DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 1 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
CONTRACTORS EHS INDUCTION
GUIDELINES
1. INTRODUCTION AND SCOPE: .............................................................................. 5
2. DEFINITIONS: ......................................................................................................... 5
3. EHS RESPONSIBILITIES: .................................................................................... 10
3.1 KU REPRESENTATIVES/PROJECT OFFICER: .................................................. 10
3.2 PRINCIPAL CONTRACTOR: ................................................................................ 10
3.3 CONTRACTORS (INCLUDING SUBCONTRACTORS):....................................... 11
4. GUIDELINE: .......................................................................................................... 11
4.1 Contract classification: ............................................................................... 11
4.2 Contractor evaluation: ................................................................................ 12
4.3 Contract specifications: .............................................................................. 12
4.4 Contractor induction: .................................................................................. 12
4.4.1 Induction: ................................................................................................ 12 4.4.2 Contract employees or sub-contractors: ................................................. 13 4.4.3 Contractor induction guide: ..................................................................... 13
4.5 Monitoring contractors:............................................................................... 13
4.5.1 EHS Management plans:........................................................................ 14 4.5.2 Safe Work Method Statements: .............................................................. 14 4.5.3 Inspections and site walks: ..................................................................... 15 4.5.4 Contractor Performance Monitoring: ...................................................... 15
4.6 Permit to Work: .......................................................................................... 15
4.6.1 Fire Alarm Isolation: ............................................................................... 15 4.6.2 Hot Work: ............................................................................................... 16 4.6.3 Energy Isolation: ..................................................................................... 16 4.6.4 Roof Access: .......................................................................................... 16 4.6.5 Confined Space: ..................................................................................... 16
4.7 Restricted Access Areas: ........................................................................... 16
4.8 Emergencies: ............................................................................................. 16
4.8.1 Emergency Evacuation Procedures: ...................................................... 17 4.8.2 Emergency Contact Phone Numbers: .................................................... 17
4.9 Injuries, Illnesses and Incidents: ................................................................ 17
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 2 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
4.10 Hours of Work: ........................................................................................... 18
4.11 Before Commencing Work: ........................................................................ 18
4.12 Environmental Management Plan: ............................................................. 18
4.13 Certificates of Competency: ....................................................................... 18
4.14 Personal Protective Clothing and Equipment: ............................................ 19
4.15 Equipment, Plant and Tools: ...................................................................... 19
4.15.1 Electrical Equipment: .......................................................................... 19 4.15.2 Machine Guarding and Hand Tools: ................................................... 19 4.15.3 Lasers: ................................................................................................ 20 4.15.4 Explosive Power Tools:....................................................................... 20 4.15.5 Mobile Mechanical Plant: .................................................................... 20 4.15.6 Compressed Air Equipment: ............................................................... 21
4.16 Welding: ..................................................................................................... 21
4.17 Laboratories: .............................................................................................. 22
4.18 High Voltage Substations: .......................................................................... 23
4.19 Asbestos and Confined Spaces: ................................................................ 23
4.20 Interruption of Services: ............................................................................. 23
4.21 ‘Danger’ and ‘Out of Service’ Tags: ........................................................... 23
4.22 Isolation of Building Fire Protection Equipment:......................................... 24
4.23 Barricades and Fencing: ............................................................................ 24
4.24 Working on Roofs: ..................................................................................... 24
4.25 Ladder, Harness Use, scaffolds and platforms: ......................................... 26
4.26 Facade/Gutter Cleaning: ............................................................................ 27
4.27 Electrical Work: .......................................................................................... 28
4.28 Plumbing, Drainage and Gas Fitting: ......................................................... 29
4.29 Excavation Work: ....................................................................................... 29
4.30 Hot Work: ................................................................................................... 29
4.31 Movement and Storage of Materials: ......................................................... 30
4.32 Rubbish: ..................................................................................................... 30
4.33 Waste Management: .................................................................................. 31
4.34 Water Conservation, Erosion and Sediment Control: ................................. 32
4.35 Pollution: .................................................................................................... 33
4.36 Dust: .......................................................................................................... 33
4.37 Hazardous Chemicals: ............................................................................... 33
4.37.1 Solvents: ............................................................................................. 34 4.38 Noise Pollution: .......................................................................................... 34
4.39 Chemical Spill: ........................................................................................... 34
4.40 Vehicle Access: .......................................................................................... 34
4.40.1 Entry Permits: ..................................................................................... 35 4.40.2 Contractor Parking: ............................................................................. 35 4.40.3 Speed Limits: ...................................................................................... 35
4.41 Contractor non-compliance: ....................................................................... 35
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 3 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
4.42 Contractor incident management: .............................................................. 36
4.42.1 Injuries and incidents: ......................................................................... 36 4.42.2 Notifiable incidents: ............................................................................. 36
5. ACKNOWLEDGEMENTS:..................................................................................... 37
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 4 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
Title of Document : Contractors EHS Induction Guidelines
Document No. : KU – FD – EHS –GID – 14
Issue No. : 01
Issue Date : 19/11/2012
Revision No. :
Revision Date :
Activity Name / Designation Signature Date
Prepared by Roberto Macahig
EHS Assistant
04/09/2012
Reviewed / Updated by Belal Irshaid H&S Manager
07/10/2012
Approval & Issue by Ahmed Sherif
Facilities Management Director
19/11/2012
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 5 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
1. Introduction and Scope:
This guideline is designed to give contractors information on the Khalifa University’s
(KU) Contractor system Management and provide specific rules when working on
campus. By reading and understanding this guideline, everyone working within
University sites will be able to play their role in maintaining a safe workplace.
The key purpose of this guide is to advise:
EHS obligations under the Decree 42 of 2009 and other EHS Laws and
Regulations.
Identification, assessment and control of hazards relevant to the KU.
Any relevant operational issues in the management of contractors.
The KU EHS Section has prepared this guideline in order to assist contractors to
work safely on KU sites and abide by KU requirements relating to people and
property.
The contractor has full responsibility with regards to:
Identification and implementation of all applicable requirements from
workplace health and safety legislation and the environment in relation to their
work;
Comprehension of the full extent of the University and the contractors legal
obligations; and
Implementation of all necessary measures to fully protect and ensure the
safety of all persons working on, or near the contractor’s site of work.
Further information about legal requirements can be obtained from the University’s
Environment, Health and Safety Section.
2. Definitions:
Construction work:
Any work carried out in connection with the
construction, alteration, conversion, fitting-out and
commissioning, renovation, repair, maintenance,
refurbishment, demolition, and decommissioning or
dismantling of a structure.
In context of the above definition it also includes:
Any installation or testing carried out,
The removal of any product or waste resulting from
demolition,
The prefabrication or testing of elements, at a place
specifically established for the construction work, for
use in construction work,
The assembly or disassembly of prefabricated
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 6 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
elements forming part of a structure,
The installation, testing or maintenance of an
essential service in relation to a structure,
Any work connected with an excavation,
Any work connected construction site preparation
(including landscaping)
Any work that is carried out on, under or near water,
including work on buoys and obstructions to
navigation.
