TM ACCESSNETWORK
CONTRACTORSQUICK
REFERENCE
GUIDE
BY: HSBBT & ODNETWORK OPERATIONS
1
7/28/2019 Contractors Quick Reference
2/44
CONTENTS
1. COMMERCIAL REQUIREMENT .................................................................................. 3
PKK............................................................................................................................................3
TM REGISTRATION..............................................................................................................3
BANK GUARANTEE/PERFORMANCE BOND/STAMP DUTY......................................3
INSURANCE COVERAGE.....................................................................................................4
STATUTORY & CERTIFICATION REQUIREMENT......................................................7
SUBLETTING & EMPLOYMENT POLICY.......................................................................7
2. TECHNICAL REQUIREMENT ....................................................................................... 8
UNIFORM.................................................................................................................................8
PASSCARD...............................................................................................................................9
TOOLS & TEST GEAR.........................................................................................................10
VEHICLE................................................................................................................................11
PROCESS FLOW OF VENDOR CONSEQUENCES........................................................12
MERIT AND DEMERIT POINTS.......................................................................................13
LIQUIDATED DAMAGES / PENALTY.............................................................................17
3. REFERENCE DOCUMENTS TO CONTRACTS ......................................................... 20
MINI-JKH...............................................................................................................................20
COD..........................................................................................................................................21
TROS........................................................................................................................................23
4. RATES & PAYMENT PROCESS ................................................................................... 25
PROCESS FLOW IN GEMS.................................................................................................25
PROPOSED TIMELINE.......................................................................................................26
COD & JUMPERING RATES..............................................................................................27
MINI JKH COMMON WORKS & ITS PROCESS FLOW..............................................29
5. PERFORMANCE & ASSESSMENT .............................................................................. 40
ASSESSMENT CRITERIA...................................................................................................40KEY KPI DELIVERABLES.................................................................................................41
SAMPLE OF PERFORMANCE DASHBOARD................................................................42
6. INQUIRY & FEEDBACK ............................................................................................... 44
2
7/28/2019 Contractors Quick Reference
3/44
1. COMMERCIAL REQUIREMENT
PKK
If the Contractor is a company with Bumiputera status, the Contractorwarrants and undertakes to and with TM that:
(a) The majority of its shareholding/equity structure (>=51%) isBumiputera;
(b) The majority of its employees (>=51%) are Bumiputera;
(c) Key positions in the Contractors organization, such as the ChiefExecutive Officer, the Chief Operating Officer, the Managing Director,the General Manager or the Chief Financial Officer are held byBumiputeras;
(d) Certificate from Ministry Of Finance or PKK, if any; and
(e) All other TM guidelines that determine a companys qualification forBumiputera status are met.
TM REGISTRATION
the Contractor fail to renew his registration with TM after three (3) months of itsexpiry or is deregistered for whatever reason thereby becoming ineligible tocarry out the type of work offered under this Contract.
BANK GUARANTEE/PERFORMANCE BOND/STAMP DUTY
Bank Guarantee & Stamp Duty
BG Insurance Contract
Contract Value Stamp Duty (RM)1
7/28/2019 Contractors Quick Reference
4/44
INSURANCE COVERAGE
Type Of InsuranceCoverage
TROS COD Mini-JKH
Value (RM)1 Principal Existing
Property (PEP)500K 500K 1.0M
2 Third Party Liability 500K 500K 1.0M
3 Comprehensive GeneralLiability
500K 500K 1.0M
Notes:
Comprehensive General Liability is an alternative to 3rd Party
Liability that covers Personal Injuries & Property.
Workmen Compensation to indemnify & insure TM and Contractorspersonnel or staff. Not required if staff contributed to PERKESO
Contractors All Risks will insure the interest of TM & 3rd party plant,
property & building arise from works of Contractors.
4
7/28/2019 Contractors Quick Reference
