    CONTENTS

    1. COMMERCIAL REQUIREMENT .................................................................................. 3

    PKK............................................................................................................................................3

    TM REGISTRATION..............................................................................................................3

    BANK GUARANTEE/PERFORMANCE BOND/STAMP DUTY......................................3

    INSURANCE COVERAGE.....................................................................................................4

    STATUTORY & CERTIFICATION REQUIREMENT......................................................7

    SUBLETTING & EMPLOYMENT POLICY.......................................................................7

    2. TECHNICAL REQUIREMENT ....................................................................................... 8

    UNIFORM.................................................................................................................................8

    PASSCARD...............................................................................................................................9

    TOOLS & TEST GEAR.........................................................................................................10

    VEHICLE................................................................................................................................11

    PROCESS FLOW OF VENDOR CONSEQUENCES........................................................12

    MERIT AND DEMERIT POINTS.......................................................................................13

    LIQUIDATED DAMAGES / PENALTY.............................................................................17

    3. REFERENCE DOCUMENTS TO CONTRACTS ......................................................... 20

    MINI-JKH...............................................................................................................................20

    COD..........................................................................................................................................21

    TROS........................................................................................................................................23

    4. RATES & PAYMENT PROCESS ................................................................................... 25

    PROCESS FLOW IN GEMS.................................................................................................25

    PROPOSED TIMELINE.......................................................................................................26

    COD & JUMPERING RATES..............................................................................................27

    MINI JKH COMMON WORKS & ITS PROCESS FLOW..............................................29

    5. PERFORMANCE & ASSESSMENT .............................................................................. 40

    ASSESSMENT CRITERIA...................................................................................................40KEY KPI DELIVERABLES.................................................................................................41

    SAMPLE OF PERFORMANCE DASHBOARD................................................................42

    6. INQUIRY & FEEDBACK ............................................................................................... 44

    2

  • 7/28/2019 Contractors Quick Reference

    3/44

    1. COMMERCIAL REQUIREMENT

    PKK

    If the Contractor is a company with Bumiputera status, the Contractorwarrants and undertakes to and with TM that:

    (a) The majority of its shareholding/equity structure (>=51%) isBumiputera;

    (b) The majority of its employees (>=51%) are Bumiputera;

    (c) Key positions in the Contractors organization, such as the ChiefExecutive Officer, the Chief Operating Officer, the Managing Director,the General Manager or the Chief Financial Officer are held byBumiputeras;

    (d) Certificate from Ministry Of Finance or PKK, if any; and

    (e) All other TM guidelines that determine a companys qualification forBumiputera status are met.

    TM REGISTRATION

    the Contractor fail to renew his registration with TM after three (3) months of itsexpiry or is deregistered for whatever reason thereby becoming ineligible tocarry out the type of work offered under this Contract.

    BANK GUARANTEE/PERFORMANCE BOND/STAMP DUTY

    Bank Guarantee & Stamp Duty

    BG Insurance Contract

    Contract Value Stamp Duty (RM)1

  • 7/28/2019 Contractors Quick Reference

    4/44

    INSURANCE COVERAGE

    Type Of InsuranceCoverage

    TROS COD Mini-JKH

    Value (RM)1 Principal Existing

    Property (PEP)500K 500K 1.0M

    2 Third Party Liability 500K 500K 1.0M

    3 Comprehensive GeneralLiability

    500K 500K 1.0M

    Notes:

    Comprehensive General Liability is an alternative to 3rd Party

    Liability that covers Personal Injuries & Property.

    Workmen Compensation to indemnify & insure TM and Contractorspersonnel or staff. Not required if staff contributed to PERKESO

    Contractors All Risks will insure the interest of TM & 3rd party plant,

    property & building arise from works of Contractors.

    4

  • 7/28/2019 Contractors Quick Reference

    5/44

    Insurance Coverage

    COD TROS MINI JKH

    1 Contractors All Risk

    Section I

    a. Material Damage Contract Value

    RM 5K RM120K

    RM 100K RM3.0M

    RM 350K

    b. Principal ExistingProperty

    RM 500K RM 1.0M RM 500K

    Section II

    Third Party Liability RM 500K RM 1.0M RM 2.5K

    2 WorkmanCompensation

    10% of Contract value (Labour Cost)

    3 ComprehensiveGeneralLiability

    RM 500k RM 1.0M RM 1.0M

    5

  • 7/28/2019 Contractors Quick Reference

    6/44

    SUM

    INSURED-

    SECTION II

    Material

    Damage

    (A)

    Proncipal

    Existing

    Property

    (B)

    PREMIUM (RM)

    RATE: 0.125%

    C=(A+B)*0.125%

    Third Party

    Liability

    1 Mini JKH (2years) (a) 700K 700K 1M 2,125.00 1M 106.25 10.00 2,241.25 70K 200.00 10.00 10.00 220.00 2,461.25

    Mini JKH (1year) (b) 350K 350K 1M 1,687.50 1M 84.38 10.00 1,781.88 35K 200.00 10.00 10.00 220.00 2,001.88

    2 TROS (a) 1.3M 1.3M 500K 2,250.00 500K 112.50 10.00 2,372.50 130K 200.00 10.00 10.00 220.00 2,592.50

    (b) 700K 700K 500K 1,500.00 500K 75.00 10.00 1,585.00 70K 200.00 10.00 10.00 220.00 1,805.00

    (c) 500K 500K 500K 1,250.00 500K 62.50 10.00 1,322.50 50K 200.00 10.00 10.00 220.00 1,542.50

    (d) 300K 300K 500K 1,000.00 500K 50.00 10.00 1,060.00 30K 200.00 10.00 10.00 220.00 1,280.00

    3 COD (a) 120K 120K 500K 775.00 500K 38.75 10.00 823.75 12K 200.00 10.00 10.00 220.00 1,043.75

    (b) 50K 50K 500K 687.50 500K 34.38 10.00 731.88 5K 200.00 10.00 10.00 220.00 951.88

    (c) 20K 20K 500K 650.00 500K 32.50 10.00 692.50 2K 200.00 10.00 10.00 220.00 912.50

    RM10

    Stamp

    Duty

    No Item

    Total

    Contract

    Value (RM)

