Contractor Task List (CTL) Update

OQNOT012

8/29/14 —1—

Page 2: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

Objectives

By the end of this module, you will be able to describe:

• What’s changed between the current CTL and the updated CTL.

• The timetable for phase-in of the updated CTL.

• Where to get additional information about the CTL update.

—2—8/29/14

Page 3: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

Background

• In 1999 PHMSA implemented regulations requiring OQ evaluations for all personnel (company & contractors) when performing a covered task.

• In 2000 BP/USPL developed a contractor task list to satisfy regulatory requirements.

• The current Contractor Task List (CTL) contains 140 tasks and uses 3 primary third party OQ providers (OQSG, NCCER and NACE)

• Over the past 14 years regulatory expectations relating to OQ have evolved and industry has reacted (for example API RP 1161)

—3—8/29/14

Page 4: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

Why Change?

Primary reasons for changing the CTL include:

• To better align with current regulatory and industry expectations and best practice.

• Improve linkage of tasks to third party provider’s curriculum.

• Improve task definition.

• Align numbering convention with API RP 1161 when practicable.

—4—8/29/14

Page 5: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

When Is The Change Effective?

• The new CTL shall be used with all new USPL projects starting 1/1/2015 and thereafter.

• Ongoing USPL projects which have a projected completion date before 1/1/2015 (meaning all project contractor OQ task activities have been completed) may continue without imposing the new CTL requirements.

• As of 1/1/2015 any USPL projects in progress (that require ongoing/new OQ task work) will be required to utilize the new CTL task requirements on affected tasks. The project initiator will be responsible for editing the ISN jobsite to account for the new CLT as soon as possible but before tasks are to be performed in the field.

—5—8/29/14

Page 6: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

Who Is Affected?

• USPL employees that assign contractor task(s) to projects/work including: Asset owners; Project managers; EPIC; Construction supervisors; Planners/Schedulers; Team Leaders; ROW Maintenance Coordinators; Program Managers; Corrosion group, and Tank group.

• Any contractor currently assigned to a job for USPL.

• Any contractor that uses the task list to identify his/her qualification(s) gap.

—6—8/29/14

Page 7: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

What’s Changed?

The update to the current 140 task CTL consists of:

• 13 changes to the task list

• 23 tasks added

• CTL EXCEL Workbook reorganized

The following slides show the changes, additions and organization of the CTL Excel Workbook.

—7—8/29/14

Page 8: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

Changes to the CTL

1. New tasks 7.2-7.6 is a combination of old tasks 7.2-7.6 and 13.1-13.5.

2. New task 42.7 is a combination of old tasks 42.1-42.6.

3. New task 1.1-1.5 does not include corrosion activities for Bare Pipe. Bare Pipe activities for old task 1.1-1.5 are now in New Task 300.

4. Old task 20.4 is now task 304.

5. Old task 18.1 & 18.2 is now task 305.

6. Old task 28 is now task 306.

7. Old task 26 is now task 307.

8. Old task 33.1-33.3 is now task 308.

9. Old task 34 is now task 309.

10. Old task 35 is now task 310.

11. Old task 36.1-36.3 is now task 311.

12. Old task 37 is now task 312.

13. Old task 29.1 & 29.2 is now task 313.

8/29/14 —8—

Page 9: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

Added Tasks

The following task numbers were added to the task list:

44.3 301 330

44.4 303 331

44.5 314 332

44.6 315

44.7 316

44.8 317

63.1 318

63.2 321

63.3 322

63.4 329

8/29/14 —9—

Page 10: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

The Updated CTL Workbook

—10—

The updated CTL Workbook contains six worksheets:• Task List• Guide• Matrix• OQSG• NCCER• NACE

8/29/14

Page 11: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

Guide

—11—

The Guide worksheet explains the contents of the Workbook.

8/29/14

Page 12: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

Task List

—12—

The Task List worksheet lists each task by BP Task Category.

8/29/14

Page 13: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

—13—

Most of the tasks have comments that provide additional information about the task.

8/29/14

Page 14: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

Matrix

—14—

The Matrix worksheet shows for each task, the specific vendor program that BP accepts as OQ for that task.

8/29/14

Page 15: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

—15—

Some tasks have comments that provide information about • Additional qualification requirements• Acceptable substitute qualifications• Task reorganization from the previous CTL

8/29/14

Page 16: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

OQSG

—16—

The OQSG worksheet maps OQSG Tasks to the BP Contractor Task List.

8/29/14

Page 17: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

NCCER

—17—

The NCCER worksheet maps NCCER Tasks to the BP Contractor Task List.

8/29/14

Page 18: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

NACE

—18—

The NACE worksheet maps NACE Tasks to the BP Contractor Task List.

8/29/14

Page 19: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

For More Information

• For additional information/assistance, contact

Frank Torres Operator Qualifications Coordinator (219) [email protected]

—19—8/29/14

Page 20: Contractor Task List (CTL) Update OQNOT012 8/29/14 —1—

Summary

You should now be able to describe:

• What’s changed between the current CTL and the updated CTL.

• The timetable for phase-in of the updated CTL.

• Where to get additional information about the CTL update.