Upload
russt2
View
214
Download
0
Embed Size (px)
Citation preview
7/30/2019 Contractor SWP Template
1/4
SAFE WORK PLAN
CONTRACTOR TEMPLATE
PROJECT / CONTRACT DETAILS:
Principal Contractor / Client: Brisbane Airport Corporation Pty Ltd
Project Name / Title: (provide brief description / name)
Work Site Address / Location at the Airport:
Project / Contract Duration: (include dates)
CONTRACTOR DETAILS:
Contractor Company Name: ABN:
Company Address:
Company Contact Details: Phone: Fax:
Safe Work Plan Author: Name: Direct Contact Details:
REVIEW CONFIRMATION:
Safe Work Plan Review: (BAC Representative)I have reviewed the Safe Work Plan, sighted and identified associated Work Method Statements and supporting documentation and sought clarificationwhere appropriate with respect to the scope of work to which this plan relates.
Name of Review Person (First & Last) Signature Date
Page 1 of 4
7/30/2019 Contractor SWP Template
2/4
SAFE WORK PLAN
CONTRACTOR TEMPLATE
DESCRIPTION OF SERVICES TO BE PERORMED BY THE CONTRACTOR:
Identify and provide a summarised description of all the services / work activities to be performed at the Brisbane Airport for the scope of this project /contract. Include any project schedule / plan (or reference thereof) that highlights the various activities to be performed.
Page 2 of 4
7/30/2019 Contractor SWP Template
3/4
SAFE WORK PLAN
CONTRACTOR TEMPLATE
IDENTIFICATION OF SPECIFIC WORK ACTIVITIES
Identify below whether work activities to be performed for the scope of this project / contract align to the specific work activity prompts contained in thisSection. Tick all applicable work activity prompts. For additional explanatory information relating to the following work activity prompts refer to the OH&SInformation section within the Working at Brisbane Airport website: www.workingatbrisbaneairport.com
Entry into a confined space
Excavation or digging at a depth greater than 300mm, including the driving of objects into the ground
Hot work outside of a designated workshop area
Access or work at heights where a fall of 2m or more could occur, including access on any roof with a pitch steeper than 26o
Electrical work on live plant / parts or work within an exclusion zone for an energised part or overhead line, excluding testing or basic low voltage fault finding
A plant isolation involving lock-out and/or tag-out of plant (not including high voltage installations) is required
High voltage (HV) electrical switching
Use of a hazardous substance that requires health surveillance or that is also a dangerous good, or use of explosives
Asbestos removal work or work on asbestos containing material (ACM) that includes maintenance, cleaning & repair activities that have the potential to disturb ACM
Demolition work
Work involving tilt-up and precast construction workStructural alterations that require temporary support to prevent collapse
Work involving the movement of powered mobile plant at the workplace, (e.g. movement & use of mobile cranes, forklifts & interactions of heavy earthmoving plant)
Work on a telecommunications tower
Work in / over / adjacent to water where there is a risk of drowning
Work on / adjacent to a road or railway
Work on / near a pressurised gas distribution mains and consumer piping, or on /near a chemical, fuel or refrigerant line
Work in an area that may have a contaminated or flammable atmosphere
Work in an area where there are artificial extremes of temperature.
Work in immediate proximity to members of the public (in / around buildings / terminals) where basic exclusion is not deemed adequate to manage the risks involved
Work Method Statement (WMS) Requirements
For each of the above listed work activities identified, a Work Method Statement (WMS) must be developed and submitted as part of the Contractors SafeWork Plan. For those Contractors who do not have established Work Method Statements for the above activities or who require a WMS Template, refer to theOH&S Information section within the Working at Brisbane Airport website: www.workingatbrisbaneairport.com for a copy of the Contractor WMS FormTemplate.
Page 3 of 4
7/30/2019 Contractor SWP Template
4/4
SAFE WORK PLAN
CONTRACTOR TEMPLATE
ADDITIONAL INFORMATION REQUIRED Attach additional information listings if there is insufficient space below.
Plant & Equipment:Provide a listing of plant / equipment items intended to bebrought onto the site as part of the work scope.
Hazardous Substances:Provide a listing of hazardous substances intended to bebrought onto the site as part of the work scope. Include adescription of the location where MSDS and other relevantsubstance information will be located during the work.
First Aid, Fire & Emergency Response:Provide summary details of specific first aid, fire, rescue oremergency response provisions intended to be suppliedand made available on the site due to the work scope beingundertaken.
Communication & Consultation:
Provide summary details of specific communication devicesto be supplied as well as pre-work and ongoing consultationto be undertaken during the work scope.
Prescribed Occupation Holders:Provide a listing of the prescribed occupations that workerswill be performing as part of the work scope. Includeworker names, prescribed occupation titles and licence /certification numbers.
Specific Training:Provide summary details of specific training, inclusive ofOHS related training / courses that specific on-site workersinvolved have undertaken.
Prescribed Activity Works:For asbestos removal &/or demolition works, provide thefollowing information:
certificate number for performing the prescribed activity(a certificate to perform a prescribed activity must besubmitted to BAC prior to work),
detailed training arrangements (as per WH&SRegulation 2008 Part 4)
detailed supervision arrangements (as per WH&SRegulation 2008 Part 4 - Section 50)
Page 4 of 4