Meaning of “high risk
construction work”:
means construction work that:
Involves a risk of a person falling more than 2
metres, or
Is carried out on a telecommunication tower, or
Involves demolition of an element of a structure that
is load-bearing or otherwise related to the physical
integrity of the structure, or
Involves, or is likely to involve, the disturbance of
asbestos, or
Involves structural alterations or repairs that require
temporary support to prevent collapse, or
Is carried out in or near a confined space, or
Is carried out in or near: a shaft or trench with an
excavated depth greater than 1.5 metres, or a
tunnel, or
Involves the use of explosives, or
Is carried out on or near pressurized gas distribution
mains or piping, or
Is carried out on or near chemical, fuel or refrigerant
lines, or
Is carried out on or near energized electrical
installations or services, or
Is carried out in an area that may have a
contaminated or flammable atmosphere, or
Involves tilt-up or precast concrete, or
Is carried out on, in or adjacent to a road, railway,
shipping lane or other traffic corridor that is in use
by traffic other than pedestrians, or
Is carried out in an area at a workplace in which
there is any movement of powered mobile plant, or
Is carried out in an area in which there are artificial
extremes of temperature, or
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 7 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
Is carried out in or near water or other liquid that
involves a risk of drowning, or
Involves diving work.
Contractor: A person or company(s), including sub-contractors,
who are engaged by the university to perform work,
carry out a service or provide labor hire.
Induction: A formal process of providing information on safety
requirements prior to commencement of work
Major Contract: Contracted works are classified as major if they pose a
significant risk of serious injury or illness. Major
contracts may involve (but are not limited to) the
following activities:
Construction work;
Working in or near confined spaces and trenches
(>1.5M deep) and tunnels;
Working at a height greater than 2 meters;
Working with asbestos;
Working on or near pressurized piping;
Electrical work;
On or near chemical, fuel or refrigerant lines;
Manual handling;
Installation, use or maintenance of plant or
equipment;
Hazardous processes including spray painting,
abrasive blasting, welding, electroplating, molten
metal and lead processes and lead risk work;
Entry to a laboratory or restricted access area;
Working with explosives
Working on telecommunications towers
Structural alterations or repairs that require
temporary support to prevent collapse
Diving for construction purposes
Demolition
Works involving tilt-up or precast concrete,
Where there is a risk of drowning
Where artificial extremes of temperature could be
present
Working on or near powered mobile plant
Working out on, in or adjacent to a road, railway,
shipping lane or other traffic corridor that is in use
by traffic other than pedestrians,
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 8 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
Working in an area that may have a contaminated
or flammable atmosphere and use of subcontractors
in any of the above.
The above list is not exhaustive; other contracted
works may also be classified as major if significant risk
is identified at the conclusion of a risk assessment.
Minor contract: Contracts which sit outside the scope of a major
contract, due to size, expenditure or absence of ‘high
risk’ activities.
EHS Management
Plan:
Documentation from the contractor which outlines how
EHS will be managed for the contract. It includes:
A statement of responsibilities listing the names,
positions and responsibilities of all persons who will
have specific responsibilities on the site for EHS;
Details of the arrangements for ensuring
compliance with the requirements for EHS induction
training;
Details of the arrangements for managing EHS
incidents, including the identity of and contact
details for the person(s) who will be available to
prevent, prepare for, respond to and recover from
EHS incidents;
Any site safety rules and details of the
arrangements for ensuring all persons at the place
of work (whether employees or visitors) are aware
of the rules, and
Safe work method statements for all activities
identified as having EHS risks.
Safe Work Method
Statement:
Documentation that:
Describes how the work is to be carried out;
Identifies the work activities assessed as having
safety risks;
Identifies the safety risks;
Describes the control measures that will be applied
to the work activities; includes a description of the
equipment used in the work, the standards or codes
of practice to be complied with and the qualification
and training of the personnel doing the work.
Describes how the control measures are to be
implemented, monitored and reviewed.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 9 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
Risk Assessment: Is concerned with the prevention of accidents and ill-
health and to identify the environmental impacts. It is
the key to successful management of Environment
health and safety. Generally, regulations are
increasingly moving away from a list of "what to do"
with the trends in legislation now placing greater
emphasis on risk assessments to address the actual
risk rather than the perceived risk. This ensures that
resources are targeted to the areas where they are
most needed and are most effective.
Risk Control Plan: A Risk Control Plan is an action plan that sets out how
the EHS risks identified in a Risk Assessment will be
eliminated or controlled. Risk Control Plans are
developed from risk assessments. Risk Control Plans
may include a list of:
Hazards identified
Risks associated with the hazards identified
Existing risk controls
Proposed short-term controls (including proposed
completion dates)
Proposed medium-term controls (including
proposed completion dates)
Proposed long-term controls (including proposed
completion dates)
Person(s) responsible for implementation of controls
Resources required for implementation of controls
The proposed review date.
Principal Contractor
for Construction
Work:
(a) The principal contractor for construction work is the
person / entity appointed by the developer / client to
manage, supervise and perform the construction work
and:
(b) Is the entity who is in control of the site, site access
and all construction works at the workplace, including
work performed by sub-contractors.
(c) Generally the main construction contractor is
appointed as the principal contractor for the
construction work; and
(d) If the developer / client fails to appoint a principal
contractor to a workplace the developer / client is taken
to be the principal contractor and assume all
obligations of the principal contractor.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 10 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
Sub-Contractor(s): (a) A Sub Contractor is any contractor on site where
“Construction Work” is taking place who are not the
officially appointed “Principal Contractor”, regardless of
contractual arrangement.
(b) Shall report to and be managed by the principal
contractor.
3. EHS Responsibilities:
3.1 KU Representatives/Project Officer:
A KU Representative responsible for coordinating and managing contract work is to
implement the requirements of this guide as appropriate. At a minimum, a KU
Representative is to:
Assess the competence of contractors to meet any identified EHS requirements
or specifications.
Ensure contractors receive an induction in accordance with this guide, so that
they are aware of KU expectations in regards to EHS.
Inform contractors of any EHS hazards that may exist in the area in which they
are working.
Monitor the performance of the contracted work with regards to working safely,
and initiate corrective action to remedy any deficiencies.
Verifying that contractors have current workers compensation insurance and
public liability insurance and that certificate of currency are provided by the
contractor prior to commencing work.
Undertake contractor management Induction with the EHS Section on the
processes covered by these guidelines.
3.2 Principal Contractor:
Under AD EHS RI - CoP - 53.0 - EHS Management during Construction Work a
Principal Contractor needs to be appointed for a construction project. A construction
project is a project that involves construction work.
Responsibilities of a Principal Contractor include:
Signs are installed and are clearly visible from the outside that show the
Principal Contractor’s name and telephone contact numbers (including after-
hours contact), the location of the site office
Ensure a written EHS management plan is written before work on the project
commences
Take all reasonable steps to obtain copies of safe work method statements
relating to high risk construction work before such work commences
Manage risks associated with the following:
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 11 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
o The storage, movement and disposal of construction materials and waste for
the worksite
o Storage of plant that is not in use
o Traffic in the vicinity of the workplace that may be affected by construction
work
o Essential services at the workplace
Ensure general construction induction training is undertaken by employees,
agents and contractors of the contractor undertaking construction work
Communicate with the University any major EHS issues as they arise, including
all work notifiable events.