5/44
Insurance Coverage
COD TROS MINI JKH
1 Contractors All Risk
Section I
a. Material Damage Contract Value
RM 5K RM120K
RM 100K RM3.0M
RM 350K
b. Principal ExistingProperty
RM 500K RM 1.0M RM 500K
Section II
Third Party Liability RM 500K RM 1.0M RM 2.5K
2 WorkmanCompensation
10% of Contract value (Labour Cost)
3 ComprehensiveGeneralLiability
RM 500k RM 1.0M RM 1.0M
5
7/28/2019 Contractors Quick Reference
6/44
SUM
INSURED-
SECTION II
Material
Damage
(A)
Proncipal
Existing
Property
(B)
PREMIUM (RM)
RATE: 0.125%
C=(A+B)*0.125%
Third Party
Liability
1 Mini JKH (2years) (a) 700K 700K 1M 2,125.00 1M 106.25 10.00 2,241.25 70K 200.00 10.00 10.00 220.00 2,461.25
Mini JKH (1year) (b) 350K 350K 1M 1,687.50 1M 84.38 10.00 1,781.88 35K 200.00 10.00 10.00 220.00 2,001.88
2 TROS (a) 1.3M 1.3M 500K 2,250.00 500K 112.50 10.00 2,372.50 130K 200.00 10.00 10.00 220.00 2,592.50
(b) 700K 700K 500K 1,500.00 500K 75.00 10.00 1,585.00 70K 200.00 10.00 10.00 220.00 1,805.00
(c) 500K 500K 500K 1,250.00 500K 62.50 10.00 1,322.50 50K 200.00 10.00 10.00 220.00 1,542.50
(d) 300K 300K 500K 1,000.00 500K 50.00 10.00 1,060.00 30K 200.00 10.00 10.00 220.00 1,280.00
3 COD (a) 120K 120K 500K 775.00 500K 38.75 10.00 823.75 12K 200.00 10.00 10.00 220.00 1,043.75
(b) 50K 50K 500K 687.50 500K 34.38 10.00 731.88 5K 200.00 10.00 10.00 220.00 951.88
(c) 20K 20K 500K 650.00 500K 32.50 10.00 692.50 2K 200.00 10.00 10.00 220.00 912.50
RM10
Stamp
Duty
No Item
Total
Contract
Value (RM)
ERECTION ALL RISK
Total
Cost
WORKMEN COMPENSATION
Total
Estimated
Insurance
Premium
EAR & WC
SUM INSURED- SECTION I
5%
Service
Tax
RM10
Stamp
Duty
Total
Cost
Sum
Insured
(RM)
(10% of
Contract
Value)
PREMIUM
(RM)
RATE:
0.15%
5%
Service
Tax
Note: Insurance Cost1. Erection All Risk rate is generally 0.125% subjected to minimum premium of RM250.00 depending on insurance company2. Workmen Compensation rate is generally 0.15% subjected to minimum premium of RM125.00 depending on insurancecompany3. Comprehensive General Liability insurance is not required if Third Party Liability is covered under Erection All Risk underSection II
6
7/28/2019 Contractors Quick Reference
7/44
STATUTORY & CERTIFICATION REQUIREMENT
CA & NIOSH
Certification TROS COD Mini-JKH Course Fee (RM)CA CA 1A CA 1A CA 2A RM 300 + RM 80
(inclusive training)
NIOSH Safety NTMSP NTMSP NTMSP RM 150 + RM 30(inclusive training)
Broadband BasicBroadband
X X RM 750
SUBLETTING & EMPLOYMENT POLICY
Assignment and Sub-Contracting
The Contractor shall not assign this Contract or any part thereof or any benefitor interest therein or there under without the prior written consent of TM.
The Contractor shall not sub-contract or sub-let all or any part of the Contractwithout the prior written consent of TM provided that such consent shall not beunreasonably withheld, and such consent, if given, shall not relieve theContractor from any liability or obligation under this Contract and he shall beresponsible for all the acts, defaults and neglects of any subcontractor, his
agents, servants or workmen as fully as if they were the acts, defaults orneglects of the Contractor, his agents, servants or workmen.
Foreign Workers Policy
The contractors personnel shall be only legal citizen of Malaysia and noforeign personnel shall be allowed.
7
7/28/2019 Contractors Quick Reference
8/44
2. TECHNICAL REQUIREMENT
UNIFORM
1. Dark Red T-Shirt ( Colour Code: Corporate Red Pantone 186)2. Black coloured collar and sleeves.3. Kontraktor & TM logo on the top left of the T-shirt.4. KONTRAKTOR PEMBAIKIAN TM on the upper half, at the
back of the T-Shirt5. Writing on the T-shirt to be printed in white
1. Orange T-Shirt (Colour code: Corporate Pantone 166)2. Black coloured collar and sleeves.3. Kontraktor & TM logo on the top left of the T-shirt.4. KONTRAKTOR PEMASANGAN TM on the upper half,
at the back of the T-Shirt5. Writing on the T-shirt to be printed in black
8
7/28/2019 Contractors Quick Reference
9/44
1. Blue T-Shirt (Color Code: Corporate Pantone 661)2. Black coloured collar and sleeves.
3. Kontraktor & TM logo on the top left of the T-shirt.4. KONTRAKTOR PENYELENGGARAAN TM printed at the back ofthe shirts
5. Writing on the T-shirt to be printed in white
Note: The pants for all contractors shall be durable Dark Blue Long Pants andshoes shall be black.
PASSCARD
The Contractor shall also be required to apply for the identification cards fromTM. The Contractor shall ensure that his staffs display the identification cardprominently while on duty.The identification card is not transferable and shall be returned to TM in theevent that the personnel cease to be employed by the Contractor. Any lossand/or damage to the card shall be reported to TM immediately. A policereport is required to be submitted to TM before a replacement card can beissued.
In the event of new staff being engaged by the Contractor, the Contractor
shall apply for the identification cards for the new staff before the staff couldcommence his job under the Contract.
The identification card remains the property of TM and the Contractor shallreturn them to TM when instructed to do so. TM reserves the rights towithdraw these identification cards from the staff at any time without priornotice.
All costs incurred shall be borne by the Contractor.