    ERECTION ALL RISK

    Total

    Cost

    WORKMEN COMPENSATION

    Total

    Estimated

    Insurance

    Premium

    EAR & WC

    SUM INSURED- SECTION I

    5%

    Service

    Tax

    RM10

    Stamp

    Duty

    Total

    Cost

    Sum

    Insured

    (RM)

    (10% of

    Contract

    Value)

    PREMIUM

    (RM)

    RATE:

    0.15%

    5%

    Service

    Tax

    Note: Insurance Cost1. Erection All Risk rate is generally 0.125% subjected to minimum premium of RM250.00 depending on insurance company2. Workmen Compensation rate is generally 0.15% subjected to minimum premium of RM125.00 depending on insurancecompany3. Comprehensive General Liability insurance is not required if Third Party Liability is covered under Erection All Risk underSection II

    6

  • 7/28/2019 Contractors Quick Reference

    7/44

    STATUTORY & CERTIFICATION REQUIREMENT

    CA & NIOSH

    Certification TROS COD Mini-JKH Course Fee (RM)CA CA 1A CA 1A CA 2A RM 300 + RM 80

    (inclusive training)

    NIOSH Safety NTMSP NTMSP NTMSP RM 150 + RM 30(inclusive training)

    Broadband BasicBroadband

    X X RM 750

    SUBLETTING & EMPLOYMENT POLICY

    Assignment and Sub-Contracting

    The Contractor shall not assign this Contract or any part thereof or any benefitor interest therein or there under without the prior written consent of TM.

    The Contractor shall not sub-contract or sub-let all or any part of the Contractwithout the prior written consent of TM provided that such consent shall not beunreasonably withheld, and such consent, if given, shall not relieve theContractor from any liability or obligation under this Contract and he shall beresponsible for all the acts, defaults and neglects of any subcontractor, his

    agents, servants or workmen as fully as if they were the acts, defaults orneglects of the Contractor, his agents, servants or workmen.

    Foreign Workers Policy

    The contractors personnel shall be only legal citizen of Malaysia and noforeign personnel shall be allowed.

    7

  • 7/28/2019 Contractors Quick Reference

    8/44

    2. TECHNICAL REQUIREMENT

    UNIFORM

    1. Dark Red T-Shirt ( Colour Code: Corporate Red Pantone 186)2. Black coloured collar and sleeves.3. Kontraktor & TM logo on the top left of the T-shirt.4. KONTRAKTOR PEMBAIKIAN TM on the upper half, at the

    back of the T-Shirt5. Writing on the T-shirt to be printed in white

    1. Orange T-Shirt (Colour code: Corporate Pantone 166)2. Black coloured collar and sleeves.3. Kontraktor & TM logo on the top left of the T-shirt.4. KONTRAKTOR PEMASANGAN TM on the upper half,

    at the back of the T-Shirt5. Writing on the T-shirt to be printed in black

    8

  • 7/28/2019 Contractors Quick Reference

    9/44

    1. Blue T-Shirt (Color Code: Corporate Pantone 661)2. Black coloured collar and sleeves.

    3. Kontraktor & TM logo on the top left of the T-shirt.4. KONTRAKTOR PENYELENGGARAAN TM printed at the back ofthe shirts

    5. Writing on the T-shirt to be printed in white

    Note: The pants for all contractors shall be durable Dark Blue Long Pants andshoes shall be black.

    PASSCARD

    The Contractor shall also be required to apply for the identification cards fromTM. The Contractor shall ensure that his staffs display the identification cardprominently while on duty.The identification card is not transferable and shall be returned to TM in theevent that the personnel cease to be employed by the Contractor. Any lossand/or damage to the card shall be reported to TM immediately. A policereport is required to be submitted to TM before a replacement card can beissued.

    In the event of new staff being engaged by the Contractor, the Contractor

    shall apply for the identification cards for the new staff before the staff couldcommence his job under the Contract.

    The identification card remains the property of TM and the Contractor shallreturn them to TM when instructed to do so. TM reserves the rights towithdraw these identification cards from the staff at any time without priornotice.

    All costs incurred shall be borne by the Contractor.

    9

  • 7/28/2019 Contractors Quick Reference

    10/44

    TOOLS & TEST GEAR

    The Contractor is required to be fully equipped with the relevant tools andequipment as stated

    1. TOOLS

    Team,Company

    orIndividual

    COD Mini JKH TROS

    Hammer Drill Team x x x

    Complete Tool Box Team x x x

    Complete Tools forJointing of Plastic Cable

    Company x

    Complete Tools for

    Jointing of Lead Cable

    Company x

    Complete Tools for Pullingof Overhead Cable

    Company x

    Complete Tools for Pullingof Underground Cable

    Company x

    Water Pump Company x

    Generator Company x

    Exhaust Fan Company x

    Puncher tool set Team x x x

    Pair identifier Team x

    2. TEST GEARS

    Signal strength tester(Rill/Will)

    Company x(optional)

    ADSL Tester Team x

    Laptop Team x

    Multimeter Team x x x

    Insulation Tester Team x

    Faultsman Telephone Team x x x

    ISDN BRI Test Set Company x (optional) x (optional)

    Earth Tester Company x (optional)Gas Detector Company x

    Pair Verification/UpdatingInstrument

    TM tosupply

    3. SAFETY GEARS

    Safety Cone Team x x x

    Safety Belt Team x x x

    Safety Helmet Individual x x x

    Safety Vest Individual x x x

    Ladder with safetyfeatures

    Team x x x

    10

  • 7/28/2019 Contractors Quick Reference

    11/44

    First Aid Kid Team x x x

    Signboard Team x

    Body Harness Team x x x

    Wellington Boot Individual x

    Safety Boot Individual x

    Safety Goggles Individual x x x

    Blinkers Team x

    Aviation Lights Team x

    Note: "x" required items

    VEHICLE

    The Contractor is required to possess a suitable vehicle with his companylogo prominently displayed on the side to carry out the works.

