Revised By: Approved By: Date: Date: For ADCE Use Only Contractor Pre-Qualification Document Document Check List Ver.02/February2019 TMP-FMF-003 Commercial License issued by Dept. of Economic Development Abu Dhabi Chamber of Commerce Certificate of: "Percentage of National Ownership" Abu Dhabi Department of Planning Contractor Classification Certificate Contractor Company Copy of QA Certificate for ISO 9000 Contractor Company Organization Chart Contractor Company Product Catalogues List of Projects executed along with Project Completion Certificate Financial statements (Audited) for last year 3 years List of staff working for the company Project Engineer In charge CV Submission of ADCE filled forms (No's 12) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Company: Authorised Person: Signature: 1/6

Contractor Pre-Qualification Document Document Check List · 2019-03-10 · Revised By: Approved By: Date: Date: For ADCE Use Only Contractor Pre-Qualification Document Document

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Contractor Pre-Qualification Document Document Check List · 2019-03-10 · Revised By: Approved By: Date: Date: For ADCE Use Only Contractor Pre-Qualification Document Document

Revised By:

Approved By:

Date:

Date:

For ADCE Use Only

Contractor Pre-Qualification Document

Document Check List

Ve

r.0

2/F

eb

ruar

y20

19

TM

P-F

MF-

00

3

Commercial License issued by Dept. of Economic Development

Abu Dhabi Chamber of Commerce Certificate of: "Percentage of National Ownership"

Abu Dhabi Department of Planning Contractor Classification Certificate

Contractor Company Copy of QA Certificate for ISO 9000

Contractor Company Organization Chart

Contractor Company Product Catalogues

List of Projects executed along with Project Completion Certificate

Financial statements (Audited) for last year 3 years

List of staff working for the company

Project Engineer In charge CV

Submission of ADCE filled forms (No's 12)

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

Company:

Authorised Person:

Signature:

1/6

Page 2: Contractor Pre-Qualification Document Document Check List · 2019-03-10 · Revised By: Approved By: Date: Date: For ADCE Use Only Contractor Pre-Qualification Document Document

Contractor General Information

Company Name (As in Registration Cert.):

Short Name:

Sister or Parent Cie.:

Date Established:

Established in:

Company Profile:

Address in Abu Dhabior Al Ain:

Other Address

Contact Persons (Please include also the GM of the Company)

Street/Building

P.O. Box No. Email Address

Telephone No. Fax No.

Street/Building

P.O. Box No. Email Address

Telephone No. Fax No.

Nationality

Abu Dhabi Al Ain Other (please specify)

Name Designation Email Address Telephone No. Mobile No.

Contractor’s Ownership Details & POA

100% Owned by UAE National 51% Owned by UAE National Other (please specify)

Name of Owner(s) Nationality % of Ownership

If company is sponsored in Abu Dhabi, please provide details

Name(s) of Sponsor(s) Address Tel No. Fax No. Email

Authorised Signatory (as per company law)

Name Designation Specimen Signature

2/6

Page 3: Contractor Pre-Qualification Document Document Check List · 2019-03-10 · Revised By: Approved By: Date: Date: For ADCE Use Only Contractor Pre-Qualification Document Document

Certificates & Licenses(Copies of Certificates and Liceses are to be attached)

Classified related work Yes No

Description

Trade Registration Certificate from Abu Dhabi Municipality

Trade License from Dept. of Economic Development

Industrial License issued by U.A.E Government

Contractor Classification from Department of Economic Development

Registration No. Date of Registration Reg. Expiry Date

Equipment/Vehicles/Facilities and its Make Location Address

Location

In Abu Dhabi

In other Emirates

Location Details

Capacity Quantity Month / Year

Contractor’s ExperienceProjects Portfolio

To provide brief details of work experience / clients over the last 5 years

Please attach below details in a separate sheet

Also attach Client's Reference Letters

• List of Projects (Completed and On-Going) • Contract Scope of Work • Contract Project Title • Role in the Project • Project Value • Project Schedule -Planned vs. Actual (reference docs. to be attached separately)

Contractor’s Resources

A. Equipment/Vehicles/ Facilities

( Please specify the Nature of Equipment / Vehicles / Facilities in the U.A.E )

B. Warehouses / Stores / Show Rooms / Workshops

3/6

Page 4: Contractor Pre-Qualification Document Document Check List · 2019-03-10 · Revised By: Approved By: Date: Date: For ADCE Use Only Contractor Pre-Qualification Document Document

Organisational Structure

Please fill in below, where applicable, the boxes for each specialisation along with the respective CV:

*IMP: PLEASE ATTACH THE LIST OF LABORS FROM THE MINISTRY OF LABOR

Please provide Organization Chart for your Local Office and Head Office

Specialisation

Architects

Civil Engineers & Supervisors

Structural Engineers

Commissioning Engineers

Contract/Project Management

Design/drawing Personnel

Planning Engineers

Electrical Engineers

Electrical Supervisors/Technicians

Estimating Engineers

Mechanical Engineers

Mechanical Supervisors/Technicians

Metallurgists

Purchasing Personnel

QA/Inspection Personnel

Research/Development Personnel

Safety Personnel

Sales Personnel

Piping Engineers

Piping Technicians

Welding Engineers/Technicians

Others (Please specify)

Total Num. Permament Hired

4/6

Page 5: Contractor Pre-Qualification Document Document Check List · 2019-03-10 · Revised By: Approved By: Date: Date: For ADCE Use Only Contractor Pre-Qualification Document Document

Infrastructure

(A) Space

Quality Assurance Confirmation

(B) Office Automation

Please specify in square metres

Offices: Warehouses: Workshops/Plants:

No. of Computers:

Do you use AutoCAD or similar program?

Please list Softwares used with you including Planning and Designing Systems:

Please describe briefly the communication facilities available:

Yes No (Please Specify)

1. Do you have a QA Manual?

Yes (Please specify to which standard) No

2. Does your QA system meet the requirements of ISO 9000 series?

Yes (Please specify to which standard) No

3. Is your QA System approved by any Inspection Agency ?

4. Do you have an HSE Manual ?

5. What Test/Codes/Standards are applied ?

Yes (Please specify to which standard) No

6. Do you have a Training Manual ?

Yes No

Yes No

Yes No

No. of Other Hardwares:

Showrooms: Laboratories: Others:

5/6

Page 6: Contractor Pre-Qualification Document Document Check List · 2019-03-10 · Revised By: Approved By: Date: Date: For ADCE Use Only Contractor Pre-Qualification Document Document

Financial Background

Contractor to provide Financial details of the company for the last three fiscal years with supporting documents. Documents to Include:

1. Principal Bankers

2. Performance for 3 Fiscal years

3. Financial Statement for last 3 Fiscal years

Signature Full Name

Designation On Behalf of

Date

Contractor’s Declaration

We declare that the given statements and information are true to the best of our knowledge. We acknowledge that the submission of this Questionnaire does not give the right to be invited to any work for ADCE. In case of any changes, ADCE shall be informed periodically.

6/6