9
7/28/2019 Contractors Quick Reference
10/44
TOOLS & TEST GEAR
The Contractor is required to be fully equipped with the relevant tools andequipment as stated
1. TOOLS
Team,Company
orIndividual
COD Mini JKH TROS
Hammer Drill Team x x x
Complete Tool Box Team x x x
Complete Tools forJointing of Plastic Cable
Company x
Complete Tools for
Jointing of Lead Cable
Company x
Complete Tools for Pullingof Overhead Cable
Company x
Complete Tools for Pullingof Underground Cable
Company x
Water Pump Company x
Generator Company x
Exhaust Fan Company x
Puncher tool set Team x x x
Pair identifier Team x
2. TEST GEARS
Signal strength tester(Rill/Will)
Company x(optional)
ADSL Tester Team x
Laptop Team x
Multimeter Team x x x
Insulation Tester Team x
Faultsman Telephone Team x x x
ISDN BRI Test Set Company x (optional) x (optional)
Earth Tester Company x (optional)Gas Detector Company x
Pair Verification/UpdatingInstrument
TM tosupply
3. SAFETY GEARS
Safety Cone Team x x x
Safety Belt Team x x x
Safety Helmet Individual x x x
Safety Vest Individual x x x
Ladder with safetyfeatures
Team x x x
10
7/28/2019 Contractors Quick Reference
11/44
First Aid Kid Team x x x
Signboard Team x
Body Harness Team x x x
Wellington Boot Individual x
Safety Boot Individual x
Safety Goggles Individual x x x
Blinkers Team x
Aviation Lights Team x
Note: "x" required items
VEHICLE
The Contractor is required to possess a suitable vehicle with his companylogo prominently displayed on the side to carry out the works.
The vehicle used by contractor must comply with the following items:
Valid registration
Clean and good working conditions.
11
7/28/2019 Contractors Quick Reference
12/44
PROCESS FLOW OF VENDOR CONSEQUENCES
12
7/28/2019 Contractors Quick Reference
13/44
MERIT AND DEMERIT POINTS
1.1. Demerit points are based on the category of minor, major
and critical. The definition of these are as follows:
1.1.1. Minor: -
(a) One time occurrence
(b) No impact on the revenue / business
(c) Low impact on the image
1.1.1.2. Major: -
(a) Repeating event
(b) Purposely not following practice / procedure
(c) Having potential and low impact on the performance / image / revenue
(d) Involve top priority customer
1.1.1.3. Critical: -
(a) More than 3 times repeating on the same issue / event
(b) Proven issue / event which impact the performance / image / revenue
(c) Critical Offences with 60 points score
1. 2. Major Offences
The following are categories of major offences which carry maximum of 60demerit points:
GENERAL DemeritPoints
Assign or sublet work without TMs approval 60
Engage foreign workers 60
CONDUCT
False Claim 60
Rude or ill mannered 60
Threaten TMs corporate image 60
Illegal tapping of telephone line 60
Involved in any criminal activities such as theft, drugs etc. 60
13
7/28/2019 Contractors Quick Reference
14/44
For any major offences committed by the contractors, the merit points
awarded shall be considered as void.
1.32 The following demerit points shall be imposed on the
Contractor for the negligence as follows:
No DESCRIPTIONSPoints(MN/MJ/CR)
A GENERAL
1 Not wearing uniform or ID not displayed 1/3/5
2 Fail to make police report on lost/stolen ID 3
3Difficult/no reply when contacted through handphone
3
4 Change contact number without notifying 1/3/5
5 No conformity to OSH safety requirement 5
6 Fail to submit or complete report as per SLA 10/20/30
7 Disruption to customers service 1/3/5
8 Damage to customers property 5
9 Perform unauthorized Works 1/3/5
10Failed to submit invoice before the 7th of everymonth (if applicable)
3/5/10
11 Canvassing of TM staff 10
12 Unwilling to accept work order 10
13 Engage TM staff for the work 5/10/15
14 Assign or sublet work without TMs consent 60
15 Engage foreign workers 60
16Engage non-competent staff without CA-1A(COD & TROS), CA-2A (MINI JKH) after ninemonths of recruitment
20
17Less than 25% with CA-1A (COD & TROS),CA-2A (MINI JKH) after 6 months of contract
15
18Less than 50% with CA-1A (COD & TROS),
CA-2A (MINI JKH) after 6 months of contract
10
19Less than 75% with CA-1A (COD & TROS),CA-2A (MINI JKH) after 6 months of contract
5
20Engage field staff without TM-NIOSH SafetyPassport
20
B CONDUCT
1 Rude or ill mannered 60
2Complaint received by TM on Contractorsconduct, work quality, wrongly reportedPremise Close etc (verbal/written)
10/20/30
3 Threaten TMs corporate image 604 Illegal tapping of telephone line 60
14
7/28/2019 Contractors Quick Reference
15/44
5Involve in any criminal activities such as theft,drug etc
60
6Non issuance of official receipt to customer (forCOD only)
10/20/30
7 False Claim 60
C QUALITY
1 The use of improper tools or vehicle 5
2Fail to maintain cleanliness at cabinet, SDF,MPOC, FTTS & FTTO after work completion
5
3Part or whole of a installation work is substandard
10
4Failed to feedback/update on cable pairchange
3/5/10
D DELIVERABLES
D.1 CODFail to achieve TMs QoS monthly performance
1 P1 98% within Same Day 10
2 P2 98% within 8 Hours 10
3 P3 98% within 12 Hours 10
4 ADSL Jumpering 80% within 24hrs 10
5 ADSL Jumpering 100% within 48 hrs 10
6 ISDN BRI 100% Meeting Appointment 10
7 Missing appointment 10/20/30
8Failed to feedback delay to the centre due tocustomers request
3/5/10
D.2 TROS
Fail to achieve TMs QoS monthly performance
1 P1 90% within 8 Hours 10
2 P2 90% within 16 Hours 10
3 P3 90% within 16 Hours 10
4 P4 90% within 24 Hours 10
5 PPOE 80% within 24 Hours 106 PPOA 90% within 4 Hours 10
7 ISDN BRI 90% within 4 Hours 10
8Docket closed without repair (as per-complaintreceived) per TR
20