    The vehicle used by contractor must comply with the following items:

    Valid registration

    Clean and good working conditions.

    11

  • 7/28/2019 Contractors Quick Reference

    12/44

    PROCESS FLOW OF VENDOR CONSEQUENCES

    12

  • 7/28/2019 Contractors Quick Reference

    13/44

    MERIT AND DEMERIT POINTS

    1.1. Demerit points are based on the category of minor, major

    and critical. The definition of these are as follows:

    1.1.1. Minor: -

    (a) One time occurrence

    (b) No impact on the revenue / business

    (c) Low impact on the image

    1.1.1.2. Major: -

    (a) Repeating event

    (b) Purposely not following practice / procedure

    (c) Having potential and low impact on the performance / image / revenue

    (d) Involve top priority customer

    1.1.1.3. Critical: -

    (a) More than 3 times repeating on the same issue / event

    (b) Proven issue / event which impact the performance / image / revenue

    (c) Critical Offences with 60 points score

    1. 2. Major Offences

    The following are categories of major offences which carry maximum of 60demerit points:

    GENERAL DemeritPoints

    Assign or sublet work without TMs approval 60

    Engage foreign workers 60

    CONDUCT

    False Claim 60

    Rude or ill mannered 60

    Threaten TMs corporate image 60

    Illegal tapping of telephone line 60

    Involved in any criminal activities such as theft, drugs etc. 60

    13

  • 7/28/2019 Contractors Quick Reference

    14/44

    For any major offences committed by the contractors, the merit points

    awarded shall be considered as void.

    1.32 The following demerit points shall be imposed on the

    Contractor for the negligence as follows:

    No DESCRIPTIONSPoints(MN/MJ/CR)

    A GENERAL

    1 Not wearing uniform or ID not displayed 1/3/5

    2 Fail to make police report on lost/stolen ID 3

    3Difficult/no reply when contacted through handphone

    3

    4 Change contact number without notifying 1/3/5

    5 No conformity to OSH safety requirement 5

    6 Fail to submit or complete report as per SLA 10/20/30

    7 Disruption to customers service 1/3/5

    8 Damage to customers property 5

    9 Perform unauthorized Works 1/3/5

    10Failed to submit invoice before the 7th of everymonth (if applicable)

    3/5/10

    11 Canvassing of TM staff 10

    12 Unwilling to accept work order 10

    13 Engage TM staff for the work 5/10/15

    14 Assign or sublet work without TMs consent 60

    15 Engage foreign workers 60

    16Engage non-competent staff without CA-1A(COD & TROS), CA-2A (MINI JKH) after ninemonths of recruitment

    20

    17Less than 25% with CA-1A (COD & TROS),CA-2A (MINI JKH) after 6 months of contract

    15

    18Less than 50% with CA-1A (COD & TROS),

    CA-2A (MINI JKH) after 6 months of contract

    10

    19Less than 75% with CA-1A (COD & TROS),CA-2A (MINI JKH) after 6 months of contract

    5

    20Engage field staff without TM-NIOSH SafetyPassport

    20

    B CONDUCT

    1 Rude or ill mannered 60

    2Complaint received by TM on Contractorsconduct, work quality, wrongly reportedPremise Close etc (verbal/written)

    10/20/30

    3 Threaten TMs corporate image 604 Illegal tapping of telephone line 60

    14

  • 7/28/2019 Contractors Quick Reference

    15/44

    5Involve in any criminal activities such as theft,drug etc

    60

    6Non issuance of official receipt to customer (forCOD only)

    10/20/30

    7 False Claim 60

    C QUALITY

    1 The use of improper tools or vehicle 5

    2Fail to maintain cleanliness at cabinet, SDF,MPOC, FTTS & FTTO after work completion

    5

    3Part or whole of a installation work is substandard

    10

    4Failed to feedback/update on cable pairchange

    3/5/10

    D DELIVERABLES

    D.1 CODFail to achieve TMs QoS monthly performance

    1 P1 98% within Same Day 10

    2 P2 98% within 8 Hours 10

    3 P3 98% within 12 Hours 10

    4 ADSL Jumpering 80% within 24hrs 10

    5 ADSL Jumpering 100% within 48 hrs 10

    6 ISDN BRI 100% Meeting Appointment 10

    7 Missing appointment 10/20/30

    8Failed to feedback delay to the centre due tocustomers request

    3/5/10

    D.2 TROS

    Fail to achieve TMs QoS monthly performance

    1 P1 90% within 8 Hours 10

    2 P2 90% within 16 Hours 10

    3 P3 90% within 16 Hours 10

    4 P4 90% within 24 Hours 10

    5 PPOE 80% within 24 Hours 106 PPOA 90% within 4 Hours 10

    7 ISDN BRI 90% within 4 Hours 10

    8Docket closed without repair (as per-complaintreceived) per TR

    20

    9 Repeated TR due to Poor Workmanship 20

    10 Missing appointment 10/20/30

    11Failed to feedback delay to the centre due tocustomers request

    3/5/10

    D.3 MINI JKHFail to achieve TMs QoS monthly performance

    15

  • 7/28/2019 Contractors Quick Reference

    16/44

    190% projects or work orders completion withinthe required time frame (RFS Date)

