.

PJ069Maintenance Dredging Works at Pasir

Panjang Terminal, Area A, B & C

Dredging at -15.0 and -

16.0 MCD and Rock

Rectification Works

$2,088,411.00Nov 2004 ~

Jul 2006PSA Corporation Limited

Yeng Tong Construction

Pte Ltd

PJ069Maintenance Dredging at Pasir Panjang

Terminal Area DDredging at -15.0 MCD $505,667.00

Nov 2004 ~

Jul 2005PSA Corporation Ltd

Yeng Tong Construction

Pte Ltd

PJ069Maintenance Dredging at Sembawang

WharvesDredging at -11.00 MCD $490,000.00

Nov 2004 ~

Jan 2005PSA Corporation Ltd

Yeng Tong Construction

Pte Ltd

Page 26: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

PJ068Dredging Works at Pasir Panjang

WharvesDredging Works $350,000.00

Nov 2003 ~

Dec 2003PSA Corporation Ltd

Yeng Tong Construction

Pte Ltd

Dredging at Tanjong Pagar Terminal to

Deepen Berth from -12.0m to -13.6m CDDredging Works $500,000.00

May 2003 ~

Jul 2003PSA Corporation Limited

Yeng Tong Construction

Pte Ltd

PJ057

Reclamation of Jurong Island Phase 4 &

Tuas View Extension - Shore Protection

Works

Shore Protection Works $15,500,581.00 2002 ~ 2005 Jurong Town Corporation

Hyundai Engineering &

Construction Co. Ltd &

Van Oord ACZ Ballast

Ham Rock Joint Venture

Removal of 25 Nos. Mooring Piles From

Sentosa Cove Marina at Sentosa

Removing Steel Piles from

Seabed$39,583.33 Feb 2002

Sentosa Development

Corporation

Yeng Tong Construction

Pte Ltd

Proposed Redevelopment of Changi Point

Ferry Terminal - Dredging Works

Dredging Works and

Breaking underwater Rocks$1,000,000.00 2001 ~ 2002

Urban Redevelopment

Authority

Swee Hong Engineering

Construction Pte Ltd

Maintenance Dredging At Tanjong Pagar

Terminal, Keppel Terminal, Pasir Panjang

Terminal and Pasir Panjang Wharves

Dredging Works $700,000.00Oct 2001 ~

Jan 2002PSA Corporation Limited

Yeng Tong Construction

Pte Ltd

North Eastern Coast Reclamation Phase 4

Area At Punggol And Coney IslandTrimming Seabed to Profiles $125,000.00 Aug 2001 Government of Singapore Jan De Nul (S) Pte Ltd

Reclamation at Changi East - Area 'A'

North - Proposed Soil Improvement

Works at Asian Aerospace Site - Changi

East

Surcharge Removal Works $4,828,570.00 2001 - 2003Building Construction

Authority of Singapore

Hyundai - Koon - Boskalis

Joint Venture

Proposed Additional Changi East

Reclamation (Phase 1C) SingaporeShore Protection Works $750,000.00 May - Dec 2001 Government of Singapore

Hyundai - Koon - Boskalis

Joint Venture

Reclamation at Pulau Ubin and Pulau

Tekong (Part I)

Site Clearence and Removal

of Rock Headlands$1,630,000.00 2001

Housing Development

Board, Singapore

TOA-JDN (PUT) Joint

Venture

Page 27: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

Reclamation at Changi East Area "A"

(South) - Surcharge Removal Work in M-

1 Area (SPEC/QS/431/98)

Surcharge Remvoal Work $3,690,000.00 2001 Government of Singapore

Samsung Corporation

(Engineering &

Construction Group)

Proposed Additional Reclamation at

Southern Sentosa Cove

Reclamation / Dredging Soil

Improvement and

Revetment Works

$10,333,000.00 2000 ~ 2001Sentosa Development

Corporation

Yeng Tong Construction

Pte Ltd

Dredging Works at Berth K13-K14

Keppel TerminalDredging Works $68,000.00 1999 ~ 2000

Port of Singapore

Authority

Yeng Tong Construction

Pte Ltd

Proposed Changi East Reclamation (Phase

1C), Singapore

Revetment Construction

Works$26,228,327.00 1997 ~ 1999 Government of Singapore

Hyundai - Koon - Boskalis

Joint Venture

Proposed Design & Construction of Off-

Shore Islets at Siloso Beach, Sentosa,

Singapore

Reclamation / Dredging and

Beach Fromation Works$6,800,000.00 1997 ~ 1998

Sentosa Development

Corporation

Sing Lian Huat-Yeng Tong

Construction Pte Ltd

Construction of Marina Entrance and

Revetment Works, Singapore

Construction of Marina /

Dredging and Shore

Protection Works

$14,870,000.00 1997 ~ 1998Sentosa Development

Corporation

Sing Lian Huat - Yeng

Tong Construction Joint

Venture

Bridge at Marina Bay Project, Singapore Revetment Works $190,055.00 1997 Public Works Department Obayashi Corporation