9 Repeated TR due to Poor Workmanship 20
10 Missing appointment 10/20/30
11Failed to feedback delay to the centre due tocustomers request
3/5/10
D.3 MINI JKHFail to achieve TMs QoS monthly performance
15
7/28/2019 Contractors Quick Reference
16/44
190% projects or work orders completion withinthe required time frame (RFS Date)
10
290% monthly performance on projectcompletion quality checklist
10
1.4 MERIT POINTS
A GENERAL
1 Assist in promoting TM products 5
2100% staff with CA-1A (COD & TROS), CA-2A (MINIJKH)
5
3 100% staff with TM Safety Passport- NIOSH 5
4 Not receive demerit point for three consecutives month 5
5 Achieve 80% on quarterly performance Assessment 10
6 Conform to OSH Safety Procedures 5
7 Fast to response and give feedback on enquiry 5
8Update cable pair changes and maintain high accuracyof pair/port inventory
5
B DELIVERABLES
B.1 COD
1Achieve 100 % of monthly targets in the categories P1,P2, P3, ADSL Jumpering & ISDN BRI (awarded point foreach category)
5
2Achieve 100 % targets for three consecutives month incategories P1, P2, P3, ADSL Jumpering & ISDNBR(awarded point for each category)
10
B.2 TROS
1Achieve 100 % of monthly targets in the categories P1,P2, P3, P4, BRI ISDN, PPoA & PPoE (awarded point foreach category)
5
2Achieve 100 % targets for three consecutives months incategories P1, P2, P3, P4, BRI ISDN, PPoA & PPoE(awarded point for each category)
10
B.3 MINI JKH
1Achieve 90% of monthly projects or work orderscompletion within the required time frame (RFS Date)
5
2 Achieve 90% monthly performance on projectcompletion quality checklist
5
16
7/28/2019 Contractors Quick Reference
17/44
3Achieve 90% targets for three consecutives months onprojects or work orders completion within the requiredtime frame (RFS Date)
10
4Achieve 90% targets for three consecutives months onproject completion quality checklist
10
Note: Maximum allowable merit points per quarter are 60 points.
LIQUIDATED DAMAGES / PENALTY
i) COD
RM30 per Service Order in the event Contractor fails to complete installationas per appointment date and time (miss appointment).
ii) TROS
RM25 for failure of achieving the required targets for fault restoration
as referred to the Contract.
RM50 for failure of achieving the required targets for fault restoration
as referred to the Contract for repeated fault of the same nature for thesame telephone number in the same month.
RM50 for failure of achieving the required targets for fault restoration
as referred to the Contract for docket that was previously reportedclosed by the Contractor but was proven that the reported docket was
not attended to.
iii) Mini JKH
Refer to the clause 14 in the contract.
Termination of Contract
(a) The accumulated demerit points of the Contractor within three (3) months are sixty (60) points or more.
(b) Committed the following major offences which eachcarry a 60 demerit points:
Illegal tapping of lines;
Assign or sublet work without TMs consent;
Theft or other unlawful activities;
Causing TMs image to be tarnished;
Commit any unauthorised acts, or criminal activity against TM and oragainst any third parties.
Engage foreign workers without TMs consent
17
7/28/2019 Contractors Quick Reference
18/44
(c) Without reasonable cause, wholly or partially fails toachieve the Date of Completion within the time specified in the WorksOrder or any extended period granted.
(d) Neglects to execute the Works with due diligence
and expedition to the satisfaction of the S.O.
(e) Overall non-performance or partial non-performanceby the Contractor.
(f) Persistently refuses or neglects, after notice inwriting from TM, to remove defective work or improper material.
(g) Fails to comply in respect of the sub-letting andassignment requirements.
(h) Acts against the expressed policies and instructionsof TM.
(i) Commits a breach of any of the conditions or stipulations in the Contract.
(j) The Contractor commits an act of bankruptcy or becomes bankrupt.
(k) The Contractor becomes insolvent or compoundswith or makes arrangement with his creditors.
(l) The Contractor, being a company, has a winding uporder (other than for the purpose of amalgamation or reconstruction)made against him.
(m) A provisional liquidator, receiver or manager of theContractors business or undertaking has been duly appointed, orpossession has been taken by or on behalf of creditors or debentureholders secured by a floating charge of any property of the Contractorcomprised in or is a subject of the said floating charge.
(n) The Contractor fail to renew his registration with TMafter three (3) months of its expiry or is deregistered for whatever reasonthereby becoming ineligible to carry out the type of work offered underthis Contract.
(o) TM has any reason to believe that the Contractor or any one employed by him or acting on his behalf, whether with orwithout the Contractor's knowledge, is engaged or has engaged incorrupt practice in connection with the Contract.
18
7/28/2019 Contractors Quick Reference
19/44
(p) The Contractor transfers more than half his totalnumber of shares to a third party, whether by way of a single transferor a series of transfers.
19
7/28/2019 Contractors Quick Reference
20/44
3. REFERENCE DOCUMENTS TO CONTRACTS
MINI-JKH
No DESCRIPTIONSTYPE OFDOC.
SECTION REFERENCE
1TECHNICALSPECIFICATIONS
TECHNICALSPEC.
SECTIONIV-A
1.a Area of ResponsibilityTECHNICALSPEC.
Section IV-A
Appendix III-1& Appendix III-2
1.b Work ProgramTECHNICALSPEC.
Section IV-A
1.c Maintenance Work TECHNICALSPEC. Section IV-A
1.d Contractor Work FlowTECHNICALSPEC.