    10

    290% monthly performance on projectcompletion quality checklist

    10

    1.4 MERIT POINTS

    A GENERAL

    1 Assist in promoting TM products 5

    2100% staff with CA-1A (COD & TROS), CA-2A (MINIJKH)

    5

    3 100% staff with TM Safety Passport- NIOSH 5

    4 Not receive demerit point for three consecutives month 5

    5 Achieve 80% on quarterly performance Assessment 10

    6 Conform to OSH Safety Procedures 5

    7 Fast to response and give feedback on enquiry 5

    8Update cable pair changes and maintain high accuracyof pair/port inventory

    5

    B DELIVERABLES

    B.1 COD

    1Achieve 100 % of monthly targets in the categories P1,P2, P3, ADSL Jumpering & ISDN BRI (awarded point foreach category)

    5

    2Achieve 100 % targets for three consecutives month incategories P1, P2, P3, ADSL Jumpering & ISDNBR(awarded point for each category)

    10

    B.2 TROS

    1Achieve 100 % of monthly targets in the categories P1,P2, P3, P4, BRI ISDN, PPoA & PPoE (awarded point foreach category)

    5

    2Achieve 100 % targets for three consecutives months incategories P1, P2, P3, P4, BRI ISDN, PPoA & PPoE(awarded point for each category)

    10

    B.3 MINI JKH

    1Achieve 90% of monthly projects or work orderscompletion within the required time frame (RFS Date)

    5

    2 Achieve 90% monthly performance on projectcompletion quality checklist

    5

    16

  • 7/28/2019 Contractors Quick Reference

    17/44

    3Achieve 90% targets for three consecutives months onprojects or work orders completion within the requiredtime frame (RFS Date)

    10

    4Achieve 90% targets for three consecutives months onproject completion quality checklist

    10

    Note: Maximum allowable merit points per quarter are 60 points.

    LIQUIDATED DAMAGES / PENALTY

    i) COD

    RM30 per Service Order in the event Contractor fails to complete installationas per appointment date and time (miss appointment).

    ii) TROS

    RM25 for failure of achieving the required targets for fault restoration

    as referred to the Contract.

    RM50 for failure of achieving the required targets for fault restoration

    as referred to the Contract for repeated fault of the same nature for thesame telephone number in the same month.

    RM50 for failure of achieving the required targets for fault restoration

    as referred to the Contract for docket that was previously reportedclosed by the Contractor but was proven that the reported docket was

    not attended to.

    iii) Mini JKH

    Refer to the clause 14 in the contract.

    Termination of Contract

    (a) The accumulated demerit points of the Contractor within three (3) months are sixty (60) points or more.

    (b) Committed the following major offences which eachcarry a 60 demerit points:

    Illegal tapping of lines;

    Assign or sublet work without TMs consent;

    Theft or other unlawful activities;

    Causing TMs image to be tarnished;

    Commit any unauthorised acts, or criminal activity against TM and oragainst any third parties.

    Engage foreign workers without TMs consent

    17

  • 7/28/2019 Contractors Quick Reference

    18/44

    (c) Without reasonable cause, wholly or partially fails toachieve the Date of Completion within the time specified in the WorksOrder or any extended period granted.

    (d) Neglects to execute the Works with due diligence

    and expedition to the satisfaction of the S.O.

    (e) Overall non-performance or partial non-performanceby the Contractor.

    (f) Persistently refuses or neglects, after notice inwriting from TM, to remove defective work or improper material.

    (g) Fails to comply in respect of the sub-letting andassignment requirements.

    (h) Acts against the expressed policies and instructionsof TM.

    (i) Commits a breach of any of the conditions or stipulations in the Contract.

    (j) The Contractor commits an act of bankruptcy or becomes bankrupt.

    (k) The Contractor becomes insolvent or compoundswith or makes arrangement with his creditors.

    (l) The Contractor, being a company, has a winding uporder (other than for the purpose of amalgamation or reconstruction)made against him.

    (m) A provisional liquidator, receiver or manager of theContractors business or undertaking has been duly appointed, orpossession has been taken by or on behalf of creditors or debentureholders secured by a floating charge of any property of the Contractorcomprised in or is a subject of the said floating charge.

    (n) The Contractor fail to renew his registration with TMafter three (3) months of its expiry or is deregistered for whatever reasonthereby becoming ineligible to carry out the type of work offered underthis Contract.

    (o) TM has any reason to believe that the Contractor or any one employed by him or acting on his behalf, whether with orwithout the Contractor's knowledge, is engaged or has engaged incorrupt practice in connection with the Contract.

    18

  • 7/28/2019 Contractors Quick Reference

    19/44

    (p) The Contractor transfers more than half his totalnumber of shares to a third party, whether by way of a single transferor a series of transfers.

    19

  • 7/28/2019 Contractors Quick Reference

    20/44

    3. REFERENCE DOCUMENTS TO CONTRACTS

    MINI-JKH

    No DESCRIPTIONSTYPE OFDOC.

    SECTION REFERENCE

    1TECHNICALSPECIFICATIONS

    TECHNICALSPEC.

    SECTIONIV-A

    1.a Area of ResponsibilityTECHNICALSPEC.

    Section IV-A

    Appendix III-1& Appendix III-2

    1.b Work ProgramTECHNICALSPEC.

    Section IV-A

    1.c Maintenance Work TECHNICALSPEC. Section IV-A

    1.d Contractor Work FlowTECHNICALSPEC.

