CONFIDENTIAL. This presentation is the property of Nestl Philippines Inc. No part of it may be disclosed, circulated or reproduced withoutthe consent of Nestl Philippines, Inc. This material was used in an oral presentation and is not a complete record of the discussions.
NPI CONTRACTORSSAFETY, HEALTH & ENVIRONMENTMANDATORY REQUIREMENTS
7/30/2019 Contractor Safety Requirement
2/10
7/30/2019 Contractor Safety Requirement
3/10
2. Prescribed no. of Safety Officer(s) & Health Personnel o
2.1 Dept. Order #16 (issued by DOLE)
Number of Workers Number of SafetyOfficers
1-50 1
51-200 3
201-250 4
251-500 5
Every addtl 250or fraction thereof
1 additional
2.2 Dept. Order #13 (issued by DOLE)
Number of HeavyEquipment
Number of SafetyOfficers
For every 10 units 1
NOTE:A Safety Offhave attendeBasic OccupSafety & He& with 3 yrs
Experience
7/30/2019 Contractor Safety Requirement
4/10
Number of Workers Number of Health Personnel
1-50 or less 1 First Aider
51-200 1 Nurse
201-300 1 Nurse; 1 Part-time Physician& Dentist; Clinic
Excess of 300 1 Nurse; 1 Full time Physician &Dentist; Clinic
Written contract with the nearesthospital
Within 5 km radius or can bereached within 25 min.
2.2 Dept. Order #13 (issued by DOLE) Section 8
HEALTH PERSONNEL
7/30/2019 Contractor Safety Requirement
5/10
3. Pre employment Requirement s
3.1 For all Workers--Pre employment requirementsMedical fit-to-work
Drug test clearanceNBI or Police ClearanceBio data with PicturesAttend Safety Orientation (1 hr. session)
3.2 For Skilled Workers
-- Certification Workers from TESDA accredited agenciesHeavy Equipment OperatorsForklift OperatorsBoom Truck & Crane OperatorsRiggersWelders
Electricians
7/30/2019 Contractor Safety Requirement
6/10
4. Heavy Equipment Certification
Ensure that appropriate certification is obtainedfrom DOLE duly accredited organizations
Heavy EquipmentsBackhoeDumpTruck
Lifting Equipments
All types of CraneBoom TruckForklift
7/30/2019 Contractor Safety Requirement
7/10
5. Personal Protective Equipment
Every employer shall, at his own expense, furnish his workers with protectequipment. The equivalent cost for the provision of PPE (life span, depreci
replacement, etc.) shall be an integral part of the project cost.Hardhat
White all supervisors & managersBlue/Green/Yellow all workersRed all Safety Officer
Safety GlassLuminous Vest
Orange for all supervisors, managers & safety officersYellow green for all workers
Safety ShoesBody HarnessWelding ShieldDust Mask
Welding Apron
7/30/2019 Contractor Safety Requirement
8/10
6. Documented SH&E Program / Plan for Scope of Work
Note:The Safety Program must be approved by DOLE Regional Office IV as required by DO#13
7/30/2019 Contractor Safety Requirement
9/10
7. CONSTRUCTION SIGNAGES
Must be provided to warn the workers and the public of hazards existing in tworkplace
Shall be posted in prominent positions at strategic location and, as far aspracticable, be in the language understandable to most of the workers emplo
The signages include but are not limited to:Mandatory requirement on the usage of PPE.Areas where there are potential risks of falling objects.Areas where there are potential risks of falling.Areas where explosives and flammable substances are used or stored.Areas where there are tripping or slipping hazards.Approaches to working areas where danger from toxic or irritant airborne contaminants/subAll places where contact with or proximity to electrical/facility equipment can cause dangeAll places where workers may come in contact with dangerous moving parts of machineriesequipment.
7/30/2019 Contractor Safety Requirement
10/10
8. IMPLEMENTATION & COMPLIANCE
Ensure that its subcontractors, if any, strictly comply withthe same requirements