Section IV-A
Appendix III-3,Appendix III-4,Appendix III-5,Appendix III-6,Appendix III-7,Appendix III-8, AppendixIII 9
1.e Allocation of WorkTECHNICAL
SPEC.
Section IV-
A
1.fTools, Test Gears andSafety Gears
TECHNICALSPEC.
Section IV-A
Appendix III-12
1.gWork TechnicalSpecifications
TECHNICALSPEC.
Section IV-A
2STANDARDOPERATINGPROCEDURES (SOP)
SOPSECTIONIV-B
2.aMATERIALMANAGEMENT
SOPSection IV-B(i)
QP-RNO-A09-MM
2.bPERTUKARANPASANGANKABEL/PORT
SOP Section IV-B(ii)
WI-RNO-A16-PPK
2.cVENDORMANAGEMENT
SOPSection IV-B(iii)
QP-RNO-A13-VMGMT
2.dVENDORPERFORMANCEASSESSMENT
SOPSection IV-B(iv)
WI-RNO-A24-VPA
2.eGUIDELINES ONMERIT AND DEMERITFOR CONTRACTORS
SOPSection IV-B(v)
WI-RNO-A25-VMD
2.f ONE PAIR DROP WIRE SOP Section IV-B(vi)
MTI BBD40301- Print
20
7/28/2019 Contractors Quick Reference
21/44
from COD MTIFile
2.g
Installation andMaintenance ofunderground and aerial
cable, SpecificationLines WE 0303
Section IV-
B(vii)
WE 0303
2.h
Installation andMaintenance ofunderground Plastic Air-Core Primary Cables,Specification Lines WE0306
Section IV-B(viii)
WE 0306
2.iPlant Unit RNODescription
Section IV-B(ix)
2.j
Installation andMaintenance of Opticalcable, SpecificationLines WE - F0001
Section IV-B(x)
WE - F0001
3 OTHERS DOCUMENT OTHERSSECTIONIV-C
3.a
GUIDELINES FORCONTRACTORSINSTALLATION CARDAND UNIFORM
OTHERSSectionIVC(i)
COD
No DESCRIPTIONSTYPE OFDOC.
PART REFERENCE
1TECHNICAL ANDWORKSSPECIFICATIONS
TECHNICALSPEC.
PART III
1.aTECHNICAL ANDWORKSSPECIFICATIONS
TECHNICALSPEC.
Part lll -A SECTION 1
1.b FRANCHISED AREASTECHNICALSPEC.
Part lll -A SECTION 2
1.cSAMPLE OF SERVICEORDER (CASS andSIEBEL)
TECHNICALSPEC.
Part lll -A SECTION 3
1.dTELEPHONE JOBSHEET COMPLETION
TECHNICALSPEC.
Part lll -ASECTION 4(a)
1.eCOD-TELEPHONEINSTALLATIONQUALITY CHECK LIST
TECHNICALSPEC.
Part lll -ASECTION 4(b)
1.f SPECIFICATION OFINSTALLATION TECHNICALSPEC. Part lll -A SECTION 5
21
7/28/2019 Contractors Quick Reference
22/44
1.g
MEASUREMENTSPECIFICATION FORISDN BRI CIRCUIT(COPPER AND FIBRE)
TECHNICALSPEC.
Part lll -A SECTION 6
1.h
CONTRACTOR
TELEPHONE/CDMAINSTALLATION DAILYBALANCE SHEET
TECHNICALSPEC.
Part lll -A SECTION 7
1.i
LIST OF TOOLS, TESTGEARS AND SAFETYGEARS REQUIREDFORTELEPHONE/WIRELESS INSTALLATION
TECHNICALSPEC.
Part lll -A SECTION 8
2
STANDARDOPERATINGPROCEDURES (SOP)DOCUMENTS
SOP PART III-B
2.aPEMASANGANPERKHIDMATAN ADSLSTREAMYX
SOP Part lll- B(i)QP-RNO-A04-IADSL
2.bPEMASANGANPERKHIDMATAN DEL
SOPPart lll-B(ii)
QP-RNO-A05-IDEL
2.cPEMASANGANPERKHIDMATANCDMA
SOPPart lll-B(iii)
QP-RNO-A06-ICDMA
2.d PEMASANGANPERKHIDMATAN ISDNBRI
SOP Part lll-B(iv)
QP-RNO-A07-IISDNB
2.eMATERIALMANAGEMENT
SOPPart lll-B(v)
QP-RNO-A09-MM
2.fPERTUKARANPASANGANKABEL/PORT
SOPPart lll-B(vi)
WI-RNO-A16-PPK
2.gVENDORMANAGEMENT
SOPPart lll-B(vii)
QP-RNO-A13-VMGMT
2.h
VENDOR
PERFORMANCEASSESSMENT
SOP Part lll-B(viii) WI-RNO-A24-VPA
2.iGUIDELINES ONMERIT AND DEMERITFOR CONTRACTORS
SOPPart lll-B(ix)
WI-RNO-A25-VMD
2.j ONE PAIR DROP WIRE SOPPart lll-B(x)
MTI BBD40301- Printfrom COD MTIFile
3 OTHERS DOCUMENT OTHERS PART III-C
3.a GUIDELINES FORCONTRACTORS
OTHERS Part lll C(i)
22
7/28/2019 Contractors Quick Reference
23/44
INSTALLATION CARDAND UNIFORM
3.b
TATACARAPENGENDALIAN DANKESELAMATAN HARTA
BENDA PELANGGAN
OTHERSPart lll-C(ii)
Print fromCOD MTI File
TROS
No DESCRIPTIONSTYPE OFDOC.