    Section IV-A

    Appendix III-3,Appendix III-4,Appendix III-5,Appendix III-6,Appendix III-7,Appendix III-8, AppendixIII 9

    1.e Allocation of WorkTECHNICAL

    SPEC.

    Section IV-

    A

    1.fTools, Test Gears andSafety Gears

    TECHNICALSPEC.

    Section IV-A

    Appendix III-12

    1.gWork TechnicalSpecifications

    TECHNICALSPEC.

    Section IV-A

    2STANDARDOPERATINGPROCEDURES (SOP)

    SOPSECTIONIV-B

    2.aMATERIALMANAGEMENT

    SOPSection IV-B(i)

    QP-RNO-A09-MM

    2.bPERTUKARANPASANGANKABEL/PORT

    SOP Section IV-B(ii)

    WI-RNO-A16-PPK

    2.cVENDORMANAGEMENT

    SOPSection IV-B(iii)

    QP-RNO-A13-VMGMT

    2.dVENDORPERFORMANCEASSESSMENT

    SOPSection IV-B(iv)

    WI-RNO-A24-VPA

    2.eGUIDELINES ONMERIT AND DEMERITFOR CONTRACTORS

    SOPSection IV-B(v)

    WI-RNO-A25-VMD

    2.f ONE PAIR DROP WIRE SOP Section IV-B(vi)

    MTI BBD40301- Print

    20

  • 7/28/2019 Contractors Quick Reference

    21/44

    from COD MTIFile

    2.g

    Installation andMaintenance ofunderground and aerial

    cable, SpecificationLines WE 0303

    Section IV-

    B(vii)

    WE 0303

    2.h

    Installation andMaintenance ofunderground Plastic Air-Core Primary Cables,Specification Lines WE0306

    Section IV-B(viii)

    WE 0306

    2.iPlant Unit RNODescription

    Section IV-B(ix)

    2.j

    Installation andMaintenance of Opticalcable, SpecificationLines WE - F0001

    Section IV-B(x)

    WE - F0001

    3 OTHERS DOCUMENT OTHERSSECTIONIV-C

    3.a

    GUIDELINES FORCONTRACTORSINSTALLATION CARDAND UNIFORM

    OTHERSSectionIVC(i)

    COD

    No DESCRIPTIONSTYPE OFDOC.

    PART REFERENCE

    1TECHNICAL ANDWORKSSPECIFICATIONS

    TECHNICALSPEC.

    PART III

    1.aTECHNICAL ANDWORKSSPECIFICATIONS

    TECHNICALSPEC.

    Part lll -A SECTION 1

    1.b FRANCHISED AREASTECHNICALSPEC.

    Part lll -A SECTION 2

    1.cSAMPLE OF SERVICEORDER (CASS andSIEBEL)

    TECHNICALSPEC.

    Part lll -A SECTION 3

    1.dTELEPHONE JOBSHEET COMPLETION

    TECHNICALSPEC.

    Part lll -ASECTION 4(a)

    1.eCOD-TELEPHONEINSTALLATIONQUALITY CHECK LIST

    TECHNICALSPEC.

    Part lll -ASECTION 4(b)

    1.f SPECIFICATION OFINSTALLATION TECHNICALSPEC. Part lll -A SECTION 5

    21

  • 7/28/2019 Contractors Quick Reference

    22/44

    1.g

    MEASUREMENTSPECIFICATION FORISDN BRI CIRCUIT(COPPER AND FIBRE)

    TECHNICALSPEC.

    Part lll -A SECTION 6

    1.h

    CONTRACTOR

    TELEPHONE/CDMAINSTALLATION DAILYBALANCE SHEET

    TECHNICALSPEC.

    Part lll -A SECTION 7

    1.i

    LIST OF TOOLS, TESTGEARS AND SAFETYGEARS REQUIREDFORTELEPHONE/WIRELESS INSTALLATION

    TECHNICALSPEC.

    Part lll -A SECTION 8

    2

    STANDARDOPERATINGPROCEDURES (SOP)DOCUMENTS

    SOP PART III-B

    2.aPEMASANGANPERKHIDMATAN ADSLSTREAMYX

    SOP Part lll- B(i)QP-RNO-A04-IADSL

    2.bPEMASANGANPERKHIDMATAN DEL

    SOPPart lll-B(ii)

    QP-RNO-A05-IDEL

    2.cPEMASANGANPERKHIDMATANCDMA

    SOPPart lll-B(iii)

    QP-RNO-A06-ICDMA

    2.d PEMASANGANPERKHIDMATAN ISDNBRI

    SOP Part lll-B(iv)

    QP-RNO-A07-IISDNB

    2.eMATERIALMANAGEMENT

    SOPPart lll-B(v)

    QP-RNO-A09-MM

    2.fPERTUKARANPASANGANKABEL/PORT

    SOPPart lll-B(vi)

    WI-RNO-A16-PPK

    2.gVENDORMANAGEMENT

    SOPPart lll-B(vii)

    QP-RNO-A13-VMGMT

    2.h

    VENDOR

    PERFORMANCEASSESSMENT

    SOP Part lll-B(viii) WI-RNO-A24-VPA

    2.iGUIDELINES ONMERIT AND DEMERITFOR CONTRACTORS

    SOPPart lll-B(ix)

    WI-RNO-A25-VMD

    2.j ONE PAIR DROP WIRE SOPPart lll-B(x)

    MTI BBD40301- Printfrom COD MTIFile

    3 OTHERS DOCUMENT OTHERS PART III-C

    3.a GUIDELINES FORCONTRACTORS

    OTHERS Part lll C(i)

    22

  • 7/28/2019 Contractors Quick Reference

    23/44

    INSTALLATION CARDAND UNIFORM

    3.b

    TATACARAPENGENDALIAN DANKESELAMATAN HARTA

    BENDA PELANGGAN

    OTHERSPart lll-C(ii)

    Print fromCOD MTI File

    TROS

    No DESCRIPTIONSTYPE OFDOC.