3.3 Contractors (including subcontractors):
For types of work where there is a risk to the health and safety of contractors, KU
staff, students or visitors to the University, a risk assessment (or safe work method
statement) must be produced to the KU Representative.
Specifically, under the Regulation, contractors must not commence construction or
demolition work unless they:
Have been provided with a copy of the relevant parts of the EHS management
plan where applicable.
Have undertaken a risk assessment of the work to be carried out and provided
a written safe work method statement to the Principal Contractor, including the
risk assessment.
Have ensured that the contractor and their employees have undertaken general
construction induction training.
Maintain and keep up-to-date safe work method statements.
Provide the Principal Contractor with updated safe work method statements and
other information in relation to hazardous chemicals.
For construction work, a contractor must not commence work unless they have:
Undertaken a risk assessment of the work to be carried out and provided the
Principal Contractor with a written safe work method statement including any
changes made to that statement.
Ensured that they and their workers have undertaken EHS Induction training as
required.
Taken necessary measures to eliminate and/or control the identified hazard.
4. Guideline:
4.1 Contract classification:
Contracts are classified as major or minor depending on legislative requirements
and the level of risk of workplace injury or illness of the operations being conducted.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 12 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
4.2 Contractor evaluation:
All contractors (minor and major contract) must be evaluated prior to their
engagement, to ensure that they meet the minimum requirements of the University.
Contractors must be evaluated using EHS Contractor Evaluation Checklist.
The organisation being evaluated must demonstrate that there is an EHS system in
place to address the risk(s) associated with the contracted works. The EHS
Contractor Evaluation Checklist lists the minimum requirements for a potential
contractor’s EHS management system.
Assessment of the contractor’s EHS management system is to be conducted by the
University EHS Section supervising the contract or Tender Committee.
Assistance may be sought from the EHS Unit to help assess a contractor’s EHS
management system. Examples of EHS policies, procedures, SWMS/SOP's and
risk assessments relevant to the contract are to be included in the contractor
evaluation as verification of the contractor’s HS system.
Where appropriate, contracts should be procured in compliance with the KU
Procurement Policy and Tendering Procedure (contact Strategic Procurement for
assistance and advice).
4.3 Contract specifications:
When establishing a major contract, specific EHS clauses and requirements should
be identified in the contract documentation (Strategic Procurement can assist with
this). EHS Requirements Checklist for Tenders and Contracts may be used to form
the basis of such contract specifications. These specifications should be included in
the contract documents.
Note: Any proposed Facilities Management construction contracts should be done
using the standard templates and any amendment to a Facilities Management
construction contract template should only be made with Legal Office review and
input.
4.4 Contractor induction:
4.4.1 Induction:
All contractors working at KU must be inducted. Depending on the type of
contract, this may include a number of levels of induction. These may include:
1. A general KU induction.
2. A site specific induction (e.g. The induction outlined in the Laboratory
Clearance Certificate)
3. All persons undertaking construction work must hold an ID CARD Green
labeled EHS general induction for construction work in KU.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 13 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
Contractor EHS induction checklist may be used to record the information relayed
at the site specific induction and retained accordingly. Names of inducted
personnel can be recorded on the Contractor induction register. At the induction
contractors must provide to KU any information relevant to their work that may
affect the health and safety of KU workers, students, visitors and others in the
area.
Contractors required attending local induction involving the areas of the
University in which they will be working at. Local inductions are arranged and
delivered by the KU EHS Officer and may involve local area University personnel
as required.
4.4.2 Contract employees or sub-contractors:
Other contractor employees or sub-contractors which are employed after the
initial local induction are to be inducted by the contractor. Records of this training
are to be recorded using either the contractor’s own induction form or the
University’s form. Records are to be forwarded to the KU EHS Section.
4.4.3 Contractor induction guide:
Induction should include the information provided in:
Contractor induction guide (general) for general contracts
Contractor induction guide (construction) if the contract involves construction
work.
It is the responsibility of the contractor to instruct their employees and any
subcontractors on the information provided in the Contractor Induction
Guidelines.
The contractor is to make their employees available to attend the initial site
specific induction. It is a requirement of the contractor to ensure that any new
employees or subcontractors in their control, who work on the University’s
premises, receive an induction prior to commencement and is recorded
appropriately.
4.5 Monitoring contractors:
Contractors must be monitored throughout the contract. The frequency of the
monitoring will be determined by the risk of the work involved.
Major contracts may be monitored by the following means:
Review of EHS Management Plans
Review of SWMS’s/SOP;s
Conducting inspections and site walks
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 14 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
Regular meetings with the contractor to discuss HS performance issues
(minutes of these meeting are to be recorded to communicate action items);
Periodic inspection of work activities to verify that safe work method statements
are being implemented;
Completion of EHS Performance Report for Contractors for major contracts
which extend over a period of 1 month;
The review of site inspection records conducted by the contractor;
Monitoring and following up on corrective actions where non-conformances are
identified;
The review of accident and incident reports, third party reports and complaints;
4.5.1 EHS Management plans: Where a contractor has provided an EHS Management Plan, this plan should be
kept up to date by the contractor and periodically reviewed by the University EHS
Section supervising the contract. HS Management Plan Checklist may be used to
determine if the EHS Management Plan meets KU requirements.
This checklist has been developed to aid in the review of project-specific EHS
plans. It is not exhaustive and particular attention should be paid to project-
specific EHS risk areas. Formulation of the project-specific EHS plans should be
based on details of the actual project and ‘generic’ project EHS plans are not
acceptable.
Any contracts extending longer than six months may be audited by the EHS
Section to determine if the EHS Management Plan conforms to KU Standards.
4.5.2 Safe Work Method Statements: Safe work method statements (SWMS)/Standard Operation Procedures (SOPs)
must be provided to the University prior to the commencement of work or a
service where there is a risk to health and safety or the need is identified by the
University.
SWMS’s should be reviewed by the University EHS Section or the Officer
supervising the contract, to ensure that they reflect the nature of the work and
meet legislative requirements. SWMS Checklist may be used to assess the
content of an SWMS. This review should also be undertaken periodically
throughout the life of the contract.
If the work method or any other aspects of the job change for any reason, then a
revised SWMS/SOPs must be submitted by the contractor and reviewed by the
University EHS Section or the Officer supervising the contract.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 15 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
All SWMS/SOPs used by contractors at KU must be site specific. The use of
generic SWMS is discouraged and the University EHS Section or the Officer
supervising the contract should review the SWMS to ensure that it is consistent
with the work being undertaken.
4.5.3 Inspections and site walks:
Periodic inspections and site walks should be undertaken by the University EHS
Section or the Officer supervising the contract. This may be done using the follow
methods:
Construction Site Inspection checklist*
Follow-up actions for EHS issues should be specified and recorded for
implementation by appropriate persons involved in the project.
*For non-construction contracts, the work method should be assessed against
the information provided in the SWMS/SOPs.
4.5.4 Contractor Performance Monitoring: During the implementation of the contract the KU EHS Officer shall monitor EHS
performance by:
Monitoring the work of contractors to ensure that all legal requirements are
met.