Part REFERENCE
1 TECHNICAL ANDWORKSSPECIFICATIONS
TECHNICALSPEC.
Part lll -A
1.a TELEPHONE/ADSL/ISDN BRI SERVICERESTORATION
TECHNICALSPEC.
Part lll -A APPENDIX I-1,l-2,1-3,1-4
1.b FRANCHISED AREA TECHNICALSPEC.
Part lll -A APPENDIX I-5
1.c SUPERVISORS ROLEFOR OUTSOURCEAREA
TECHNICALSPEC.
Part lll -A APPENDIX ll-1
1.d ACTIVITY FLOW FORTELEPHONE FAULTRESTORATION WORK
TECHNICALSPEC.
Part lll -A APPENDIX ll-2TO ll-4
1.e DISTRICT STOREREQUISITION FORM(DSR)
TECHNICALSPEC.
Part lll -A APPENDIX lll-1
1.f BORANAGPEMBERITAHUANPERTUKARANPASANGANKABEL/PAIR/PORTCPAS
TECHNICALSPEC.
Part lll -A APPENDIX III-2
1.g ACTIVITY JOB SHEET TECHNICALSPEC.
Part lll -A APPENDIX III-3
1.h REPAIR TEAM DAILYACTIVITY LOG
TECHNICALSPEC.
Part lll -A APPENDIX III-4
1.i ADDITIONALPAYMENT BYCUSTOMER FORREPLACEMENT OFINTERNAL WIRING
TECHNICALSPEC.
Part lll- A APPENDIX III-5
1.j TOOLS, TEST GEARS,OFFICE & VEHICLESREQUIREMENTS
TECHNICALSPEC.
Part lll- A APPENDIX III-6
23
7/28/2019 Contractors Quick Reference
24/44
1.k SPECIFICATION FORPROVISION OFTELECOMMUNICATION WIRING AT DP TOCUSTOMERS
PREMISES
TECHNICALSPEC.
Part lll- A APPENDIX III-7
2 STANDARDOPERATINGPROCEDURES (SOP)DOCUMENTS
SOP PART III-B
2.a Baikpulih PerkhidmatanADSL Streamyx
SOP PART III-B(i)
WI-RNO-A07-RADSL
2.b Baikpulih PerkhidmatanDEL
SOP PART III-B(ii)
WI-RNO-A08-RDEL
2.c Baikpulih Perkhidmatan
CDMA
SOP PART III-
B(iii)
WI-RNO-A09-
RCDMA2.d Baikpulih Perkhidmatan
ISDN BRIPART III-B(iv)
WI-RNO-A10-RISDNB
2.e Material management SOP PART III-B(v)
QP-RNO-A09-MM
2.f Pertukaran PasanganKabel/Port
SOP PART III-B(vi)
WI-RNO-A16-PPK
2.g VENDORMANAGEMENTDOCUMENT
SOP PART III-B(vii)
(QP-RNO-A13-VMGMT)
2.h VENDORPERFORMANCEASSESSMENTDOCUMENT
SOP PART III-B(viii)
(WI-RNO-A24-VPA)
2.i GUIDELINES ONMERIT AND DEMERITFOR CONTRACTORS
SOP PART III-B(ix)
(WI-RNO-A25-VMD)
2.j One Pair Drop Wire SOP PART III-B(x)
MTI BBD40301 (Printfrom TROSMTI File)
3 OTHER DOCUMENTS OTHERS PART III-C3.a GUIDELINES FOR
CONTRACTORSINSTALLATION CARDAND UNIFORM
OTHERS PART III-C(i)
3.b Tatacara PengendalianDan Keselamatan HartaBenda Pelanggan
OTHERS PART III-C(ii)
Print fromTROS MTI File
24
7/28/2019 Contractors Quick Reference
25/44
4. RATES & PAYMENT PROCESS
PROCESS FLOW IN GEMS
User
Create PR orAutomatic PR
from Mtce Order
Release PR
Create PO Release POSPC
VendorReceive PO
Send UATdocument
Fin SSO
Receive UAT
document
Send Invoice
Receive invoice
and update inSAP
Issue payment
Through chequeor telegraphic transfer
Receive payment
GR/Svc Entry
in SAP
To check
PO status
Job done
UATProcess
User
Create PR orAutomatic PR
from Mtce Order
Release PR
Create PO Release POSPC
VendorReceive PO
Send UATdocument
Fin SSO
Receive UAT
document
Send Invoice
Receive invoice
and update inSAP
Issue payment
Through chequeor telegraphic transfer
Receive payment
GR/Svc Entry
in SAP
To check
PO status
Job done
Create PR orAutomatic PR
from Mtce Order
Release PR
Create PO Release POSPC
VendorReceive PO
Send UATdocument
Fin SSO
Receive UAT
document
Send Invoice
Receive invoice
and update inSAP
Issue payment
Through chequeor telegraphic transfer
Receive payment
GR/Svc Entry
in SAP
To check
PO status
Job done
UATProcess
25
7/28/2019 Contractors Quick Reference
26/44
PROPOSED TIMELINE
Bil Activities Ownership
Timeline
1 Advice and acknowledge MINI JKHContractor to carry out works
Zone'sExec
Immediately
2 Estimate cost & prepare MaintenanceOrder (MO) - to enable material can betaken out *
Zone'sExec
24 hours
3 Upon job completion MINI JKH Cont. tosubmit UAT doc. to respective Zone's exec
MINIJKHCont.