Proposed Demolition of Existing Ramp

and Construction of Revetment at Tanjong

Beach, Sentosa, Singapore

Construction Ramp

Construction and Revetment

Works

$121,234.00 1995 ~ 1996Sentosa Development

Corporation

Yeng Tong Construction

Pte Ltd

Modification to Shore Protection Works

Adjacent to Ramp at Shell Ferry Terminal,

Pasir Panjang, Singapore

Shore ProtectionWorks $60,000.00 1995Port of Singapore

Authority

Uninec Construction Pte

Ltd

Construction of Dredging Ditch and Slope

Protection Work at Western Catchment

Revervoirs, Singapore

Construction of Concrete

Drains and Slope Protection$350,000.00 1995 ~ 1996 Public Utilities Board

Yeng Tong Construction

Pte Ltd

Repairs to Existing Sunken Rockbunds

and Revetment at Southern Island,

Singapore

Repair and Construct New

Revetment$1,538,501.00 1993 ~ 1994

Sentosa Development

Corporation

Yeng Tong Construction

Pte Ltd

Page 28: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

Repairs of Seawall at 30 Bukit Chermin

Road, SingaporeRepair Concrete Seawall $19,000.00 1993

Port of Singapore

Authority

Yeng Tong Construction

Pte Ltd

Reno Matters for Bedok Fifth Subsidiary

Drain, SingaporeConstruction of Drain $40,000.00 1993 Ministry of Environment

Swee Hong Engineering

Construction Pte Ltd

Proposed Revetment for KYC Machine

Industry (S) Pte Ltd, SingaporeRevetment Works $35,000.00 1993

KYC Machine Industry (S)

Pte Ltd

Yeng Tong Construction

Pte Ltd

Proposed Changi East Reclamation (Phase

1A), SingaporeShore Protection Works $37,525,624.60 1992 ~ 1996 Government of Singapore

Obayashi - Toyo Joint

Venture

Reconstruction of Granite - Block Stone &

Drain, SingaporeRubble Stone Drains $25,000.00 1992 Bukit Timah Turf Club

Uninec Construction Pte

Ltd

- Reconstruction of Tanjong Berlayer

Seawall, SingaporeConcrete Seawall $130,108.00 1992 ~ 1993 P. W. D.

Obayashi - Toyo Joint

Venture

Maintenance of Seawall at Raffles

Lighthouse, SingaporeRepair of Revetment $240,000.00 1991 ~ 1992

Port of Singapore

Authority

Uninec Construction Pte

Ltd

Proposed Dredging Work at Tiong Woon

Jetty, SingaporeDredging Works $50,000.00 1991

Tiong Woon Crane &

Transport Pte Ltd

Yeng Tong Construction

Pte Ltd

Proposed Dredging at Selat Samulun,

SingaporeDredging Works $300,000.00 1991 M.O.E. N. C. Senan & Sons Pte Ltd

-Proposed Johor - Singapore Ferry

Terminal, SingaporeDredging Works $500,000.00 1991 ~ 1992 J. K. R. Syarikat Sri Shah Sdn Bhd

Proposed Reconstruction of Outlet Drain

at Pioneer Sector, Singapore

Concrete Outfall Drain

Construction$178,000.00 1991 M.O.E.

Yeng Tong Construction

Pte Ltd

Proposed Extension of Workshop with

Additions and Alternations to Existing

Factory and Office on Plot 3181 Gul

Avenue, Jurong, Singapore

Structural Steel Workshop

Construction$1,250,600.00 1990 ~ 1991 Akitek Yeokhoo Degree Engineering Pte Ltd

Page 29: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

Proposed Infrastructural Development at

Pulau Sudong, SingaporeInfrastructure $1,393,000.00 1990 ~ 1991 Mindef RSEA International Pte Ltd

Proposed Part 1 / Part 2 Storey Factory

With Ancillary Facilities on Plot A10593

MK 11 at Kranji Road, Singapore

Concrete / Steel Frame

Building for Factory$600,000.00 1990

Thiong Shen Auto Parts

TradingDegree Engineering Pte Ltd

Proposed Development at Sungei Berih,

SingaporeDredging Works $650,000.00 1990 ~ 1991 Mindef

Yeng Tong Construction

Pte Ltd

Stone Revetments & Seabed Protection

Works for Beach & Lagoon Improvements

for Sentosa, Singapore

Dredging and Revetment

Works$1,109,000.00 1988 ~ 1989

Sentosa Development

Corporation

Van Oord International /

RDC / Antara Koh J.V.