Ensuring regular site inspections are conducted with the contractor.
Advising the contractor on newly identified hazards and risks.
Monitoring and following up on corrective actions where non-conformances
are identified.
The review accident and incident reports, third party reports and complaints
Regular meetings with the contractor and record any EHS performance
issues.
EHS Performance Report for Contractors are similar information is required to be
submitted by the contractor to the KU EHS Officer for all Principal Contractors
with work extending greater than one month in duration.
For other contractors the KU project officer can use the Sub-Contractor Safety
Inspection Checklist. This is not a mandatory process.
4.6 Permit to Work:
4.6.1 Fire Alarm Isolation:
There are instances when fire alarm systems are required to be isolated to
accommodate work without disruption to occupants. Contractors must comply
with the process outlined in Section 4.22 of this guide.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 16 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
4.6.2 Hot Work: Hot work (i.e. welding, thermal or oxygen cutting or heating and other related
heat or spark producing operations) requires the issue of a hot work permit prior
to the task commencing. Contractors must comply with the process outlined in
Section 4.30 of this guide.
4.6.3 Energy Isolation: Contractors must comply with Facilities Management Isolation (Danger Tagging
and Lockout) Procedure for any work that involves energy isolation. Refer to
section 4.27.
4.6.4 Roof Access:
Any access to University roofs requires a permit. Specific hazards and risk exist
on roofs and appropriate controls are required to ensure working safely. Refer to
section 4.24.
4.6.5 Confined Space: Entry to an area defined as a confined space shall only occur under an issued
permit. Further information on the University’s Permit to Work System can be
obtained from EHS Section. Refer to section 4.19.
4.7 Restricted Access Areas:
Due to the variety and nature of activities carried out at KU for teaching, research
and development, contractors may come across areas which are unique when
compared to the average workplace. In many cases these areas can be hazardous
and are often designated as restricted areas.
Induction procedures will occur for areas deemed hazardous and contractors shall
not enter restricted access areas until they have had an induction from the KU EHS
Section and/or local personnel. Restricted access areas on University campuses
include but are not restricted to:
Building B – Research Support Facility
Building K – Administration.
Laboratories; including chemical, biological, engineering, radiation or laser
laboratories.
Chemical stores.
High voltage sub stations.
Confined spaces.
Roofs of buildings.
4.8 Emergencies:
Detailed procedures are displayed in all buildings at the Khalifa University
describing the University’s Standard Fire Orders and Emergency Evacuation
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 17 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
Procedures. This signage contains information on assembly points and contact
numbers in case of an emergency.
The University also has Emergency Response Procedures which contain
information on how to deal with a number of emergencies, including the following:
Fire
Chemical spill
Gas leak
Explosion
Bomb threat
Structure collapse
Medical emergency – single or multiple casualties
Traffic accident
Armed robbery, or
Any other incident considered to be an emergency.
4.8.1 Emergency Evacuation Procedures: If you hear a continuous alarm bell or are requested, by a building warden or a
member of staff, to evacuate the building you must:
Leave the building immediately by the nearest exit
Proceed to the assembly area indicated on the evacuation map
Remain in the assembly area until advised the emergency is over
Do not re-enter the building until advised it is safe to do so by a KU Building
Warden or KU Security.
4.8.2 Emergency Contact Phone Numbers: Contractors must immediately notify any emergency to University personnel. This
shall be the case for any contractor works or for dedicated building sites.
In the event of an emergency occurring contractors are to notify:
University Emergency/ Control Room: 02 4018200 (or extension 8200)
University Security: 02 4018100 (or extension 8100)
KU EHS Section: 02 4018056 (or extension 8056)
4.9 Injuries, Illnesses and Incidents:
Any injury, illness or incident occurring from work performed by a contractor shall be
reported to the KU EHS Section.
For serious incidents where medical attention is required KU Security should be
contacted in the first instance on 02 401 8100 as well as the EHS Section on 02 401
8200 or 8056.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 18 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
4.10 Hours of Work:
Normal hours of work for contractors on KU premises are 5:00pm - 7:00am, Sunday
to Thursday in administrative and teaching areas. Other times may be authorized
through prior arrangement with the KU Project Officer or Representative only.
4.11 Before Commencing Work:
In accordance with the provisions of the AD EHSMS Decree 2009, any contractor or
sub-contractor working on KU buildings or infrastructure is considered as
undertaking construction work.
Therefore:
For construction work the "Principle Contractor" shall prepare and keep up to
date during the course of the work, a site-specific occupational health and
safety plan and have it approved by the EHS Section Officer.
For high-risk construction work, the "Principle Contractor" shall provide safe
work method statement(s) for itself and sub-contractor(s) and have it/them
approved by the EHS Section Officer.
All Contractors are also required to:
Show to the Project Officer that any employee(s), self-employed person(s) or
sub-contractor(s) have a valid EHS General Induction for Construction work in
KU card, and
Provide evidence to the Project Officer that any employee(s), self-employed
person(s) or sub-contractor(s) have completed this KU Contractor Induction as
well as a site-specific EHS induction.
KU may audit contractors or sub-contractor's procedures and certificates at any
time.
4.12 Environmental Management Plan:
For construction work where the cost exceeds 1million AED, the "Contractor" shall
prepare and keep up to date during the course of the work, a site-specific
Environmental Management Plan (EMP) which may be combined with the OHS
Plan. The EMP must be approved by the Project Officer.
KU reserves the right to carry out a "second party" audit of a contractor's EMP.
4.13 Certificates of Competency:
All Contractors and their staff must have relevant Certificates of Competency and or
licenses for the equipment being used or tasks being performed, as required by
Sector Regulatory Authority. That certificate or license must be shown to the
Facilities Management Project Officer and a copy kept on site for presentation if
requested.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 19 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
4.14 Personal Protective Clothing and Equipment:
Contractors shall supply their employees with all appropriate personal protective
clothing and equipment (PPCE). For example:
Hard hats
Safety boots
Gloves
Safety glasses, and
Clothing
Contractors shall ensure that their employees use and maintain the equipment
correctly, as required by applicable legislation and codes of practice.
Note: that PPCE, while necessary, is the last line of defense for safety. Where-ever
possible, other measures should be considered first, such as:
Substituting for something less hazardous (e.g. using lead-free solder)
Engineering controls (such as machine guarding), or
Administrative controls (such as scheduling noisy work for a time when as few
people are on site as possible).
4.15 Equipment, Plant and Tools:
4.15.1 Electrical Equipment: Unless double insulated, all equipment and appliances that are plugged or direct-
wired shall be connected to an Earth Leakage Circuit Breaker (ELCB).
All equipment and appliances must be tested and tagged by a competent person.
All electrical leads must be:
Tested and tagged by a competent person within the period specified by
Regulation
Always supported off the ground or floors
Only connected to the nearest power outlet
Removed from the power outlet when not in use
Protected if passing under doors or through doorways.
Damaged leads, piggyback plugs and/or double adaptors must not be used.
4.15.2 Machine Guarding and Hand Tools: All hand tools, machinery or other equipment must be operated with effective
guards in accordance with Australian Standards.