5 working days
4 To carry out Acceptance Test (UAT) Zone'sExec &
MINIJKHCont.
5 To release MO with actual costing basedon UAT
Zone'sExec
24 hours
6 PR Release Mgr/AGM
7 Create PO SPC 3 working days
8 Release PO SPC
9 Submit (fax) PO to MINI JKH contractor SPC
10 Prepare Invoice & submit to State Finance
SSO (original copy) and to User (Photostatcopy)
MINI
JKHCont.
3 days
11 Prepare GR / Svc Acceptance (Refer toitem 3 above)
Zone'sExec
24 hours
12 Release payment in SAP Fin SSO 3 working days
26
7/28/2019 Contractors Quick Reference
27/44
COD & JUMPERING RATES
1. INSTALLATION CHARGES
NO DESCRIPTION UNIT PRICE(RM)
1. Successful complete installation of telephoneservice using drop wire from DP to last pointat Customer premise and install new internalwiring.
Per DELInstallation
50.00
2. For the successful complete installation oftelephone service using drop wire from DP tocustomer premise with existing internalwiring.
Per DELInstallation
30.00
3. For successful complete installation ofCDMA service using internal antenna.
PerWirelessInstallation
30.00
4. For successful complete installation ofCDMA service using external antenna.
PerWirelessInstallation
50.00
5. Successful complete installation of ISDN BRIservice using drop wire from DP to last pointat Customer premise and install new internalwiring.
Per NTInstallation
50.00
6. For the successful complete installation ofISDN BRI service using drop wire from DP tocustomer premise with existing internalwiring.
Per NTInstallation
30.00
2. PAYMENT BY CUSTOMER & INCREMENTAL RATE PAYMENT BY TM
Description Items UrbanSub-urban Rural
ExistingRate BornebyCustomers
Installationwork InvolvesInternal WiringwithinCustomerspremises
With Existing Int. Wiring RM30.00 New Int. Wiring RM 50.00*
IncrementalRate paid byTM
All new DELservicesFulfilments willbe counted by
Weekly
1 lineRM 7.50per line
RM 15.00per line
RM 30.00per line
2 to 10lines RM 5.00
per lineRM 10.00per line
RM 20.00per line
> 11lines
RM 15.00per line
27
7/28/2019 Contractors Quick Reference
28/44
3. JUMPERING PAYMENT BY TM1. For DEL
DESCRIPTION Category PRICE(RM)
Test and jumper at cabinet/SDF and recover existingjumper wire if required.Per Order
Urban 4.50
Sub-Urban 5.50
Rural 7.00
2. For Streamyx
DESCRIPTION Category DSLAM RDSLAM RTDSLAM
Test and jumper at eachcategory and recoverexisting jumper wire ifrequired
Urban 4.50 6.50 10.50
Sub-Urban 5.50 7.50 11.50
Rural 7.00 9.00 13.00
28
7/28/2019 Contractors Quick Reference
29/44
MINI JKH COMMON WORKS & ITS PROCESS FLOW
Type of Work Description of Work
Type of Work 1 Replacing one span stolen/breakdown cable200pr O/H, D/S (pole to pole) Straight Joint
Type of Work 2 Replacing stolen IB cable involving Y-joint(originally Straight-joint in the middle)
Type of Work 3 Localising faulty 200pair UG cable.
Type of Work 4 Localising faulty 200pair OH cable.
Type of Work 5 Localisation to clear 1 docket OH/UG (fault atjoint) - Overhead (TR pair & spare pairs disc)
Type of Work 6 Localisation to clear 1 docket OH/UG (fault atjoint) - Underground (TR pair & spare pairsdisc)
Type of Work 7 Localisation to clear 1 docket OH/UG (fault atjoint) - Underground (TR pair & spare pairslow IR)
Type of Work 8 Replacing tag (at the cabinet).
Type of Work 9 Replacing cable ES UG breakdown/sectionfault (2400pr)
Type of Work 10 Localising and replacing cable ES UG sectionlow (2400pr)
29
7/28/2019 Contractors Quick Reference
30/44
Type Of Work 1 - Replacing one span stolen/breakdown cable 200pr O/H,D/S (pole to pole) Straight Joint
30
7/28/2019 Contractors Quick Reference
31/44
Type Of Work 2 - Replacing stolen IB cable involving Y-joint (originallyStraight-joint in the middle)
31
7/28/2019 Contractors Quick Reference
32/44
Type Of Work 3 - Localising faulty 200pair UG cable
32
7/28/2019 Contractors Quick Reference
33/44
Type Of Work 4 - Localising faulty 200pair OH cable
33
7/28/2019 Contractors Quick Reference
34/44
Type Of Work 5 - Localisation to clear 1 docket OH/UG (fault at joint) -Overhead (TR pair & spare pairs disc)
34
7/28/2019 Contractors Quick Reference
35/44
Type of Work 6 - Localisation to clear 1 docket OH/UG (fault at joint) -Underground (TR pair & spare pairs disc)
35
7/28/2019 Contractors Quick Reference
36/44
Type of Work 7 - Localisation to clear 1 docket OH/UG (fault at joint) -Underground (TR pair & spare pairs low IR)
36
7/28/2019 Contractors Quick Reference
37/44
Type of Work 8 - Replacing tag (at the cabinet).