    Part REFERENCE

    1 TECHNICAL ANDWORKSSPECIFICATIONS

    TECHNICALSPEC.

    Part lll -A

    1.a TELEPHONE/ADSL/ISDN BRI SERVICERESTORATION

    TECHNICALSPEC.

    Part lll -A APPENDIX I-1,l-2,1-3,1-4

    1.b FRANCHISED AREA TECHNICALSPEC.

    Part lll -A APPENDIX I-5

    1.c SUPERVISORS ROLEFOR OUTSOURCEAREA

    TECHNICALSPEC.

    Part lll -A APPENDIX ll-1

    1.d ACTIVITY FLOW FORTELEPHONE FAULTRESTORATION WORK

    TECHNICALSPEC.

    Part lll -A APPENDIX ll-2TO ll-4

    1.e DISTRICT STOREREQUISITION FORM(DSR)

    TECHNICALSPEC.

    Part lll -A APPENDIX lll-1

    1.f BORANAGPEMBERITAHUANPERTUKARANPASANGANKABEL/PAIR/PORTCPAS

    TECHNICALSPEC.

    Part lll -A APPENDIX III-2

    1.g ACTIVITY JOB SHEET TECHNICALSPEC.

    Part lll -A APPENDIX III-3

    1.h REPAIR TEAM DAILYACTIVITY LOG

    TECHNICALSPEC.

    Part lll -A APPENDIX III-4

    1.i ADDITIONALPAYMENT BYCUSTOMER FORREPLACEMENT OFINTERNAL WIRING

    TECHNICALSPEC.

    Part lll- A APPENDIX III-5

    1.j TOOLS, TEST GEARS,OFFICE & VEHICLESREQUIREMENTS

    TECHNICALSPEC.

    Part lll- A APPENDIX III-6

    23

  • 7/28/2019 Contractors Quick Reference

    24/44

    1.k SPECIFICATION FORPROVISION OFTELECOMMUNICATION WIRING AT DP TOCUSTOMERS

    PREMISES

    TECHNICALSPEC.

    Part lll- A APPENDIX III-7

    2 STANDARDOPERATINGPROCEDURES (SOP)DOCUMENTS

    SOP PART III-B

    2.a Baikpulih PerkhidmatanADSL Streamyx

    SOP PART III-B(i)

    WI-RNO-A07-RADSL

    2.b Baikpulih PerkhidmatanDEL

    SOP PART III-B(ii)

    WI-RNO-A08-RDEL

    2.c Baikpulih Perkhidmatan

    CDMA

    SOP PART III-

    B(iii)

    WI-RNO-A09-

    RCDMA2.d Baikpulih Perkhidmatan

    ISDN BRIPART III-B(iv)

    WI-RNO-A10-RISDNB

    2.e Material management SOP PART III-B(v)

    QP-RNO-A09-MM

    2.f Pertukaran PasanganKabel/Port

    SOP PART III-B(vi)

    WI-RNO-A16-PPK

    2.g VENDORMANAGEMENTDOCUMENT

    SOP PART III-B(vii)

    (QP-RNO-A13-VMGMT)

    2.h VENDORPERFORMANCEASSESSMENTDOCUMENT

    SOP PART III-B(viii)

    (WI-RNO-A24-VPA)

    2.i GUIDELINES ONMERIT AND DEMERITFOR CONTRACTORS

    SOP PART III-B(ix)

    (WI-RNO-A25-VMD)

    2.j One Pair Drop Wire SOP PART III-B(x)

    MTI BBD40301 (Printfrom TROSMTI File)

    3 OTHER DOCUMENTS OTHERS PART III-C3.a GUIDELINES FOR

    CONTRACTORSINSTALLATION CARDAND UNIFORM

    OTHERS PART III-C(i)

    3.b Tatacara PengendalianDan Keselamatan HartaBenda Pelanggan

    OTHERS PART III-C(ii)

    Print fromTROS MTI File

    24

  • 7/28/2019 Contractors Quick Reference

    25/44

    4. RATES & PAYMENT PROCESS

    PROCESS FLOW IN GEMS

    User

    Create PR orAutomatic PR

    from Mtce Order

    Release PR

    Create PO Release POSPC

    VendorReceive PO

    Send UATdocument

    Fin SSO

    Receive UAT

    document

    Send Invoice

    Receive invoice

    and update inSAP

    Issue payment

    Through chequeor telegraphic transfer

    Receive payment

    GR/Svc Entry

    in SAP

    To check

    PO status

    Job done

    UATProcess

    User

    Create PR orAutomatic PR

    from Mtce Order

    Release PR

    Create PO Release POSPC

    VendorReceive PO

    Send UATdocument

    Fin SSO

    Receive UAT

    document

    Send Invoice

    Receive invoice

    and update inSAP

    Issue payment

    Through chequeor telegraphic transfer

    Receive payment

    GR/Svc Entry

    in SAP

    To check

    PO status

    Job done

    Create PR orAutomatic PR

    from Mtce Order

    Release PR

    Create PO Release POSPC

    VendorReceive PO

    Send UATdocument

    Fin SSO

    Receive UAT

    document

    Send Invoice

    Receive invoice

    and update inSAP

    Issue payment

    Through chequeor telegraphic transfer

    Receive payment

    GR/Svc Entry

    in SAP

    To check

    PO status

    Job done

    UATProcess

    25

  • 7/28/2019 Contractors Quick Reference

    26/44

    PROPOSED TIMELINE

    Bil Activities Ownership

    Timeline

    1 Advice and acknowledge MINI JKHContractor to carry out works

    Zone'sExec

    Immediately

    2 Estimate cost & prepare MaintenanceOrder (MO) - to enable material can betaken out *

    Zone'sExec

    24 hours

    3 Upon job completion MINI JKH Cont. tosubmit UAT doc. to respective Zone's exec

    MINIJKHCont.