Tools that must be checked regularly include tools like:
Picks
Shovels
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 20 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
Axes
Crowbars
Hammers
Spanners, and
Screwdrivers
Use an approved wrist-stop or lanyard to secure a tool if there is a risk of it falling
and injuring people below.
Where damage or defects are present, the tool must not be used.
4.15.3 Lasers: Lasers used must conform to Safety of Laser Products Part 1: Equipment
classification, requirements and user's guide.
Lasers shall only be used with the following precautions:
Operators must have completed a recognized course in laser safety
Up to Class 3A lasers only are to be used on any KU construction site
Ensure that persons do not look directly into the beam
Laser equipment must be positioned so as not to be at eye height in areas
where there may be passers by
Warning signs are erected indicating the use of a laser in the area.
4.15.4 Explosive Power Tools: Explosive powered tools may only be used by operators who hold a certificate
issued by a statutory authority and after the following precautions have been
taken:
Explosive charges for explosive powered tools shall be kept in an approved,
locked box, in a secure place, and
A warning sign displayed and barriers erected at each place the explosive
powered tool is being used.
Suitable PPCE is to be worn when using the explosive powered tool.
4.15.5 Mobile Mechanical Plant: Mobile equipment includes:
Front-end loaders
Dozers
Backhoes, and
Forklifts
When not in use, mobile equipment must:
Have the keys removed
Have blades and buckets lowered onto the ground, and
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 21 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
Be chocked/blocked
All operators are to produce to the Project Officer an appropriate operator's
certificate (or copy) for the plant being operated on request.
No mobile equipment or vehicles are to be parked on slopes.
4.15.6 Compressed Air Equipment:
Compressed Air Equipment refers to equipment such as:
Scabblers
Water/air jets
Impact wrenches, and
Grinding tools.
All compressors must:
Have a current pressure vessel certificate
Be appropriately secured, and
Have their regulators protected from accidental knocks.
Care must be taken when working with compressed air. Remember, if
compressed air enters the blood stream through a break in the skin it can be
fatal. Under no circumstances should a jet of air be directed towards the body of
another person.
4.16 Welding:
Before any welding commences, a Hot Work Permit must be obtained from the EHS
Section Officer.
Appropriate PPCE must be worn. For example:
Aprons
Leather sleeves
Gauntlet gloves
Eye protection, and
It is a requirement that people using electric welders wear insulated footwear when
working in damp areas where the danger of electric shock exists. All electrical
welding cables must be inspected in accordance with Electrical Procedures by a
competent person and maintained in good condition.
Screens shall be erected where there is a danger to co-workers or passersby from
sparks or welding flash.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 22 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
4.17 Laboratories:
All laboratories contain hazardous materials, either solid, liquid, gas or fume
(aerosols). These materials include:
Radioactive solids
Liquids
Chemicals
Dangerous gases
Animals
Electro-magnetic fields
Biological, infectious and clinical waste, and
Sharps.
Many laboratories have hazards that must not be allowed to escape into the
environment and therefore specific requirements must be met in order to work in
these areas.
You must make sure that the laboratory manager is aware when you arrive and
when you leave the site of the work being undertaken.
Do not move or touch anything in a laboratory that is not part of the scope of your
work. It is the responsibility of the lab manager to ensure that the area is safe and
free of hazards before work commences.
1. Before Working in Laboratories:
Contractors and/or their employees are not to enter laboratories without
permission from the laboratory manager. Permission may be required for each
occasion.
Before you commence work in a hazardous area, obtain a "Laboratory Clearance
Certificate" form, this shall be from the Project Officer and have it completed by
the Laboratory Manager as per Guidelines for Work in Laboratories.
2. Maintenance and Isolation of Fume Cupboards:
Routine maintenance of fume cupboards must be pre-arranged with the lab
manager on each occasion. Fume cupboard or chemical store ventilation can only
be isolated by arrangement with the Project Officer.
Fume cupboard extraction fans shall not be isolated before 'tagging out' all
affected laboratory fume hoods to prevent their use.
Contractors must advise laboratory staff that they are about to start work on a
fume cupboard system.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 23 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
4.18 High Voltage Substations: A Contractor needing access to a high voltage substation must obtain a "Permit to
Work in HV Substations on non HV Work" from the Project Officer.
4.19 Asbestos and Confined Spaces:
If Asbestos is found in a building, no work should be carried out in that area and the
Project Officer should be contacted immediately.
No Contractor, their employee(s) or subcontractor shall enter a confined space
unless they:
Obtain a "Confined Space Entry Permit and Risk Assessment form", from the
Project Officer, and
Can produce a certificate of competency for Safe Entry and Working in
Confined Spaces, issued by an accredited training provider
4.20 Interruption of Services:
Adequate notice must be given to the Project Officer when a Contractor's work
involves a requirement to isolate services to all or part of a building. This includes
services like:
Electricity
Gas
Telephone
Communications, and
Water supply
The Project Officer will inform appropriate University staff. Should services be shut-
down accidentally, the Contractor should immediately advise the Project Officer or
Security on 02 4018100.
4.21 ‘Danger’ and ‘Out of Service’ Tags:
Whenever a service or any piece of equipment is isolated, contractors and their staff
shall place a "Danger" or "Isolation" tag(s) on all control switches, valves, main
isolators or key rings.
All tags must display:
Date and time of isolation
Name of person carrying out the isolation
Name of the company
A contact number.
Always remove tags when work has been completed. Never remove another
person's isolation tag.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 24 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
4.22 Isolation of Building Fire Protection Equipment:
Many areas of KU are covered by automatic fire detection and alarm systems. If the
work involves any of the following, Contractors must ensure that fire alarms are
temporarily isolated by arranging this with the Project Officer:
Dust
Vibration
Moisture
Aerosol sprays
Fumes, or
Mechanical damage to detection equipment.
This must be done by 5:00pm the day prior to commencing work.
The process for a contractor to arrange for fire isolation in a building is outlined
below:
Determine the appropriate procedure for the work to be completed;
Determine the need to isolate the fire management system, i.e. smoke, or dust
generation;
If no isolation is required, commence the job following EHS procedures;
If isolation is required, the contractor is required to complete a KU work permit
and risk assessment;
On approval from the maintenance supervisor the contractor is required to
satisfy the requirements prior to commencing work. Part of this is confirming the
isolation is in place with Security (x8100), prior to commencing work;
The contractor must also advise maintenance supervisor when the work is
complete and confirm that the area is re-activated.
If you fail to notify the Project Officer of the need to isolate an alarm, you will be
warning for any unnecessary false alarm.
4.23 Barricades and Fencing:
Contractors must supply and erect any necessary barricades, fencing and lighting to
ensure the safety of all persons on and around the work-site and those passing by.
Care must be taken to regularly check and secure the barricades and fences;
particularly whenever contract staff leaves the work area.
4.24 Working on Roofs:
The following minimum requirements should be reflected in the Safe Work Method
Statement. These must be met to access and work on roofs.