Stone Revetment Works at Penjuru Lane,

SingaporeRevetment Works $45,000.00 1988

Containerisation &

Packaging Industries Pte

Ltd

Koh Brothers Building &

Civil Engineering

Contractor Pte Ltd

Repairs & Pointing to Revetments at

Marina Park, Singapore

Repair & Cement Pointing of

Revetment$288,000.00 1987 ~ 1988 P. W. D.

Yeng Tong Construction

Pte Ltd

Rock Bund Construction for Yishun MRT

Contract 402, SingaporeRock Bund Construction $740,000.00 1986 ~ 1987 MRTC

GTM-SN Coignet

Contractors

Page 30: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

* All Amounts are in SGD unless otherwise stated.

TITLEYENG TONG'S SCOPE OF

WORKSCONTRACT VALUE YEAR CLIENT MAIN CONTRACTOR

Proposed Construction and Completion of

Coastal Protection Works at Teluk Lipat,

Dungun, Terengganu Darul Iman

Shore Protection Works RM37,919,100.00July 2012 ~ Jan

2015

East Coast Economic

Region Development

Council (ECERDC)

Pembinaan Yeng Tong Sdn

Bhd

Proposed Construction and Completion of

Coastal Protection Works at Tanjung

Batu, Pekan, Pahang Darul Makmur

Shore Protection Works RM1,832,800.00Aug 2012 ~ Nov

2012

East Coast Economic

Region Development

Council (ECERDC)

Pembinaan Yeng Tong Sdn

Bhd

-

Proposed Widening of the Existing

Penang Bridge Low Level viaduct from

East Abutment to Pier 24E and from Pier

24W to Pier 69W - Optim3B (Marine)

Bored pile and pile cap

worksRM90,235,982.00

Feb 2007 ~

Mar 2009Penang Bridge Sdn Bhd

UEM Construction Sdn

Bhd & Biaxis Sdn Bhd

-

Cadangan Pembinaan Pelabuhan Tanjung

Pelepas Fasa 3 - The Construction,

completion and Maintenance of Wharves

Structures at Berth 9 & 10

Dredging and Arnour Rock

ProtectionRM9,386,500.00

May 2005 ~

May 2006

Tanjung Pelepas Port

Authority, Johor

Zelan Construction Sdn

Bhd & Omni-Kwang JV

-

Dredging and Armour Rock Works to

C.W Outfall and C.W Intake for Power

Plant at Tanjung Bin, Johor

Dredging and Arnour Rock

ProtectionRM9,095,030.00

Mar 2005 ~

Jun 2005

Tanjung Bin Power Plant

Sdn Bhd

Zelan Construction Sdn

Bhd & Omni-Kwang JV

-Cadangan Pembangunan Pelabuhan

Tanjung Pelepas - Phase IIRock Revetment Work RM34,000,000.00

Oct 2003 ~

Jun 2004

Tanjung Pelepas Port

Authority, JohorInai Kiara Sdn Bhd

Construction & Completion of Jetties,

Breakwater, Groyne, Dredging, Beach

Reclamation and Associated Marine

Works at Tanjong Leman & Pulau Sibu

Tengah, Mersing, Johor

Construction of Jetties,

Breakwater Groyne,

Dredging and Reclamation

RM8,800,000.00 1996 ~ 1997Kumpulan Penambang

(Johor) Sdn Bhd

Tidalmarine Engineering

Sdn Bhd

CONTRACTS EXECUTED BY YTC ( IN MALAYSIA )

Page 31: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

Proposed North Butterworth Container

Terminal, MalaysiaShore Protection Works RM10,502,175.00 1992

Penang Port

CommissionerIJM Corporation Bhd

Page 32: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

* All Amounts are in SGD unless otherwise stated.