    5 working days

    4 To carry out Acceptance Test (UAT) Zone'sExec &

    MINIJKHCont.

    5 To release MO with actual costing basedon UAT

    Zone'sExec

    24 hours

    6 PR Release Mgr/AGM

    7 Create PO SPC 3 working days

    8 Release PO SPC

    9 Submit (fax) PO to MINI JKH contractor SPC

    10 Prepare Invoice & submit to State Finance

    SSO (original copy) and to User (Photostatcopy)

    MINI

    JKHCont.

    3 days

    11 Prepare GR / Svc Acceptance (Refer toitem 3 above)

    Zone'sExec

    24 hours

    12 Release payment in SAP Fin SSO 3 working days

    26

  • 7/28/2019 Contractors Quick Reference

    27/44

    COD & JUMPERING RATES

    1. INSTALLATION CHARGES

    NO DESCRIPTION UNIT PRICE(RM)

    1. Successful complete installation of telephoneservice using drop wire from DP to last pointat Customer premise and install new internalwiring.

    Per DELInstallation

    50.00

    2. For the successful complete installation oftelephone service using drop wire from DP tocustomer premise with existing internalwiring.

    Per DELInstallation

    30.00

    3. For successful complete installation ofCDMA service using internal antenna.

    PerWirelessInstallation

    30.00

    4. For successful complete installation ofCDMA service using external antenna.

    PerWirelessInstallation

    50.00

    5. Successful complete installation of ISDN BRIservice using drop wire from DP to last pointat Customer premise and install new internalwiring.

    Per NTInstallation

    50.00

    6. For the successful complete installation ofISDN BRI service using drop wire from DP tocustomer premise with existing internalwiring.

    Per NTInstallation

    30.00

    2. PAYMENT BY CUSTOMER & INCREMENTAL RATE PAYMENT BY TM

    Description Items UrbanSub-urban Rural

    ExistingRate BornebyCustomers

    Installationwork InvolvesInternal WiringwithinCustomerspremises

    With Existing Int. Wiring RM30.00 New Int. Wiring RM 50.00*

    IncrementalRate paid byTM

    All new DELservicesFulfilments willbe counted by

    Weekly

    1 lineRM 7.50per line

    RM 15.00per line

    RM 30.00per line

    2 to 10lines RM 5.00

    per lineRM 10.00per line

    RM 20.00per line

    > 11lines

    RM 15.00per line

    27

  • 7/28/2019 Contractors Quick Reference

    28/44

    3. JUMPERING PAYMENT BY TM1. For DEL

    DESCRIPTION Category PRICE(RM)

    Test and jumper at cabinet/SDF and recover existingjumper wire if required.Per Order

    Urban 4.50

    Sub-Urban 5.50

    Rural 7.00

    2. For Streamyx

    DESCRIPTION Category DSLAM RDSLAM RTDSLAM

    Test and jumper at eachcategory and recoverexisting jumper wire ifrequired

    Urban 4.50 6.50 10.50

    Sub-Urban 5.50 7.50 11.50

    Rural 7.00 9.00 13.00

    28

  • 7/28/2019 Contractors Quick Reference

    29/44

    MINI JKH COMMON WORKS & ITS PROCESS FLOW

    Type of Work Description of Work

    Type of Work 1 Replacing one span stolen/breakdown cable200pr O/H, D/S (pole to pole) Straight Joint

    Type of Work 2 Replacing stolen IB cable involving Y-joint(originally Straight-joint in the middle)

    Type of Work 3 Localising faulty 200pair UG cable.

    Type of Work 4 Localising faulty 200pair OH cable.

    Type of Work 5 Localisation to clear 1 docket OH/UG (fault atjoint) - Overhead (TR pair & spare pairs disc)

    Type of Work 6 Localisation to clear 1 docket OH/UG (fault atjoint) - Underground (TR pair & spare pairsdisc)

    Type of Work 7 Localisation to clear 1 docket OH/UG (fault atjoint) - Underground (TR pair & spare pairslow IR)

    Type of Work 8 Replacing tag (at the cabinet).

    Type of Work 9 Replacing cable ES UG breakdown/sectionfault (2400pr)

    Type of Work 10 Localising and replacing cable ES UG sectionlow (2400pr)

    29

  • 7/28/2019 Contractors Quick Reference

    30/44

    Type Of Work 1 - Replacing one span stolen/breakdown cable 200pr O/H,D/S (pole to pole) Straight Joint

    30

  • 7/28/2019 Contractors Quick Reference

    31/44

    Type Of Work 2 - Replacing stolen IB cable involving Y-joint (originallyStraight-joint in the middle)

    31

  • 7/28/2019 Contractors Quick Reference

    32/44

    Type Of Work 3 - Localising faulty 200pair UG cable

    32

  • 7/28/2019 Contractors Quick Reference

    33/44

    Type Of Work 4 - Localising faulty 200pair OH cable

    33

  • 7/28/2019 Contractors Quick Reference

    34/44

    Type Of Work 5 - Localisation to clear 1 docket OH/UG (fault at joint) -Overhead (TR pair & spare pairs disc)

    34

  • 7/28/2019 Contractors Quick Reference

    35/44

    Type of Work 6 - Localisation to clear 1 docket OH/UG (fault at joint) -Underground (TR pair & spare pairs disc)

    35

  • 7/28/2019 Contractors Quick Reference

    36/44

    Type of Work 7 - Localisation to clear 1 docket OH/UG (fault at joint) -Underground (TR pair & spare pairs low IR)

    36

  • 7/28/2019 Contractors Quick Reference

    37/44

    Type of Work 8 - Replacing tag (at the cabinet).