The roof must be structurally sound before a person walks on or places a load
on a roof
The roof is not too steep or slippery to access
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 25 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
Roof areas are kept tidy and clean
Rubbish is regularly removed
All stored items are secured appropriately
The Project Officer is aware of personnel present or working on the roof and the
expected time frame for return.
Do not:
o Store or stack materials where they interfere with access to work
o Access or work on a roof unless trained appropriately
o Access roofs in adverse weather conditions such as wind, rain or
thunderstorms, or
o Store or stack materials within 2 metres of the edge of the roof.
1. Roof Access:
A safe and satisfactory means of access should be used to reach a roof, particularly
when other roofs need to be crossed to reach an area for work. Where fixed or
permanent access is not available, it may be necessary to use temporary access
such as mobile work platforms or ladders.
Make sure that appropriate PPCE is worn at all times.
2. Handling Materials and Tools on and Around Roofs:
Measures adopted for safely handling materials and tools on and around roofs
should be reflected in the Safe Work Method Statement, and should make sure that:
Manual handling is minimized while working on roofs
Awkward or heavy loads are always craned to the roof by appropriately trained
personnel
Lift boxes and cages are provided to prevent items from falling
To minimize the risk of falling objects injuring a person a combination of the
following control measures should be adopted:
Containment sheeting
Toe boards
Lanyards secured to tools
Exclusion zones
Hoardings
Catch platforms
Signs and warning devices
Barricades, and
Traffic controllers
The following measures should also be adopted for safely handing materials around
roofs and should be reflected in the Safe Work Method Statement:
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 26 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
If the only option is using a rope to lift tools or small sized materials on to and
off roofs, a rail or some type of restraining device shall be provided to keep the
personnel loading onto the roof away from the roof's edge, and
Areas where materials are being lifted and loaded on and off roofs should be
barricaded. Make sure there are no personnel in the loading area.
Tools or materials must not be carried while climbing up and down ladders.
3. Prevention of Falls:
If work is to be carried out within 2 metres of an edge of a roof where any person
could fall 2 metres or more, provision must be made to prevent persons falling.
Work should only be carried after complying with the Code of Practice for Safe work
on roofs.
The preferred method is safety mesh and guardrails. Other available methods
include:
Individual fall arrest systems
Scaffolding
Safety nets
Elevated work platforms, or
A combination of these methods.
The selected method is to be determined by the work being undertaken. On steep
pitched roofs a roof ladder may also have to be used. Guard railing is not
appropriate for pitches exceeding 45 degrees.
4.25 Ladder, Harness Use, scaffolds and platforms:
No domestic ladders are to be used on KU campuses. Industrial ladders shall be
designed, constructed, used and maintained in accordance with AD EHS RI - CoP -
37.0 – Ladders.
The appropriate ladder should always be selected for the task. For example,
NEVER use a metal ladder for electrical work. Ladder Inspection Checklist may be
used to determine if the Ladder meets KU requirements.
When working at heights where no other protection is available, a full parachute
safety harness conforming to UAE Standards must be worn and secured to approve
fixing devices. Contractors and their employee(s) must have a certificate of
competency in the use of a safety harness before access to roofs is granted.
1. Using Portable Ladders:
When using portable ladders:
NEVER climb higher than the third rung from the top of the ladder
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 27 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
Make sure the ladder is adequately supported at the base and firmly attached
where possible
NEVER 'walk' a ladder while standing on it
One ladder, one person
Have three limbs on the ladder at all times
Always wear fully enclosed slip resistant footwear, and
If being used in a thoroughfare or where the danger of a collision with the ladder
exists, the area around the ladder must be barricaded.
Ladders must not be used on working platforms or to support a working platform.
2. Scaffolds and Platforms:
Make sure a Safe Work Method Statement has been completed before erecting,
using and dismantling scaffolding or a power operated mobile work platform.
All scaffolding and working platforms, suspended or not, must conform to statutory,
AD EHS RI - CoP - 26.0 – Scaffolding requirements and may only be erected by an
individual with an appropriate certificate of competency.
Please note mobile scaffolds should not be moved while personnel are on the
scaffold.
4.26 Facade/Gutter Cleaning:
When cleaning façade or gutters:
Tie or secure any tools being used so they are not able to fall
Always use harness points or safety systems
Do not over-extend or over-reach during cleaning
Only vacuum type machines shall be used to clean gutters and the operator
must wear appropriate PPCE
Overhanging trees should be reported to Facilities Management to ensure less
build up in gutters, and
Note difficulties, damaged gutters or any other unsafe conditions and report
back to the Project Officer
A full Risk Assessment and Method Statement should be available. This should
outline any potential hazards in doing the activity and must detail how the job
will be carried out.
A Permit to Work document must also be obtained from the Building
Administration/ Maintenance Office.
All safety devices must be operating correctly e.g. stops, override switches, and
brakes.
All control buttons (including emergency buttons) and switches are functioning
correctly and can control the cradle properly.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 28 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
Check for any physical signs of wear or damage of the equipment.
Cradle, tracks or runways should be free from any signs of extensive corrosion.
Designated safe anchorage points are provided on the cradle.
All electrical connectors are secured.
There should be no naked or exposed electrical wiring.
All tracks or runways are not kinked or damaged.
Supporting ropes are reeved correctly into winding drum and over all pulleys.
All ropes are secured correctly at anchor ends.
The floor of the cradle is not damaged when viewed from above and below.
Check all guard rails by applying a short, sharp pull on them from the outside of
the cradle. Edge protection must have toe boards and material should not fall
from or through the cradle’s base.
For articulated equipment, check if all connecting pins are in place.
Cradle should run smoothly and that there are no faults along the cable. This is
done by carrying out a number of ascents and descents prior to starting work. If
there is any doubt about its mechanical integrity, DO NOT USE IT!
Consider the weather conditions and DO NOT OPERATE if the wind speed is
too high and/or not go beyond manufacturer’s recommendation e.g. 25km/hr.
4.27 Electrical Work:
Prior to the commencement of any electrical work on any KU campus and property,
all electrical contractors are to provide to the Project Officer, documentary evidence
of a current Electrical Contractor's License, as well as licenses held by contractor
staff.
All contractors carrying out electrical work must comply strictly with the AD EHS RI -
CoP - 15.0 - Electrical Safety, and be familiar with and adhere to the Codes of
Practice:
Electrical Safety on Construction Sites;
Temporary Electrical Systems; and
Competency Requirements for Working with Electrical Systems.
Contractors engaged to carry out work on high voltage installations must possess a
High Voltage Operators Certificate, issued from an energy supply authority, and
must also undergo specific KU High Voltage Induction training.
1. Distribution Boards and Completion of Electrical Work:
All distribution boards (DB) must have up-to-date circuit schedules. Contractors
must update schedules whenever any alterations are made.
For major changes, the contractor will be supplied with a file in EXCEL format by
the Project Officer. The contractor must update the spread sheet and return the file
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 29 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
to the Project Officer. The contractor must also provide a hard copy fitted in the
holder in the DB.
Minor changes are to be advised to the Project Officer. The changes will be made
and the contractor will be provided with an updated hard copy to be installed in the
DB holder.
At the completion of all electrical work, contractors are to submit a completed
"Notification of Work Certificate" to the Project Officer.