TITLEYENG TONG'S SCOPE OF

WORKSCONTRACT VALUE YEAR CLIENT MAIN CONTRACTOR

-Shuaibah Phase III IWPP Desalination

Plant (Civil Offshore Works)

Shoreline Protection and

Offshore WorksRM25,700,420.00

Oct 2006 ~

Nov 2007

Shuaibah Water and

Electricity Company

Zelan Construction Arabia

Co. Ltd & Pembinaan Yeng

Tong Sdn Bhd JV

Seabed Preparation Pipeline Installation

and Rock Armour Protection Works in

Indonesian Waters

Reinstating Seabed and

Filling Trench over Gas

Pipeline

$220,000.00Jun 2003 ~

Aug 2003

PT. Perusahaan Gas

NegaraBoskalis-Idors J.O.

PJ066

PGN Offshore Pipeline Project at Kuala

Tunkal, Sumatra & Batam Island in

Indonesia

Placing Rock on Gas Pipeline

in Seabed$1,423,015.00

Jun 2003 ~

Jul 2003

PT. Perusahaan Gas

Negara

Hyundai Heavy Industries

Co. Ltd

J130 - Seraya Project 2 (Civil Works For

Non-Revamp Area)

Shore Protection Works For

Cooling Water Outfall

Station

$420,000.00 2001 Ellba Eastern (Shell) Gammon Pte Ltd

Redevelopment of Colombo Port, Sri

Lanka Dredging Works $2,200,000.00 1999 ~ 2001 Government of Sri Lanka

Hyundai Engineering and

Construction Limited

- Subcontract for Rubble/Revetment

Wall ConstructionRubble / Revetment Wall $288,000.00 1991 P. W. D.

Obayashi - Toyo Joint

Venture

PJ063Powergas / PMG Submarine Gas Pipeline

Project at Pulau Sakra, BruneiReinstatement of Revetment $321,000.00

Apr 2003 ~

Jun 2003Powergas Ltd JDN - Boskalis JV

Removal and Reinstallation Of Revetment

At Pulau Sakra Landfall East And West

Natuna Pipeline, Brunei

Removal and Reinstallation

of Revetment$332,839.00

Jun 2002 ~

Aug 2002Powergas Ltd

Jan De Nul - Boskalis Joint

Venture

CONTRACTS EXECUTED BY YTC (Other Countries ) Indonesia, Brunei, Sri Lanka

Page 33: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …

Construction of Two Breakwaters and

Other Facilities at Jerudong Beach, Brunei

Breakwater Construction

WorksB$ 78,395,028.00 1997 ~ 1998

Amedeo Development

Corporation Sdn Bhd

Hyundai Engineering &

Construction Co. Ltd

Control of Beach Erosion of Coastline of

Berakas Camp Coastline Protection -

Brunei Darussalam.

Shore Protection Works B$ 6,500,000.00 1994 ~ 1995 Government of Singapore Daito Kogyo Co Ltd

-Shore Protection Works at Pantai Mentiri

Gold Course, BruneiShore Protection Works B$ 2,700,000.00 1989 ~ 1990 P. W. D. (Brunei) Ted Sdn Bhd

Upgrading of Western Trainning Wall at

Muara, Brunei

Construction of Conrete

SeawallB$ 176,000.00 1989 P. W. D. (Brunei) Daito Kogyo Co Ltd

Headlands Construction at Eastern End of

Pelompong Spit, Brunei

Granite Headland

ConstructionB$ 2,100,000.00 1987 ~ 1988 P. W. D. (Brunei) Daito Kogyo Co Ltd

-

Rock Bund Construction for Dredging

and Reclamation Works at Muara

Harbour, Brunei

Rock Bund Construction B$ 500,000.00 1986 ~ 1987 P. W. D. (Brunei) Daito Kogyo Co Ltd

Shore Protection Works for Fish Landing

Complex at Muara, BruneiShore Protection Works B$ 70,000.00 1986 P. W. D. (Brunei)

San Hin Welding &

Construction

Shore Protection Works for Reclamation

of Terumbu Pesek, BruneiShore Protection Works B$ 500,000.00 1985 Jurong Town Council Boka-Ballast

Shore Protection Works for Reclamation

of Pulau Sakra, BruneiShore Protection Works B$ 2,200,000.00 1984 ~ 1985 Jurong Town Council Boka - Ballast

Shore Protection Works for Reclamation

of Pulau Busing, BruneiShore Protection Works B$ 1,800,000.00 1983 ~ 1984 Jurong Town Corporation Boka - Ballast

Headland Construction at Pelompong

Spit, BruneiHeadland Construction B$ 1,500,000.00 1982 P.W. D. (Brunei) Daito Kogyo Co Ltd

Page 34: CONTRACTS EXECUTED BY YENG TONG CONSTRUCTION …