37
7/28/2019 Contractors Quick Reference
38/44
Type of Work 9 - Replacing cable ES UG breakdown/section fault (2400pr)
38
7/28/2019 Contractors Quick Reference
39/44
Type of Work 10 - Localising and replacing cable ES UG section low (2400pr)
39
7/28/2019 Contractors Quick Reference
40/44
5. PERFORMANCE & ASSESSMENT
ASSESSMENT CRITERIA
Contractors are assessed QUATERLY based the following elements:
ELEMENTS WEIGHTAGE
1. KPI Performance Measurement 50%
2. Merit & Demerit Points 20%
3. Auditing 20%
4. Administrations & Initiatives 10%
Contractors are ranked based on the following ratings.
RATING RANGE TOTAL SCORE
EXCELLENT More than 90%
GOOD More than 80%
FAIR More than 70%
POOR 70% and less
Passing Marks = 70%
*Note: The contractor shall be required to achieve a minimum passing scoreof70% during the first year of assessment of performance weightage. In theevent the Contractor fails to achieve the minimum passing score of70%,TMhereby reserves its right to terminate the Contract at any time during thesecond year of the Contract Period.
40
7/28/2019 Contractors Quick Reference
41/44
KEY KPI DELIVERABLES
1. COD Contractor
Appointment Met for NI from PAMS. Percentage of new installation
that meet appointment
2. MINI JKH Contractor
Average percentage Document submission checklist and
Average work order completed as per RFS date as per quality
accepted by TM.
3. TR Outsourcing Contractor
Numbers of KPIs meeting target
Average Restoration Cycle Time
COD
KPI Target
DEL P1 < 8 HRS > 98 %
DEL P2 < 16 HRS > 98 %
DEL P3 < 24 HRS > 98 %
Mini JKH
KPI Target
AVERAGE RFS > 90 %AVERAGE DOCUMENT SUBMISSION > 90 %
TROS
KPI Target
DEL P1 < 8 HRS > 90 %
DEL P2 < 16 HRS > 90 %
DEL P3 < 16 HRS > 90 %
DEL P4 < 24 HRS > 90 %
DEL ALL < 3 DAYS > 100 %
ADSL POA < 4 HRS > 90 %
ADSL POE < 24 HRS > 80 %
ADSL ALL < 3 DAYS > 100 %
ISDN BRI < 4 HRS > 80 %
CDMA < 24 HRS > 80 %
REPEAT REPORT < 15 %
41
7/28/2019 Contractors Quick Reference
42/44
SAMPLE OF PERFORMANCE DASHBOARD
KPI Title Max Quarter 1 Quarter 2 Quarter 3 Quarter 4
PAYMENT 3 % 3 % 3 % 3 % 3 %
REPORTS SUBMISSION ASPER SLA
2 % 2 % 2 % 2 % 2 %
MEETING / TRAINING
PARTICIPATION / ETC
2 % 2 % 2 % 2 % 2 %
INNOVATION 3 % 1 % 1 % 1 % 1 %
SCORE (MAX 10%) 8.00 % 8.00 % 8.00 % 8.00 %
KPI Score
KPI Title Target Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
AVERAGE RFS > 90 % 85 % 86 % 86 % 87 % 88 % 90 % 90 % 89 % 90 % 90 % 90 % 90 %
AVERAGE DOCUMENTSUBMISSION
> 90 % 90 % 90 % 90 % 90 % 90 % 90 % 90 % 90 % 90 % 90 % 90 % 90 %
AVERAGE OVERALL 87.50 % 88.00 % 88.00 % 88.50 % 89.00 % 90.00 % 90.00 % 89.50 % 90.00 % 90.00 % 90.00 % 90.00 %
MARKS 43.75 % 44.00 % 44.00 % 44.25 % 44.50 % 45.00 % 45.00 % 44.75 % 45.00 % 45.00 % 45.00 % 45.00 %
SCORE (MAX 50%) 43.92 % 44.58 % 44.92 % 45.00 %
Audit
KPI Title Max Quarter 1 Quarter 2 Quarter 3 Quarter 4AUDIT 100 % 80 % 80 % 80 % 80 %
SCORE (MAX 20%) 16.00 % 16.00 % 16.00 % 16.00 %
Merit / Demerit
KPI Title Max Quarter 1 Quarter 2 Quarter 3 Quarter 4
42
7/28/2019 Contractors Quick Reference
43/44
MERIT 60 0 0 0 0
DEMERIT 60 0 0 0 0
SCORE (MAX 20%) 0.00 % 0.00 % 0.00 % 0.00 %
Remarks
Title Quarter 1 Quarter 2 Quarter 3 Quarter 4
MERIT ... ... ... ...
DEMERIT ... ... ... ...CUSTOMER COMPLAINTS ... ... ... ...
Final Result
Title Quarter 1 Quarter 2 Quarter 3 Quarter 4
ADMIN 8.00 8.00 8.00 8.00
KPI 43.92 44.58 44.92 45.00
AUDIT 16.00 16.00 16.00 16.00
MERIT 0.00 0.00 0.00 0.00
TOTAL 67.92 68.58 68.92 69
43
7/28/2019 Contractors Quick Reference
44/44
6. INQUIRY & FEEDBACK
SMSSend SMS to 0322402940
Portalwww.netops.tm.com.my