4.28 Plumbing, Drainage and Gas Fitting:
Prior to the commencement of any plumbing, drainage or gas fitting work on any
campus or property, all plumbing contractors are to provide to the KU Project Officer
documentary evidence of a current license as well as licenses held by contractor
staff and or sub-contractors.
Permits are to be obtained from the relevant authority and a copy provided to the
Procurement Department.
Never install gas equipment beneath air intake vents.
After completion of the work, where required, the Contractor shall arrange
inspections by the relevant supply authority and provide certificates of compliance
to the Project Officer.
4.29 Excavation Work:
All excavations and trenches shall comply with AD EHS RI - CoP - 29.0 –
Excavation.
Before carrying out any excavation work, the Contractor shall:
Seek approval from the Project Officer
Obtain a drawing of the site services from the Project Officer
Ensure excavation is appropriately fenced off at all times.
On completion of the excavation work, the Contractor shall return drawings to the
Project Officer with any changes to services marked on those drawings.
4.30 Hot Work:
Hot work (i.e. welding, thermal or oxygen cutting or heating and other related heat
or spark producing operations) requires the issue of a hot work permit prior to the
task commencing.
Hot work may only occur in the designated location as written on the permit. Hot
work permits are issued for work that is non-routine and/or the type of work is not
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 30 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
normally performed in the specified location. University areas designated for hot
work (such as a workshop e.g. engineering) do not require the issue of a permit.
How work must be completed in accordance with the provisions specified in the hot
work permit. Where hot work is to be conducted in laboratory areas, the laboratory
manager or supervisor is to be contacted.
A Hot Work Permit must be completed prior to commencing any hot work such as
welding, brazing or paint removal by heat gun or burner. Adequate fire extinguishers
must be present.
The Contractor must also ensure that fire alarms are isolated.
4.31 Movement and Storage of Materials:
Contractors are not to use public space or lifts to store or transport materials, unless
prior approval has been granted by the Project Officer. Contractors shall pay
particular attention to ensure access is available at all times for the physically
impaired.
Nothing is to be stored in fire escapes. Fire escapes must never be chocked open.
Storage of items must never prevent access and egress to buildings.
4.32 Rubbish:
Rubbish must be removed progressively by Contractor(s) at their own expense.
Contractors are not permitted to use KU bins or skips to transport or deposit
rubbish.
Under no circumstances are contractors to dump rubbish on vacant land on the KU
campuses or properties. The disposal and washing out of excess concrete from
trucks is not permitted on KU campuses or properties.
The disposal of paints or residue from cleaning and painting equipment is not
permitted on KU campuses or properties as this poses an environmental risk.
1. Site Tidiness and Recycling:
The work-site and surrounding area shall be kept clean and tidy and any safety or
fire hazards removed promptly, for example:
Oily rags
Flammable materials, and
Garbage.
Keep in mind other safety actions such as:
Replacing lids and caps on containers;
Wiping up spills;
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 31 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
Removing or bending over nails or bolts; and
Progressively removing other dangerous protruding objects.
KU collects recyclable containers in the same bin with general rubbish. Recyclable
containers are separated and recovered off-site.
4.33 Waste Management:
KU expects Contractors and their employees to identify waste minimization options
at the start of each project consistent with state government legislation.
At most work sites, industrial rubbish skip is required but only for materials that
cannot be re-used or recycled. Contractors must ensure that rubbish does not blow
away, or spill from the skip.
You are legally responsible to ensure your waste is disposed of in the correct
manner.
Contractors shall not use KU rubbish bins/recycling bins/skips to deposit
construction and demolition waste and are expected to maximize recovery of
construction and demolition waste for reuse or recycling.
Contaminated Waste, Asbestos and Refrigerant Gases (CFCs):
Never dispose of contaminated waste in KU rubbish or recycling bins. This is not
only unlawful but it also presents a great risk to the health and safety of cleaning
staff.
Asbestos must only be removed by a licensed contractor.
Refrigerant gases (CFCs):
Must be collected in specially sealed cylinders by a licensed disposal company
Must not be released into the atmosphere.
Chemical Waste:
When handling chemical waste:
Contract a licensed waste disposal company to remove from site
Store in original packaging and ensure that lids are sealed, and
Never pour chemicals down the sink, onto the ground, or into a storm water
drain
PCBs:
If polychlorinated biphenyls (PCBs) are encountered in fittings or are spilt, it is the
Contractor's responsibility to clean up the spill safely and dispose of any PCB waste
using a licensed waste removal company.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 32 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
Contractors servicing transformers, where PCB is contained in the waste oil, must:
Store this oil in special containers, and
Have these containers collected and disposed of by a licensed waste removal
company
Never pour oils down the sink, onto the ground, or into a storm water drain.
Contaminated Soils:
Soil may become contaminated with:
Oil
Asbestos
Cyanide
Heavy metals, or
Any other toxic material.
The Project Officer must be informed of any incidence of soil contamination.
A licensed waste disposal contractor should be engaged to collect contaminated
soil in an approved container. Do not remove any contaminated soil from KU
campuses or properties without authorization from the Project Officer.
Protection of Landscaped Areas:
All flora and fauna is valued very highly, and Contractors are asked to respect the
campus ecology when on the grounds.
If any work is likely to disturb landscaping or grassed areas, the Contractor must
advise the Project Officer a minimum of one week prior to the intended
commencement of the work.
Every effort must be made to avoid disturbing trees as well as landscaped and
grassed areas. Where negligent work results in damage to these areas, the cost of
rectifying the damage will be recovered from the Contractor.
Never light a fire on University grounds. In general, it is against the law to burn-off.
4.34 Water Conservation, Erosion and Sediment Control:
It is against the law to place any material other than clean water in a position where
it is likely to leak, fall or be blown into any drain or gutter that is used to receive
rainwater.
Before work starts, erosion and sediment controls must be installed when it is
possible that work on KU grounds will cause erosion or sediment losses.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 33 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
1. Bore Water:
Please also note that only bore water should be used for such purposes as:
Site shed toilet flushing
Washing down
Street cleaning
Trench compaction
Pipe cleaning, and
Testing.
Due to its low PH level, bore water is not recommended for use in concrete.
Drinking water is only to be used for human consumption and ablutions.
4.35 Pollution:
To help control pollution:
Suitable erosion and sediment controls must be installed around work sites to
keep the footpath and gutters free of litter, soil and sand at all times
Litter, leaves and anything else must not be swept into drains or gutters
Rubbish bins must be kept covered, and
Clean-up kits for spills should be kept on site.
4.36 Dust:
Dust can cause health problems for workers and others on KU campus and
properties. If a work-site is generating dust:
That dust must be contained within that work-site
Materials and stockpiles that generate dust should be covered
Sweepings should be placed into a bag or box before being put into a skip to
prevent dust from becoming airborne when the bin is emptied, and
Face masks and respirators should be worn to protect your health as
necessary.
4.37 Hazardous Chemicals:
There are a large range of hazardous chemicals, stored and used on University
sites. Contractors should be aware of this and check with relevant staff in the
various departments to ensure that the workplace is safe and, if necessary are
removed or made safe before work commences.