    37

  • 7/28/2019 Contractors Quick Reference

    38/44

    Type of Work 9 - Replacing cable ES UG breakdown/section fault (2400pr)

    38

  • 7/28/2019 Contractors Quick Reference

    39/44

    Type of Work 10 - Localising and replacing cable ES UG section low (2400pr)

    39

  • 7/28/2019 Contractors Quick Reference

    40/44

    5. PERFORMANCE & ASSESSMENT

    ASSESSMENT CRITERIA

    Contractors are assessed QUATERLY based the following elements:

    ELEMENTS WEIGHTAGE

    1. KPI Performance Measurement 50%

    2. Merit & Demerit Points 20%

    3. Auditing 20%

    4. Administrations & Initiatives 10%

    Contractors are ranked based on the following ratings.

    RATING RANGE TOTAL SCORE

    EXCELLENT More than 90%

    GOOD More than 80%

    FAIR More than 70%

    POOR 70% and less

    Passing Marks = 70%

    *Note: The contractor shall be required to achieve a minimum passing scoreof70% during the first year of assessment of performance weightage. In theevent the Contractor fails to achieve the minimum passing score of70%,TMhereby reserves its right to terminate the Contract at any time during thesecond year of the Contract Period.

    40

  • 7/28/2019 Contractors Quick Reference

    41/44

    KEY KPI DELIVERABLES

    1. COD Contractor

    Appointment Met for NI from PAMS. Percentage of new installation

    that meet appointment

    2. MINI JKH Contractor

    Average percentage Document submission checklist and

    Average work order completed as per RFS date as per quality

    accepted by TM.

    3. TR Outsourcing Contractor

    Numbers of KPIs meeting target

    Average Restoration Cycle Time

    COD

    KPI Target

    DEL P1 < 8 HRS > 98 %

    DEL P2 < 16 HRS > 98 %

    DEL P3 < 24 HRS > 98 %

    Mini JKH

    KPI Target

    AVERAGE RFS > 90 %AVERAGE DOCUMENT SUBMISSION > 90 %

    TROS

    KPI Target

    DEL P1 < 8 HRS > 90 %

    DEL P2 < 16 HRS > 90 %

    DEL P3 < 16 HRS > 90 %

    DEL P4 < 24 HRS > 90 %

    DEL ALL < 3 DAYS > 100 %

    ADSL POA < 4 HRS > 90 %

    ADSL POE < 24 HRS > 80 %

    ADSL ALL < 3 DAYS > 100 %

    ISDN BRI < 4 HRS > 80 %

    CDMA < 24 HRS > 80 %

    REPEAT REPORT < 15 %

    41

  • 7/28/2019 Contractors Quick Reference

    42/44

    SAMPLE OF PERFORMANCE DASHBOARD

    KPI Title Max Quarter 1 Quarter 2 Quarter 3 Quarter 4

    PAYMENT 3 % 3 % 3 % 3 % 3 %

    REPORTS SUBMISSION ASPER SLA

    2 % 2 % 2 % 2 % 2 %

    MEETING / TRAINING

    PARTICIPATION / ETC

    2 % 2 % 2 % 2 % 2 %

    INNOVATION 3 % 1 % 1 % 1 % 1 %

    SCORE (MAX 10%) 8.00 % 8.00 % 8.00 % 8.00 %

    KPI Score

    KPI Title Target Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    AVERAGE RFS > 90 % 85 % 86 % 86 % 87 % 88 % 90 % 90 % 89 % 90 % 90 % 90 % 90 %

    AVERAGE DOCUMENTSUBMISSION

    > 90 % 90 % 90 % 90 % 90 % 90 % 90 % 90 % 90 % 90 % 90 % 90 % 90 %

    AVERAGE OVERALL 87.50 % 88.00 % 88.00 % 88.50 % 89.00 % 90.00 % 90.00 % 89.50 % 90.00 % 90.00 % 90.00 % 90.00 %

    MARKS 43.75 % 44.00 % 44.00 % 44.25 % 44.50 % 45.00 % 45.00 % 44.75 % 45.00 % 45.00 % 45.00 % 45.00 %

    SCORE (MAX 50%) 43.92 % 44.58 % 44.92 % 45.00 %

    Audit

    KPI Title Max Quarter 1 Quarter 2 Quarter 3 Quarter 4AUDIT 100 % 80 % 80 % 80 % 80 %

    SCORE (MAX 20%) 16.00 % 16.00 % 16.00 % 16.00 %

    Merit / Demerit

    KPI Title Max Quarter 1 Quarter 2 Quarter 3 Quarter 4

    42

  • 7/28/2019 Contractors Quick Reference

    43/44

    MERIT 60 0 0 0 0

    DEMERIT 60 0 0 0 0

    SCORE (MAX 20%) 0.00 % 0.00 % 0.00 % 0.00 %

    Remarks

    Title Quarter 1 Quarter 2 Quarter 3 Quarter 4

    MERIT ... ... ... ...

    DEMERIT ... ... ... ...CUSTOMER COMPLAINTS ... ... ... ...

    Final Result

    Title Quarter 1 Quarter 2 Quarter 3 Quarter 4

    ADMIN 8.00 8.00 8.00 8.00

    KPI 43.92 44.58 44.92 45.00

    AUDIT 16.00 16.00 16.00 16.00

    MERIT 0.00 0.00 0.00 0.00

    TOTAL 67.92 68.58 68.92 69