Contractors who bring hazardous chemicals or dangerous goods onto University
premises are required to have the following:
A copy of the current safety data sheet;
A copy of the risk assessment relating to use(s) of the hazardous chemical;
Work procedures required for safe storage, use and disposal;
Training details of those required to use the chemical.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 34 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
4.37.1 Solvents: Many chemicals release polluting vapors when bottles are open.
When using solvents:
Care must be taken so that vapors do not escape into the surrounding area or
air intake vents
Always seal solvent containers with a tight lid, and
Use water-based or biodegradable strippers and cleaners wherever possible.
4.38 Noise Pollution:
The physical environment of KU campus needs to remain conducive to learning and
research at all times.
Machinery noise shall be controlled by fitting noise suppressors and by regular
maintenance.
Noisy work and noisy truck movements shall be scheduled to minimize
disruption.
Radios and other loud outdoor music are not permitted on KU grounds.
PPCE must be worn by Contractors and their employees.
4.39 Chemical Spill:
In the event of a chemical spill, contain the spill if it is safe to do so, and:
Prevent further spillage
Follow MSDS information, and
Block storm water drain inlet.
Report the spill by informing the Project Officer immediately, or if urgent, call
Security on 02 4018100 (24 hours).
When cleaning up a chemical spill:
Clean up as quickly as possible and reduce the risk of pollution running off the
site
Never wash chemicals down the drain or pour chemicals onto the ground, and
Absorbent material used to contain the spill must be disposed of off-site by the
contractor.
4.40 Vehicle Access:
Contractors should be aware that the KU campus car parks and related areas roads
are under the KU Rules. All vehicles entering campuses must park in accordance
with the restricted parking area conditions and posted directions.
Restricted parking area conditions apply 7 days a week, 24 hours a day. Permit and
access conditions apply Sunday to Thursday from 8.00am to 7.00pm.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 35 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
4.40.1 Entry Permits: KU Entry Permits only provide access for vehicles that are required for essential
service activities on job sites or activity being carried out.
4.40.2 Contractor Parking: Contractors may access parking using visitor parking permits or a work zone
permit, which can be obtained through the KU Representative or Facilities
Management Department.
4.40.3 Speed Limits: Speed limits on Campus roads are posted. These limits must be carefully
observed remembering that you are driving in a pedestrian precinct.
Contractors must ensure that their employees operate vehicles with caution in
high pedestrian activity areas. In high pedestrian activity areas (particularly the
duck pond area) vehicles are required to:
Observe posted speed limits;
Operate the vehicle hazard lights, to alert pedestrians of the moving vehicle;
and
Give way to pedestrians;
Tailgating on all KU roads is prohibited;
Park within marked visitor spot;
Not obstruct the gate and emergency vehicle access; and
Not drive onto pavers in front of building entrances or on pedestrian pavement
around the front of the campus.
Where necessary, particularly when a vehicle is reversing, if a second employee
is present, they should alight from the vehicle and act as an observer aiding the
driver to avoid a collision with pedestrians. Reversing a vehicle in a pedestrian
area should be avoided where an observer is not available.
4.41 Contractor non-compliance:
If during the execution of a contract, if a contractor or sub-contractor is in breach of
any condition of contract or any EHS requirements, the process set out in the
contract for managing such breaches should be followed exactly (all work with
regards to that activity shall be suspended until the matter can be resolved).
Where a major breach of safety is identified then the University Project Officer
supervising the contract or an EHS Section representative may suspend work until
the breach is rectified. Work cannot recommence until the University Project Officer
supervising the contract or the EHS Section is satisfied that adequate risk controls
are in place to avoid risk of injury.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 36 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
Poor EHS performance, including one-off instances or continuous breaches of EHS
requirements, can lead to the termination of a contract and failure of not being
awarded any further contract work.
Note: Penalties for breaches and stop work clauses must be included in contract
documentation to ensure this is enforceable.
4.42 Contractor incident management:
4.42.1 Injuries and incidents:
Where an injury has occurred to a contractor’s employee or subcontractor in
relation to contracted works performed at the University, the University EHS
Section Officer supervising the contract must be informed within 48 hours (unless
it is a notifiable incident under the EHS Regulations, in which case it must be
reported to both the University and Sector Regulatory Authority - ADEC
immediately). Any injury received by a contractor whilst undertaking work for the
University is to be reported to the University EHS Section or the Officer
supervising the contract and recorded on the online hazard reporting system or
forwarded to the EHS Section using the Incident Report form.
Contractors may call upon University Security on 02 4018100 or 02 4018200 (in
emergencies) to provide first aid assistance if required.
4.42.2 Notifiable incidents: In the instance of a notifiable incident, the contractor shall contact University
Security on 02 4018100 or 02 4018200 in the first instance to preserve the scene
of the accident and request emergency services.
In the event of a serious incident involving the contractor’s staff, the contractor
must complete an investigation into the incident and forward this to the University
EHS Section or the Officer supervising the contract. Where an incident occurs
that involves injury or potential for injury to a KU staff member, student, tenant or
other affiliate then a joint investigation should be undertaken by both KU and the
contractor.
It is the contractor’s responsibility to notify EHS Section of any notifiable incident
involving their employees or subcontractors, within the required timeframes.
Any inspection or correspondence relating to a University contract should be
reported to the University EHS Section immediately. Corrective actions resulting
from any inspection shall be reported by the contractor to the University EHS
Section in writing.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 37 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
5. Acknowledgements:
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP- 01 Hazardous Material.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 2.0 - Personal Protective Equipment.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 3.0 - Occupational Noise.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP- 6.0 Emergency Management Requirements.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP- 7.0 Fire Prevention, Planning and Control.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP- 14.0 Manual Handling and Ergonomics.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 15.0 - Electrical Safety.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 21.0 - Permit to Work.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 22.0 - Barricading of Hazards.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 23.0 - Working at Heights.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 24.0 - Tag-out - Lock-out.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 26.0 – Scaffolding.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 27.0 - Confined Spaces.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 28.0 - Hot Work Operations.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 34.0 - Safe Use of Lifting Equipment and Lifting
Accessories.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 35.0 - Portable Power Tools.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 36.0 - Plant and Equipment.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 37.0 – Ladders.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 47.0 - Machine Guarding
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 38 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP- 49.0 Compressed Gas and Air.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 53.0 - EHS Management During Construction Work.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 53.1 - EHS Construction Management Plan.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 54.0 - Waste Management.
Abu Dhabi Environment, Health and Safety Management System (AD
EHSMS RF) - CoP - 55.0 - Environmental Management.
DEPARTMENT PROCESS AND PROCEDURE MANUAL Contractors EHS Induction Guidelines
Document No: KU – FD – EHS – PPM – 14 Issue no: 01 Issue Date: 04.07.2014 Page: 39 of 39
Copies of this document available in KU EHS Intranet are only the latest, valid and controlled documents. All other copies are uncontrolled and valid only on the date printed. Last printed: 10/7/2014 12:20:00 AM
Record of Reviews & Revisions
REV. DATE
ISSUED
DESCRIPTION OF REVISION REVIEWED
BY AUTHORIZED
BY PAGE NO COMMENT